Newmont Mining Corporation I Merian Site Tour I Slide 2March 2, 2017
Welcome and introductions
Name Position Program
Tom Palmer EVP and Chief Operating Officer Introduction
Adriaan Van Kersen Managing Director, Merian Project Merian Project Delivery
Tony Esplin General Manager, Merian Complex Merian Overview
Albert Ramdin Senior Director, External Relations Sustainability & External Relations
Trent Tempel Senior Vice President, South America
David Portugal Regional CFO, South America
Krishna Singh Engineering Superintendent Mine Tour
Kirk Schmidt Exploration Manager Mine Tour – Exploration
Tom Ohrling Processing Manager Process Tour
Newmont Mining Corporation I Merian Site Tour I Slide 3March 2, 2017
Cautionary statement
Cautionary statement regarding forward looking statements:
This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and
Section 21E of the Securities Exchange Act of 1934, as amended, and are intended to be covered by the safe harbor provided for under
such sections. Such forward-looking statements may include, without limitation: (i) estimates of future production and production profiles;
(ii) estimates of future costs applicable to sales and All-in sustaining costs; (iii) estimates of future capital expenditures; (iv) estimates of
future full potential improvements, including reduced costs, increased efficiency and other optimizations and improvements; (v)
expectations regarding future exploration, expansion, mine development, timing of phases and mine life; (vi) future grade, mill and
processing estimates and expectations; and (vii) expectations regarding future returns, value creation, financial performance and other
outlook or guidance. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be
incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical,
hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s operations and
projects being consistent with current expectations and mine plans, including without limitation receipt of export approvals; (iii) political
developments being consistent with its current expectations; (iv) certain price assumptions for gold, copper and oil; (v) prices for key
supplies being approximately consistent with current levels; (vi) the accuracy of our current models and study work; (vii) exchange rates
being approximately consistent with current levels, and (viii) other assumptions. Where the Company expresses an expectation or belief as
to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such
statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results
expressed, projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold and other metals price
volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining
plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental
regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2016 Annual Report
on Form 10-K, filed on or about February 21, 2017, with the Securities and Exchange Commission (the “SEC”), as well as the Company’s
other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,”
including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of
unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a
previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking
statements” is at investors' own risk.
Newmont Mining Corporation I Merian Site Tour I Slide 4March 2, 2017
Safety share
As our guest, we ask that you please
 Stay alert and aware of your surroundings – remain with Newmont personnel at all times
 Stay hydrated
 Protect against bug bites – cover exposed skin by wearing long-sleeved shirts and long pants
 Eat and drink safely
 Keep away from animals
 Stay alert to changing weather conditions
Newmont Mining Corporation I Merian Site Tour I Slide 5March 2, 2017
Merian delivers strategy to create long-term value
Improve the
underlying
business
Industry leader in safety and sustainability performance
Continued cost improvements – AISC1 of $650 – 750/oz
Steady gold production – Attributable production of 300 – 375Koz/year
Strengthen
the portfolio
Establishing foothold in prospective new district – Guiana Shield
Added 600Koz of Reserves2 – by the drill bit
Advancing studies on brownfield opportunities – at Sabajo
Create value
for
shareholders
Project delivered safely, on schedule and $150M below budget
Robust margins – 2017E3 outlook is 350 – 390Koz @ $560 – 610 AISC/oz
Generating solid returns for investors – IRR of >25%
(1) (2) (3) See endnote on slide 13. (2) Reserves (proven and probable) of 450Koz attributable to Newmont
AISC/oz and Koz/year represent first 5-year averages
Newmont Mining Corporation I Merian Site Tour I Slide 6March 2, 2017
Long-term value requires investment through cycle
Merian case study:
• Investment – entered Suriname in 2004 to establish prospective district
• Exploration – grown to 6.3Moz attributable Reserve & Resource* base by 2016
• Partnership – government of Suriname buys in as 25% owner in 2014
• Projects – delivered $150M below budget in 2016; IRR of >25% and mine life of +13 years
Merian* Represents 4.3Moz reserves (proven and probable) and 2.0Moz resources (measured, indicated, and inferred) on attributable basis
Newmont Mining Corporation I Merian Site Tour I Slide 7March 2, 2017
Geology overview – regional and local
Las Christinas
Omai
Rosebel
Merian
Guiana Shield Gondwanaland ~250 million years ago
Major gold deposits
Existing gold operations
Newmont operations
Birimian Shield
Guiana Shield
Newmont Mining Corporation I Merian Site Tour I Slide 8March 2, 2017
Creating a culture of zero harm
• Eight reportable injuries in 2016, none serious; one reportable injury for 2017 YTD
• Strong focus on Fatality Risk Management
• Safety Leadership training and coaching commencing in 2017
• Comprehensive incident and near miss reporting
• Cyanide and chemical awareness training for all employees with plant access; ICMC Certification
TRIFR
2016 Target
0.40
2016 Actual
0.33
Zero harm ~2,400,000 hours
Visible felt
leadership
Safety focused interactions
with employees in the field
0.33
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Merian Total Recordable Injury Frequency Rate (TRIFR)
Newmont Mining Corporation I Merian Site Tour I Slide 9March 2, 2017
Commercial production and successful ramp-up
• Strong emphasis on safety and health
• G-Mining partnership – engineering,
construction, transition to operations
• Start-up and commissioning support from
Newmont technical teams
• Completed strong first quarter of commercial
production; exceeding production ramp-up
targets
1,489
1,000
1,200
1,400
1,600
1,800
Aug-16 Sep-16 Oct-16 Nov-16 Dec-16
Nameplate 7 Day Moving Average
Merian Throughput (Tonnes per Operating Hour)
Newmont Mining Corporation I Merian Site Tour I Slide 10March 2, 2017
Initiating Full Potential in 2017; identifying upside
• Operational
̶ Complete expansion (crusher, conveyor, stacker, power and infrastructure)
̶ Optimize existing process facilities
̶ Target wet season operational continuity and productivity
• Upside
̶ Wingspan and brownfields saprolite targets; refine strategic options; reserve conversions
̶ Underground evaluation; Sabajo; drill targets in Area of Interest; opportunities in the Guiana Shield
Newmont Mining Corporation I Merian Site Tour I Slide 11March 2, 2017
Shared value creation – national and local
Establish
Newmont’s
reputation
Effective partnership Newmont (75%) with GoS, through Staatsolie (25%)
Mineral Agreement signed in 2013 – government royalty of 6%
Contributing to Surinamese economy – 5 to 7 percent of GDP; 1,250 employees
Mitigate and prevent risks through proactive engagement – Advisory Council
Maintain social
license to
operate
Cooperation agreement - employment, procurement and infrastructure rehab
Community development fund – electricity, water, education and healthcare
Biodiversity programs – conservation and stewardship of resources
Support government in improving practices of artisanal small-scale miners
Newmont Mining Corporation I Merian Site Tour I Slide 12March 2, 2017
Questions?
Ore stockpiles at Merian
Newmont Mining Corporation I Merian Site Tour I Slide 13March 2, 2017
Endnotes
Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement
on slide 3 and the factors described under the “Risk Factors” section of the Company’s Form 10-K, filed with the SEC on February 21, 2017 and
disclosure in the Company’s other recent SEC filings.
1. All-in sustaining cost is a non-GAAP metric. All-in sustaining cost (“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined
as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the
current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense,
advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. A reconciliation
has not been provided in reliance on Item 10(e)(1)(i)(B) of Regulation S-K because such reconciliation is not available without unreasonable
efforts. For a reconciliation of the Company’s historical AISC or 2017 Consolidated Gold AISC Outlook, see page 22 of Newmont’s earnings
release for the fourth quarter and full year 2016 available on the Company’s website www.newmont.com in the newsroom section.
2. U.S. investors are reminded that reserves were prepared in compliance with Industry Guide 7 published by the SEC. Whereas, the term
resource, measured resource, indicated resources and inferred resources are not SEC recognized terms, Newmont has determined that such
resources would be substantively the same as those prepared using the Guidelines established by the Society of Mining, Metallurgy and
Exploration and defined as Mineral Resource. Estimates of resources are subject to further exploration and development, are subject to
additional risks, and no assurance can be given that they will eventually convert to future reserves. Inferred resources, in particular, have a
great amount of uncertainty as to their existence and their economic and legal feasibility. Investors are cautioned not to assume that any part
or all of the inferred resource exists, or is economically or legally mineable. Inventory and upside potential have a greater amount of
uncertainty. Investors are cautioned that drill results illustrated in certain graphics in this presentation are not necessarily indicative of future
results or future production. Even if significant mineralization is discovered and converted to reserves, during the time necessary to ultimately
move such mineralization to production the economic and legal feasibility of production may change. As such, investors are cautioned against
relying upon those estimates. For more information regarding the Company’s reserves, see the Company’s Annual Report filed with the SEC
on February 21, 2017 for the Proven and Probable reserve tables prepared in compliance with the SEC’s Industry Guide 7, which is available
at www.sec.gov or on the Company’s website. Investors are further reminded that the reserve and resource estimates used in this
presentation are estimates as of December 31, 2016.
3. Outlook projections used in this presentation are considered forward-looking statements and represent management’s good faith estimates or
expectations of future production results as of February 21, 2017. Outlook is based upon certain assumptions, including, but not limited to,
metal prices, oil prices, certain exchange rates and other assumptions. For example, 2017 Outlook assumes $1,200/oz Au, $2.25/lb Cu, $0.75
USD/AUD exchange rate and $55/barrel WTI; AISC and CAS estimates do not include inflation, for the remainder of the year. Assumptions
used for purposes of Outlook may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, Outlook
cannot be guaranteed. See cautionary statement on slide 3.
Tour participants are reminded that the cautionary note on slide 3 and the endnotes listed above on this slide should also be considered in
connection with the poster board presentation at the tour stops, which follows.
Story board – Mining
Newmont Mining Corporation I Merian Site Tour I Slide 15March 2, 2017
Mine physicals and fleet
25 CAT 785D Haul TrucksKey Mining Information
Pit production ~50Mt per year
Mine life 13+ years
LOM Grade Average 1.2 g/t*
LOM Strip Ratio 3.1
2 primary pits Merian 2, Maraba
6 Hitachi EX3600 Shovels
4 Atlas DML DTH Drills
4-5 CAT 16M Graders
6-7 CAT D10T Tractors
18-20 Ancillary Equipment
* Includes reserves (proven & probable) and resources (measured & indicated)
Newmont Mining Corporation I Merian Site Tour I Slide 16March 2, 2017
Maraba
Merian 2
Kupari
Maraba
South
Merian mine - pit designs
• Merian 2, Phase 1 pit mostly saprolite
• Final pit depth ~260m
• Dual ramp reduces risk; shortens waste haul
• Resource conversion on east wall
• Material types
‒ Waste = <0.4 g/t
‒ Low grade = 0.4 – 0.7g/t
‒ High grade = >0.7 g/t
• Merian 2: bench height 5m / ~55°face angle
• Maraba: bench height 10m
Merian 2
Maraba
Kupari / Maraba South
-
10,000
20,000
30,000
40,000
50,000
60,000
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Merian Tonnes Mined by Pit (Kt)
Story board – Exploration
Newmont Mining Corporation I Merian Site Tour I Slide 18March 2, 2017
Merian Project Reserve & Resource Growth Profile
Reserves and Resources (Consolidated, 100% basis)
Reserves
(Proven & Probable)
5.72Moz 141Mt @ 1.3 g/t
Resources2
(Measured & Indicated)
0.92Moz 26Mt @ 1.1 g/t
Resources2
(Inferred)
1.73Koz 49Mt @ 1.1 g/t
2016 Reserve increase: 600Koz (net of depletion)
32m @ 5.2g/t
Incl. 17.0m @ 9.0g/t
45m @ 1.8g/t
82m @ 3.45g/t
Incl. 11.0m @ 6.3g/t
6.0m @ 7.9g/t
100m
Saprolite
Saprock
Freshrock
2015 $1200 RSV pit
2016 $1200 RSV pit
2016 Drillholes
Reserves and Resources – growth continues
3.56
4.25
4.81 5.12
5.72
0
2
4
6
2012 2013 2014 2015 2016
Saprolite Transitional Fresh Rock
Merian Reserve1 growth (Moz)
Drill results are not necessarily indicative of future production; see endnote 2
(1) Reserves (proven and probable) on 100% consolidated basis
(2) See endnote 2
Newmont Mining Corporation I Merian Site Tour I Slide 19March 2, 2017
Merian district exploration – focus and highlights
• Extend saprolite mining beyond 2022
• Extend Merian mine life beyond 2030
• Advance Sabajo Project
• Continued exploration of prospective “greenstone” belts
Story board - Processing
Newmont Mining Corporation I Merian Site Tour I Slide 21March 2, 2017
Merian Process Plant
Newmont Mining Corporation I Merian Site Tour I Slide 22March 2, 2017
Process feed and throughput
Key Processing Information
Nominal Nameplate ~12 Mtpa
LOM Avg. Head Grade 1.2 g/t
LOM Avg. Gold Recovery >93%
• Feed material – fine saprolite with limited quartz vein
material; sand/silt from former small scale mine tailings
• Feed system – CAT D10T dozers & 349 excavators;
apron feeders in the sub-tunnel; discharge onto the SAG
feed conveyor
• Mill will transition to hard rock feed from 2024
-
0.40
0.80
1.20
1.60
-
3,000
6,000
9,000
12,000
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Saprolite Transitional Fresh Rock Head Grade
Merian Mill Feed (Kt) and Head Grade (grams per tonne)
Newmont Mining Corporation I Merian Site Tour I Slide 23March 2, 2017
Maximizing the plant through Full Potential
• Successful commissioning: early operations
exceeded 1,489 tph (nameplate) throughput
• Process optimization in progress; potential to
increase throughput rates – approaching 1,750
tph
• Full Potential expected to lower unit processing
costs; power consumption, reagents and grinding
media
• Asset Management System implementation in
progress
• Metallurgically clean deposit – limits
environmental risks: <5 ppm CNWAD limit
Comminution Circuit
Design nameplate 1,489 tonnes per hour
13MW SAG Mill
34’ x 19’ variable speed
Metso/ABB
13MW Ball Mill
26’ x 42’ variable speed
Metso/ABB
2MW Cyclone pumps Krebs 28” x 26
Cyclones Krebs gMAX26” x16
Pebble Crusher Metso HP4
Power Plant
Power
generators
5 x 8.8MW,13.8kV
Wärtsilä engines
HFO storage tanks
2 x 1,500m3 (3-4 weeks
inventory)
Site Power Draw 20MW (peak 25MW)

Weitere ähnliche Inhalte

Was ist angesagt?

17 04 04 european gold forum - zurich
17 04 04   european gold forum - zurich17 04 04   european gold forum - zurich
17 04 04 european gold forum - zurichrichmontminesinc2016
 
17 02-27 slw presentation final (march)
17 02-27 slw presentation final (march)17 02-27 slw presentation final (march)
17 02-27 slw presentation final (march)silverwheaton2016
 
Corporate presentation november 2016 v final
Corporate presentation   november 2016 v finalCorporate presentation   november 2016 v final
Corporate presentation november 2016 v finalnewgold2011
 
17 04-06 slw presentation final (april 2)
17 04-06 slw presentation final (april 2)17 04-06 slw presentation final (april 2)
17 04-06 slw presentation final (april 2)silverwheaton2016
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation Karen Willoughby
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017DalradianResource
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationAgnico Eagle Mines
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferencePretiumR
 
June 2017 – Corporate Presentation
June 2017 – Corporate PresentationJune 2017 – Corporate Presentation
June 2017 – Corporate Presentationsilverwheaton2016
 
04 27-2017-q1-slides-final3
04 27-2017-q1-slides-final304 27-2017-q1-slides-final3
04 27-2017-q1-slides-final3Teranga Gold
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)PretiumR
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalalamosgoldinc
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentationyamanagold2016
 
110316 q3 webcast website
110316 q3 webcast website110316 q3 webcast website
110316 q3 webcast websiteKinrossGold
 
11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-finalTeranga Gold
 
bmo capital markets mining and metals confernce-handouts-29 feb16
bmo capital markets mining and metals confernce-handouts-29 feb16bmo capital markets mining and metals confernce-handouts-29 feb16
bmo capital markets mining and metals confernce-handouts-29 feb16kirklandlakegoldinc
 
080217 q2 webcast
080217 q2 webcast080217 q2 webcast
080217 q2 webcastKinrossGold
 

Was ist angesagt? (20)

17 04 04 european gold forum - zurich
17 04 04   european gold forum - zurich17 04 04   european gold forum - zurich
17 04 04 european gold forum - zurich
 
17 02-27 slw presentation final (march)
17 02-27 slw presentation final (march)17 02-27 slw presentation final (march)
17 02-27 slw presentation final (march)
 
Corporate presentation november 2016 v final
Corporate presentation   november 2016 v finalCorporate presentation   november 2016 v final
Corporate presentation november 2016 v final
 
17 04-06 slw presentation final (april 2)
17 04-06 slw presentation final (april 2)17 04-06 slw presentation final (april 2)
17 04-06 slw presentation final (april 2)
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation
 
Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017Dalradian Resources AGM Presentation 2017
Dalradian Resources AGM Presentation 2017
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
June 2017 – Corporate Presentation
June 2017 – Corporate PresentationJune 2017 – Corporate Presentation
June 2017 – Corporate Presentation
 
04 27-2017-q1-slides-final3
04 27-2017-q1-slides-final304 27-2017-q1-slides-final3
04 27-2017-q1-slides-final3
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-final
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentation
 
2016 agm presentation final
2016 agm presentation final2016 agm presentation final
2016 agm presentation final
 
Q4-2016 Results
Q4-2016 ResultsQ4-2016 Results
Q4-2016 Results
 
110316 q3 webcast website
110316 q3 webcast website110316 q3 webcast website
110316 q3 webcast website
 
11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final
 
bmo capital markets mining and metals confernce-handouts-29 feb16
bmo capital markets mining and metals confernce-handouts-29 feb16bmo capital markets mining and metals confernce-handouts-29 feb16
bmo capital markets mining and metals confernce-handouts-29 feb16
 
080217 q2 webcast
080217 q2 webcast080217 q2 webcast
080217 q2 webcast
 

Andere mochten auch

BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceAgnico Eagle Mines
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference yamanagold2016
 
Ort presentation aga_2016_francais-web
Ort presentation aga_2016_francais-webOrt presentation aga_2016_francais-web
Ort presentation aga_2016_francais-weborbitealuminae
 
Ort agm presentation_2016_web
Ort agm presentation_2016_webOrt agm presentation_2016_web
Ort agm presentation_2016_weborbitealuminae
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentationrichmontminesinc2016
 
Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016richmontminesinc2016
 
10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentation10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentationrichmontminesinc2016
 
First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016richmontminesinc2016
 
07 12-16-td-marketing
07 12-16-td-marketing07 12-16-td-marketing
07 12-16-td-marketingRichmontIR
 
05 17-16 nb ig site tour
05 17-16 nb ig site tour05 17-16 nb ig site tour
05 17-16 nb ig site tourRichmontIR
 

Andere mochten auch (20)

BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Ort presentation aga_2016_francais-web
Ort presentation aga_2016_francais-webOrt presentation aga_2016_francais-web
Ort presentation aga_2016_francais-web
 
Cgg ppt-pdac-finalized final -中文翻译
Cgg ppt-pdac-finalized final -中文翻译Cgg ppt-pdac-finalized final -中文翻译
Cgg ppt-pdac-finalized final -中文翻译
 
Ort agm presentation_2016_web
Ort agm presentation_2016_webOrt agm presentation_2016_web
Ort agm presentation_2016_web
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver Marketing
 
Q4 2016 webcast presentation
Q4 2016 webcast presentationQ4 2016 webcast presentation
Q4 2016 webcast presentation
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation
 
2016 Annual General Meeting
2016 Annual General Meeting2016 Annual General Meeting
2016 Annual General Meeting
 
Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016
 
10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentation10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentation
 
11 14-16 ric european marketing
11 14-16 ric european marketing11 14-16 ric european marketing
11 14-16 ric european marketing
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
Texas Marketing
Texas MarketingTexas Marketing
Texas Marketing
 
First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016
 
07 12-16-td-marketing
07 12-16-td-marketing07 12-16-td-marketing
07 12-16-td-marketing
 
Richmont Island Gold Site Tour
Richmont Island Gold Site TourRichmont Island Gold Site Tour
Richmont Island Gold Site Tour
 
05 17-16 nb ig site tour
05 17-16 nb ig site tour05 17-16 nb ig site tour
05 17-16 nb ig site tour
 
2016 PDAC Convention
2016 PDAC Convention2016 PDAC Convention
2016 PDAC Convention
 
Canaccord Technical Session
Canaccord Technical SessionCanaccord Technical Session
Canaccord Technical Session
 

Ähnlich wie Merian investor presentation final

Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 
Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalNewmont Mining Corporation
 

Ähnlich wie Merian investor presentation final (20)

Full Year and Q4 2016 Earnings
Full Year and Q4 2016 EarningsFull Year and Q4 2016 Earnings
Full Year and Q4 2016 Earnings
 
Baml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 finalBaml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 final
 
2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final
 
13 december 2016 investor deck final
13 december 2016 investor deck final13 december 2016 investor deck final
13 december 2016 investor deck final
 
13 december 2016 investor deck
13 december 2016 investor deck13 december 2016 investor deck
13 december 2016 investor deck
 
2018 may investor presentation final (1)
2018 may investor presentation final (1)2018 may investor presentation final (1)
2018 may investor presentation final (1)
 
2018 march investor presentation final (2)
2018 march investor presentation final (2)2018 march investor presentation final (2)
2018 march investor presentation final (2)
 
Q1 Earnings Results Presentation 2017
Q1 Earnings Results Presentation 2017Q1 Earnings Results Presentation 2017
Q1 Earnings Results Presentation 2017
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
November 2016 investor presentation
November 2016 investor presentationNovember 2016 investor presentation
November 2016 investor presentation
 
January 2018 investor presentation final
January 2018 investor presentation finalJanuary 2018 investor presentation final
January 2018 investor presentation final
 
Baml presentation may2017 final
Baml presentation may2017 finalBaml presentation may2017 final
Baml presentation may2017 final
 
2017 newmont investor day presentation
2017 newmont investor day presentation2017 newmont investor day presentation
2017 newmont investor day presentation
 
Ccv site tour presentation final
Ccv site tour presentation finalCcv site tour presentation final
Ccv site tour presentation final
 
Presentation dgf
Presentation dgfPresentation dgf
Presentation dgf
 
Nem december 2016 investor presentation
Nem december 2016 investor presentationNem december 2016 investor presentation
Nem december 2016 investor presentation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
Q3 2017 results presentation_final
Q3 2017 results presentation_finalQ3 2017 results presentation_final
Q3 2017 results presentation_final
 
Investor presentation may2017
Investor presentation may2017Investor presentation may2017
Investor presentation may2017
 
Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation final
 

Mehr von Newmont Mining Corporation (15)

August investor presentation final
August investor presentation finalAugust investor presentation final
August investor presentation final
 
2018 baml conference presentation print final
2018 baml conference presentation print final2018 baml conference presentation print final
2018 baml conference presentation print final
 
Q12018 earnings-presentation final
Q12018 earnings-presentation finalQ12018 earnings-presentation final
Q12018 earnings-presentation final
 
2018 february investor presentation final
2018 february investor presentation final2018 february investor presentation final
2018 february investor presentation final
 
Investor Presentation February 2018
Investor Presentation February 2018Investor Presentation February 2018
Investor Presentation February 2018
 
Newmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentationNewmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentation
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
2017 denver gold forum presentation
2017 denver gold forum presentation2017 denver gold forum presentation
2017 denver gold forum presentation
 
2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
September 2017 investor presentation
September 2017 investor presentationSeptember 2017 investor presentation
September 2017 investor presentation
 
August 2017 investor presentation
August 2017 investor presentationAugust 2017 investor presentation
August 2017 investor presentation
 
Q2 2017 results presentation_final
Q2 2017 results presentation_finalQ2 2017 results presentation_final
Q2 2017 results presentation_final
 
Bmo presentation 27 feb2017_final
Bmo presentation 27 feb2017_finalBmo presentation 27 feb2017_final
Bmo presentation 27 feb2017_final
 
Goldman sachs conference slides
Goldman sachs conference slidesGoldman sachs conference slides
Goldman sachs conference slides
 

Kürzlich hochgeladen

WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 

Kürzlich hochgeladen (20)

Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 

Merian investor presentation final

  • 2. Newmont Mining Corporation I Merian Site Tour I Slide 2March 2, 2017 Welcome and introductions Name Position Program Tom Palmer EVP and Chief Operating Officer Introduction Adriaan Van Kersen Managing Director, Merian Project Merian Project Delivery Tony Esplin General Manager, Merian Complex Merian Overview Albert Ramdin Senior Director, External Relations Sustainability & External Relations Trent Tempel Senior Vice President, South America David Portugal Regional CFO, South America Krishna Singh Engineering Superintendent Mine Tour Kirk Schmidt Exploration Manager Mine Tour – Exploration Tom Ohrling Processing Manager Process Tour
  • 3. Newmont Mining Corporation I Merian Site Tour I Slide 3March 2, 2017 Cautionary statement Cautionary statement regarding forward looking statements: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, and are intended to be covered by the safe harbor provided for under such sections. Such forward-looking statements may include, without limitation: (i) estimates of future production and production profiles; (ii) estimates of future costs applicable to sales and All-in sustaining costs; (iii) estimates of future capital expenditures; (iv) estimates of future full potential improvements, including reduced costs, increased efficiency and other optimizations and improvements; (v) expectations regarding future exploration, expansion, mine development, timing of phases and mine life; (vi) future grade, mill and processing estimates and expectations; and (vii) expectations regarding future returns, value creation, financial performance and other outlook or guidance. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s operations and projects being consistent with current expectations and mine plans, including without limitation receipt of export approvals; (iii) political developments being consistent with its current expectations; (iv) certain price assumptions for gold, copper and oil; (v) prices for key supplies being approximately consistent with current levels; (vi) the accuracy of our current models and study work; (vii) exchange rates being approximately consistent with current levels, and (viii) other assumptions. Where the Company expresses an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2016 Annual Report on Form 10-K, filed on or about February 21, 2017, with the Securities and Exchange Commission (the “SEC”), as well as the Company’s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own risk.
  • 4. Newmont Mining Corporation I Merian Site Tour I Slide 4March 2, 2017 Safety share As our guest, we ask that you please  Stay alert and aware of your surroundings – remain with Newmont personnel at all times  Stay hydrated  Protect against bug bites – cover exposed skin by wearing long-sleeved shirts and long pants  Eat and drink safely  Keep away from animals  Stay alert to changing weather conditions
  • 5. Newmont Mining Corporation I Merian Site Tour I Slide 5March 2, 2017 Merian delivers strategy to create long-term value Improve the underlying business Industry leader in safety and sustainability performance Continued cost improvements – AISC1 of $650 – 750/oz Steady gold production – Attributable production of 300 – 375Koz/year Strengthen the portfolio Establishing foothold in prospective new district – Guiana Shield Added 600Koz of Reserves2 – by the drill bit Advancing studies on brownfield opportunities – at Sabajo Create value for shareholders Project delivered safely, on schedule and $150M below budget Robust margins – 2017E3 outlook is 350 – 390Koz @ $560 – 610 AISC/oz Generating solid returns for investors – IRR of >25% (1) (2) (3) See endnote on slide 13. (2) Reserves (proven and probable) of 450Koz attributable to Newmont AISC/oz and Koz/year represent first 5-year averages
  • 6. Newmont Mining Corporation I Merian Site Tour I Slide 6March 2, 2017 Long-term value requires investment through cycle Merian case study: • Investment – entered Suriname in 2004 to establish prospective district • Exploration – grown to 6.3Moz attributable Reserve & Resource* base by 2016 • Partnership – government of Suriname buys in as 25% owner in 2014 • Projects – delivered $150M below budget in 2016; IRR of >25% and mine life of +13 years Merian* Represents 4.3Moz reserves (proven and probable) and 2.0Moz resources (measured, indicated, and inferred) on attributable basis
  • 7. Newmont Mining Corporation I Merian Site Tour I Slide 7March 2, 2017 Geology overview – regional and local Las Christinas Omai Rosebel Merian Guiana Shield Gondwanaland ~250 million years ago Major gold deposits Existing gold operations Newmont operations Birimian Shield Guiana Shield
  • 8. Newmont Mining Corporation I Merian Site Tour I Slide 8March 2, 2017 Creating a culture of zero harm • Eight reportable injuries in 2016, none serious; one reportable injury for 2017 YTD • Strong focus on Fatality Risk Management • Safety Leadership training and coaching commencing in 2017 • Comprehensive incident and near miss reporting • Cyanide and chemical awareness training for all employees with plant access; ICMC Certification TRIFR 2016 Target 0.40 2016 Actual 0.33 Zero harm ~2,400,000 hours Visible felt leadership Safety focused interactions with employees in the field 0.33 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Merian Total Recordable Injury Frequency Rate (TRIFR)
  • 9. Newmont Mining Corporation I Merian Site Tour I Slide 9March 2, 2017 Commercial production and successful ramp-up • Strong emphasis on safety and health • G-Mining partnership – engineering, construction, transition to operations • Start-up and commissioning support from Newmont technical teams • Completed strong first quarter of commercial production; exceeding production ramp-up targets 1,489 1,000 1,200 1,400 1,600 1,800 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Nameplate 7 Day Moving Average Merian Throughput (Tonnes per Operating Hour)
  • 10. Newmont Mining Corporation I Merian Site Tour I Slide 10March 2, 2017 Initiating Full Potential in 2017; identifying upside • Operational ̶ Complete expansion (crusher, conveyor, stacker, power and infrastructure) ̶ Optimize existing process facilities ̶ Target wet season operational continuity and productivity • Upside ̶ Wingspan and brownfields saprolite targets; refine strategic options; reserve conversions ̶ Underground evaluation; Sabajo; drill targets in Area of Interest; opportunities in the Guiana Shield
  • 11. Newmont Mining Corporation I Merian Site Tour I Slide 11March 2, 2017 Shared value creation – national and local Establish Newmont’s reputation Effective partnership Newmont (75%) with GoS, through Staatsolie (25%) Mineral Agreement signed in 2013 – government royalty of 6% Contributing to Surinamese economy – 5 to 7 percent of GDP; 1,250 employees Mitigate and prevent risks through proactive engagement – Advisory Council Maintain social license to operate Cooperation agreement - employment, procurement and infrastructure rehab Community development fund – electricity, water, education and healthcare Biodiversity programs – conservation and stewardship of resources Support government in improving practices of artisanal small-scale miners
  • 12. Newmont Mining Corporation I Merian Site Tour I Slide 12March 2, 2017 Questions? Ore stockpiles at Merian
  • 13. Newmont Mining Corporation I Merian Site Tour I Slide 13March 2, 2017 Endnotes Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement on slide 3 and the factors described under the “Risk Factors” section of the Company’s Form 10-K, filed with the SEC on February 21, 2017 and disclosure in the Company’s other recent SEC filings. 1. All-in sustaining cost is a non-GAAP metric. All-in sustaining cost (“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. A reconciliation has not been provided in reliance on Item 10(e)(1)(i)(B) of Regulation S-K because such reconciliation is not available without unreasonable efforts. For a reconciliation of the Company’s historical AISC or 2017 Consolidated Gold AISC Outlook, see page 22 of Newmont’s earnings release for the fourth quarter and full year 2016 available on the Company’s website www.newmont.com in the newsroom section. 2. U.S. investors are reminded that reserves were prepared in compliance with Industry Guide 7 published by the SEC. Whereas, the term resource, measured resource, indicated resources and inferred resources are not SEC recognized terms, Newmont has determined that such resources would be substantively the same as those prepared using the Guidelines established by the Society of Mining, Metallurgy and Exploration and defined as Mineral Resource. Estimates of resources are subject to further exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert to future reserves. Inferred resources, in particular, have a great amount of uncertainty as to their existence and their economic and legal feasibility. Investors are cautioned not to assume that any part or all of the inferred resource exists, or is economically or legally mineable. Inventory and upside potential have a greater amount of uncertainty. Investors are cautioned that drill results illustrated in certain graphics in this presentation are not necessarily indicative of future results or future production. Even if significant mineralization is discovered and converted to reserves, during the time necessary to ultimately move such mineralization to production the economic and legal feasibility of production may change. As such, investors are cautioned against relying upon those estimates. For more information regarding the Company’s reserves, see the Company’s Annual Report filed with the SEC on February 21, 2017 for the Proven and Probable reserve tables prepared in compliance with the SEC’s Industry Guide 7, which is available at www.sec.gov or on the Company’s website. Investors are further reminded that the reserve and resource estimates used in this presentation are estimates as of December 31, 2016. 3. Outlook projections used in this presentation are considered forward-looking statements and represent management’s good faith estimates or expectations of future production results as of February 21, 2017. Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain exchange rates and other assumptions. For example, 2017 Outlook assumes $1,200/oz Au, $2.25/lb Cu, $0.75 USD/AUD exchange rate and $55/barrel WTI; AISC and CAS estimates do not include inflation, for the remainder of the year. Assumptions used for purposes of Outlook may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, Outlook cannot be guaranteed. See cautionary statement on slide 3. Tour participants are reminded that the cautionary note on slide 3 and the endnotes listed above on this slide should also be considered in connection with the poster board presentation at the tour stops, which follows.
  • 14. Story board – Mining
  • 15. Newmont Mining Corporation I Merian Site Tour I Slide 15March 2, 2017 Mine physicals and fleet 25 CAT 785D Haul TrucksKey Mining Information Pit production ~50Mt per year Mine life 13+ years LOM Grade Average 1.2 g/t* LOM Strip Ratio 3.1 2 primary pits Merian 2, Maraba 6 Hitachi EX3600 Shovels 4 Atlas DML DTH Drills 4-5 CAT 16M Graders 6-7 CAT D10T Tractors 18-20 Ancillary Equipment * Includes reserves (proven & probable) and resources (measured & indicated)
  • 16. Newmont Mining Corporation I Merian Site Tour I Slide 16March 2, 2017 Maraba Merian 2 Kupari Maraba South Merian mine - pit designs • Merian 2, Phase 1 pit mostly saprolite • Final pit depth ~260m • Dual ramp reduces risk; shortens waste haul • Resource conversion on east wall • Material types ‒ Waste = <0.4 g/t ‒ Low grade = 0.4 – 0.7g/t ‒ High grade = >0.7 g/t • Merian 2: bench height 5m / ~55°face angle • Maraba: bench height 10m Merian 2 Maraba Kupari / Maraba South - 10,000 20,000 30,000 40,000 50,000 60,000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Merian Tonnes Mined by Pit (Kt)
  • 17. Story board – Exploration
  • 18. Newmont Mining Corporation I Merian Site Tour I Slide 18March 2, 2017 Merian Project Reserve & Resource Growth Profile Reserves and Resources (Consolidated, 100% basis) Reserves (Proven & Probable) 5.72Moz 141Mt @ 1.3 g/t Resources2 (Measured & Indicated) 0.92Moz 26Mt @ 1.1 g/t Resources2 (Inferred) 1.73Koz 49Mt @ 1.1 g/t 2016 Reserve increase: 600Koz (net of depletion) 32m @ 5.2g/t Incl. 17.0m @ 9.0g/t 45m @ 1.8g/t 82m @ 3.45g/t Incl. 11.0m @ 6.3g/t 6.0m @ 7.9g/t 100m Saprolite Saprock Freshrock 2015 $1200 RSV pit 2016 $1200 RSV pit 2016 Drillholes Reserves and Resources – growth continues 3.56 4.25 4.81 5.12 5.72 0 2 4 6 2012 2013 2014 2015 2016 Saprolite Transitional Fresh Rock Merian Reserve1 growth (Moz) Drill results are not necessarily indicative of future production; see endnote 2 (1) Reserves (proven and probable) on 100% consolidated basis (2) See endnote 2
  • 19. Newmont Mining Corporation I Merian Site Tour I Slide 19March 2, 2017 Merian district exploration – focus and highlights • Extend saprolite mining beyond 2022 • Extend Merian mine life beyond 2030 • Advance Sabajo Project • Continued exploration of prospective “greenstone” belts
  • 20. Story board - Processing
  • 21. Newmont Mining Corporation I Merian Site Tour I Slide 21March 2, 2017 Merian Process Plant
  • 22. Newmont Mining Corporation I Merian Site Tour I Slide 22March 2, 2017 Process feed and throughput Key Processing Information Nominal Nameplate ~12 Mtpa LOM Avg. Head Grade 1.2 g/t LOM Avg. Gold Recovery >93% • Feed material – fine saprolite with limited quartz vein material; sand/silt from former small scale mine tailings • Feed system – CAT D10T dozers & 349 excavators; apron feeders in the sub-tunnel; discharge onto the SAG feed conveyor • Mill will transition to hard rock feed from 2024 - 0.40 0.80 1.20 1.60 - 3,000 6,000 9,000 12,000 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Saprolite Transitional Fresh Rock Head Grade Merian Mill Feed (Kt) and Head Grade (grams per tonne)
  • 23. Newmont Mining Corporation I Merian Site Tour I Slide 23March 2, 2017 Maximizing the plant through Full Potential • Successful commissioning: early operations exceeded 1,489 tph (nameplate) throughput • Process optimization in progress; potential to increase throughput rates – approaching 1,750 tph • Full Potential expected to lower unit processing costs; power consumption, reagents and grinding media • Asset Management System implementation in progress • Metallurgically clean deposit – limits environmental risks: <5 ppm CNWAD limit Comminution Circuit Design nameplate 1,489 tonnes per hour 13MW SAG Mill 34’ x 19’ variable speed Metso/ABB 13MW Ball Mill 26’ x 42’ variable speed Metso/ABB 2MW Cyclone pumps Krebs 28” x 26 Cyclones Krebs gMAX26” x16 Pebble Crusher Metso HP4 Power Plant Power generators 5 x 8.8MW,13.8kV Wärtsilä engines HFO storage tanks 2 x 1,500m3 (3-4 weeks inventory) Site Power Draw 20MW (peak 25MW)