SlideShare ist ein Scribd-Unternehmen logo
1 von 33
Downloaden Sie, um offline zu lesen
POLARIS:
Helping Managers Get Answers Fast!

     Patricia Corcoran, Jeffery Webster
      NASA Project Management Challenge 2007
      Moody Gardens Hotel & Convention Center
                 Galveston, Texas
                 February 6-7, 2007




                                                1
Background

• NASA Office of the Chief Engineer (OCE) vision:
 “achieve Project Management Excellence”
   • OCE mission: “provide policy direction, oversight, and
        assessment for the NASA program management communities”
• OCE tasked late in 2004 to improve several areas,
 including Agency investment management and support
    • Create revision to NASA Program and Project Management
        Processes and Requirements (NPR 7120.5)
    •   Develop a web-based tool (POLARIS) to support the PM
        community in implementing the revised policy




                                                                  2
Overview

•   NASA-wide, web-based system, providing
    access to information related to Program and
    Project Management primarily in NPR 7120.5
     •   Supports NASA’s Four Product Lines:
         • Basic and Applied Research
         • Technology Development
         • Flight Systems and Ground Support
         • Institutional Infrastructure
•   NASA Sponsor: Office of the Chief Engineer
    (OCE)
•   MSFC Project Manager
         • Develop system requirements, including
           content
         • Conduct operational test and verification
         • MSFC NASA Data Center to host &
           maintain the final operational system
•   JPL Task to Develop POLARIS
         • Based on JPL’s Project Support Website
         • Phased delivery: Prototype, followed by
           several builds
         • Formed Project late 2004; began 2005




                                                       3
What will this website do for users?

Provide a one-stop shop for access to….
 • A searchable, sortable database of all requirements for all product
     lines
     in NPR 7120.5
 •   Project life cycle diagrams with reviews
 •   Project review definitions with products review information from
     NPR 7123.1, NASA Systems Engineering Processes and
     Requirements
 •   Templates and examples of products
 •   Project standard WBSs with dictionaries, and requirements for
     implementation and approval
 •   Information from NASA’s Metadata Manager (MdM): Attributes of
     Missions, Themes, Programs & Projects
 •   NPR7120.5 waiver form and instructions
                             …….and much more
                                                                         4
POLARIS Build Descriptions

•   Prototype Build: May 2005 (Basic look & feel for ‘go ahead’)

•   Build 1.0: ‘LIVE at NDC’ June 15, 2006 (7120.5C & static MdM
    data)
    − Build 1.1: September 27, 2006 (Weekly updates of MdM data)
    − Build 1.1.1: October 20, 2006 (MdM attribute changes)
    − Build 1.2: ~2 weeks after 7120.5D is approved
            Revise POLARIS Home Page to announce issuance of NPR 7120.5D and
            provide links to specific sections of the document –see next slide
•   Build 2.0
    − Build 2.1: NPR 7120.5D & review information from NPR
      7123.1. (Note: 7120.5C is still valid for the other product lines.)
      Operational date March or April 2007
    − Build 2.2: Revision of POLARIS web site to update the System
      Administrator functions relevant to 7120.5D. Operational date is
      TBD
•   Build 3.0: TBD for other NASA product lines currently
    under revision
                                                                                 5
Build 1.2




            6
Build 2.1

• Modifications for 7120.5D and 7123.1A (Note:
 7120.5C for other product lines)
  − Links to the NODIS Documents
  − Program & Project Life Cycle Diagrams
  − Life Cycle Review Descriptions, and Entrance & Success Criteria
    (7123.1A)
  − Program & Project Gate Products
  − 7120.5D Requirements (shalls) in a keyword searchable database
  − 7120.5C Requirements (shalls) for BAR, ATD, and Institutional
    programs and projects in a searchable database (Requirements for
    Flight/ground Support Projects removed)
  − Project Categorization
  − Key Decision Points & Decision Authority
  − Technical Authority
  − Center Implementation Plans
  − Templates for: Program Plan, Project Plan, FAD, PCA, etc
  − Waiver Form for NPR 7120.5D Requirements

                                                                       7
Build 2.1 Front Page

 Main Navigation Menu,                             Available on each page
consistent throughout the
         system




                                                   News listing, updated
                                                        regularly




                                                                           8
Meta Data Manager (MdM) & POLARIS
        Program/Project List




                                    9
Build 2.1Adds NASA Product Lines



         POLARIS is
       structured to be
     Product Line Centric




                                   10
Program Life Cycle Chart




More detailed information
is provided by clicking on
  each KDP and Review




                              11
Program Key Decision Points (KDPs)




          More detailed information
          is provided by clicking on
                  each KDP




                                       12
Program Reviews




              More detailed information is
             provided by clicking on each
                         Review.
              All technical reviews will be
           directly linked to NPR 7123.1 for
              entrance and success criteria




                                               13
Space Flight Project Life Cycle Chart




More detailed information
is provided by clicking on
  each KDP and Review


                                                          14
Project KDPs




   More detailed information
   is provided by clicking on
           each KDP




                                15
Requirements Search




                      16
Space Flight Program Requirements




                                    17
Space Flight Project Requirements




                                    18
ATD Requirements Search




                          19
Archived Requirements Search




                           Initially available for
                               7120.5C only




                                                     20
Waiver Requests




                  21
Initiating Programs/Projects




                               22
Roles and Responsibilities




                             23
Key Decision Points
& Decision Authorities




                         24
Technical Authority




                      25
Strategic Acquisition




                        26
Tools and Checklists




                       27
Topics covered include:
•Policy & Requirements
•Handbooks & Guidance
•Helpful sites/links
•Training
•Tools
•Products, Templates, Examples
•Points of Contact
                                 28
We need your help…..

           We want POLARIS to be a living tool,
          providing improving support to Program
           and Project Managers as management
         policy and requirements evolve. We need
         your good ideas and constructive criticism
         to make this tool responsive to your needs.
          Please take the time to let us know what
                         you think!




                                                       29
Planned Future Enhancements After Build 2

• New NPRs for NASA’s other product lines: Advanced Technology
    and Development (ATD), Basic and Applied Research (BAR), and
    Institutional/Facilities
•   If available from the Agency’s MdM database, POLARIS may add
    more information on Programs and Projects, including product line,
    category, Governing PMC, manager name, life cycle phase, leading
    center, etc.
        • Dependent on agency MdM application being fully populated and kept
         current
• Daily updates of Program & Project data from MdM
• Additional product templates and examples
• Additional review content (example data packages, example
    agendas, review plans, etc)

           Many items dependent on HQ for review and approval of content

                                                                               30
Other Possible Applications

Of the website…..

    • NPR 7123, Systems Engineering Processes and Requirements
         Either import remainder of NPR7123.1 into POLARIS (merges
         Systems Engineering and Project Management into one site)
         Or, create similar site for Systems Engineering
    • Use POLARIS-type site for mission directorates, with content
     being mission directorate specific
         Potential for linking (traceablility) of agency requirements
    • Use POLARIS type site for Center level application, with
     content being Center level policy, requirements, guidance and
     links.
       • Potential for linking (traceability) of agency requirements



                                                                        31
Other Possible Applications, cont’d

• Of the requirements database…..(unlimited potential)
    • All Agency requirements (NPRs) databased with keywords
        and linked to show traceability and dependency. Keywords
        could allow:
           Generation of requirements list by role (i.e. all requirements a facilities
           manager must meet)
           Generation of comprehensive requirements list on a particular subject
           (i.e. all EVM requirements)
           Generation of job descriptions & performance evaluations
    • All Mission Directorate requirements databased with keywords
        and linked to have traceability to Agency requirements.
    •   All Center requirements databased with keywords and linked
        to have traceability to both Mission Directorate and Agency
        requirements.


                                                                                         32
Summary

• POLARIS tool is designed to support Program and Project
 Management
   • Continuous improvement planned
   • Maintenance planned to remain current

• POLARIS needs your support and input to be successful
    • Make it what you need

• POLARIS could be applied to other agency
 requirements (NPRs) and to Mission Directorates and
 Field Centers
    • Requires up front investment and on-going maintenance
      support

                                                              33

Weitere ähnliche Inhalte

Was ist angesagt?

Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
NASAPMC
 
Daniel.dvorak
Daniel.dvorakDaniel.dvorak
Daniel.dvorak
NASAPMC
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susan
NASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
NASAPMC
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
NASAPMC
 
Ken poole
Ken pooleKen poole
Ken poole
NASAPMC
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
NASAPMC
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
NASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrong
NASAPMC
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
NASAPMC
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
NASAPMC
 
Ortiz
OrtizOrtiz
Ortiz
NASAPMC
 
Hazen michael
Hazen michaelHazen michael
Hazen michael
NASAPMC
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
NASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
NASAPMC
 

Was ist angesagt? (19)

Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Daniel.dvorak
Daniel.dvorakDaniel.dvorak
Daniel.dvorak
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susan
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
 
Ken poole
Ken pooleKen poole
Ken poole
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrong
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
Ortiz
OrtizOrtiz
Ortiz
 
Hazen michael
Hazen michaelHazen michael
Hazen michael
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 

Andere mochten auch (7)

Dezfuli.homayoon
Dezfuli.homayoonDezfuli.homayoon
Dezfuli.homayoon
 
Paradis.bill
Paradis.billParadis.bill
Paradis.bill
 
Thomas.londrigan
Thomas.londriganThomas.londrigan
Thomas.londrigan
 
Pfarr.barbara
Pfarr.barbaraPfarr.barbara
Pfarr.barbara
 
William.tippin.update
William.tippin.updateWilliam.tippin.update
William.tippin.update
 
Salute.joan
Salute.joanSalute.joan
Salute.joan
 
Alteraçþes bucais em pacientes imunocomprometidos
Alteraçþes bucais em pacientes imunocomprometidos Alteraçþes bucais em pacientes imunocomprometidos
Alteraçþes bucais em pacientes imunocomprometidos
 

Ähnlich wie Corcoran webster

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Petze.lara
Petze.laraPetze.lara
Petze.lara
NASAPMC
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docx
stirlingvwriters
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
NASAPMC
 
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
Deltares
 
IWSM2014 COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
IWSM2014   COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)IWSM2014   COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
IWSM2014 COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
Nesma
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
NASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
NASAPMC
 
Bhasin reinert barnes_golden
Bhasin reinert barnes_goldenBhasin reinert barnes_golden
Bhasin reinert barnes_golden
NASAPMC
 

Ähnlich wie Corcoran webster (20)

Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Petze.lara
Petze.laraPetze.lara
Petze.lara
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docx
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
 
SWP Take Three - Lets Talk Agile - 27 Jul 2022b.pptx
SWP Take Three - Lets Talk Agile - 27 Jul 2022b.pptxSWP Take Three - Lets Talk Agile - 27 Jul 2022b.pptx
SWP Take Three - Lets Talk Agile - 27 Jul 2022b.pptx
 
Madhu_Resume
Madhu_ResumeMadhu_Resume
Madhu_Resume
 
Experiences in building a PaaS Platform - Java One SFO 2012
Experiences in building a PaaS Platform - Java One SFO 2012Experiences in building a PaaS Platform - Java One SFO 2012
Experiences in building a PaaS Platform - Java One SFO 2012
 
Chap12
Chap12Chap12
Chap12
 
Agile Development – Why requirements matter
Agile Development – Why requirements matterAgile Development – Why requirements matter
Agile Development – Why requirements matter
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation Project
 
Sysdev
SysdevSysdev
Sysdev
 
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
DSD-INT 2014 - Delft-FEWS Users Meeting - Challenges related to extending, te...
 
IWSM2014 COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
IWSM2014   COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)IWSM2014   COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
IWSM2014 COSMIC masterclass part 2 - dealing with NFR (Chris Woodward)
 
IWSM2014 COSMIC masterclass part 2 - Dealing with NFR (Chris Woodward)
IWSM2014   COSMIC masterclass part 2 - Dealing with NFR (Chris Woodward)IWSM2014   COSMIC masterclass part 2 - Dealing with NFR (Chris Woodward)
IWSM2014 COSMIC masterclass part 2 - Dealing with NFR (Chris Woodward)
 
Unlock the value of your big data infrastructure
Unlock the value of your big data infrastructureUnlock the value of your big data infrastructure
Unlock the value of your big data infrastructure
 
PeopleSoft and Oracle Fusion Applications Update
PeopleSoft and Oracle Fusion Applications UpdatePeopleSoft and Oracle Fusion Applications Update
PeopleSoft and Oracle Fusion Applications Update
 
Comp8 unit5 lecture_slides
Comp8 unit5 lecture_slidesComp8 unit5 lecture_slides
Comp8 unit5 lecture_slides
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Bhasin reinert barnes_golden
Bhasin reinert barnes_goldenBhasin reinert barnes_golden
Bhasin reinert barnes_golden
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

KĂźrzlich hochgeladen

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
Christopher Logan Kennedy
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

KĂźrzlich hochgeladen (20)

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 

Corcoran webster

  • 1. POLARIS: Helping Managers Get Answers Fast! Patricia Corcoran, Jeffery Webster NASA Project Management Challenge 2007 Moody Gardens Hotel & Convention Center Galveston, Texas February 6-7, 2007 1
  • 2. Background • NASA Office of the Chief Engineer (OCE) vision: “achieve Project Management Excellence” • OCE mission: “provide policy direction, oversight, and assessment for the NASA program management communities” • OCE tasked late in 2004 to improve several areas, including Agency investment management and support • Create revision to NASA Program and Project Management Processes and Requirements (NPR 7120.5) • Develop a web-based tool (POLARIS) to support the PM community in implementing the revised policy 2
  • 3. Overview • NASA-wide, web-based system, providing access to information related to Program and Project Management primarily in NPR 7120.5 • Supports NASA’s Four Product Lines: • Basic and Applied Research • Technology Development • Flight Systems and Ground Support • Institutional Infrastructure • NASA Sponsor: Office of the Chief Engineer (OCE) • MSFC Project Manager • Develop system requirements, including content • Conduct operational test and verification • MSFC NASA Data Center to host & maintain the final operational system • JPL Task to Develop POLARIS • Based on JPL’s Project Support Website • Phased delivery: Prototype, followed by several builds • Formed Project late 2004; began 2005 3
  • 4. What will this website do for users? Provide a one-stop shop for access to…. • A searchable, sortable database of all requirements for all product lines in NPR 7120.5 • Project life cycle diagrams with reviews • Project review definitions with products review information from NPR 7123.1, NASA Systems Engineering Processes and Requirements • Templates and examples of products • Project standard WBSs with dictionaries, and requirements for implementation and approval • Information from NASA’s Metadata Manager (MdM): Attributes of Missions, Themes, Programs & Projects • NPR7120.5 waiver form and instructions …….and much more 4
  • 5. POLARIS Build Descriptions • Prototype Build: May 2005 (Basic look & feel for ‘go ahead’) • Build 1.0: ‘LIVE at NDC’ June 15, 2006 (7120.5C & static MdM data) − Build 1.1: September 27, 2006 (Weekly updates of MdM data) − Build 1.1.1: October 20, 2006 (MdM attribute changes) − Build 1.2: ~2 weeks after 7120.5D is approved Revise POLARIS Home Page to announce issuance of NPR 7120.5D and provide links to specific sections of the document –see next slide • Build 2.0 − Build 2.1: NPR 7120.5D & review information from NPR 7123.1. (Note: 7120.5C is still valid for the other product lines.) Operational date March or April 2007 − Build 2.2: Revision of POLARIS web site to update the System Administrator functions relevant to 7120.5D. Operational date is TBD • Build 3.0: TBD for other NASA product lines currently under revision 5
  • 7. Build 2.1 • Modifications for 7120.5D and 7123.1A (Note: 7120.5C for other product lines) − Links to the NODIS Documents − Program & Project Life Cycle Diagrams − Life Cycle Review Descriptions, and Entrance & Success Criteria (7123.1A) − Program & Project Gate Products − 7120.5D Requirements (shalls) in a keyword searchable database − 7120.5C Requirements (shalls) for BAR, ATD, and Institutional programs and projects in a searchable database (Requirements for Flight/ground Support Projects removed) − Project Categorization − Key Decision Points & Decision Authority − Technical Authority − Center Implementation Plans − Templates for: Program Plan, Project Plan, FAD, PCA, etc − Waiver Form for NPR 7120.5D Requirements 7
  • 8. Build 2.1 Front Page Main Navigation Menu, Available on each page consistent throughout the system News listing, updated regularly 8
  • 9. Meta Data Manager (MdM) & POLARIS Program/Project List 9
  • 10. Build 2.1Adds NASA Product Lines POLARIS is structured to be Product Line Centric 10
  • 11. Program Life Cycle Chart More detailed information is provided by clicking on each KDP and Review 11
  • 12. Program Key Decision Points (KDPs) More detailed information is provided by clicking on each KDP 12
  • 13. Program Reviews More detailed information is provided by clicking on each Review. All technical reviews will be directly linked to NPR 7123.1 for entrance and success criteria 13
  • 14. Space Flight Project Life Cycle Chart More detailed information is provided by clicking on each KDP and Review 14
  • 15. Project KDPs More detailed information is provided by clicking on each KDP 15
  • 17. Space Flight Program Requirements 17
  • 18. Space Flight Project Requirements 18
  • 20. Archived Requirements Search Initially available for 7120.5C only 20
  • 24. Key Decision Points & Decision Authorities 24
  • 28. Topics covered include: •Policy & Requirements •Handbooks & Guidance •Helpful sites/links •Training •Tools •Products, Templates, Examples •Points of Contact 28
  • 29. We need your help….. We want POLARIS to be a living tool, providing improving support to Program and Project Managers as management policy and requirements evolve. We need your good ideas and constructive criticism to make this tool responsive to your needs. Please take the time to let us know what you think! 29
  • 30. Planned Future Enhancements After Build 2 • New NPRs for NASA’s other product lines: Advanced Technology and Development (ATD), Basic and Applied Research (BAR), and Institutional/Facilities • If available from the Agency’s MdM database, POLARIS may add more information on Programs and Projects, including product line, category, Governing PMC, manager name, life cycle phase, leading center, etc. • Dependent on agency MdM application being fully populated and kept current • Daily updates of Program & Project data from MdM • Additional product templates and examples • Additional review content (example data packages, example agendas, review plans, etc) Many items dependent on HQ for review and approval of content 30
  • 31. Other Possible Applications Of the website….. • NPR 7123, Systems Engineering Processes and Requirements Either import remainder of NPR7123.1 into POLARIS (merges Systems Engineering and Project Management into one site) Or, create similar site for Systems Engineering • Use POLARIS-type site for mission directorates, with content being mission directorate specific Potential for linking (traceablility) of agency requirements • Use POLARIS type site for Center level application, with content being Center level policy, requirements, guidance and links. • Potential for linking (traceability) of agency requirements 31
  • 32. Other Possible Applications, cont’d • Of the requirements database…..(unlimited potential) • All Agency requirements (NPRs) databased with keywords and linked to show traceability and dependency. Keywords could allow: Generation of requirements list by role (i.e. all requirements a facilities manager must meet) Generation of comprehensive requirements list on a particular subject (i.e. all EVM requirements) Generation of job descriptions & performance evaluations • All Mission Directorate requirements databased with keywords and linked to have traceability to Agency requirements. • All Center requirements databased with keywords and linked to have traceability to both Mission Directorate and Agency requirements. 32
  • 33. Summary • POLARIS tool is designed to support Program and Project Management • Continuous improvement planned • Maintenance planned to remain current • POLARIS needs your support and input to be successful • Make it what you need • POLARIS could be applied to other agency requirements (NPRs) and to Mission Directorates and Field Centers • Requires up front investment and on-going maintenance support 33