BPD MP.docx
1. Y.B. PATIL POLYTECHNIC
SECTOR NO. 29, AKURDI, PUNE -411044, INDIA
HRISHIKESH TARANGE – Y-2070-1901340102
ATHARVA PATIL – Y-2075-1901340081
YOGESH YELAVI -Y-2083-1901340103
PRATHAMESH ROKDE – Y-2031-1901340079
AVINASH SAKHARE – Y-2058 -1901340080
DAVENDRA SUTHAR – Y-2077-1901340104
This is to certify ;has satisfactorily carried out and completed the project work entitled
Topic- DOCUMENTS REQUIRED FOR COMPLETION OF INDUSTRIAL
BUILDING PLAN
This work is being submitted for the award of Diploma in civil Engineering
partial fulfillment of prescribed syllabus of M.S.B.T.E Mumbai for academic
Year 2020
MS.SHEETAL MR,ABHIJEET PATIL
GUIDE HOD CIVIL DEPARTMENT
PRINCIPLE
PROF.A.S KONDEKAR
2.
3. Micro project proposal
topic-DOCUMENTS REQUIRED FOR COMPLETION OF INDUSTRIAL
BUILDING PLAN
1.Aims/benefits of micro project: To get knowledge about total station its
objective its component use in civil engineering introduction & knowledge of
total station
2 Course outcome addressed.
1 To learn about DOCUMENTS REQUIRED FOR
COMPLETION OF INDUSTRIAL BUILDING PLAN
2. To learn about component & it use
3. To learn about their advantage & disadvantage
3 Action plan
Sr.
No.
Details of
activity
Planned
Start date
Planed
Finished
date
Name of
responsible
team
member
1) Collection of information. 20/06/2020 20/06/2020 HRISHIKESH
TARANGE –
Y2070
ATHARVA PATIL
– Y2075
2) Working of Microsoft
Word.
20/06/2020 23/06/2020 YOGESH
YELAVI – Y2083
PRATHAMESH
ROKDE – Y2031
3) Taking Prints of the
project made in Microsoft
Word & Microsoft word &
binding it
22/06/2020 22/06/2020 AVINASH
SAKHARE –
Y2058
DAVENDRA
SUTAR – Y2077
4. 5 Resource Required
Sr.no Name of resource /materials specification Qty Remark
1 Internet and reference book Collect
information
1
2 laptop Working on
Microsoft word
1
Name of team member with roll no
HRISHIKESH TARANGE – Y-2070-1901340102
ATHARVA PATIL – Y-2075-1901340081
YOGESH YELAVI -Y-2083-1901340103
PRATHAMESH ROKDE – Y-2031-1901340079
AVINASH SAKHARE – Y-2058 -1901340080
DAVENDRA SUTHAR – Y-2077-1901340104
6. Name of programme: micro project on the topic
Semester:1st
Course title: Building construction
Title of micro project :
Course outcome achieved
1 To learn about DOCUMENTS REQUIRED FOR
COMPLETION OF INDUSTRIAL BUILDING PLAN
2. To learn about component & it use
3. To learn about their advantage & disadvantage
7. Sr
no
Characteristic to be
assessed
Poor
(mark 1-
3)
Average
(mark 4-5)
Good
(mark 6-8)
Excellent
(mark 9-10)
Sub
total
(A)PROCESS AND PRODUCT ASSESSMENT CONVERT ABOVE TOTAL MARK OUT OF
6 MARK
1 Relevance to the course
2 Literature
review/information
3 Completion of the target as
per project proposal
4 Analysis of date and
representation
5 Quality of prototype/model
6 Report preparation
(B)INDIVIDUAL PRESENTATION/VIVA CONVERT ABOVE MARK OUT OF 4 MARKS
7 Presentation
8 viva
8. NAME ROLL NO
(A)
PROCESS AND
PRODUCT ASSESSMENT
(6MARK)
(B)
INDIVIDUAL
PRESENTATION/
VIVA (4 MARK)
TOTAL MARK
(10 MARK)
HRISHIKESH
TARANGE
Y-2070
ATHARVA PATIL Y-2075
YOGESH YELAVI Y-2083
PRATHAMESH
ROKDE
Y-2031
AVINASH SAKHERE Y-2058
DAVENDRA SUTAR Y-2077
COMMENTS/SUGGESTION ABOUT TEAMWORK/LEADERSHIP/INTERPERSONAL
COMMUNICATION ( IF ANY)
NAME AND DESIGNATION OF TEACHER …………………………………………………
DATED SIGNATURE………………………………
9. LIST OF DOCUMENTS REQUIRED FOR APPROVAL FOR SANCTION OF
INDUSTRIAL BUILDING PLANS
1. Appendix-1
2. Supervision of building work (Appendix-2)
3. Structural stability certificate from the licensed technical
personnel(Appendix-3)
4. certificate of architect in case of simplified sanction of Industrial
plots(Appendix-4)
5. Indemnity bond(incase basement only)On Rs.100/-stamp paper owner
signed and notary (Appendix5)
6. General specification sheet(Appendix-6)
7. Application for drainage of premises in duplicate (Appendix-7)
8. Appendix 8A, 8B, 8C.(if applicable)
9. Photo copy of registration of architect signing the building plan and
appendix.
10. Photocopy of certificate of structural engineer ( signing Appendix-3,&
8A,B,C)
11. Copy of certificate of town planner (If required.)
12. Affidavit duly notarized regarding Rain water harvesting
13. Affidavit duly notarized regarding tree plantation certificate undertaking.
14. Three copies of drawing (One copy cloth mounted )
15. In case of Pvt.Ltd. or Ltd. Company copy of Board resolution of Person
Authority for signing Building plan and relevant documents .
16. Environment Clearance From competent Authority(if applicable)
17. Structural Design vetting by IIT or equivalent in case built-up area is more
than 5000 sqm or more.
18. OWNERSHIP DOCUMENTS TO BE SUBMITTED BY APPLICANT.
a) Copy of lease deed
b) Copy of allotment letter
c) Copy of lease plan
d) Copy of possession certificate
e) Copy of SSI registration
f) Copy of N.O.C. form Pollution department
10. g) Soft copy of drawings (in Auto CAD)
h) Fire N.O.C. i) Explosive NOC (If Applicable).
j) Labour cess Registration with labour Departments
k) No dues Certificate from Industrial Department.
l) Transfer Letter & Transfer Deed (if Applicable).
19. COPY OF FEES CHALAN /CHARGES as per Provision in Building
Byelaws
a) Plan Processing fee
b) Layout plan fee
c) Malba charges
d) Water Connection
e) Sewer Connection
f) Drain Connection
g) Electric & Telephone pipe
h) Service connection charges( if applicable)
i) Temporary Structure Fees
j) Revision fees
k) Revalidation charges
l) Rain water Harvesting fees
LIST OF DOCUMENTS REQUIRED FOR COMPLETION OF INDUSTRIAL
BUILDING PLAN
1. Time Extension Certificate (in AutoCAD format).
2. Soft Copy of drawings (Checked/working).
3. Fire NOC (for existing Building )
4. Explosive NOC (If Applicable).
5. Appendix 9.
6. Appendix 8a, 8b, 8d (If Applicable).
7. Photo copy of registration of architect.
8. Photo copy of certificate of structural engineer. ( signing Appendix-
8A,B,C)
9. Copy of certificate of town planner.
10.Photograph of Building From Front, rear and side set backs
11.Pollution Consent.
11. 12.Copy of Labour cess fees deposited at labour cess Office.
13.No dues certificate from Ind. Dept.
14.Three copies of drawing (One copy cloth mounted) duly signed by owner
and Architect. In case of Plot above 20,000 sqm. Layout plan is also to be
signed by Townplanner. 15.Environment Clearancefrom competent
Authority(if applicable)
16.CHALAN COPY OF FEES/CHARGES
a) Completion fee
b) Malba Charges
c) Revision fees (If Applicable).
d) Revised layout fees (If Applicable).
e) Revalidation charges (If Applicable).
f) Advance water charges for one year.
g) Unsanctioned area fees (If Applicable).
h) Copy of Challan Service Connection Charge already paid.