SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
Résumé of Nermeen Atef / Page 1
Nermeen Atef Azer
Address: Group 99 Building 10-21 Al-Rehab city
Mobile: +201282056309
Email: ynermeen.michael@gmail.com
SENIOR POSITION IN: PROJECT MANAGEMENT
TARGET SECTOR: POWER /OIL & GAS/CONTRACTING/CONSULTANCY
Key Expertise: Project Planning • Resource Planning • Project monitoring • Budget Management • Cost
Management
Career Snapshot
Project Management & Cost Planning Professional offering successful career spanning 11 years.
 A dynamic, outcome-oriented PRMG Certified professional with rich industrial experience in Project Planning,
Project Control and Monitoring, comprising 8 years international experience in the MENA areas.
Industry experience creating and increasing productivity, efficiency and profitability.
 Recognized for Verifiable performance and expertise in program management contracts, including planning &
scheduling (P6), cost control, contract administration, forecasting
 Hands on capabilities in operating the business as a profit center and meeting revenue and profitability targets
 Hands on experience in the developing plans & procedures for focused cost management & profit maximization.
Areas of Expertise
 Proficiency in project controls through controlling enterprise overheads, resource configuration & optimization
 Demonstrated domain expertise project construction planning & scheduling as well as skills in problem solving &
systems analysis
 Expertise in cost optimization, with significant expertise in establishing policies & monitoring expenses
 Proven capability of working on cost control functions under the integrated ERP system as well as participating in
Oracle suite ERP implementation process and its underlying data migration phase.
 Possess good understanding of project monitoring as per company procedures, systems, & operational metrics.
 Demonstrated skills in submission of contractual claims, as well as preparation of cost and value reconciliation
statements for the projects & achieving financial stability.
 Expertise in documentation including drafting subcontract documents, commercial review of contract/ tender
documents & driving for cost effective solutions for construction as well as facility management projects.
Work Outline
Samcrete Engineering and contracting, Egypt
 Sr. Planning and Cost Engineer (Nov 2015 to Date)
Kharafi National, Kuwait
 Planning and Cost Engineer (Dec 2010 to Sep 2015)
Al-Daleel construction, Kuwait
 Senior Planning Engineer (Aug 2007 – Nov-2010)
 Tender Engineer (Aug-2007- Jan-2010)
Résumé of Nermeen Atef / Page 2
ORASCOM CONSTRUCTION, Egypt, Cairo
 Technical Office Engineer (Oct-2005 – Jul-2007)
El_Sakhra Company for General Contracts, Egypt, Cairo
 Project Engineer (Jun-2004 – Sep-2005)
Summary of Achievements
Samcrete Engineering and contracting, Egypt
(A leading construction of roads and precast concrete product )
 Sr.Planning and Cost Engineer (Nov 2015 to Date)
(Reported to the Project controls Manager)
 Prepared work breakdown structure as well as assigned project cost coding structure.
 Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.
 Identify scope of schedule activities.
 Determined milestones to support project schedule, including identification of contractual milestones.
 Establish activity durations and sequence for specific work disciplines.
 Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing
organizations and units to coordinate work sequences within total project plan
 Developed of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform
quantity and manpower resource loading for assigned schedules.
 Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and
proposes corrective action/work around solutions.
 Estimated cash flows, controlled deficits verses surplus, tracked and updated invoices submittals and receivables.
 Identify and reports activities which have a critical or potential impact on schedule.
 prepared schedule, manpower, and quantity progress and performance reports.
 Prepared resource loaded project schedule
 Established Quantity Management System & periodically reviewed report on actual vs. budgeted manpower &
quantities
 Highlighted cost over runs and recommended corrective measures.
 Issued revised budget and/ or budget adjustments as a response to client VO’s or subject to internal change of the
execution strategy.
 Interfaced with project site management & client counterparts for specific costing & scheduling tasks.
 Tracked the current level of commitments, actuals, and value of work done.
Kharafi National, Kuwait
(A leading infrastructure project developing firm specializing turnkey projects in water, wastewater treatment and
reclamation, district cooling, solid waste management and enhanced oil recovery as well as a leading operation and
maintenance contractor and facilities management service provider to the petroleum, chemicals, power, water and
commercial sectors in the MENA)
Planning and Cost Engineer (Dec 2010 to Aug-15)
(Reported to the Project controls Manager)
Job Profile:
 Prepared work breakdown structure as well as assigned project cost coding structure.
 Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.
 Identify scope of schedule activities.
 Determined milestones to support project schedule, including identification of contractual milestones.
 Establish activity durations and sequence for specific work disciplines.
 Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing
organizations and units to coordinate work sequences within total project plan
 Developed of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform
quantity and manpower resource loading for assigned schedules.
Résumé of Nermeen Atef / Page 3
 Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and
proposes corrective action/work around solutions.
 Managed sub-contractors progress, resource allocation and payment recommendations
 Estimated cash flows, controlled deficits verses surplus, tracked and updated invoices submittals and receivables.
 Identify and reports activities which have a critical or potential impact on schedule.
 prepared schedule, manpower, and quantity progress and performance reports.
 Developed & executed project plan & prepared project closeout report
 Prepared resource loaded project schedule
 Established Quantity Management System & periodically reviewed report on actual vs. budgeted manpower &
quantities
 Issued productivity reports as well as prepared & monitored weekly and monthly progress reports
 Highlighted cost over runs and recommended corrective measures.
 Issued revised budget and/ or budget adjustments as a response to client VO’s or subject to internal change of the
execution strategy.
 Planned, organized, & supervised data collection & issued Project Cost Forecast Report (PFR).
 Interfaced with project site management & client counterparts for specific costing & scheduling tasks.
 Tracked the current level of commitments, actuals, and value of work done
Al-Daleel construction, Kuwait
(General Trading and contracting Company in Kuwait)
 Senior Planning Engineer (Aug 2007 – Nov-2010)
(Reporting to the Managing Director/ Operations Manager)
Job Profile:
 Prepared work breakdown structure as well as assigned project cost coding structure.
 Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.
 Identify scope of schedule activities.
 Determined milestones to support project schedule, including identification of contractual milestones.
 Establish activity durations and sequence for specific work disciplines.
 Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing
organizations and units to coordinate work sequences within total project plan
 Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and
proposes corrective action/work around solutions.
 Identify and reports activities which have a critical or potential impact on schedule
 Tender Engineer (Aug-2007- Jan-2010)
 Reviewed draft tender documents to ensure all systems and components of the tender are included.
 Prepared tender documentation queries to consultants/clients to confirm and collect any missing data including;
shipping costs, insurance, and any regional requirements
 Prepared reports and supporting documents to submit to Proposal Coordinator to identify areas requiring more
information to ensure the Company is positioned to win and secure bids.
 Developed tender cost summaries including equipment, materials and labour calculations for final approval.
 Interpreted & review system drawings to identify any difference to tender requirements and raise queries against
specification.
 Reviewed and generate Bill of Quantity against system drawings to ensure alignment and to identify materials types
& quantities and prepare equipment lists and rough drawings for cost estimation.
 Interpreted and follow Company tendering processes and procedures to ensure all aspects of tenders are met
including relevant discipline codes and standards.
 Prepared specification documents to submit to vendors for quotations of cost/price of materials and equipment and
evaluate same against tender specifications to include in final tender documentation.
 Built relationships and liaise with internal customers and external suppliers and vendors and manage daily
correspondence for quantities, costs and specifications.
Résumé of Nermeen Atef / Page 4
ORASCOM CONSTRUCTION, Egypt, Cairo
(A leader international fertilizer producer and construction contractor, Construction Group ranks among the world’s top
global contractors and undertakes large industrial, infrastructure and select commercial projects for public and private
customers principally in Europe, the Middle East and North Africa)
Technical Office Engineer (Oct-2005 – Jul-2007)
(Reported to the Technical Office Manager)
Job Profile:
 Reviewed the projects documents and study the scope of supply and project specifications
 Followed up and receive the drawings from design department and engineering sub-suppliers (if any).
 Studied and check drawings prior preparing bill of material for material procurement and prior release to the
concerned parties in the project
 Issued and release the drawings to documents control to distribute them to concerned parties in the project
 Checked BOM (Bill of Material) prepared by technical office engineers as per drawings and calculations
 Checked TDC (Technical Delivery Condition) in accordance with project specifications and relevant code
 Checked and evaluate material supplier quotations/offers technically
 Review sub-supplier engineering documents (if any) prior sending to client for approval and to concerned parties in
the project.
 Review detail shop drawings, plate cutting layout and nesting program according to the construction drawings.
El_Sakhra Company for General Contracts, Egypt, Cairo
(A General trading and contracting company)
 Project Engineer (Jun-2004 – Sep-2005)
(Reported to the Project Manager)
Job Profile:
 Prepared daily, weekly and monthly reports and represented the company in meetings produce
 Attend regular meetings with clients, architects and consultants and keeping them informed of progress .
 Supervised and monitored the site labour force through General Foreman and or Supervisors, monitoring the work of
any subcontractors to complete the work as per customer's satisfaction.
 Oversee quality control and safety matters on the site, and ensure that regulations are adhered to.
 Solved any unexpected technical difficulties and other problems that may arise at any time.
 Oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the
materials are as specified.
 Supervised and ensure proper maintenance of materials and to advise on technology and modifications required for a
simpler and cost saving mechanism.
 Prepared necessary paperwork for the completion of work and get it authorised by the client after their inspection.
Projects Handled in Brief
Projects handled at Kharafi National, Annual turnover KD 73 Million:
Project: Rehabilitation of Building and Systems at Bayan Palace, Amiri Diwan, Kuwait, Project Value: KD 12.29 Million
Project: Arwa Printing Press, Arwa Real Estate Trading & Contracting, Kuwait, Project Value: KD 7.7 Million
Project: Garage 9 & 10 at Bayan Palace, HH Sheikh Naser, Project Value: KD 4.2 Million
Project: Ahmadi Villa, Amiri Diwan, Kuwait, Project Value: KD 4.81 Million
Project: New State Guest House & Ahmadi Governor House at Ahmadi, Kuwait Oil Company, Kuwait
Project Value: KD 4 Million
Project: Kharafi Villa Substations, MAK Kuwait, Project Value: KD 2.87 Million
Project: Design & construction of HH Sheikh Naser’s car museum at Shuwaikh area, Kuwait, Project Value: KD 1.2 Million
Project: Maintenance of Bayan Palace, Amiri Diwan, Kuwait, Project Value: KD 20.62 Million
Project : Maintenance of Customs , Kuwait , Project Value: 30.2 Million
Résumé of Nermeen Atef / Page 5
Projects handled at Al Daleel , Annual turnover Kd 12 Million:
Project: Sulibkhat Mall, Project Value: KD 5.1 Million
Project: salmiya tower, Project Value: KD 2.1 Million
Project: Almulla garage, Project value: KD 1.8 Million
Projects handled Orascom, Annual turnover L.E. 130 Million
Project: Al Raya Tower 6
th
October , Project Value: L.E. 20 Million
Training & Development
 Attended IELTS and secured overall score of 6 in spoken and written English
Educational Credentials
 Project Management Diploma Certificate, American University, Cairo (2007)
o PRMG 010: Project planning and control techniques .
o PRMG 020: Management of Project Recourses.
o PRMG 030: Project Budgeting and financial control.
o PRMG 080 : Project Bids and Contracts.
o PRMG050 : Project Feasibility studies.
o PRMG 004 : Primavera program P3 , P6 (June 2010).
o PRMG 075: Course Preparation for International Certificate of PSP (Dec-16)
o PRMG 090: Course Preparation for International Certificate of CCP ( Dec-16)
 Bachelors in Architectural Engineering, Ain shams University, Egypt (2004)
Personal Information
 Date of Birth: 17th July 1982
 Language Proficiency: Arabic & English
 Computer Literacy: Windows XP MS Office (Word, Excel, Power Point ), Oracle ERP projects module, P3, P6
,AutoCAD 2010 & ArchiCAD 7.0
Nationality: Egyptian, Passport No.: A03614035 valid up to 04 May 2018

Weitere ähnliche Inhalte

Was ist angesagt?

Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Jon Rocchino
 
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib, PMP, PMI-RMP
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plantabhishekthakur309
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Kenneth Ifidon
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cvjamli haythem
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpinePenny McAlpine
 
Alexander Joy Cartwright Iv Cpa V4
Alexander  Joy Cartwright Iv Cpa V4Alexander  Joy Cartwright Iv Cpa V4
Alexander Joy Cartwright Iv Cpa V4mrbaseball
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction EngineersAmit Kumar Senapati, PMP®
 
Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant Kale
 

Was ist angesagt? (19)

Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015Resume_Rocchino Dec 2015
Resume_Rocchino Dec 2015
 
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATEL
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plant
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
RRV CV
RRV CVRRV CV
RRV CV
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
 
Alexander Joy Cartwright Iv Cpa V4
Alexander  Joy Cartwright Iv Cpa V4Alexander  Joy Cartwright Iv Cpa V4
Alexander Joy Cartwright Iv Cpa V4
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction Engineers
 
Hemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-ResumeHemant-Mukund-Kale-Resume
Hemant-Mukund-Kale-Resume
 
CV_KAD_PMP+BDM
CV_KAD_PMP+BDMCV_KAD_PMP+BDM
CV_KAD_PMP+BDM
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
C.V
C.VC.V
C.V
 

Ähnlich wie Resume - Nermeen Atef sam

Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
PETER CRAMER CV April 2016
PETER CRAMER CV April 2016PETER CRAMER CV April 2016
PETER CRAMER CV April 2016Peter Cramer
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Project controls function
Project controls functionProject controls function
Project controls functionHatem Hegazi
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CVkiran kumar Reddy
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 

Ähnlich wie Resume - Nermeen Atef sam (20)

Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
resume
resumeresume
resume
 
Resume
ResumeResume
Resume
 
PETER CRAMER CV April 2016
PETER CRAMER CV April 2016PETER CRAMER CV April 2016
PETER CRAMER CV April 2016
 
Randolph Angelito CV
Randolph Angelito CVRandolph Angelito CV
Randolph Angelito CV
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Igwebuike CV_Project Control Engineer
Igwebuike CV_Project Control EngineerIgwebuike CV_Project Control Engineer
Igwebuike CV_Project Control Engineer
 
Project controls function
Project controls functionProject controls function
Project controls function
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 

Resume - Nermeen Atef sam

  • 1. Résumé of Nermeen Atef / Page 1 Nermeen Atef Azer Address: Group 99 Building 10-21 Al-Rehab city Mobile: +201282056309 Email: ynermeen.michael@gmail.com SENIOR POSITION IN: PROJECT MANAGEMENT TARGET SECTOR: POWER /OIL & GAS/CONTRACTING/CONSULTANCY Key Expertise: Project Planning • Resource Planning • Project monitoring • Budget Management • Cost Management Career Snapshot Project Management & Cost Planning Professional offering successful career spanning 11 years.  A dynamic, outcome-oriented PRMG Certified professional with rich industrial experience in Project Planning, Project Control and Monitoring, comprising 8 years international experience in the MENA areas. Industry experience creating and increasing productivity, efficiency and profitability.  Recognized for Verifiable performance and expertise in program management contracts, including planning & scheduling (P6), cost control, contract administration, forecasting  Hands on capabilities in operating the business as a profit center and meeting revenue and profitability targets  Hands on experience in the developing plans & procedures for focused cost management & profit maximization. Areas of Expertise  Proficiency in project controls through controlling enterprise overheads, resource configuration & optimization  Demonstrated domain expertise project construction planning & scheduling as well as skills in problem solving & systems analysis  Expertise in cost optimization, with significant expertise in establishing policies & monitoring expenses  Proven capability of working on cost control functions under the integrated ERP system as well as participating in Oracle suite ERP implementation process and its underlying data migration phase.  Possess good understanding of project monitoring as per company procedures, systems, & operational metrics.  Demonstrated skills in submission of contractual claims, as well as preparation of cost and value reconciliation statements for the projects & achieving financial stability.  Expertise in documentation including drafting subcontract documents, commercial review of contract/ tender documents & driving for cost effective solutions for construction as well as facility management projects. Work Outline Samcrete Engineering and contracting, Egypt  Sr. Planning and Cost Engineer (Nov 2015 to Date) Kharafi National, Kuwait  Planning and Cost Engineer (Dec 2010 to Sep 2015) Al-Daleel construction, Kuwait  Senior Planning Engineer (Aug 2007 – Nov-2010)  Tender Engineer (Aug-2007- Jan-2010)
  • 2. Résumé of Nermeen Atef / Page 2 ORASCOM CONSTRUCTION, Egypt, Cairo  Technical Office Engineer (Oct-2005 – Jul-2007) El_Sakhra Company for General Contracts, Egypt, Cairo  Project Engineer (Jun-2004 – Sep-2005) Summary of Achievements Samcrete Engineering and contracting, Egypt (A leading construction of roads and precast concrete product )  Sr.Planning and Cost Engineer (Nov 2015 to Date) (Reported to the Project controls Manager)  Prepared work breakdown structure as well as assigned project cost coding structure.  Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.  Identify scope of schedule activities.  Determined milestones to support project schedule, including identification of contractual milestones.  Establish activity durations and sequence for specific work disciplines.  Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing organizations and units to coordinate work sequences within total project plan  Developed of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform quantity and manpower resource loading for assigned schedules.  Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.  Estimated cash flows, controlled deficits verses surplus, tracked and updated invoices submittals and receivables.  Identify and reports activities which have a critical or potential impact on schedule.  prepared schedule, manpower, and quantity progress and performance reports.  Prepared resource loaded project schedule  Established Quantity Management System & periodically reviewed report on actual vs. budgeted manpower & quantities  Highlighted cost over runs and recommended corrective measures.  Issued revised budget and/ or budget adjustments as a response to client VO’s or subject to internal change of the execution strategy.  Interfaced with project site management & client counterparts for specific costing & scheduling tasks.  Tracked the current level of commitments, actuals, and value of work done. Kharafi National, Kuwait (A leading infrastructure project developing firm specializing turnkey projects in water, wastewater treatment and reclamation, district cooling, solid waste management and enhanced oil recovery as well as a leading operation and maintenance contractor and facilities management service provider to the petroleum, chemicals, power, water and commercial sectors in the MENA) Planning and Cost Engineer (Dec 2010 to Aug-15) (Reported to the Project controls Manager) Job Profile:  Prepared work breakdown structure as well as assigned project cost coding structure.  Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.  Identify scope of schedule activities.  Determined milestones to support project schedule, including identification of contractual milestones.  Establish activity durations and sequence for specific work disciplines.  Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing organizations and units to coordinate work sequences within total project plan  Developed of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform quantity and manpower resource loading for assigned schedules.
  • 3. Résumé of Nermeen Atef / Page 3  Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.  Managed sub-contractors progress, resource allocation and payment recommendations  Estimated cash flows, controlled deficits verses surplus, tracked and updated invoices submittals and receivables.  Identify and reports activities which have a critical or potential impact on schedule.  prepared schedule, manpower, and quantity progress and performance reports.  Developed & executed project plan & prepared project closeout report  Prepared resource loaded project schedule  Established Quantity Management System & periodically reviewed report on actual vs. budgeted manpower & quantities  Issued productivity reports as well as prepared & monitored weekly and monthly progress reports  Highlighted cost over runs and recommended corrective measures.  Issued revised budget and/ or budget adjustments as a response to client VO’s or subject to internal change of the execution strategy.  Planned, organized, & supervised data collection & issued Project Cost Forecast Report (PFR).  Interfaced with project site management & client counterparts for specific costing & scheduling tasks.  Tracked the current level of commitments, actuals, and value of work done Al-Daleel construction, Kuwait (General Trading and contracting Company in Kuwait)  Senior Planning Engineer (Aug 2007 – Nov-2010) (Reporting to the Managing Director/ Operations Manager) Job Profile:  Prepared work breakdown structure as well as assigned project cost coding structure.  Prepared planning and scheduling tools to be used in control, monitoring and reporting of project status.  Identify scope of schedule activities.  Determined milestones to support project schedule, including identification of contractual milestones.  Establish activity durations and sequence for specific work disciplines.  Identify inter-discipline restraints or interfaces which define activity sequences and work with the performing organizations and units to coordinate work sequences within total project plan  Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.  Identify and reports activities which have a critical or potential impact on schedule  Tender Engineer (Aug-2007- Jan-2010)  Reviewed draft tender documents to ensure all systems and components of the tender are included.  Prepared tender documentation queries to consultants/clients to confirm and collect any missing data including; shipping costs, insurance, and any regional requirements  Prepared reports and supporting documents to submit to Proposal Coordinator to identify areas requiring more information to ensure the Company is positioned to win and secure bids.  Developed tender cost summaries including equipment, materials and labour calculations for final approval.  Interpreted & review system drawings to identify any difference to tender requirements and raise queries against specification.  Reviewed and generate Bill of Quantity against system drawings to ensure alignment and to identify materials types & quantities and prepare equipment lists and rough drawings for cost estimation.  Interpreted and follow Company tendering processes and procedures to ensure all aspects of tenders are met including relevant discipline codes and standards.  Prepared specification documents to submit to vendors for quotations of cost/price of materials and equipment and evaluate same against tender specifications to include in final tender documentation.  Built relationships and liaise with internal customers and external suppliers and vendors and manage daily correspondence for quantities, costs and specifications.
  • 4. Résumé of Nermeen Atef / Page 4 ORASCOM CONSTRUCTION, Egypt, Cairo (A leader international fertilizer producer and construction contractor, Construction Group ranks among the world’s top global contractors and undertakes large industrial, infrastructure and select commercial projects for public and private customers principally in Europe, the Middle East and North Africa) Technical Office Engineer (Oct-2005 – Jul-2007) (Reported to the Technical Office Manager) Job Profile:  Reviewed the projects documents and study the scope of supply and project specifications  Followed up and receive the drawings from design department and engineering sub-suppliers (if any).  Studied and check drawings prior preparing bill of material for material procurement and prior release to the concerned parties in the project  Issued and release the drawings to documents control to distribute them to concerned parties in the project  Checked BOM (Bill of Material) prepared by technical office engineers as per drawings and calculations  Checked TDC (Technical Delivery Condition) in accordance with project specifications and relevant code  Checked and evaluate material supplier quotations/offers technically  Review sub-supplier engineering documents (if any) prior sending to client for approval and to concerned parties in the project.  Review detail shop drawings, plate cutting layout and nesting program according to the construction drawings. El_Sakhra Company for General Contracts, Egypt, Cairo (A General trading and contracting company)  Project Engineer (Jun-2004 – Sep-2005) (Reported to the Project Manager) Job Profile:  Prepared daily, weekly and monthly reports and represented the company in meetings produce  Attend regular meetings with clients, architects and consultants and keeping them informed of progress .  Supervised and monitored the site labour force through General Foreman and or Supervisors, monitoring the work of any subcontractors to complete the work as per customer's satisfaction.  Oversee quality control and safety matters on the site, and ensure that regulations are adhered to.  Solved any unexpected technical difficulties and other problems that may arise at any time.  Oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the materials are as specified.  Supervised and ensure proper maintenance of materials and to advise on technology and modifications required for a simpler and cost saving mechanism.  Prepared necessary paperwork for the completion of work and get it authorised by the client after their inspection. Projects Handled in Brief Projects handled at Kharafi National, Annual turnover KD 73 Million: Project: Rehabilitation of Building and Systems at Bayan Palace, Amiri Diwan, Kuwait, Project Value: KD 12.29 Million Project: Arwa Printing Press, Arwa Real Estate Trading & Contracting, Kuwait, Project Value: KD 7.7 Million Project: Garage 9 & 10 at Bayan Palace, HH Sheikh Naser, Project Value: KD 4.2 Million Project: Ahmadi Villa, Amiri Diwan, Kuwait, Project Value: KD 4.81 Million Project: New State Guest House & Ahmadi Governor House at Ahmadi, Kuwait Oil Company, Kuwait Project Value: KD 4 Million Project: Kharafi Villa Substations, MAK Kuwait, Project Value: KD 2.87 Million Project: Design & construction of HH Sheikh Naser’s car museum at Shuwaikh area, Kuwait, Project Value: KD 1.2 Million Project: Maintenance of Bayan Palace, Amiri Diwan, Kuwait, Project Value: KD 20.62 Million Project : Maintenance of Customs , Kuwait , Project Value: 30.2 Million
  • 5. Résumé of Nermeen Atef / Page 5 Projects handled at Al Daleel , Annual turnover Kd 12 Million: Project: Sulibkhat Mall, Project Value: KD 5.1 Million Project: salmiya tower, Project Value: KD 2.1 Million Project: Almulla garage, Project value: KD 1.8 Million Projects handled Orascom, Annual turnover L.E. 130 Million Project: Al Raya Tower 6 th October , Project Value: L.E. 20 Million Training & Development  Attended IELTS and secured overall score of 6 in spoken and written English Educational Credentials  Project Management Diploma Certificate, American University, Cairo (2007) o PRMG 010: Project planning and control techniques . o PRMG 020: Management of Project Recourses. o PRMG 030: Project Budgeting and financial control. o PRMG 080 : Project Bids and Contracts. o PRMG050 : Project Feasibility studies. o PRMG 004 : Primavera program P3 , P6 (June 2010). o PRMG 075: Course Preparation for International Certificate of PSP (Dec-16) o PRMG 090: Course Preparation for International Certificate of CCP ( Dec-16)  Bachelors in Architectural Engineering, Ain shams University, Egypt (2004) Personal Information  Date of Birth: 17th July 1982  Language Proficiency: Arabic & English  Computer Literacy: Windows XP MS Office (Word, Excel, Power Point ), Oracle ERP projects module, P3, P6 ,AutoCAD 2010 & ArchiCAD 7.0 Nationality: Egyptian, Passport No.: A03614035 valid up to 04 May 2018