SlideShare ist ein Scribd-Unternehmen logo
1 von 13
Downloaden Sie, um offline zu lesen
PAGE 1

ADDRESS :	

		
PHONE : 	
FAX : 	
EMAIL : 	
WEB : 	

31 Niagara Lane
Melbourne VIC 3000
+61 3 9624 8700
+61 3 9624 8780
plans@one2one.net.au
www.one2one.net.au

BEECHWORTH MONTESSORI SCHOOL:
REPORT APPROVED BY:	

....................(SIGN)

				

....................(PRINT)

POSITION:				

....................

1:1 ARCHITECTS - PRINCIPAL CONSULTANT:
REPORT APPROVED BY:	

....................(SIGN)

				

....................(PRINT)

POSITION:				

....................

Beechworth montessori school
Masterplan

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

(revised 2/8/11)
PAGE 2

project overview

project brief

Beechworth Montessori commenced as a pre-school (Tiny Tots and Cycle 1) in 1997. In 2007
the school expanded to include primary school ages from 6-12 (Cycles 2 & 3). The school is
presently accommodated in the Emerald and Amathyst Buildings, rented premises on the La
Trobe University Campus in Beechworth. These facilities were formerly a part of the Mayday
Hills Hospital, later purchased by La Trobe. The school has ‘made do’ with the former hospital
facilities with minor works undertaken to allow it to function as a school.

The existing hostel building on Gilchrist Avenue is to be converted to a school ideal for Montessori
education, to accommodate both early childhood and primary school aged children, thereby
enabling the Beechworth Montessori School to relocate from the current leased premises on
the La Trobe University Campus.

This lease arrangement at La Trobe University has always been on a year-to-year basis,
leading the school to seek a more permanent home to facilitate rapid enrolment growth and
expansion. Due to the short term lease arrangements at La Trobe, the school has in the past
been unable to obtain any assistance with funding of capital works.

‱	
To accommodate the projected future growth of the school up to 250 students from 	
	Tiny Tots to adolescents.

Searching for a permanent home within Beechworth has been extremely difficult given the
lack of large sites within planning zones appropriately zoned for schools however following
the sale the Ovens and Murray Hospital site (adjacent to the La Trobe Campus), Beechworth
Montessori School has now secured an indefinite lease on the former Hately Hostel building
(2400m2) and surrounding grounds (1.4 hectares) on Gilchrist Avenue. The school now intends
to fully relocate the school from the La Trobe Campus to a permanent location at Gilchrist
Avenue.
The existing hostel building has been vacant for over a decade and prior to the school’s relocation
will require structural alterations to convert bedrooms to adequately sized classrooms, along
with a refurbishment of finishes and wet area provisions.  Once the relocation has occurred
and the Ovens and Murray Hospital site subdivision has been finalised, the school has a
call option to purchase the site on Gilchrist Avenue, well below market value. Beechworth
Montessori intends to exercise this option.

Existing premises at La Trobe University

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

The following summarises the primary objectives of the master plan:

‱	
	

To open up the existing bedrooms and corridors to create generous classroom layouts 	
suitable for the Montessori style of teaching.

‱	
	

To build a sense of community by directing all circulation through a central 		
administration area for students, staff, parents and visitors.

‱	

To maximise opportunities for natural light penetration to all habital spaces.

‱	

To provide generous storage space.

‱	
	

To provide multipurpose facilities suitable for school and broader community usage,	
with direct external access.

‱	
	

To seperate classrooms from parent gathering areas to minimise disruption to 		
classes.

‱	

To provide both kitchen and science wet area facilities to all classrooms.

‱	

To provide supervised external teaching areas.

‱	
	

To maximise the potential of the existing building layout to achieve the above 		
outcomes in the most rational, economical and ecological sustainable manner.

Former hostel building on Gilchrist Avenue
PAGE 3

Project consultants
The following consultants were enganged by the school for the preparation of this report:

1:1 Architects Pty Ltd
- Royal Australian Institute of Architects Client/Architect Agreement with provision to proceed to
design, documentation and contract administration services, subject to funding approval.
- A0N Professional Indemnity Insurance policy No 93303096. Limit $5,000,000 for any one claim
and $10,000,000 in the aggregate.

Existing foyer

Westbay Consulting Services
- Approved fee proposal and scope of works to Cost Plan B. Further engagement to be
negotiated subject to funding approval.
- A0N Professional Indemnity Insurance policy No 02PI536413 - Limit $5,000,000.

Indigo Shire - Municipal Building Surveyor
- Approved fee proposal and scope of works to provide buliding surveyor’s report on planning and
building regulations. It is anticipated that the school will engage a private building surveyor for
next stage of the project.
- Civic Mutual Plus insurance policy No CMP000254 - Limit $300,000,000.
Hostel grounds

Existing chapel building

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

View from carpark

Existing corridor
PAGE 4

former ovens & murray hospital site

proposed subdivision
The new school location on Gilchrist Avenue forms a part of the former Ovens and Murray Hospital
site. The site is yet to be subdivided into separate titles, however the school presently leases
proposed Lots 7 and 7a as shown. Once the subdivision occurs, the school intends to purchase
these titles. The lease has provision for this to occur in the form of a call option.

site description
The site has well established trees and vegetation and it is intended that the vast majority of
trees will remain, aside from those effecting allergies or undermining existing structures. The site
slopes to the south west.
The 1974 hostel building has been vacant for over 10 years and requires alterations and
refurbishment in order to operate as a school building. The heritage listed chapel also requires
refurbishment. Its adjacent timber structure is in poor condition and may require demolition
(subject to heritage advice and Planning approval). The existing carpark on Lot 7a is suitable for
the school’s use immediately.

site reports
A Due Diligence environmental site assessment report was undertaken on the site, identifying
asbestos in the eaves, the PCB’s in the light fittings and vinyl tile floor coverings under the
existing carpet of the hostel building. This report and is available from the school on request.

LOT 7A - Existing carpark & carport

LOT 7 - Existing hostel 	
	
and chapel 		

TOTAL SITE AREA 			

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

2600m2
94m2

1.4 HECTARES
PAGE 5

existing / demolition site plan
1:500 @ A3

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 6

existing floor plan
1:250 @ A3

Existing courtyards

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 7

summary of alterations
1:250 @ A3

Former courtyard to be reinstated

Existing courtyard
Major alterations and internal
refurbishment (opening up of smaller
spaces to create open plan classrooms &
multi-purpose rooms)
Minor internal alterations and
refurbishment
Proposed demolition
BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 8

proposed site plan
1:500 @ A3

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 9

Transportation & circulation
1:500 @ A3

Staff
parking

Deliveries/
emergency
vehicles
Semi-public

Staff / Visitors
Car travellers
Buses

Students

Bus travellers

Parents
Pedestrians
Vehicles
Play area Students/staff

Entrance hub

Play area Students/staff

Primary Objectives

Bus route
1. Provide safe pedestrian
circulation by separating vehicular
and pedestrian access
2. Build ‘community’ by centralising
staff/student/parent/visitor
circulation through entrance hub

Cyclists

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 10

proposed floor plan
1:250 @ A3

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 11

proposed usage / circulation
1:250 @ A3

Cycles 2 & 3 (Primary School)

Primary circulation
Secondary circulation

Staff

Existing rectilinear circulation pattern

Community / Multi-purpose

Tiny Tots / Cycle 1 (Early Childhood)

Circulation hub

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

Proposed circulation pattern
PAGE 12

proposed staging - internal works
1:250 @ A3

Stage 1a
Cycle 2 & 3 (primary school age), Library

Stage 1b
Tiny Tots & Cycle 1 (early childhood)

Stage 2
Adminstration & staff areas, amenities, Cycle 3/Specialist

Stage 3
Multi-purpose spaces

Stage 4
Art / Woodwork refurbishment

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
PAGE 13

proposed staging - external works
1:500 @ A3

Stage 1b
Short term (includes removal
of trees effecting allergies
as shown)

Stage 2
Medium term

Stage 4
Long term (includes removal of
tree undermining structure as
shown)

BEECHWORTH MONTESSORI SCHOOL
FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010

Weitere Àhnliche Inhalte

Was ist angesagt?

Public cons boddingtons v10 fc
Public cons boddingtons v10 fcPublic cons boddingtons v10 fc
Public cons boddingtons v10 fcFiona Elton
 
Hastings Way Redevelopment by Jeremy Gragert‹
Hastings Way Redevelopment by Jeremy Gragert‹Hastings Way Redevelopment by Jeremy Gragert‹
Hastings Way Redevelopment by Jeremy Gragert‹volumeone
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization PresentationChris Neil
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
Aston Jeremy_Work Experience Examples_Jan 2017
Aston Jeremy_Work Experience Examples_Jan 2017Aston Jeremy_Work Experience Examples_Jan 2017
Aston Jeremy_Work Experience Examples_Jan 2017Jeremy Aston
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Sherwood Close Phase 3 Ealing
Sherwood Close Phase 3 EalingSherwood Close Phase 3 Ealing
Sherwood Close Phase 3 EalingFiona Elton
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Darren Shaw, SIOR
 
High path phase 4 7 webinar rev a-fc
High path phase 4 7 webinar rev a-fcHigh path phase 4 7 webinar rev a-fc
High path phase 4 7 webinar rev a-fcFiona Elton
 
Cv 28 08 2011
Cv 28 08 2011Cv 28 08 2011
Cv 28 08 2011Rob_Borland
 
Murch Elementary School SIT Meeting (February 11, 2016)
Murch Elementary School SIT Meeting (February 11, 2016)Murch Elementary School SIT Meeting (February 11, 2016)
Murch Elementary School SIT Meeting (February 11, 2016)DC Department of General Services
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020RamaChilamkurthy
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoToronto 2030 District
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015Steve Joel
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationIsland Health
 
Turnkey total swimming pool refurbishment project to prestigious school in th...
Turnkey total swimming pool refurbishment project to prestigious school in th...Turnkey total swimming pool refurbishment project to prestigious school in th...
Turnkey total swimming pool refurbishment project to prestigious school in th...DAVID GREEN
 
Forty mile cultural resource management plan
Forty mile cultural resource management planForty mile cultural resource management plan
Forty mile cultural resource management planRohit Vysyaraju
 

Was ist angesagt? (19)

Public cons boddingtons v10 fc
Public cons boddingtons v10 fcPublic cons boddingtons v10 fc
Public cons boddingtons v10 fc
 
Hastings Way Redevelopment by Jeremy Gragert‹
Hastings Way Redevelopment by Jeremy Gragert‹Hastings Way Redevelopment by Jeremy Gragert‹
Hastings Way Redevelopment by Jeremy Gragert‹
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization Presentation
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Aston Jeremy_Work Experience Examples_Jan 2017
Aston Jeremy_Work Experience Examples_Jan 2017Aston Jeremy_Work Experience Examples_Jan 2017
Aston Jeremy_Work Experience Examples_Jan 2017
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
Sherwood Close Phase 3 Ealing
Sherwood Close Phase 3 EalingSherwood Close Phase 3 Ealing
Sherwood Close Phase 3 Ealing
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23
 
High path phase 4 7 webinar rev a-fc
High path phase 4 7 webinar rev a-fcHigh path phase 4 7 webinar rev a-fc
High path phase 4 7 webinar rev a-fc
 
Cv 28 08 2011
Cv 28 08 2011Cv 28 08 2011
Cv 28 08 2011
 
Murch Elementary School SIT Meeting (February 11, 2016)
Murch Elementary School SIT Meeting (February 11, 2016)Murch Elementary School SIT Meeting (February 11, 2016)
Murch Elementary School SIT Meeting (February 11, 2016)
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe Lobko
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce Presentation
 
Turnkey total swimming pool refurbishment project to prestigious school in th...
Turnkey total swimming pool refurbishment project to prestigious school in th...Turnkey total swimming pool refurbishment project to prestigious school in th...
Turnkey total swimming pool refurbishment project to prestigious school in th...
 
Forty mile cultural resource management plan
Forty mile cultural resource management planForty mile cultural resource management plan
Forty mile cultural resource management plan
 

Ähnlich wie Beech worth montessori school

2016_project sheets
2016_project sheets2016_project sheets
2016_project sheetscathy kubany
 
Id455 Project Information Packet
Id455 Project Information PacketId455 Project Information Packet
Id455 Project Information PacketBilly Plyler
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010San Ramon Valley USD
 
Final Presentation SDNX 621
Final Presentation SDNX 621Final Presentation SDNX 621
Final Presentation SDNX 621Matthew Caruso
 
Final zba presentation - for jan. 3rd 2012
Final zba presentation - for jan. 3rd 2012Final zba presentation - for jan. 3rd 2012
Final zba presentation - for jan. 3rd 2012cityofevanston
 
Proposal Quals
Proposal QualsProposal Quals
Proposal Qualsgrantashleym
 
Woodburn booklet web
Woodburn booklet webWoodburn booklet web
Woodburn booklet webJared Gorby
 
Ici final 2
Ici final 2Ici final 2
Ici final 2Ricco Wei
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysTim Hays
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)Teoh Sze Ming
 
Groundwork Guyandotte SWV 2015 Project Plan
Groundwork Guyandotte SWV 2015 Project PlanGroundwork Guyandotte SWV 2015 Project Plan
Groundwork Guyandotte SWV 2015 Project PlanKenneth Goode
 
Laurencekirk Report 2
Laurencekirk Report 2Laurencekirk Report 2
Laurencekirk Report 2Ashley Rabot
 
Sustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain GardenSustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain GardenMatthewLawrence70
 
Holy trinity primary school proposal for relocation to a safe site (3)
Holy trinity primary school proposal for relocation to a safe site (3)Holy trinity primary school proposal for relocation to a safe site (3)
Holy trinity primary school proposal for relocation to a safe site (3)Rodrick Beazer, CC
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_AyaAya Irin
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Andrea Drabicki
 

Ähnlich wie Beech worth montessori school (20)

2016_project sheets
2016_project sheets2016_project sheets
2016_project sheets
 
Id455 Project Information Packet
Id455 Project Information PacketId455 Project Information Packet
Id455 Project Information Packet
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
Final Presentation SDNX 621
Final Presentation SDNX 621Final Presentation SDNX 621
Final Presentation SDNX 621
 
Final zba presentation - for jan. 3rd 2012
Final zba presentation - for jan. 3rd 2012Final zba presentation - for jan. 3rd 2012
Final zba presentation - for jan. 3rd 2012
 
Proposal Quals
Proposal QualsProposal Quals
Proposal Quals
 
Woodburn booklet web
Woodburn booklet webWoodburn booklet web
Woodburn booklet web
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)
 
Groundwork Guyandotte SWV 2015 Project Plan
Groundwork Guyandotte SWV 2015 Project PlanGroundwork Guyandotte SWV 2015 Project Plan
Groundwork Guyandotte SWV 2015 Project Plan
 
Laurencekirk Report 2
Laurencekirk Report 2Laurencekirk Report 2
Laurencekirk Report 2
 
Sustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain GardenSustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain Garden
 
A4 Long CV
A4 Long CVA4 Long CV
A4 Long CV
 
Holy trinity primary school proposal for relocation to a safe site (3)
Holy trinity primary school proposal for relocation to a safe site (3)Holy trinity primary school proposal for relocation to a safe site (3)
Holy trinity primary school proposal for relocation to a safe site (3)
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
Proposal
ProposalProposal
Proposal
 
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
Landfill Remediation Project - Student redesigns: Land Use Sustainable Develo...
 

KĂŒrzlich hochgeladen

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 

KĂŒrzlich hochgeladen (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
 

Beech worth montessori school

  • 1. PAGE 1 ADDRESS : PHONE : FAX : EMAIL : WEB : 31 Niagara Lane Melbourne VIC 3000 +61 3 9624 8700 +61 3 9624 8780 plans@one2one.net.au www.one2one.net.au BEECHWORTH MONTESSORI SCHOOL: REPORT APPROVED BY: ....................(SIGN) ....................(PRINT) POSITION: .................... 1:1 ARCHITECTS - PRINCIPAL CONSULTANT: REPORT APPROVED BY: ....................(SIGN) ....................(PRINT) POSITION: .................... Beechworth montessori school Masterplan BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010 (revised 2/8/11)
  • 2. PAGE 2 project overview project brief Beechworth Montessori commenced as a pre-school (Tiny Tots and Cycle 1) in 1997. In 2007 the school expanded to include primary school ages from 6-12 (Cycles 2 & 3). The school is presently accommodated in the Emerald and Amathyst Buildings, rented premises on the La Trobe University Campus in Beechworth. These facilities were formerly a part of the Mayday Hills Hospital, later purchased by La Trobe. The school has ‘made do’ with the former hospital facilities with minor works undertaken to allow it to function as a school. The existing hostel building on Gilchrist Avenue is to be converted to a school ideal for Montessori education, to accommodate both early childhood and primary school aged children, thereby enabling the Beechworth Montessori School to relocate from the current leased premises on the La Trobe University Campus. This lease arrangement at La Trobe University has always been on a year-to-year basis, leading the school to seek a more permanent home to facilitate rapid enrolment growth and expansion. Due to the short term lease arrangements at La Trobe, the school has in the past been unable to obtain any assistance with funding of capital works. ‱ To accommodate the projected future growth of the school up to 250 students from Tiny Tots to adolescents. Searching for a permanent home within Beechworth has been extremely difficult given the lack of large sites within planning zones appropriately zoned for schools however following the sale the Ovens and Murray Hospital site (adjacent to the La Trobe Campus), Beechworth Montessori School has now secured an indefinite lease on the former Hately Hostel building (2400m2) and surrounding grounds (1.4 hectares) on Gilchrist Avenue. The school now intends to fully relocate the school from the La Trobe Campus to a permanent location at Gilchrist Avenue. The existing hostel building has been vacant for over a decade and prior to the school’s relocation will require structural alterations to convert bedrooms to adequately sized classrooms, along with a refurbishment of finishes and wet area provisions. Once the relocation has occurred and the Ovens and Murray Hospital site subdivision has been finalised, the school has a call option to purchase the site on Gilchrist Avenue, well below market value. Beechworth Montessori intends to exercise this option. Existing premises at La Trobe University BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010 The following summarises the primary objectives of the master plan: ‱ To open up the existing bedrooms and corridors to create generous classroom layouts suitable for the Montessori style of teaching. ‱ To build a sense of community by directing all circulation through a central administration area for students, staff, parents and visitors. ‱ To maximise opportunities for natural light penetration to all habital spaces. ‱ To provide generous storage space. ‱ To provide multipurpose facilities suitable for school and broader community usage, with direct external access. ‱ To seperate classrooms from parent gathering areas to minimise disruption to classes. ‱ To provide both kitchen and science wet area facilities to all classrooms. ‱ To provide supervised external teaching areas. ‱ To maximise the potential of the existing building layout to achieve the above outcomes in the most rational, economical and ecological sustainable manner. Former hostel building on Gilchrist Avenue
  • 3. PAGE 3 Project consultants The following consultants were enganged by the school for the preparation of this report: 1:1 Architects Pty Ltd - Royal Australian Institute of Architects Client/Architect Agreement with provision to proceed to design, documentation and contract administration services, subject to funding approval. - A0N Professional Indemnity Insurance policy No 93303096. Limit $5,000,000 for any one claim and $10,000,000 in the aggregate. Existing foyer Westbay Consulting Services - Approved fee proposal and scope of works to Cost Plan B. Further engagement to be negotiated subject to funding approval. - A0N Professional Indemnity Insurance policy No 02PI536413 - Limit $5,000,000. Indigo Shire - Municipal Building Surveyor - Approved fee proposal and scope of works to provide buliding surveyor’s report on planning and building regulations. It is anticipated that the school will engage a private building surveyor for next stage of the project. - Civic Mutual Plus insurance policy No CMP000254 - Limit $300,000,000. Hostel grounds Existing chapel building BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010 View from carpark Existing corridor
  • 4. PAGE 4 former ovens & murray hospital site proposed subdivision The new school location on Gilchrist Avenue forms a part of the former Ovens and Murray Hospital site. The site is yet to be subdivided into separate titles, however the school presently leases proposed Lots 7 and 7a as shown. Once the subdivision occurs, the school intends to purchase these titles. The lease has provision for this to occur in the form of a call option. site description The site has well established trees and vegetation and it is intended that the vast majority of trees will remain, aside from those effecting allergies or undermining existing structures. The site slopes to the south west. The 1974 hostel building has been vacant for over 10 years and requires alterations and refurbishment in order to operate as a school building. The heritage listed chapel also requires refurbishment. Its adjacent timber structure is in poor condition and may require demolition (subject to heritage advice and Planning approval). The existing carpark on Lot 7a is suitable for the school’s use immediately. site reports A Due Diligence environmental site assessment report was undertaken on the site, identifying asbestos in the eaves, the PCB’s in the light fittings and vinyl tile floor coverings under the existing carpet of the hostel building. This report and is available from the school on request. LOT 7A - Existing carpark & carport LOT 7 - Existing hostel and chapel TOTAL SITE AREA BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010 2600m2 94m2 1.4 HECTARES
  • 5. PAGE 5 existing / demolition site plan 1:500 @ A3 BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 6. PAGE 6 existing floor plan 1:250 @ A3 Existing courtyards BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 7. PAGE 7 summary of alterations 1:250 @ A3 Former courtyard to be reinstated Existing courtyard Major alterations and internal refurbishment (opening up of smaller spaces to create open plan classrooms & multi-purpose rooms) Minor internal alterations and refurbishment Proposed demolition BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 8. PAGE 8 proposed site plan 1:500 @ A3 BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 9. PAGE 9 Transportation & circulation 1:500 @ A3 Staff parking Deliveries/ emergency vehicles Semi-public Staff / Visitors Car travellers Buses Students Bus travellers Parents Pedestrians Vehicles Play area Students/staff Entrance hub Play area Students/staff Primary Objectives Bus route 1. Provide safe pedestrian circulation by separating vehicular and pedestrian access 2. Build ‘community’ by centralising staff/student/parent/visitor circulation through entrance hub Cyclists BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 10. PAGE 10 proposed floor plan 1:250 @ A3 BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 11. PAGE 11 proposed usage / circulation 1:250 @ A3 Cycles 2 & 3 (Primary School) Primary circulation Secondary circulation Staff Existing rectilinear circulation pattern Community / Multi-purpose Tiny Tots / Cycle 1 (Early Childhood) Circulation hub BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010 Proposed circulation pattern
  • 12. PAGE 12 proposed staging - internal works 1:250 @ A3 Stage 1a Cycle 2 & 3 (primary school age), Library Stage 1b Tiny Tots & Cycle 1 (early childhood) Stage 2 Adminstration & staff areas, amenities, Cycle 3/Specialist Stage 3 Multi-purpose spaces Stage 4 Art / Woodwork refurbishment BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010
  • 13. PAGE 13 proposed staging - external works 1:500 @ A3 Stage 1b Short term (includes removal of trees effecting allergies as shown) Stage 2 Medium term Stage 4 Long term (includes removal of tree undermining structure as shown) BEECHWORTH MONTESSORI SCHOOL FEASIBILITY REPORT + MASTERPLAN _ DECEMBER 2010