PM Challenge 2007




     Systems Engineering Processes
    In Principle Investigator Missions


Frank Snow, NASA/GSFC Explorers Program Office
Dennis Lee, Systems Engineer, Swales Aerospace
Agenda
• Overview/Summary
• Acknowledgements
• PI Mode missions
• Systems Engineering Definition
• Safety Compliance
•Organizational Lines of Communication
• Utilizing Existing Assets
• System Engineering Design Tools
• Requirements Management
• Configuration & Document Management
• Risk Management
• Lessons Learned
• Reliability, EEE Parts and Material Control
• Validation, Verification and Integration
Overview/Summary
• Presentation Overview
    – This presentation will focus on systems engineering processes and technical
    management in PI mode missions.
• Summary
    – Complex scientific space flight mission are challenged to meet system
    requirements and top level mission success criteria.
    – The discussion will detail the systems engineering processes used to ensure PI
    mode mission success.
    – The presentation will discuss the technical engineering management
    techniques used to meet mission objectives in a satellite constellation mission.
    – Specific technical case studies will be provided to demonstrate the systems
    engineering techniques used in the Explorers Program Office.
Acknowledgements
NASA/GSFC, Explorers Program Office
    Joe Bolek, Chief Engineer, Projects: THEMIS, AIM, GALEX, IBEX


Space Science Laboratory, University of California, Berkeley
    Peter Harvey, Project Manager, Projects: THEMIS, RHESSI, FAST
    Dr. Ellen Taylor, Systems Engineer, Projects: THEMIS, ChipSat


Swales Aerospace, Beltsville, Maryland
    Mike Cully, Project Manager, Projects: THEMIS, Explorer Orbiter-1
    Tom Ajluni, Systems Engineer, Projects: THEMIS, FUSE, WMAP
    Kevin Brenneman, Systems Engineer, Projects: THEMIS, EO-1
    Warren Chen , Systems Engineer, Projects: THEMIS
Principle Investigator (PI) Mode Mission
•   NASA/Goddard Space Flight Center manages PI mode mission from the Explorers
    Program Office for NASA Headquarters
     – Explorers is responsible for the development, fabrication, test, launch and initial orbit
       operations
     – Medium and Small Explorers (MIDEX, SMEX) missions are very popular in the PI
       scientific research community
•   During the past decade, Explorers has produced highly successful, world class
    science mission
     – Nobel Laureate in Physics (2006), Dr. John Mather, “Legacy of COBE” includes
       discoveries from WMAP (Wilkinson Microwave Anisotropy Probe) MIDEX mission
     – PI defines minimum science requirements for mission success
•   PI mission offer special challenges to Systems Engineering process
     – MIDEX and SMEX are cost capped missions, $210 M and $100 M
          • Explorers Program Office manages cost and schedule margins
          • Cost cap also drives mission schedule and technical decision process
     – PI mission require expertise in system engineering processes
          • Understanding of systems engineering process is fundamental to mission success
          • Minimal redundancy with MIDEX and no redundancy on SMEX missions
     – Explorers mission begin with elements at relatively low Technology Readiness Levels
          • Payload instrument can start at TR 4, which is technology under laboratory development
          • Lower technology levels adds technical risk and management challenges to mission
            development
Risk/Uncertainty with (PI) Mode Mission
• Comparison of uncertainty (risk) between SMEX and Space Technology (ST)
technology demonstration and validation missions
Definition of Systems Engineering
•   Systems Engineering is the application of diverse technical processes to achieve
    specific objectives and goals
•   Technical processes include:
     –    Identification and quantification of system goals and requirements
     –   Assess system design safety
     –   Creation of alternative system designs
     –   Performing design trades
     –   Selection of optimal design
     –   Implementation of baseline design
     –   Verification of system design and interfaces
•   Systems Engineering works in concert with technical and project management
     – Optimal project decisions consider alternative designs utilizing trade studies and
       developed in recursive manner
     – Risk management becomes a fundamentally important during design, implementation
       and test verification
     – Cost effective decisions are made with engineering perspective and detailed technical
       information
Safety Compliance
•   “Safety First” is NASA’s slogan
•   Explorers Program Office manages system safety compliance
     – NASA safety assurance is assigned to NASA organization, independent of project
       management
     – System Safety Implementation Plan (SSIP) identifies GSFC safety requirement
     – Launch range safety requirements satisfy the Air Force EWR 127-1
•   System safety compliance is initially evaluated as part of design reviews
     – Safety Peer Review is completed before Critical Design Review
•   Launch range safety is coordinated through Missile System Program Safety Plan
    (MSPSP)
     – Meets the requirements of EWR 127-1
     – MSPSP identifies all hazards associated with launch integration and operations
•   System Engineering analysis is used to validate safety issues during integration
    and test
     – Analyses validate safe testing approaches for hazardous operating conditions
     – Hazard Reports are reviewed and understood to identify ways to mitigate safety
       concerns
Organizations and Lines of Communication
•   Project development and implementation is efficient with flat management
    organization and effective communication
•   Systems Engineering effective with an established and structured project
    organizations
     – Project Work Breakdown Structure (WBS) for project control
     – Engineering and project documentation “tree” provides guidance during implementation
     – Organization needs to support Project Manager’s decision process with systems
       engineering input
•   Some suggestions for more effective communications
     – Be responsible for verbal and written communications
          • Communication is successful when there is a 100% commitment to delivering the message
          • Be aware and intolerant to circular communications
     – Tell the “story”
          • Extremely effective in communicating and delivering a message
     – Storytelling varies depending on the audience
          • Ask the requestor for a format, style or example, what should the presentation, document or
            memo look like
          • For engineers, hierarchical presentation (mission, to system, to subsystem, to component, to
            subassembly) communicates technical details effectively
Systems Engineering Design Tools
•   Trade Studies are the tool used to develop robust designs and risk mitigation
     – Engineering trade studies balance design concepts against system requirements to
       achieve optimal design within cost and schedule
     – Trade studies are basic tool for risk assessment and reduction
•   System analysis tools provides for project specific power and mass resource
    management
     – Mass and power management fundamental to project success
     – Margins are established by AIAA standards and provides management constraints for
       limited resources, allocation, tracking and trending
     – Resource trending identifies problem areas early in development cycle
•   Subsystem models and analyses tools demonstrate design meets system
    performance requirements
     – Mechanical, Thermal and Attitude Control simulations are engineering tools used in
       system design
     – Sophisticated modeling demonstrate system capabilities and provide guidance for
       design decisions
•   Flatsat test beds provide dual purpose system design tool for system validation,
    software checkout and verification testing
Utilizing Existing Designs and Assets
•   Heritage spaceflight designs and hardware can save significant non-recurring costs
     – Heritage hardware must meet the system or subsystem performance requirements
     – Heritage hardware must have flown on orbit or gone through qualification level
       environmental verification testing
     – Heritage hardware must demonstrate reliability requirements and failure free hours of
       operations, preferably on orbit
•   System designers prefer heritage hardware, because the hardware saves
    engineering time, looks good on paper and in design reviews
     – Heritage hardware claims need to be independently reviewed and meet the criteria set
       forth above, before the hardware is acceptable
•   NASA has a great deal of system support assets and infrastructure
     – Incorporating these assets into Explorer projects has saved valuable resources, has
       been effective and rewarding
     – NASA/GSFC environmental test facilities are easily coordinated into a project’s
       verification test program
     – NASA Ground Network (GN) provides worldwide mission operations support
     – NASA Space Network (TDRSS) has been used for contingency operations and early
       orbit support
     – Deep Space Network supports planetary and higher orbit science missions
Requirements Management
•   Principle elements of Requirement Management
     – Formal process to establish, control and verify design and performance requirements
     – Consistency between technical requirements, cost and schedule are essential to
       mission success
•   PI mode missions develop science and mission requirements during Phase A,
    Mission Concept Development Study
     – Mission demonstrates flow-down of science requirements to mission, systems and
       subsystem requirements
•   Mission requirements are refined in Phase B with a formal set of NASA reviews,
    including Systems Requirements Review, Preliminary Design Review and Mission
    Confirmation Review
     – Confirmation Review verifies mission requirements can be met with sufficient technical,
       cost and schedule margin
•   Systems Engineering is focal point for Requirements Management
     – Requirement Management implementation compliant with ISO or CMMI standards
     – Project level Requirements Management documented in Systems Engineering
       Management Plan (SEMP)
•   Requirement Management includes traceability attribute
     – Flow down of top-level mission (parents) to system, subsystem (children) requirements
     – Requirements are clearly traceable to the verification methods and results
Requirements Management, continued
•     Requirement Management tools can be greatly simplified
       – Relational Requirement Management database are available in the commercial market
       – Swales and UCB implemented a simplified tool in Excel with clearly defined attributes
    RM Attribute                 Description
    Organization                 Identify which organization is responsible for generating this requirement
    Owner+Others                 Identify which individual is responsible for verifying this requirement, as well as
                                 those others with a significant effort in the verification activities.
    WBS                          WBS number, e.g. WBS-2.2.2 (for Probe Bus)
    ID                           Unique identification number, e.g. PB-356 (for Probe Bus)
                                 See Key below for a complete list
    Level                        Drivers (Level 1), System/Segment (Level 2), Element (Level 3), Subsystem
                                 (Level 4)
    Title                        Descriptive title
    Statement                    Requirement statement:
                                 "The _____shall provide___.",
                                 "The _____ shall weigh less than_____.", etc.)
    Rationale                    Explanation/context of requirement
    Parent ID                    ID of immediate higher level requirement
    Source                       Source of requirement (Design description document, Element Spec, analysis,
                                 best practice, etc.)
    Child ID                     ID of immediate lower level requirement
    Status                       TBD, TBR, Defined, Approved, Verified, Deleted
    Verification method          Inspection / Analysis / Demonstration / Test : Description of type of test, if
                                 needed (i.e. a Verification Requirement)
    Verification Documentation   Documentation in which the requirement is verified
    Verification Result          Summarizes verification results
    Change history               Change History, (SCN, ECR, ECP, ECN, Revision Levels)
Configuration & Document Management
•   CM is the glue that holds systems together
     –   CM is a disciplined, rigorous approach to systems management
     –   CM ties together engineering change control with technical project management
     –   CM provides a formal method for subcontracts, project management and cost control
     –   Simply put: no CM, no system control
•   In Explorers, document management is a mechanism for controlling project data
    and documents
     – Explorers requires technical CM, without formal, programmatic configuration control
     – DM provides a supporting role to CM
•   Baseline mission configuration established at end of Phase B, finalized at CDR
•   During Phase C/D, maintenance of project CM establishes product at delivery
     – Configuration audits verify project configuration and correct documentation status
•   Accurate and viable CM systems provide a true picture of project status
     – Evaluate system configuration by ECN and revision level change activity
     – External review teams can gain a quick and accurate understanding of a mission’s
       status by auditing project CM system
•   Document Management allows a deeper understanding of CM and access to
    technical documentation
     – Documentation Tree provides a flow between CM and technical requirements
Project Document Tree
Risk Management
•   Continuous Risk Management (CRM) is a process implemented early and executed
    throughout the project lifecycle
     – CRM is most effective when the process is part of corporate culture
     – For NASA, CRM is mandated in NPR 7120.5B
•   CRM is a well defined risk management process
     – CRM sub-processes (Identify, Analyze, Plan, Track, Control) allow a dialogue and
       communications between technical staff and management groups
     – Continual discussions in the form of periodic risk management meeting and technical
       feedback form the basis for exercising CRM sub-processes
•   CRM Control sub-process is easily implemented in a shared relational database
     – Swales developed PRIMX tool to provide CRM risk management process at GSFC
•   CRM process implementation strategies vary depending on project and risk
    management objectives
     – Project tailored CRM is documented in a Risk Management Plan
     – Risk tolerance varies with project objectives, driven by mission reliability requirements
•   For Project Management, there is significant value in an effective CRM system
     – Managers get visibility into issues that can represent significant cost drivers
     – Risk mitigation efforts are effective means for project control
Risk Management, continued




    Continuous Risk Management Process
Lessons Learned
•   Lessons Learned concept is a well known condition of human nature
     – “Those who don’t learn from history are doomed to repeat it.”, Winston Churchill
•   Lessons Learned is a disciplined and continuous process in System Engineering
    and Project Management
     – Lessons Learned process needs to be incorporated throughout project life cycle
     – Using Lessons Learned during project design phase, inherent risks from past
       experience can be identified and mitigated before problems arise
     – Utilizing Lessons Learned in the preliminary and critical design phase provides
       confidence in design process
•   Lessons Learned as a basic and necessary function of project risk management
    and risk mitigation
     – NASA Lessons Learned Information System (LLIS) is a valuable resource for project
       risk mitigation
     – Lessons Learned citations can validate risk mitigation approaches by providing case
       studies associated with similar risks and potential problems
•   Implementation of Lessons Learned for SMEX mission is important, because of
    limited resources and to provide maximum leverage past program experiences
     – NASA Lessons Learned database is a good example of investing a small amount of
       resources to gain a large amount of value
Lessons Learned, continued
• NASA LLIS validates important SMEX Phase-A proposal risks
• Helps and supports the identification of potential proposal risk and suggests risk
mitigation approaches
• Leverages NASA past program and project experiences.
NASA Lessons Learned Information System Search & Survey
                                            Total      Relevant NASA LLIS             Search String
           Risk Description                Citations   Citations Citations             Parameters
Limit Project Management experience           2           2     0904, 0919 PI Mode Project Management
S/A undersized for power                      1           1        692       Solar Array Sizing
Z-dependence of Charge Resolution             0           0        N/A       GCR Charge Resolution
Shuttle manifesting and scheduling            0           0        N/A       Space Shuttle Manifest Schedule
Orbit decay & mission lifetime                0           0        N/A      Orbital Decay Mission Lifetime
                                                                0695, 0852, Optimize Spacecraft Design
Optimize mission & spacecraft design          7           4     0839, 0893 Mission
                                                                            Space Flight Qualification,
No flight experience w/ SMEX Lite bus         12          2     0637, 0725 Hardware Heritage
S/C rate control retrieval (failed case)      0           0        N/A       Spacecraft Rate Control
S/A shadowing in new configuration            0           0        N/A      Solar Array Shadowing
                                                                0479, 0533,
                                                                0594, 0619,
ENTICE development schedule                   17          5        0968     Instrument Development Schedule
Reliability and Material Control
•   In Explorers, Systems and Quality Engineering manages and controls design
    reliability to ensure mission success
     – Reliability contributes to system’s cost effectiveness and mission success
     – Risks can be managed and mitigated with proper application of system reliability
•   Explorers Program Office identifies mission classification by reliability and risk
     – Explorer projects are rated Class C: medium to high risk, relatively low cost missions
     – SMEX missions are single string systems with a lower overall cost factor
     – MIDEX missions provide additional system redundancy with a higher price tag
•   Electronic part reliability can be significantly increased by testing for infant mortality
     –   EEE screening specifications test and qualify part types for lot acceptance
     –   GSFC requires FPGA in circuit assemblies to accumulate 1000 hours of test
     –   Reliability screening at component level is less common
     –   RHESSI cyrocooler is an example process screening for “Last Man Standing”
•   Material control provides the basis for reliability, quality engineering and
    management control
     – Explorers projects place stringent management control on Parts and Material Plans
     – EEE parts are reviewed, approved and controlled both “as designed” and “as built”
     – Material and Processes are managed space environmental compatibility and
       contamination control
Reliability and Material Control, continued
•      Predictions of RHESSI cryocooler assessed grim picture for mission success
         – Best case probability for meeting minimum science requirements (6 months of mission
           operations was ~65%; worse case was ~30%

    Probability of Failure*         HESSI Cryocooler Failure Probability
           1.0                                           Confidence Level = 95%
                                                     Safety Factor Associates                                   Confidence Level = 80%
           0.9                                                    (Dr. Frank)                                         Goddard
                                                                                                                      Cryocooler
           0.8                                                                                                        Test Results
           0.7
           0.6
                                                                                           HESSI Cryocooler
           0.5                                                                        Reliability Assessment,
                                                 Goddard                               Rev. 3, JPL (Dr. Ross)
           0.4
                                                 Pf = .39
           0.3
           0.2
           0.1             FM2 Cryocooler        Launch      Minimum Science Missio
                                                 11000 Hrs   15000 Hrs
           0.0
                                        8760                    17520                  26280                35040
                 0                      (1 Yr)                                         (3 Yrs)              (4 Yrs)
                                                                (2 Yrs)
                                            Cryocooler Total Hours of Operation
    * Probability of Failure = 1- Probability of Success                                     HESSI Launched February 5, 2002
Validation, Integration and Verification
•   In systems design, there is a successive process in order to achieve mission
    requirements and performance checkout
     – Testing mitigates significant amounts of risk
•   Validation demonstrates system concept designs can meet mission requirements
     –   Design models are used to simulate basic features of systems design
     –   Simulation model fidelity is important to gain confidence in design approach
     –   Early structural testing with mass simulators achieves qualified flight structure
     –   Structural test data is provided for launch vehicle loads interaction and system
         environmental (structural) test verification
•   Integration is vital and necessary step for system verification testing
     – Integration testing is a form of verification, at the subassembly or subsystem level
     – Integrated testing of “first time” interfaces can show unintended design features
     – Design problems found early during integration, result in significant cost and schedule
       saving during system verification testing
•   Verification testing is the final process to demonstrate for flight readiness
     – Levels of verification to demonstrate systems performance under flight-like conditions
     – System performance requirements are demonstrated and verified in test with margin
•   End-to-End system verification ensures compatibility between spacecraft and
    mission operations ground system
     – Compatibility testing on the ground is mandatory on NASA missions

Weitere ähnliche Inhalte

Was ist angesagt?

Horn thomas
Horn thomasHorn thomas
Horn thomas
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 
Dezfuli youngblood
Dezfuli youngbloodDezfuli youngblood
Dezfuli youngblood
NASAPMC
 
Thomas.mc vittie
Thomas.mc vittieThomas.mc vittie
Thomas.mc vittie
NASAPMC
 
Jenks.ken
Jenks.kenJenks.ken
Jenks.ken
NASAPMC
 
Baldwin.kristen
Baldwin.kristenBaldwin.kristen
Baldwin.kristen
NASAPMC
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
NASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
NASAPMC
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzales
NASAPMC
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
NASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
NASAPMC
 
Costello kenneth
Costello kennethCostello kenneth
Costello kenneth
NASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
NASAPMC
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012
NASAPMC
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.john
NASAPMC
 
Terry.conroy
Terry.conroyTerry.conroy
Terry.conroy
NASAPMC
 
Newman.steve
Newman.steveNewman.steve
Newman.steve
NASAPMC
 
Fussell.louis
Fussell.louisFussell.louis
Fussell.louis
NASAPMC
 
Stefanini.trinh
Stefanini.trinhStefanini.trinh
Stefanini.trinh
NASAPMC
 
Jim.free
Jim.freeJim.free
Jim.free
NASAPMC
 

Was ist angesagt? (20)

Horn thomas
Horn thomasHorn thomas
Horn thomas
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Dezfuli youngblood
Dezfuli youngbloodDezfuli youngblood
Dezfuli youngblood
 
Thomas.mc vittie
Thomas.mc vittieThomas.mc vittie
Thomas.mc vittie
 
Jenks.ken
Jenks.kenJenks.ken
Jenks.ken
 
Baldwin.kristen
Baldwin.kristenBaldwin.kristen
Baldwin.kristen
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzales
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Costello kenneth
Costello kennethCostello kenneth
Costello kenneth
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.john
 
Terry.conroy
Terry.conroyTerry.conroy
Terry.conroy
 
Newman.steve
Newman.steveNewman.steve
Newman.steve
 
Fussell.louis
Fussell.louisFussell.louis
Fussell.louis
 
Stefanini.trinh
Stefanini.trinhStefanini.trinh
Stefanini.trinh
 
Jim.free
Jim.freeJim.free
Jim.free
 

Andere mochten auch

Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
NASAPMC
 
Law.richard
Law.richardLaw.richard
Law.richard
NASAPMC
 
Mc namara.karen
Mc namara.karenMc namara.karen
Mc namara.karen
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 

Andere mochten auch (20)

Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
 
Law.richard
Law.richardLaw.richard
Law.richard
 
Mc namara.karen
Mc namara.karenMc namara.karen
Mc namara.karen
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
Paradis william
Paradis williamParadis william
Paradis william
 
Wood frank
Wood frankWood frank
Wood frank
 
Yew manson
Yew mansonYew manson
Yew manson
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 

Ähnlich wie Snow lee

Systems Engineering Project Management Training
Systems Engineering Project Management TrainingSystems Engineering Project Management Training
Systems Engineering Project Management Training
Tonex
 
Btas Capabilities Briefing
Btas Capabilities BriefingBtas Capabilities Briefing
Btas Capabilities Briefing
lisamhl
 
Se lect11 btech
Se lect11 btechSe lect11 btech
Se lect11 btech
IIITA
 
O'Neil Technical Resume
O'Neil Technical ResumeO'Neil Technical Resume
O'Neil Technical Resume
monica o'neil
 

Ähnlich wie Snow lee (20)

Project management through the eye of the systems engineer
Project management through the eye of the systems engineerProject management through the eye of the systems engineer
Project management through the eye of the systems engineer
 
Scope of software engineering
Scope of software engineeringScope of software engineering
Scope of software engineering
 
Systems Engineering Project Management Training
Systems Engineering Project Management TrainingSystems Engineering Project Management Training
Systems Engineering Project Management Training
 
Deployment of a test management solution for a defence project using an integ...
Deployment of a test management solution for a defence project using an integ...Deployment of a test management solution for a defence project using an integ...
Deployment of a test management solution for a defence project using an integ...
 
architecture review software
architecture review softwarearchitecture review software
architecture review software
 
Software systems engineering PRINCIPLES
Software systems engineering PRINCIPLESSoftware systems engineering PRINCIPLES
Software systems engineering PRINCIPLES
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
 
NISI Agile Software Architecture Slide Deck
NISI Agile Software Architecture Slide DeckNISI Agile Software Architecture Slide Deck
NISI Agile Software Architecture Slide Deck
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 
Systems Engineering
Systems EngineeringSystems Engineering
Systems Engineering
 
Software management framework
Software management frameworkSoftware management framework
Software management framework
 
Btas Capabilities Briefing
Btas Capabilities BriefingBtas Capabilities Briefing
Btas Capabilities Briefing
 
Se lect11 btech
Se lect11 btechSe lect11 btech
Se lect11 btech
 
SE Module 1 New- SE Strategic Overview Spring 2019_kucukozyigit Fixed.ppt
SE Module 1 New- SE Strategic Overview Spring 2019_kucukozyigit Fixed.pptSE Module 1 New- SE Strategic Overview Spring 2019_kucukozyigit Fixed.ppt
SE Module 1 New- SE Strategic Overview Spring 2019_kucukozyigit Fixed.ppt
 
O'Neil Technical Resume
O'Neil Technical ResumeO'Neil Technical Resume
O'Neil Technical Resume
 
Systems Engineering training brochure
Systems Engineering training brochureSystems Engineering training brochure
Systems Engineering training brochure
 
Bse 3105 lecture 3-software evolution planning
Bse 3105  lecture 3-software evolution planningBse 3105  lecture 3-software evolution planning
Bse 3105 lecture 3-software evolution planning
 
INTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERINGINTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERING
 
5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems co5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems co
 
Seminar on Project Management by Rj
Seminar on Project Management by RjSeminar on Project Management by Rj
Seminar on Project Management by Rj
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
NASAPMC
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
NASAPMC
 
Martt anne
Martt anneMartt anne
Martt anne
NASAPMC
 
Manzer fred
Manzer fredManzer fred
Manzer fred
NASAPMC
 
Manthos jeff
Manthos jeffManthos jeff
Manthos jeff
NASAPMC
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
NASAPMC
 
Krahula john
Krahula johnKrahula john
Krahula john
NASAPMC
 
Kroeger lin
Kroeger linKroeger lin
Kroeger lin
NASAPMC
 
Krage jousha
Krage joushaKrage jousha
Krage jousha
NASAPMC
 
Kotnour tim
Kotnour timKotnour tim
Kotnour tim
NASAPMC
 
King richardson
King richardsonKing richardson
King richardson
NASAPMC
 

Mehr von NASAPMC (13)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Wood frank
Wood frankWood frank
Wood frank
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
 
Martt anne
Martt anneMartt anne
Martt anne
 
Manzer fred
Manzer fredManzer fred
Manzer fred
 
Manthos jeff
Manthos jeffManthos jeff
Manthos jeff
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
Krahula john
Krahula johnKrahula john
Krahula john
 
Kroeger lin
Kroeger linKroeger lin
Kroeger lin
 
Krage jousha
Krage joushaKrage jousha
Krage jousha
 
Kotnour tim
Kotnour timKotnour tim
Kotnour tim
 
King richardson
King richardsonKing richardson
King richardson
 

Kürzlich hochgeladen

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Kürzlich hochgeladen (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 

Snow lee

  • 1. PM Challenge 2007 Systems Engineering Processes In Principle Investigator Missions Frank Snow, NASA/GSFC Explorers Program Office Dennis Lee, Systems Engineer, Swales Aerospace
  • 2. Agenda • Overview/Summary • Acknowledgements • PI Mode missions • Systems Engineering Definition • Safety Compliance •Organizational Lines of Communication • Utilizing Existing Assets • System Engineering Design Tools • Requirements Management • Configuration & Document Management • Risk Management • Lessons Learned • Reliability, EEE Parts and Material Control • Validation, Verification and Integration
  • 3. Overview/Summary • Presentation Overview – This presentation will focus on systems engineering processes and technical management in PI mode missions. • Summary – Complex scientific space flight mission are challenged to meet system requirements and top level mission success criteria. – The discussion will detail the systems engineering processes used to ensure PI mode mission success. – The presentation will discuss the technical engineering management techniques used to meet mission objectives in a satellite constellation mission. – Specific technical case studies will be provided to demonstrate the systems engineering techniques used in the Explorers Program Office.
  • 4. Acknowledgements NASA/GSFC, Explorers Program Office Joe Bolek, Chief Engineer, Projects: THEMIS, AIM, GALEX, IBEX Space Science Laboratory, University of California, Berkeley Peter Harvey, Project Manager, Projects: THEMIS, RHESSI, FAST Dr. Ellen Taylor, Systems Engineer, Projects: THEMIS, ChipSat Swales Aerospace, Beltsville, Maryland Mike Cully, Project Manager, Projects: THEMIS, Explorer Orbiter-1 Tom Ajluni, Systems Engineer, Projects: THEMIS, FUSE, WMAP Kevin Brenneman, Systems Engineer, Projects: THEMIS, EO-1 Warren Chen , Systems Engineer, Projects: THEMIS
  • 5. Principle Investigator (PI) Mode Mission • NASA/Goddard Space Flight Center manages PI mode mission from the Explorers Program Office for NASA Headquarters – Explorers is responsible for the development, fabrication, test, launch and initial orbit operations – Medium and Small Explorers (MIDEX, SMEX) missions are very popular in the PI scientific research community • During the past decade, Explorers has produced highly successful, world class science mission – Nobel Laureate in Physics (2006), Dr. John Mather, “Legacy of COBE” includes discoveries from WMAP (Wilkinson Microwave Anisotropy Probe) MIDEX mission – PI defines minimum science requirements for mission success • PI mission offer special challenges to Systems Engineering process – MIDEX and SMEX are cost capped missions, $210 M and $100 M • Explorers Program Office manages cost and schedule margins • Cost cap also drives mission schedule and technical decision process – PI mission require expertise in system engineering processes • Understanding of systems engineering process is fundamental to mission success • Minimal redundancy with MIDEX and no redundancy on SMEX missions – Explorers mission begin with elements at relatively low Technology Readiness Levels • Payload instrument can start at TR 4, which is technology under laboratory development • Lower technology levels adds technical risk and management challenges to mission development
  • 6. Risk/Uncertainty with (PI) Mode Mission • Comparison of uncertainty (risk) between SMEX and Space Technology (ST) technology demonstration and validation missions
  • 7. Definition of Systems Engineering • Systems Engineering is the application of diverse technical processes to achieve specific objectives and goals • Technical processes include: – Identification and quantification of system goals and requirements – Assess system design safety – Creation of alternative system designs – Performing design trades – Selection of optimal design – Implementation of baseline design – Verification of system design and interfaces • Systems Engineering works in concert with technical and project management – Optimal project decisions consider alternative designs utilizing trade studies and developed in recursive manner – Risk management becomes a fundamentally important during design, implementation and test verification – Cost effective decisions are made with engineering perspective and detailed technical information
  • 8. Safety Compliance • “Safety First” is NASA’s slogan • Explorers Program Office manages system safety compliance – NASA safety assurance is assigned to NASA organization, independent of project management – System Safety Implementation Plan (SSIP) identifies GSFC safety requirement – Launch range safety requirements satisfy the Air Force EWR 127-1 • System safety compliance is initially evaluated as part of design reviews – Safety Peer Review is completed before Critical Design Review • Launch range safety is coordinated through Missile System Program Safety Plan (MSPSP) – Meets the requirements of EWR 127-1 – MSPSP identifies all hazards associated with launch integration and operations • System Engineering analysis is used to validate safety issues during integration and test – Analyses validate safe testing approaches for hazardous operating conditions – Hazard Reports are reviewed and understood to identify ways to mitigate safety concerns
  • 9. Organizations and Lines of Communication • Project development and implementation is efficient with flat management organization and effective communication • Systems Engineering effective with an established and structured project organizations – Project Work Breakdown Structure (WBS) for project control – Engineering and project documentation “tree” provides guidance during implementation – Organization needs to support Project Manager’s decision process with systems engineering input • Some suggestions for more effective communications – Be responsible for verbal and written communications • Communication is successful when there is a 100% commitment to delivering the message • Be aware and intolerant to circular communications – Tell the “story” • Extremely effective in communicating and delivering a message – Storytelling varies depending on the audience • Ask the requestor for a format, style or example, what should the presentation, document or memo look like • For engineers, hierarchical presentation (mission, to system, to subsystem, to component, to subassembly) communicates technical details effectively
  • 10. Systems Engineering Design Tools • Trade Studies are the tool used to develop robust designs and risk mitigation – Engineering trade studies balance design concepts against system requirements to achieve optimal design within cost and schedule – Trade studies are basic tool for risk assessment and reduction • System analysis tools provides for project specific power and mass resource management – Mass and power management fundamental to project success – Margins are established by AIAA standards and provides management constraints for limited resources, allocation, tracking and trending – Resource trending identifies problem areas early in development cycle • Subsystem models and analyses tools demonstrate design meets system performance requirements – Mechanical, Thermal and Attitude Control simulations are engineering tools used in system design – Sophisticated modeling demonstrate system capabilities and provide guidance for design decisions • Flatsat test beds provide dual purpose system design tool for system validation, software checkout and verification testing
  • 11. Utilizing Existing Designs and Assets • Heritage spaceflight designs and hardware can save significant non-recurring costs – Heritage hardware must meet the system or subsystem performance requirements – Heritage hardware must have flown on orbit or gone through qualification level environmental verification testing – Heritage hardware must demonstrate reliability requirements and failure free hours of operations, preferably on orbit • System designers prefer heritage hardware, because the hardware saves engineering time, looks good on paper and in design reviews – Heritage hardware claims need to be independently reviewed and meet the criteria set forth above, before the hardware is acceptable • NASA has a great deal of system support assets and infrastructure – Incorporating these assets into Explorer projects has saved valuable resources, has been effective and rewarding – NASA/GSFC environmental test facilities are easily coordinated into a project’s verification test program – NASA Ground Network (GN) provides worldwide mission operations support – NASA Space Network (TDRSS) has been used for contingency operations and early orbit support – Deep Space Network supports planetary and higher orbit science missions
  • 12. Requirements Management • Principle elements of Requirement Management – Formal process to establish, control and verify design and performance requirements – Consistency between technical requirements, cost and schedule are essential to mission success • PI mode missions develop science and mission requirements during Phase A, Mission Concept Development Study – Mission demonstrates flow-down of science requirements to mission, systems and subsystem requirements • Mission requirements are refined in Phase B with a formal set of NASA reviews, including Systems Requirements Review, Preliminary Design Review and Mission Confirmation Review – Confirmation Review verifies mission requirements can be met with sufficient technical, cost and schedule margin • Systems Engineering is focal point for Requirements Management – Requirement Management implementation compliant with ISO or CMMI standards – Project level Requirements Management documented in Systems Engineering Management Plan (SEMP) • Requirement Management includes traceability attribute – Flow down of top-level mission (parents) to system, subsystem (children) requirements – Requirements are clearly traceable to the verification methods and results
  • 13. Requirements Management, continued • Requirement Management tools can be greatly simplified – Relational Requirement Management database are available in the commercial market – Swales and UCB implemented a simplified tool in Excel with clearly defined attributes RM Attribute Description Organization Identify which organization is responsible for generating this requirement Owner+Others Identify which individual is responsible for verifying this requirement, as well as those others with a significant effort in the verification activities. WBS WBS number, e.g. WBS-2.2.2 (for Probe Bus) ID Unique identification number, e.g. PB-356 (for Probe Bus) See Key below for a complete list Level Drivers (Level 1), System/Segment (Level 2), Element (Level 3), Subsystem (Level 4) Title Descriptive title Statement Requirement statement: "The _____shall provide___.", "The _____ shall weigh less than_____.", etc.) Rationale Explanation/context of requirement Parent ID ID of immediate higher level requirement Source Source of requirement (Design description document, Element Spec, analysis, best practice, etc.) Child ID ID of immediate lower level requirement Status TBD, TBR, Defined, Approved, Verified, Deleted Verification method Inspection / Analysis / Demonstration / Test : Description of type of test, if needed (i.e. a Verification Requirement) Verification Documentation Documentation in which the requirement is verified Verification Result Summarizes verification results Change history Change History, (SCN, ECR, ECP, ECN, Revision Levels)
  • 14. Configuration & Document Management • CM is the glue that holds systems together – CM is a disciplined, rigorous approach to systems management – CM ties together engineering change control with technical project management – CM provides a formal method for subcontracts, project management and cost control – Simply put: no CM, no system control • In Explorers, document management is a mechanism for controlling project data and documents – Explorers requires technical CM, without formal, programmatic configuration control – DM provides a supporting role to CM • Baseline mission configuration established at end of Phase B, finalized at CDR • During Phase C/D, maintenance of project CM establishes product at delivery – Configuration audits verify project configuration and correct documentation status • Accurate and viable CM systems provide a true picture of project status – Evaluate system configuration by ECN and revision level change activity – External review teams can gain a quick and accurate understanding of a mission’s status by auditing project CM system • Document Management allows a deeper understanding of CM and access to technical documentation – Documentation Tree provides a flow between CM and technical requirements
  • 16. Risk Management • Continuous Risk Management (CRM) is a process implemented early and executed throughout the project lifecycle – CRM is most effective when the process is part of corporate culture – For NASA, CRM is mandated in NPR 7120.5B • CRM is a well defined risk management process – CRM sub-processes (Identify, Analyze, Plan, Track, Control) allow a dialogue and communications between technical staff and management groups – Continual discussions in the form of periodic risk management meeting and technical feedback form the basis for exercising CRM sub-processes • CRM Control sub-process is easily implemented in a shared relational database – Swales developed PRIMX tool to provide CRM risk management process at GSFC • CRM process implementation strategies vary depending on project and risk management objectives – Project tailored CRM is documented in a Risk Management Plan – Risk tolerance varies with project objectives, driven by mission reliability requirements • For Project Management, there is significant value in an effective CRM system – Managers get visibility into issues that can represent significant cost drivers – Risk mitigation efforts are effective means for project control
  • 17. Risk Management, continued Continuous Risk Management Process
  • 18. Lessons Learned • Lessons Learned concept is a well known condition of human nature – “Those who don’t learn from history are doomed to repeat it.”, Winston Churchill • Lessons Learned is a disciplined and continuous process in System Engineering and Project Management – Lessons Learned process needs to be incorporated throughout project life cycle – Using Lessons Learned during project design phase, inherent risks from past experience can be identified and mitigated before problems arise – Utilizing Lessons Learned in the preliminary and critical design phase provides confidence in design process • Lessons Learned as a basic and necessary function of project risk management and risk mitigation – NASA Lessons Learned Information System (LLIS) is a valuable resource for project risk mitigation – Lessons Learned citations can validate risk mitigation approaches by providing case studies associated with similar risks and potential problems • Implementation of Lessons Learned for SMEX mission is important, because of limited resources and to provide maximum leverage past program experiences – NASA Lessons Learned database is a good example of investing a small amount of resources to gain a large amount of value
  • 19. Lessons Learned, continued • NASA LLIS validates important SMEX Phase-A proposal risks • Helps and supports the identification of potential proposal risk and suggests risk mitigation approaches • Leverages NASA past program and project experiences. NASA Lessons Learned Information System Search & Survey Total Relevant NASA LLIS Search String Risk Description Citations Citations Citations Parameters Limit Project Management experience 2 2 0904, 0919 PI Mode Project Management S/A undersized for power 1 1 692 Solar Array Sizing Z-dependence of Charge Resolution 0 0 N/A GCR Charge Resolution Shuttle manifesting and scheduling 0 0 N/A Space Shuttle Manifest Schedule Orbit decay & mission lifetime 0 0 N/A Orbital Decay Mission Lifetime 0695, 0852, Optimize Spacecraft Design Optimize mission & spacecraft design 7 4 0839, 0893 Mission Space Flight Qualification, No flight experience w/ SMEX Lite bus 12 2 0637, 0725 Hardware Heritage S/C rate control retrieval (failed case) 0 0 N/A Spacecraft Rate Control S/A shadowing in new configuration 0 0 N/A Solar Array Shadowing 0479, 0533, 0594, 0619, ENTICE development schedule 17 5 0968 Instrument Development Schedule
  • 20. Reliability and Material Control • In Explorers, Systems and Quality Engineering manages and controls design reliability to ensure mission success – Reliability contributes to system’s cost effectiveness and mission success – Risks can be managed and mitigated with proper application of system reliability • Explorers Program Office identifies mission classification by reliability and risk – Explorer projects are rated Class C: medium to high risk, relatively low cost missions – SMEX missions are single string systems with a lower overall cost factor – MIDEX missions provide additional system redundancy with a higher price tag • Electronic part reliability can be significantly increased by testing for infant mortality – EEE screening specifications test and qualify part types for lot acceptance – GSFC requires FPGA in circuit assemblies to accumulate 1000 hours of test – Reliability screening at component level is less common – RHESSI cyrocooler is an example process screening for “Last Man Standing” • Material control provides the basis for reliability, quality engineering and management control – Explorers projects place stringent management control on Parts and Material Plans – EEE parts are reviewed, approved and controlled both “as designed” and “as built” – Material and Processes are managed space environmental compatibility and contamination control
  • 21. Reliability and Material Control, continued • Predictions of RHESSI cryocooler assessed grim picture for mission success – Best case probability for meeting minimum science requirements (6 months of mission operations was ~65%; worse case was ~30% Probability of Failure* HESSI Cryocooler Failure Probability 1.0 Confidence Level = 95% Safety Factor Associates Confidence Level = 80% 0.9 (Dr. Frank) Goddard Cryocooler 0.8 Test Results 0.7 0.6 HESSI Cryocooler 0.5 Reliability Assessment, Goddard Rev. 3, JPL (Dr. Ross) 0.4 Pf = .39 0.3 0.2 0.1 FM2 Cryocooler Launch Minimum Science Missio 11000 Hrs 15000 Hrs 0.0 8760 17520 26280 35040 0 (1 Yr) (3 Yrs) (4 Yrs) (2 Yrs) Cryocooler Total Hours of Operation * Probability of Failure = 1- Probability of Success HESSI Launched February 5, 2002
  • 22. Validation, Integration and Verification • In systems design, there is a successive process in order to achieve mission requirements and performance checkout – Testing mitigates significant amounts of risk • Validation demonstrates system concept designs can meet mission requirements – Design models are used to simulate basic features of systems design – Simulation model fidelity is important to gain confidence in design approach – Early structural testing with mass simulators achieves qualified flight structure – Structural test data is provided for launch vehicle loads interaction and system environmental (structural) test verification • Integration is vital and necessary step for system verification testing – Integration testing is a form of verification, at the subassembly or subsystem level – Integrated testing of “first time” interfaces can show unintended design features – Design problems found early during integration, result in significant cost and schedule saving during system verification testing • Verification testing is the final process to demonstrate for flight readiness – Levels of verification to demonstrate systems performance under flight-like conditions – System performance requirements are demonstrated and verified in test with margin • End-to-End system verification ensures compatibility between spacecraft and mission operations ground system – Compatibility testing on the ground is mandatory on NASA missions