SlideShare ist ein Scribd-Unternehmen logo
1 von 32
Nadir Baloch T.A 175
Switchgear &
Maintenance
SWITCHGEAR
switchgear is the combination of
electrical disconnect
switches, fuses or circuit breakers used
to control, protect and isolate electrical
equipment. Switchgear is used both to
de-energize equipment to allow work to
be done and to
clear faults downstream.
Switchgear
Types:
LV Switchgear
MV Switchgear
Generally electrical
switchgear rated upto 1 KV is
termed as low voltage switchgear
The most common use of LV
switchgear is in LV distribution
board.
THE ROLE OF SWITCHGEAR IS :
ELECTRICAL PROTECTION
SAFE ISOLATION FROM LIVE PARTS
LOCAL OR REMOTE SWITCHING
The basic functions of
Switchgear
Periodic Maintenance
Preventive Maintenance
a) 2 yearly Maintenance
b) 4 yearly Maintenance
Importance Of PM
Through such PM, troubles can be detected in the
Early stages and corrective actions can be taken
before extensive damage occurs.
The most common use of LV switchgear is in
LV distribution board.
This system has the following parts
Incomer
The incomer feeds incoming electrical
power to the incomer bus.
The switchgear used in the incomer should
have a main switching device.
The switchgear devices attached with incomer
should be capable of withstanding
abnormal current for a short specific duration
in order to allow downstream devices to
operate.
Generally Air Circuit Breakers are preferably
used as interrupting device.
Sub – Incomer
These sub – incomers draw power from main
incomer bus and feed this power to feeder bus
Feeders
Different feeders are connected to the feeder
bus to feeds different loads like, motor loads,
lighting loads, industrial machinery loads, air
conditioner loads, transformer cooling
system loads etc.
Main Transformer Incomer
Main Components Of Switchgears
Busbar
Busbar is a strip or bar of copper, brass or aluminium that conducts
electricity within a switchboard, distribution board, substation,
The cross-sectional size of the busbar determines the maximum amount
of current
Used to interconnect the loads and sources of electrical power.
Busbar Specification
Manufacturer: Nova Magrini Gallilio
Type of Busbar : Copper ( Insulated with Silver coated joints)
Busbar Rating : 1500 Amp
Method Of Cleaning : Clean with Lint Free Cloth
Busbar Dimensions : 2*100*8 mm
Busbar Maintenance
Full Bus Bar Inspection check for overheating signs, visual
inspection of Cu plate and nut bolts. cleaning of incoming/outgoing
spouts.
Remove dust with vacuum cleaner.
Cleaning and lubricating mechanical links with contact grease.
Check operating mechanism of shutter.
Contact Resistance of Electrical joints.
Check IR to earth and between phases on busbar and outgoing
circuits @ 2500V
Air Circuit Breaker (ACB)
A circuit breaker is an automatically operated electrical switch designed to protect
an electrical circuit from damage caused by overload or short circuit. Its basic
function is to detect a fault condition and interrupt current flow
This type of circuit breakers, is those kind
of circuit breaker which operates in air at
atmospheric pressure.
 ACBs are still preferable choice up
to voltage 15 KV
It is also good choice to avoid the risk of oil fire,
in case of oil circuit breaker.
Operation Of ACB
The first objective is usually achieved by forcing
the arc into contact with as large an area as
possible of insulating material. Every air circuit
breaker is fitted with a chamber surrounding the
contact. This chamber is called ‘arc chute’. The
arc is driven into it. If inside of the arc chute is
suitably shaped, and if the arc can be made
conform to the shape, the arc chute wall will help
to achieve cooling.
Air Circuit Breakers : Charging method
Circuit breaker closing springs may be compressed manually or by means
of a small electric motor.
The closing coil is charged by manual charging handle. For closing, first
charge the spring by using the charging handle
Maintenance of Air Circuit Breaker
LV Circuit Breakers operating at 600 volt and
below, should be inspected
Maintained every 1 to 4 years depending on their
services and operating
Conditions.
Conditions that make frequency maintenance and
inspection are necessary:
High humidity and High temp
Dusty or Dirty Atmosphere
Corrosive Atmosphere
Inspection & Cleaning
Insulating parts including bushing should be cleaned
of dust
Clean & inspect Arc Chutes for Cracks, Broken Parts
. Replace Damage Parts
Inspect Breaker Operating Mechanism for loose
hardware & missing or broken etc
Examine for wears
Check Rack in/ out mechanism for normel operation
Lubricate if necessary
Check tightness of all terminations
Contacts maintenance
Arcing contacts to be verified for burn off
To be adjusted or exchanged that arc contacts
simultaneoslu when closing
Permissible tolerance 1mm
Adjust lead of arcing contacts from main contacts such
that when arc contacts
Meet then distance between
Insulation Resistance Test (Megger)
Load and line conductors should disconnected from the breaker to make
Test. IR between phases and phases w.r.t ground with breaker closed.
the result is compared against manufacturer/ pervious data
For breaker being tested.
Cycling the breaker
On & Off the breaker several times to check the correct operation
Of breaker.
Verify For Loop Check
Insert circuit breaker at test position and on & off the breaker
from remote location
Current Transformer
A current transformer (CT) is used for
measurement of alternating electric
currents
Current transformer are used in electrical power system for stepping down
currents of the system for metering and protection purpose.
A CT functions with the same basic working principle of electrical power
transformer
CT steps down rated system current to 1 Amp or 5 Amp.
Because the relays and meters are generally designed for 1 Amp, 5 Amp and
110V
Relay
Relays is automatic device which senses an abnormal condition of
electrical circuit and closes its contacts. these contacts in turns close
and complete the circuit breaker trip coil circuit hence make the circuit
breaker tripped
Protective Relay Testing
Why do we use protective relays?
Their main duty is to isolate a faulty section within few cycles
Periodic Maintenance Testing
After a relay is commissioned it’s important to carry out regular
maintenance tests.
Some of the advantages of such testing can be stated as, it will pin point
a defective relay before it fails to act during a fault
Methods of Testing
Steady State: steady state testing is for checking the relay pick up.
Injected current, voltage. when the current is raised and then
fluctuated around pick up.
Dynamic state Time for relay operation is measured.
Freja 300
The FREJA 300 relay testing system is a computer-aided relay testing
system by injecting current and voltage.
Testing Principles
There are two main principles as primary injection and secondary
injection.
• Primary injection- High current is injected to primary side of
the CT. Test carried out covers CT, conductors, relay and
sometimes circuit breaker as well. The relay unit has to be
isolated from the power system. Usually this principle is used at
commissioning and also if the secondary of the CT is not
accessible.
• Secondary injection - Relay is disconnected from the CT and
the stepped down current is
directly injected to relay.
General Precautions to be taken
Check the Electrical Isolation First
During maintenance Earth MUST be connected
Before maintenance of breaker spring must be discharge.
Don’t use compressed air on breaker
Don’t use file or emery paper for contacts cleaning
Inspection Inside Switchgear Room
Switchgear environment (switch room access and surrounds,
including fence and external walls if outdoors.
Signs of water
Signs of unauthorized access
Condition of firefighting equipment and warning notices
General Housekeeping
Switchgear presentation
Switchgear presentation

Weitere ähnliche Inhalte

Was ist angesagt?

220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamleshKamlesh Vala
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And FunctionsNitendra Kumar Singh
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work pptDemsew Mitiku
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substationEmran Ali
 

Was ist angesagt? (20)

220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Electric substation
Electric substation Electric substation
Electric substation
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Protective relay
Protective relay Protective relay
Protective relay
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And Functions
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Corona in power system
Corona  in power systemCorona  in power system
Corona in power system
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 

Andere mochten auch

Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNikhil Kachare
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear StandardsBryan Johnson
 
Catalogo completo eletropoll
Catalogo completo eletropollCatalogo completo eletropoll
Catalogo completo eletropollWagner Campos
 
Interlocking on switchgear principles
Interlocking on switchgear principlesInterlocking on switchgear principles
Interlocking on switchgear principlesBryan Johnson
 
Relays
RelaysRelays
RelaysPPT4U
 
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)George Sey Jr., PE
 

Andere mochten auch (8)

Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Catalogo completo eletropoll
Catalogo completo eletropollCatalogo completo eletropoll
Catalogo completo eletropoll
 
Interlocking on switchgear principles
Interlocking on switchgear principlesInterlocking on switchgear principles
Interlocking on switchgear principles
 
Relays
RelaysRelays
Relays
 
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)
Microsoft PowerPoint - Impacts of Distributed Generation (Public Copy)
 
Relay
RelayRelay
Relay
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 

Ähnlich wie Switchgear presentation

switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier pptvikas kumar
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptBrijeshKumar33410
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ramGRBabu Naidu
 
newswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptxnewswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptxDrNiveditaSingh3
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipmentsEman Dacanay
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................hiiarindam
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Industrial Control Devices.pptx
Industrial Control Devices.pptxIndustrial Control Devices.pptx
Industrial Control Devices.pptxTALHARIAZ46
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 

Ähnlich wie Switchgear presentation (20)

switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier ppt
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.ppt
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
newswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptxnewswitchgearandprotection-130925105559-phpapp02.pptx
newswitchgearandprotection-130925105559-phpapp02.pptx
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipments
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
LV switchgear FINAL.pptx
LV switchgear FINAL.pptxLV switchgear FINAL.pptx
LV switchgear FINAL.pptx
 
Industrial Control Devices.pptx
Industrial Control Devices.pptxIndustrial Control Devices.pptx
Industrial Control Devices.pptx
 
SD.pptx
SD.pptxSD.pptx
SD.pptx
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 

Kürzlich hochgeladen

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 

Kürzlich hochgeladen (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 

Switchgear presentation

  • 1. Nadir Baloch T.A 175 Switchgear & Maintenance
  • 2. SWITCHGEAR switchgear is the combination of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment. Switchgear is used both to de-energize equipment to allow work to be done and to clear faults downstream.
  • 4. Types: LV Switchgear MV Switchgear Generally electrical switchgear rated upto 1 KV is termed as low voltage switchgear The most common use of LV switchgear is in LV distribution board.
  • 5.
  • 6.
  • 7. THE ROLE OF SWITCHGEAR IS : ELECTRICAL PROTECTION SAFE ISOLATION FROM LIVE PARTS LOCAL OR REMOTE SWITCHING The basic functions of Switchgear
  • 8. Periodic Maintenance Preventive Maintenance a) 2 yearly Maintenance b) 4 yearly Maintenance Importance Of PM Through such PM, troubles can be detected in the Early stages and corrective actions can be taken before extensive damage occurs.
  • 9. The most common use of LV switchgear is in LV distribution board. This system has the following parts Incomer The incomer feeds incoming electrical power to the incomer bus. The switchgear used in the incomer should have a main switching device. The switchgear devices attached with incomer should be capable of withstanding abnormal current for a short specific duration in order to allow downstream devices to operate. Generally Air Circuit Breakers are preferably used as interrupting device. Sub – Incomer These sub – incomers draw power from main incomer bus and feed this power to feeder bus Feeders Different feeders are connected to the feeder bus to feeds different loads like, motor loads, lighting loads, industrial machinery loads, air conditioner loads, transformer cooling system loads etc.
  • 11. Main Components Of Switchgears
  • 12. Busbar Busbar is a strip or bar of copper, brass or aluminium that conducts electricity within a switchboard, distribution board, substation, The cross-sectional size of the busbar determines the maximum amount of current Used to interconnect the loads and sources of electrical power.
  • 13. Busbar Specification Manufacturer: Nova Magrini Gallilio Type of Busbar : Copper ( Insulated with Silver coated joints) Busbar Rating : 1500 Amp Method Of Cleaning : Clean with Lint Free Cloth Busbar Dimensions : 2*100*8 mm Busbar Maintenance Full Bus Bar Inspection check for overheating signs, visual inspection of Cu plate and nut bolts. cleaning of incoming/outgoing spouts. Remove dust with vacuum cleaner. Cleaning and lubricating mechanical links with contact grease. Check operating mechanism of shutter. Contact Resistance of Electrical joints. Check IR to earth and between phases on busbar and outgoing circuits @ 2500V
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Air Circuit Breaker (ACB) A circuit breaker is an automatically operated electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit. Its basic function is to detect a fault condition and interrupt current flow
  • 19. This type of circuit breakers, is those kind of circuit breaker which operates in air at atmospheric pressure.  ACBs are still preferable choice up to voltage 15 KV It is also good choice to avoid the risk of oil fire, in case of oil circuit breaker. Operation Of ACB The first objective is usually achieved by forcing the arc into contact with as large an area as possible of insulating material. Every air circuit breaker is fitted with a chamber surrounding the contact. This chamber is called ‘arc chute’. The arc is driven into it. If inside of the arc chute is suitably shaped, and if the arc can be made conform to the shape, the arc chute wall will help to achieve cooling.
  • 20. Air Circuit Breakers : Charging method Circuit breaker closing springs may be compressed manually or by means of a small electric motor. The closing coil is charged by manual charging handle. For closing, first charge the spring by using the charging handle
  • 21. Maintenance of Air Circuit Breaker LV Circuit Breakers operating at 600 volt and below, should be inspected Maintained every 1 to 4 years depending on their services and operating Conditions. Conditions that make frequency maintenance and inspection are necessary: High humidity and High temp Dusty or Dirty Atmosphere Corrosive Atmosphere
  • 22. Inspection & Cleaning Insulating parts including bushing should be cleaned of dust Clean & inspect Arc Chutes for Cracks, Broken Parts . Replace Damage Parts Inspect Breaker Operating Mechanism for loose hardware & missing or broken etc Examine for wears Check Rack in/ out mechanism for normel operation Lubricate if necessary Check tightness of all terminations Contacts maintenance Arcing contacts to be verified for burn off To be adjusted or exchanged that arc contacts simultaneoslu when closing Permissible tolerance 1mm Adjust lead of arcing contacts from main contacts such that when arc contacts Meet then distance between
  • 23. Insulation Resistance Test (Megger) Load and line conductors should disconnected from the breaker to make Test. IR between phases and phases w.r.t ground with breaker closed. the result is compared against manufacturer/ pervious data For breaker being tested. Cycling the breaker On & Off the breaker several times to check the correct operation Of breaker. Verify For Loop Check Insert circuit breaker at test position and on & off the breaker from remote location
  • 24. Current Transformer A current transformer (CT) is used for measurement of alternating electric currents
  • 25. Current transformer are used in electrical power system for stepping down currents of the system for metering and protection purpose. A CT functions with the same basic working principle of electrical power transformer CT steps down rated system current to 1 Amp or 5 Amp. Because the relays and meters are generally designed for 1 Amp, 5 Amp and 110V
  • 26. Relay Relays is automatic device which senses an abnormal condition of electrical circuit and closes its contacts. these contacts in turns close and complete the circuit breaker trip coil circuit hence make the circuit breaker tripped
  • 27. Protective Relay Testing Why do we use protective relays? Their main duty is to isolate a faulty section within few cycles Periodic Maintenance Testing After a relay is commissioned it’s important to carry out regular maintenance tests. Some of the advantages of such testing can be stated as, it will pin point a defective relay before it fails to act during a fault Methods of Testing Steady State: steady state testing is for checking the relay pick up. Injected current, voltage. when the current is raised and then fluctuated around pick up. Dynamic state Time for relay operation is measured.
  • 28. Freja 300 The FREJA 300 relay testing system is a computer-aided relay testing system by injecting current and voltage.
  • 29. Testing Principles There are two main principles as primary injection and secondary injection. • Primary injection- High current is injected to primary side of the CT. Test carried out covers CT, conductors, relay and sometimes circuit breaker as well. The relay unit has to be isolated from the power system. Usually this principle is used at commissioning and also if the secondary of the CT is not accessible. • Secondary injection - Relay is disconnected from the CT and the stepped down current is directly injected to relay.
  • 30. General Precautions to be taken Check the Electrical Isolation First During maintenance Earth MUST be connected Before maintenance of breaker spring must be discharge. Don’t use compressed air on breaker Don’t use file or emery paper for contacts cleaning Inspection Inside Switchgear Room Switchgear environment (switch room access and surrounds, including fence and external walls if outdoors. Signs of water Signs of unauthorized access Condition of firefighting equipment and warning notices General Housekeeping