SlideShare ist ein Scribd-Unternehmen logo
1 von 86
Downloaden Sie, um offline zu lesen
2022
UZBEKISTAN
The First foundation of KOC GROUP
COMPANY combining almost 50
years professional experience with its
futuristic investments and reinforcing
its highly qualified proficiency level with
its staff was initiated in 1969 under
the name of UNLIMITED POWER
COMPANY in Istanbul . Since the
year 2018, KOC GROUP joined with
KOC GROUP COMPAN has fortified
its sectoral effects and has been
successful with its prospective planning
process, effective management
systems, and technological
development and is still operating
under a highly qualified and motivated
environment in both national and
international businesses.
In this competitive working
environment, we are aiming to meet
each requirements of our customers
as well as overcome our limits with
each experiences with our high-tech
engineering and knowledge, capacity
and experiences accumulated over the
years , our customer-oriented working
style, flexible administrative approach
and proven management procedures
as well as our flawless experience
constructed with idea of highly-
qualified performance.
Koc Group Company as pioneer
creating a value in the sector is
designing its business with an
intention of using the natural resources
productively, protecting and respecting
the environment as our duty, pioneering
the embracement of these values
by the next generations , managing
the environmental effects caused
by the sector after their detection
and complying with the work safety,
environment and quality policies in
our projects in line with the national
and international laws, legislations and
regulations.
Koc Group Company takes care of
and embracing your projects as its
own by realizing Turnkey Construction,
Mechanical and Electrical system
applications successfully within lost
of qualified international and national
projects including in our major
activities. We are aiming to be the one
and only undertaking company in
turnkey construction projects. We are
planning to support your achievement
together hand in hand.
ABOUT OUR
COMPANY
AIMING LONG
TERM BUSINESS
PARTNERSHIP
WE ARE HERE
TO ACQUIRE THE
BEST IN FUTURE
OUR AIM IS
NOT ONLY MEET
REQUIREMENTS
BUT GO BEYOND
FOUNDED IN
1969
AN
EXPERIENCE
OVER
50YEARS
IN MEP
CONTRACTING
IN 3 CONTINENTS &
10 COUNTRIES
PERFORMS IN
MEP CONTRACTING
AND 5 OTHER
SEGMENTS
Project Management Renewable Energy Recycling
Turn-Key Construction
Low Voltage Panel Production
Electrical & Mechanical
Contracting
Operation &
Maintenance
k More than 50 Years of Experience
k Over 200 Completed Projects
k 15 Hotels & 2 Int’l Hospital, Subways Tunnels
experience with more than 1 mn sqm
k More than 10 years in Asia
k Approximately 1,000+ Direct Employees,
k Total Workforce Between 1000-1500 with labour
Supply
k US$178.5 mn 2018 FY revenue
k The goal is to become a contractor at ENR
international Top 250
k Experience in LEED and BREEAM Certified Projects
k ISO 9001, ISO 14001, Certified
TÜRKIYE
CEZAYİR
ÖZBEKISTAN
UGANDA
RUSYA
KENYA
LIBYA
UKRAYNA
UAE
TÜRKMENİSTAN
Ongoing Projects
Turkey, Turkmenistan, Uzbekistan, Iran (Trade)
Completed Projects
Turkey, Turkmenistan, Uzbekistan, Libya, Algeria, Russia
2
1,8
1,6
1,4
1,2
1
0,8
0,6
0,4
0,2
0 2016
$112.000.000
The Revenue belongs to Koc Group Company Revenues - USD
$121.000.000
$178.500.000
$127.000.000
$170.000.000
2017 2018 2019 2020 2021
170.000.000
USD
400.000.000
USD
250.000.000
USD
127.000.000
USD
2020 2022 TARGET
2021
2019
$250.000.000
KOC
CONSTRUCTION IN
NUMBERS
EXPERIENCED TEAM IN HOUSING, SHOPPING MALL,
RESIDENCE, OFFICE, HOTEL, HOSPITAL, MARINA,
POWER PLANT, RENEWABLE ENERGY SYSTEMS,
PUBLIC BUILDINGS, CITY LIGHTING AND
SIGNALIZATION WORKS, AND MORE...
MORE
THAN 200
PROJETS
MORE
THAN
3.500
EMPLOYEES
MORE
THAN 500
WHITE
COLLAR
MORE
THAN 3,000
BLUE COLLAR
WORKERS
OUR
GOAL IS TO
ENTER THE
WORLD’S
BIGGEST 250
CONTRACTORS
IN 5 YEARS
OUR
AIM IS TO GO
BEYOND THE
NEEDS, NOT
JUST MEETING
THE NEEDS
HALF A
CENTURY OF
EXPERIENCE
KOC
CONSTRUCTION
FOUNDED IN
1969 IN ISTANBUL
170.000.000
USD
400.000.000
USD
250.000.000
USD
127.000.000
USD
2020 2022 TARGET
2021
2019
KOC
CONSTRUCTION IN
NUMBERS
BUHARA
KALYAN
MINARE
METRO
PLAZA
BUSINESS
CENTRE
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2021-….
MAIN CONTRATOR: …..
PROJECT LOCATION:
TASHKENT/UZBEKISTAN
PROJECT AREA: 87.359 M2
SERVICE GIVEN: TURNKEY
METRO
PLAZA
BUSINESS
CENTRE
LOYIHA MAYDONI............................................ 12.121m2
SAVDO MAYDONI (1.QAVAT)............................ 4.445m2
OFIS MAYDONI (2-20.QAVATLAR).................... 58.398m2
TEXNIK MAYDONLAR - SIRKULATSIYA............ 5.316m2
AVTOTURARGAH............................................. 19.200m2
AVTOTURARGAH MASHINA SONI..................... 651 ta
UMUMIY QURILISH MAYDONI........................... 87.359m2
METRO
PLAZA
BUSINESS
CENTRE
LOT 2 E
BLOCK
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRATOR: LOTUS GAS INVEST
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 211.000 M2
SERVICE GIVEN: TURNKEY
5 XONALI 180 m2
TERAS 105.1 m2
JAMI 285.1 m2
5 XONALI 180 m2
TERAS 105.1 m2
JAMI 285.1 m2
5 XONALI 161 m2
TERAS 105.1 m2
JAMI 266.1 m2
5 XONALI 158 m2
TERAS 105.1 m2
JAMI 263.1 m2
PENTHOUSE QAVAT 3D TASVIR
2. QAVAT (YIGILISH) 3D TASVIR
SERGELI
4288
APARTMENT
CATEGORY: RESIDENTAL
PROJECT YEAR: 2022-2025
MAIN CONTRATOR: AKFA
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 317. 901 M2
SERVICE GIVEN: TURNKEY
SERGELI
4288
APARTMENT
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2022-….
MAIN CONTRATOR: …..
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 211.080 M2
SERVICE GIVEN: TURNKEY
DARXAN
BUSINESS
CENTER
CATEGORY: TRADE CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRATOR: MIMAR GROUP
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 1.000.000 M2
SERVICE GIVEN: TURNKEY
SERGILI
INDEX
SERGILI
INDEX
DARXAN
BUSINESS
CENTER
CATEGORY: MILLY PARK
PROJECT YEAR: 2021-2021
MAIN CONTRATOR: AKFA
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 950.000 M2
SERVICE GIVEN: TURNKEY
YENGI
UZBEKISTAN
PARK
ZAAMIN
TOURISTIC
CENTER
CATEGORY: TOURISTIC CENTER
PROJECT YEAR: 2022-2022
MAIN CONTRATOR: AKFA
PROJECT LOCATION: CIZZAK/UZBEKISTAN
PROJECT AREA: …… M2
SERVICE GIVEN: TURNKEY
ZAAMIN
TOURISTIC
CENTER
SHYMKENT
TOWER
CATEGORY: BUSINESS & TRADE CENTER
PROJECT YEAR: 2022-2024
MAIN CONTRATOR: SOUTH OIL
PROJECT LOCATION: SHYMKENT/KAZAKHISTAN
PROJECT AREA: 108.699 M2
SERVICE GIVEN: TURNKEY
SHYMKENT
TOWER
HILTON
TASHKENT
CATEGORY: HOTEL & CONGRESS CENTER
PROJECT YEAR: 2018-2019
MAIN CONTRACTOR: AKFA DREAM WORLD LLC
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 160.000 M²
PIRAMIT
TOWER& MALL
PIRAMIT
TOWER& MALL
CATEGORY: SHOPPING MALL AND BUSINESS CENTER
PROJECT YEAR: 2021-2024
MAIN CONTRACTOR: PIRAMIT GLOBAL
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 160.000 M²
ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР И ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2024
ГЕНПОДРЯДНАЯ ОРГАНИЗАЦИЯ: PIRAMIT GLOBAL
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ /
УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 160.000 м²
TASHKENT CITY LOT 3
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 228.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: HYPER PARTNER
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 228.000 M²
SERVICES GIVEN: CONSTRUCTION
TASHKENT CITY LOT 7
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ
ПРОЕКТА: 85.000 m³ / 227.000 m²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESIDENTIAL BUILDINGS
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 85.000 M³ / 227.000 M²
SERVICES GIVEN: CONSTRUCTION
MODERA
TOWERS
CATEGORY: SHOPPING MALL AND RESIDANCE
PROJECT YEAR: 2021-2023
MAIN CONTRACTOR: TAKO SALES
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 72.000 M²
SERVICES GIVEN: CONSTRUCTION
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР И РЕЗИДЕНЦИЯ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2023
КОМПАНИЯ -РАБОТОДАТЕЛЬ: TAKO SALES
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ /
УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 72.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
SEOL BOULEVARD
ТИП ЗДАНИЯ: УМНЫЙ ГОРОД
ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.550 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SMART CITY
PROJECT YEAR: 2020-ONGOING
MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT
LOCATION: TASHKENT/ UZBEKISTAN
PROJECT AREA: 42.550 M²
SERVICES GIVEN: CONSTRUCTION WORKS
TASHKENT CITY LOT 2
ТИП ЗДАНИЯ: ПРОЕКТ СМЕШАННОГО ТИПА
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ГАЗ ИНВЕСТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ЖИЛЫХ ЗДАНИЙ БЛОКИ А,Б,С, ОТЕЛЬ РАДИССОН БЛОК Д
CATEGORY: MIXED USED PROJECT
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: LOTUS GAZ INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 220.000 M²
SERVICES GIVEN: CONSTRUCTION OF RESIDENTIAL BUILDINGS
BLOCKS A,B,C, SHOPPING MALL BLOCK D
LOT-1 SOCIAL FACILITY
ТИП ЗДАНИЯ: СОЦИАЛЬНЫЙ ОБЪЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2020-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ПОД КЛЮЧ
CATEGORY: SOCIAL FACILITY
PROJECT YEAR: 2020-2021
MAIN CONTRACTOR: DISCOVER INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 2000 M²
SERVICES GIVEN: TURNKEY
TEMIR BUSINESS CENTER
ТИП ЗДАНИЯ : БИЗНЕС ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД : 2021-2022
КОМПАНИЯ -РАБОТОДАТЕЛЬ: IMP NEW PAY
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 25.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRACTOR: IMP NEW PAY
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 25.000 M²
SERVICES GIVEN: CONSTRUCTION
BUKHARA GOVERNORSHIP’S HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2018-2019
КОМПАНИЯ-РАБОТОДАТЕЛЬ: УПРАВЛЕНИЕ СТРОИТЕЛЬСТВА
ОБЛАСТИ БУХАРА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2018-2019
MAIN CONTRACTOR: BUKHARA REGION CONSTRUCTION
DIRECTORATE
PROJECT LOCATION: BUKHARA / UZBEKISTAN
PROJECT AREA: 1500 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
MEGA BUKHARA SHOPPING MALL
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2019
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МУСТАХКАМ КУРИЛИШ
ДЕВЕЛОПМЕНТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 100.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2019
MAIN CONTRACTOR: MUSTAHKAM QURILISH DEVELOPMENT
PROJECT LOCATION: BUKHARA / UZBEKİSTAN
PROJECT AREA: 100.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
PRESIDENT SCHOOL
ТИП ЗДАНИЯ: ШКОЛА
ПРОЕКТНЫЙ ПЕРИОД: 2021-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SCHOOL
PROJECT YEAR: 2021-2021
MAIN CONTRACTOR: DISCOVER INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 9000 M²
SERVICES GIVEN: CONSTRUCTION
HUAWEI OFFICE
ТИП ЗДАНИЯ: РЕНОВАЦИЯ
ПРОЕКТНЫЙ ПЕРИОД: 2020 -
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RENOVATION
PROJECT YEAR: 2020 -
MAIN CONTRACTOR: HUAWEİ
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 1600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
ALAKA VAZIRLIGI VILLAS
ТИП ЗДАНИЯ : ВИЛЛЫ
ПРОЕКТНЫЙ ПЕРИОД : 2021-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ПОД КЛЮЧ
CATEGORY: VILLAS
PROJECT YEAR: 2021-2021
MAIN CONTRACTOR: DISCOVER
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 17.000 M²
SERVICES GIVEN: TURNKEY
UNIVERSITY PROJECT
ТИП ЗДАНИЯ: УНИВЕРСИТЕТ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2022
КОМПАНИЯ -РАБОТОДАТЕЛЬ: MIMAR DEVELOPMENT
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 250.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: UNIVERSITY
PROJECT YEAR: 2021-2022
MAIN CONTRACTOR: MIMAR DEVELOPMENT
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 250.000 M²
SERVICES GIVEN: CONSTRUCTION
HAMPTON BY HILTON
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2020 -
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: TASHKENT / UZBEKİSTAN
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 12.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2020 -
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 12.000 M2
SERVICES GIVEN: TURNKEY CONSTRUCTION
BUKHARA WYNDHAM HOTEL
ТИП ЗДАНИЯ: WYNDHAM ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: WYNDHAM HOTEL
PROJECT YEAR: 2020-ONGOING
MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT
PROJECT LOCATION: BUKHARA / UZBEKISTAN
PROJECT AREA: 33.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
MASLAK 1453 SHERATON HOTEL
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2018-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДОРУК ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 75.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2015
MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON
PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY
PROJECT AREA: 800.000 M²
SERVICES GIVEN: CONSTRUCTION WORKS
CATEGORY: HOTEL
PROJECT YEAR: 2018-2020
MAIN CONTRACTOR: DORUK CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 75.000 M2
SERVICES GIVEN: CONSTRUCTION
NUROL LIFE TOWER SINPAS BOSPHORUS CITY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2011-2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИЛЬХАН ЙИЛДИРИМ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ, ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ
ГРУПП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2011-2014
MAIN CONTRACTOR: ILHAN YILDIRIM INSAAT
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 220.000 M2
SERVICES GIVEN: CONSTRUCTION
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2009
MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 46.000 M2
SERVICES GIVEN: CONSTRUCTION
ARZUW HOTEL PUBLIC PROJECT
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 50.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2010
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 50.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: PUBLIC PROJECT
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 6400 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
SOWDA CENTER SHOPPING MALL 48 RESIDENTIAL BUILDING
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY : SHOPPING MALL
PROJECT YEAR : 2017
MAIN CONTRACTOR : POLAT CONSTRUCTION
PROJECT LOCATION :TURKMENISTAN
PROJECT AREA : 2500 M²
SERVICES GIVEN : TURNKEY CONSTRUCTİON
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 16.400 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
NURSERY PROJECT BUSINESS CENTER ONE PROJECT
ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3450 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: PUBLIC PROJECT
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 3600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
CATEGORY: BUSINESS CENTRE
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 3450 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
72 RESIDENTIAL BUILDING VILLA PROJECT
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.800 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 20.800 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 1600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
KUWWAT HOTEL KERWEN HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 30.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2012
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 35.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2011
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 30.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2012
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 35.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
WATANCY HOTEL ICE MANSION SPORT CENTER
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M’
SERVICES GIVEN: TURNKEY CONSTRUCTION
PRESIDENT PALACE CHECKPOINT CENTER AKAYLA STATION
ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 7000 М²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: КОНТРОЛЬНО ПРОПУСКНОЙ ПУНКТ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.063 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: ADMINISTRATIVE BUILDING
PROJECT YEAR: 2009
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 7000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: CHECKPOINT
PROJECT YEAR: 2014
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.063 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
MILITARY ACADEMY HOTEL OGUZKENT
ТИП ЗДАНИЯ: ОБЩЕСТВЕННОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 5000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: PUBLIC BUILDING
PROJECT YEAR: 2010
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 5000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2009
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
ASHGABAT CITY RESIDENTIAL BUILDING AWAZA SOWHUN COTTAGES
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2013
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 16.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
TURKMENBASHI 420 STUDENTS
SCHOOL AND NURSERY
ТИП ЗДАНИЯ: ШКОЛА И ДЕТСКИЙ САД
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 11.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: SCHOOL / NURSERY
PROJECT YEAR: 2011
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 11.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CHEKMEKOY STATE HOSPITAL
ТИП ЗДАНИЯ: БОЛЬНИЦА
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МИНЗДРАВ ТУРЦИИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 48.896,92 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOSPITAL
PROJECT YEAR: 2015
MAIN CONTRACTOR: MINISTRY OF HEALTH OF TURKEY
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 48.896,92 M²
GURPINAR FISHERIES CENTER IFF AROMA FACTORY
ТИП ЗДАНИЯ: ЦЕНТР МОРЕПРОДУКТОВ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШААТ / НУХОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЮРПЫНАР / СТАМБУЛ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 85.703 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИФФ АРОМА ЭСАНС
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЕБЗЕ / КОДЖАЭЛИ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 21.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: FISHERIES ESTATE
PROJECT YEAR: 2015
MAIN CONTRACTOR: NAS CONSTRUCT’ON
			 NUHOGLU CONSTRUCTION
PROJECT LOCATION: GURPINAR / ISTANBUL / TURKEY
PROJECT AREA: 85.703 M²
CATEGORY: INDUSTRIAL FACILITY
PROJECT YEAR: 2014
MAIN CONTRACTOR: IFF AROMA ESANS
PROJECT LOCATION: GEBZE / KOCAELI / TURKEY
PROJECT AREA: 21.000 M²
ISTANBUL PALACES SULTANGAZI SCHOOL
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ХАЛКАЛЫ / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 125.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ШКОЛА
ПРОЕКТНЫЙ ПЕРИОД: 2016
КОМПАНИЯ -РАБОТОДАТЕЛЬ: БИСКОН ЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.734 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESIDENTIAL BUILDINGS
PROJECT YEAR: 2013
MAIN CONTRACTOR: CIHAN CONSTRUCTION/SINPAS GYO
PROJECT LOCATION: HALKALI / ISTANBUL / TURKEY
PROJECT AREA: 125.000 M²
CATEGORY: SCHOOL
PROJECT YEAR: 2016
MAIN CONTRACTOR: BISCON YAPI
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 16.734 M²
SANKO HOLDING STORAGE AND
ADMINISTRATIVE BUILDING
SULTANGAZI CULTURAL CENTER
ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2007
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШ / ТАШЯПЫ ИНШ / НУХОГЛУ
ИНШ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СУЛТАНГАЗИ / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2007
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 42.500 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2014
MAIN CONTRACTOR: NAS CONSTRUCTION/TASYAPI
CONSTRUCTION / NUHOGLU CONSTRUCTION
PROJECT LOCATION: SULTANGAZI / ISTANBUL / TURKEY
PROJECT AREA: 46.000 M²
DAP IST MARINA VIAPORT VENEZIA
ТИП ЗДАНИЯ: ЖИЛЫЕ ДОМА / ТРЦ / ПРИСТАНЬ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДАП ЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 480.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPİNG MALL / MARİNA
PROJECT YEAR: 2015
MAIN CONTRACTOR: DAP YAPI
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 480.000 M²
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL
PROJECT YEAR: 2013
MAIN CONTRACTOR: FERYAPI
PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY
PROJECT AREA: 210.000 M²
ISTWEST EGE VALLEY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ /
ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL
PROJECT YEAR: 2013
MAIN CONTRACTOR: FERYAPI
PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY
PROJECT AREA: 210.000 M²
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: SINPAS GYO
PROJECT LOCATION: ANKARA / TURKEY
PROJECT AREA: 171.500 M²
KUYUMCU KENT SINPAS BOSPHORUS CITY
ТИП ЗДАНИЯ: ОФИС
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 82.400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУПП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: OFFICE
PROJECT YEAR: 2010
MAIN CONTRACTOR: CIHAN CONSTRUCTION
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 82.400 M²
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2009
MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 46.000 M²
MASLAK 1453 ARÇELIK TV FACTORY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ТВ ФАБРИКА
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТЕКИРДАГ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 76.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2015
MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON
PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY
PROJECT AREA: 800.000 M²
CATEGORY: TV FACTORY
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: ARK CONSTRUCTION
PROJECT LOCATION: TEKIRDAG / TURKEY
PROJECT AREA: 76.000 M²
TURK TRACTOR FACTORY TUZLA VIAPORT MARINA
ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ ОБЪЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН / КОЧ ХОЛДИНГ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САКАРЯ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 110.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ПРИСТАНЬ ДЛЯ ЯХТ / ОТЕЛЬ / ТЦ/
ТЕМАТИЧЕСКИЙ ПАРК
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: БАЙРАКТАР А..Ш.
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 600.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: İNDUSTRIAL FACILITY
PROJECT YEAR: 2014
MAIN CONTRACTOR: ARK CONSTRUCTION / KOÇ HOLDING
PROJECT LOCATION: SAKARYA / TURKEY
PROJECT AREA: 110.000 M²
CATEGORY: MARİNA / HOTEL / SHOPPİNG MALL / THEMEPARK
PROJECT YEAR: 2015
MAIN CONTRACTOR: BAYRAKTAR INC.
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 600.000 M²
EGE SIDE MURATBEY CUSTOM
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ТАМОЖЕННЫЙ ТЕРМИНАЛ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИНТЕС А.Ш.
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЧАТАЛДЖА / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 200.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: SINPAS GYO
PROJECT LOCATION: ANKARA / TURKEY
PROJECT AREA: 171.500 M²
CATEGORY: CUSTOMS DIRECTORATE
PROJECT YEAR: 2014
MAIN CONTRACTOR: INTEL INC.
PROJECT LOCATION: CHATALDJA / ISTANBUL / TURKEY
PROJECT AREA: 200.000 M²
MARMARAY HIGH SPEED TRAIN STATIONS TURKMENISTAN INTERNATIONAL SEAPORT
ТИП ЗДАНИЯ: ВЫСОКОСКОРОСТНЫЕ ЖЕЛЕЗНОДОРОЖНЫЕ СТАНЦИИ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ОХЛ КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 23.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ И
ИНЖЕНЕРНЫЕ СИСТЕМЫ
ТИП ЗДАНИЯ: МЕЖДУНАРОДНЫЙ ПОРТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНБАШИ / БАЛКАН / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: НАРУЖНОЕ ОСВЕЩЕНИЕ ПОРТА, ЗДАНИЕ ЛОТА4
И ЛОТА5 РАБОТЫ НВ И СН
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HIGH SPEED TRAIN STATION
PROJECT YEAR: 2014
MAIN CONTRACTOR: OHL CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 23.500 M²
SERVICES GIVEN: ELECTROMECHANICAL WORKS
CATEGORY: INTERNATIONAL PORT
PROJECT YEAR: 2017
MAIN CONTRACTOR: GAP CONSTRUCTION
PROJECT LOCATION: TURKMENBASHI / BALKANABAD / TURKMENISTAN
PROJECT AREA: PORT LIGHTNING SYSTEM AND LOT 4, LOT 5 M.V./L.V.
SYSTEMS
ASHGABAT SHOPPING MALL FANTAN
ТИП ЗДАНИЯ : ТРЦ
ПРОЕКТНЫЙ ПЕРИОД : 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГУДЖУРЛУ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 180.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ : ДЕКОРАТИВНЫЙ БАССЕЙН
ПРОЕКТНЫЙ ПЕРИОД : 2011-2012
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2014
MAIN CONTRACTOR: GUJURLU
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 180.000 M²
CATEGORY: DECORATIVE POOL
PROJECT YEAR: 2011-2012
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 20.000 M2
DASOGUZ HOTEL BALKAN HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.200 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOTEL
PROJECT YEAR: 2010
MAIN CONTRACTOR: ALPARSLAN CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: TEMA CONSTRUCTİON
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.200 M²
AWAZA HOTEL LEBAP AWAZA HOTEL MARY
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: КАЙЫ КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЧАКЫР ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: KAYI CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: CAKIR CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 17.000 M²
IZGANT SPOR CENTER DASOGUZ CULTURAL CENTER
ТИП ЗДАНИЯ: СПОРТИВНЫЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2012
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТУРКМЕН БИНА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: SPORT CENTER
PROJECT YEAR: 2012
MAIN CONTRACTOR: MERV CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 6000 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2013
MAIN CONTRACTOR: TURKMEN BINA
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 8500 M²
BALKANABAD NEBITDAG MUSEUM IZGANT CULTURAL CENTER
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: MUSEUM
PROJECT YEAR: 2011
MAIN CONTRACTOR: TEMA CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 9000 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2010
MAIN CONTRACTOR: MERV CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 8500 M²
HOTEL ARCHABIL HOTEL BALKAN
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТАЗЕДЖАЙ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГЛАВНОЕ УПРАВЛЕНИЕ
АВТОМОБИЛЬНЫХ ДОРОГ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 58.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: РАБОТЫ ПО ИНЖЕНЕРНЫМ СИСТЕМАМ
CATEGORY: HOTEL
PROJECT YEAR: 2015
MAIN CONTRACTOR: TAZE JAY CONSTRUCTION
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 33.000 M²
CATEGORY: ADMINISTRATIVE BUILDING
PROJECT YEAR: 2015
MAIN CONTRACTOR: GENERAL DIRECTORATE OF HIGHWAYS
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 58.000 M²
SERVICES GIVEN: MECHANICAL WORKS
SOLAR
POWER
PLANTS
TURKEY
SPP
PROJECT YEAR: 2017
CITY: AFYONKARAHISAR 5,763 MW
PROJECT YEAR: 2017
CITY: ANKARA
6 MW
PROJECT YEAR: 2017
CITY: ANKARA
8,3 MW
PROJECT YEAR: 2017
CITY: AYDIN
5,5 MW
PROJECT YEAR: 2016
CITY: AFYONKARAHISAR
5 MW
TURKEY
SPP
PROJECT YEAR : 2016
CITY: ELAZIĞ
8 MW
PROJECT YEAR: 2015
CITY: NEVŞEHİR
10,8 MW
PROJECT YEAR: 2016
CITY: AFYONKARAHISAR
11 MW
PROJECT YEAR: 2016
CITY: UŞAK
5,5 MW
PROJECT YEAR: 2016
CITY: ÇANAKKALE
4,235 MW
PROJECT YEAR: 2017
CITY: YOZGAT
6,5 MW
PROJECT YEAR: 2019
COUNTRY: UKRAINE
12 MW
UKRANIE
SPP
PROJECT YEAR: 2018
COUNTRY: UKRAINE
10 MW
PROJECT YEAR: 2019
COUNTRY: UKRAINE
24 MW
PROJECT YEAR: 2019
COUNTRY: UKRAINE
14 MW
PROJECT YEAR: 2019
COUNTRY: UKRAINE
12 MW
PROJECT YEAR: 2018
COUNTRY: UKRAINE
19 MW
TRANSMISSION
LINES GIS &
SWITCHYARDS
& DISTRIBUTION
CENTER
DISTRIBUTION
SUBSTATIONS
OF THE TASHKENT
CITY PROJECT
DISTRIBUTION SUBSTATIONS OF THE
TASHKENT CITY PROJECT
TURKMENBASHI INTERNATIONAL
SEAPORT 2 CIRCUIT 100 KV POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: РАСПРЕДЕЛИТЕЛНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: УЗБЕКИСТАН
ОПИСАНИЕ ПРОЕКТА: ДВА ТРАНСФОРМАТОРНЫХ И
ДВА РАСПРЕДЕЛИТЕЛЬНЫХ ПОДСТАНЦИЙ
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-Х ЦЕПНАЯ ЛИНИЯ
ЭЛЕКТРОПЕРЕДАЧИ 100 КВ
CATEGORY: DISTRIBUTION SUBSTATIONS
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: UZBEKISTAN
PROJECT EXPLANATION: TWO TRANSFORMER AND
TWO DISTRIBUTION SUBSTATIONS
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT POWER TRANSMISSION LINE
100 KV
TURKMENBASHI 110 KV OPEN
SWITCHYARD
TURKMENBASHI INTERNATIONAL
SEAPORT GIS CENTER
ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛНАЯ
ПОДСТАНЦИЯ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ
ПОДСТАНЦИЯ 110 кВ
ТИП ПРОЕКТА: ГАЗОПОРШНЕВАЯ УСТАНОВКА
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АББ ФИНЛЯНДИЯ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 110/35/10 (2*40mVA) УСТАНОВКА И
ПУСКОНАЛАДКА ГПУ
CATEGORY: OPEN SWITCHYARD
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110KV OPEN SWICHYARD
CATEGORY: GAS INSULATED SWITCHGEAR
MAIN CONTRACTOR: ABB FINLAND
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION 110/35/10 (2*40MVA) GIS MONTAGE
AND COMMISSIONG
TURKMENBASI TRANSFORMER
SUBSTATIONS
AWAZA ROAD LIGHTING AND
TRAFFIC SIGNALIZATION SYSTEM
ТИП ПРОЕКТА: ЭЛЕКТРИЧЕСКАЯ ИНФРАСТРУКТУРА
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 35-10 КВ ТРАНСФОРМАТОРНЫЕ
ПОДСТАНЦИИ 2 ШТ.
ТИП ПРОЕКТА: ДОРОЖНОЕ ОСВЕЩЕНИЕ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 34 km РАБОТЫ ПО ДОРОЖНОМУ
ОСВЕЩЕНИЮ И СИГНАЛИЗАЦИИ
CATEGORY: ELECTRICAL INFRASTRUCTURE
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION 2 PCS 35-10KV TRANSFORMER
SUBSTATIONS
CATEGORY: ROAD LIGHTING SYSTEM
MAIN CONTRACTOR: HATIPOGLU
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 34 KM ROADS LIGHTING AND TRAFFIC
SIGNALLING WORKS
AWAZA OPEN SWITCHYARD AND
POWER TRANSMISSION LINE
AWAZA 110 KV POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ
ПОДСТАНЦИЯ И ЛИНИЯ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ЭЛЕКТРОПЕРЕДАЧИ
220/110 КВ
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ВЛ-110кв ЛAН-1 и ЛAН-
2 от «Аваза ДЭС» до подстанции «Новруз» 110/10кВ
CATEGORY: OPEN SWITCHYARD AND POWER TRANSMISSION
LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE 220/110
KV
CATEGORY: POWER TRANSMISSION LINES
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE - 110KV
LAN-1 AND LAN-2 FROM AVAZA DES TO THE 110/10 KV
NOVRUZ SUBSTATION
GARABOGAZ FERTILIZER
FACTORY GIS CENTER
GARABOGAZ FERTILIZER FACTORY
POWER TRANSMISSION LINE
ТИП ПРОЕКТА: ГАЗОПОРШНЕВЫЕ УСТАНОВКИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 110 KV ГПУ С ТРАНСФОРМАТОРАМИ 110/11KV
2X25 MVA
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 110 КВ
CATEGORY: GAS INSULATED SWITCHGEAR
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110 KV GIS WITH 110/11KV 2X25 MVA
TRANSFORMERS
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110 KV TRANSMISSION LINE
TURKMENBASHI TRANSFORMER
SUBSTATIONS
BEKTAS TRANSFORMER
SUBSTATIONS
ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 6/0,4КВ КТП 8 ШТ.
ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 10/0,4КВ КТП 15 ШТ.
CATEGORY: TRANSFORMER SUBSTATIONS
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2X630 KVA 6/0,4KV TRANSFORMER
SUBSTATIONS 8 PCS.
CATEGORY: TRANSFORMER SUBSTATIONS
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2X630 KVA 10/0,4KV TRANSFORMER
SUBSTATIONS 15 PCS
BALKAN 35 KV CLOSED
SWITCHGEAR
500 KV DOUBLE CIRCUIT POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: ЗАКРЫТОЕ РАСПРЕДЕЛИТЕЛЬНОЕ
УСТРОЙСТВО 35 КВ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: Распределительный центр с
трансформатором 2x6,3 кВА 35/6 кВ. Ячейки 35 кВ 11 шт., ячейки 6 кВ
22 шт., сервисные трансформаторы, аккумулятор и выпрямительная
группа, НВ и панели управления, кабели управления и питания
ТИП ПРОЕКТА: ВОЗДУШНЫЕ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 90 КМ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 500 КВ
CATEGORY: 35 KV CLOSED SWITCHGEAR
MAIN CONTRACTOR: TEMA ENGINEERING
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: ENERGY DISTRIBUTION CENTER WITH
2X6,3KVA 35 / 6KV TRANSFORMER. 35KV CELLS 11 UNITS, 6KV
CELLS 22 UNITS, SERVICE TRANSFORMERS, BATTERY AND
RECTIFIER GROUP, LV AND CONTROL PANELS, CONTROL AND
POWER CABLES
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: LOTUS ENERGY
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 90 KM 500 KV TRANSMISSION LINE
KOC
GROUP
CENTRE
PLAZA
KOÇ GROUP
HEAD OFFICE
İSTANBUL/TURKEY
KOC CONSTRUCTION
53 B SHOTA RUSTAVELI STREET
YAKKASARAY DISTRICT
TASHKENT, UZBEKISTAN
KOC-CONSTRUCTION-SON-SUNUM.pdf
KOC-CONSTRUCTION-SON-SUNUM.pdf

Weitere ähnliche Inhalte

Empfohlen

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Empfohlen (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

KOC-CONSTRUCTION-SON-SUNUM.pdf

  • 2. The First foundation of KOC GROUP COMPANY combining almost 50 years professional experience with its futuristic investments and reinforcing its highly qualified proficiency level with its staff was initiated in 1969 under the name of UNLIMITED POWER COMPANY in Istanbul . Since the year 2018, KOC GROUP joined with KOC GROUP COMPAN has fortified its sectoral effects and has been successful with its prospective planning process, effective management systems, and technological development and is still operating under a highly qualified and motivated environment in both national and international businesses. In this competitive working environment, we are aiming to meet each requirements of our customers as well as overcome our limits with each experiences with our high-tech engineering and knowledge, capacity and experiences accumulated over the years , our customer-oriented working style, flexible administrative approach and proven management procedures as well as our flawless experience constructed with idea of highly- qualified performance. Koc Group Company as pioneer creating a value in the sector is designing its business with an intention of using the natural resources productively, protecting and respecting the environment as our duty, pioneering the embracement of these values by the next generations , managing the environmental effects caused by the sector after their detection and complying with the work safety, environment and quality policies in our projects in line with the national and international laws, legislations and regulations. Koc Group Company takes care of and embracing your projects as its own by realizing Turnkey Construction, Mechanical and Electrical system applications successfully within lost of qualified international and national projects including in our major activities. We are aiming to be the one and only undertaking company in turnkey construction projects. We are planning to support your achievement together hand in hand. ABOUT OUR COMPANY AIMING LONG TERM BUSINESS PARTNERSHIP WE ARE HERE TO ACQUIRE THE BEST IN FUTURE OUR AIM IS NOT ONLY MEET REQUIREMENTS BUT GO BEYOND
  • 3. FOUNDED IN 1969 AN EXPERIENCE OVER 50YEARS IN MEP CONTRACTING IN 3 CONTINENTS & 10 COUNTRIES PERFORMS IN MEP CONTRACTING AND 5 OTHER SEGMENTS Project Management Renewable Energy Recycling Turn-Key Construction Low Voltage Panel Production Electrical & Mechanical Contracting Operation & Maintenance
  • 4. k More than 50 Years of Experience k Over 200 Completed Projects k 15 Hotels & 2 Int’l Hospital, Subways Tunnels experience with more than 1 mn sqm k More than 10 years in Asia k Approximately 1,000+ Direct Employees, k Total Workforce Between 1000-1500 with labour Supply k US$178.5 mn 2018 FY revenue k The goal is to become a contractor at ENR international Top 250 k Experience in LEED and BREEAM Certified Projects k ISO 9001, ISO 14001, Certified TÜRKIYE CEZAYİR ÖZBEKISTAN UGANDA RUSYA KENYA LIBYA UKRAYNA UAE TÜRKMENİSTAN Ongoing Projects Turkey, Turkmenistan, Uzbekistan, Iran (Trade) Completed Projects Turkey, Turkmenistan, Uzbekistan, Libya, Algeria, Russia
  • 5. 2 1,8 1,6 1,4 1,2 1 0,8 0,6 0,4 0,2 0 2016 $112.000.000 The Revenue belongs to Koc Group Company Revenues - USD $121.000.000 $178.500.000 $127.000.000 $170.000.000 2017 2018 2019 2020 2021 170.000.000 USD 400.000.000 USD 250.000.000 USD 127.000.000 USD 2020 2022 TARGET 2021 2019 $250.000.000 KOC CONSTRUCTION IN NUMBERS
  • 6. EXPERIENCED TEAM IN HOUSING, SHOPPING MALL, RESIDENCE, OFFICE, HOTEL, HOSPITAL, MARINA, POWER PLANT, RENEWABLE ENERGY SYSTEMS, PUBLIC BUILDINGS, CITY LIGHTING AND SIGNALIZATION WORKS, AND MORE... MORE THAN 200 PROJETS
  • 8. OUR GOAL IS TO ENTER THE WORLD’S BIGGEST 250 CONTRACTORS IN 5 YEARS
  • 9. OUR AIM IS TO GO BEYOND THE NEEDS, NOT JUST MEETING THE NEEDS
  • 13. METRO PLAZA BUSINESS CENTRE CATEGORY: BUSINESS CENTER PROJECT YEAR: 2021-…. MAIN CONTRATOR: ….. PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 87.359 M2 SERVICE GIVEN: TURNKEY
  • 14. METRO PLAZA BUSINESS CENTRE LOYIHA MAYDONI............................................ 12.121m2 SAVDO MAYDONI (1.QAVAT)............................ 4.445m2 OFIS MAYDONI (2-20.QAVATLAR).................... 58.398m2 TEXNIK MAYDONLAR - SIRKULATSIYA............ 5.316m2 AVTOTURARGAH............................................. 19.200m2 AVTOTURARGAH MASHINA SONI..................... 651 ta UMUMIY QURILISH MAYDONI........................... 87.359m2
  • 16. LOT 2 E BLOCK CATEGORY: BUSINESS CENTER PROJECT YEAR: 2021-2022 MAIN CONTRATOR: LOTUS GAS INVEST PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 211.000 M2 SERVICE GIVEN: TURNKEY
  • 17. 5 XONALI 180 m2 TERAS 105.1 m2 JAMI 285.1 m2 5 XONALI 180 m2 TERAS 105.1 m2 JAMI 285.1 m2 5 XONALI 161 m2 TERAS 105.1 m2 JAMI 266.1 m2 5 XONALI 158 m2 TERAS 105.1 m2 JAMI 263.1 m2 PENTHOUSE QAVAT 3D TASVIR 2. QAVAT (YIGILISH) 3D TASVIR
  • 18. SERGELI 4288 APARTMENT CATEGORY: RESIDENTAL PROJECT YEAR: 2022-2025 MAIN CONTRATOR: AKFA PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 317. 901 M2 SERVICE GIVEN: TURNKEY
  • 20. CATEGORY: BUSINESS CENTER PROJECT YEAR: 2022-…. MAIN CONTRATOR: ….. PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 211.080 M2 SERVICE GIVEN: TURNKEY DARXAN BUSINESS CENTER
  • 21. CATEGORY: TRADE CENTER PROJECT YEAR: 2021-2022 MAIN CONTRATOR: MIMAR GROUP PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 1.000.000 M2 SERVICE GIVEN: TURNKEY SERGILI INDEX
  • 24. CATEGORY: MILLY PARK PROJECT YEAR: 2021-2021 MAIN CONTRATOR: AKFA PROJECT LOCATION: TASHKENT/UZBEKISTAN PROJECT AREA: 950.000 M2 SERVICE GIVEN: TURNKEY YENGI UZBEKISTAN PARK
  • 25. ZAAMIN TOURISTIC CENTER CATEGORY: TOURISTIC CENTER PROJECT YEAR: 2022-2022 MAIN CONTRATOR: AKFA PROJECT LOCATION: CIZZAK/UZBEKISTAN PROJECT AREA: …… M2 SERVICE GIVEN: TURNKEY
  • 27.
  • 28. SHYMKENT TOWER CATEGORY: BUSINESS & TRADE CENTER PROJECT YEAR: 2022-2024 MAIN CONTRATOR: SOUTH OIL PROJECT LOCATION: SHYMKENT/KAZAKHISTAN PROJECT AREA: 108.699 M2 SERVICE GIVEN: TURNKEY
  • 30. HILTON TASHKENT CATEGORY: HOTEL & CONGRESS CENTER PROJECT YEAR: 2018-2019 MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 160.000 M²
  • 32. PIRAMIT TOWER& MALL CATEGORY: SHOPPING MALL AND BUSINESS CENTER PROJECT YEAR: 2021-2024 MAIN CONTRACTOR: PIRAMIT GLOBAL PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 160.000 M² ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР И ТРЦ ПРОЕКТНЫЙ ПЕРИОД: 2021-2024 ГЕНПОДРЯДНАЯ ОРГАНИЗАЦИЯ: PIRAMIT GLOBAL МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 160.000 м²
  • 33. TASHKENT CITY LOT 3 ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2019-2020 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 228.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: SHOPPING MALL PROJECT YEAR: 2019-2020 MAIN CONTRACTOR: HYPER PARTNER PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 228.000 M² SERVICES GIVEN: CONSTRUCTION TASHKENT CITY LOT 7 ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2019-2020 КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 85.000 m³ / 227.000 m² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: RESIDENTIAL BUILDINGS PROJECT YEAR: 2019-2020 MAIN CONTRACTOR: AKFA PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 85.000 M³ / 227.000 M² SERVICES GIVEN: CONSTRUCTION
  • 34. MODERA TOWERS CATEGORY: SHOPPING MALL AND RESIDANCE PROJECT YEAR: 2021-2023 MAIN CONTRACTOR: TAKO SALES PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 72.000 M² SERVICES GIVEN: CONSTRUCTION ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР И РЕЗИДЕНЦИЯ ПРОЕКТНЫЙ ПЕРИОД: 2021-2023 КОМПАНИЯ -РАБОТОДАТЕЛЬ: TAKO SALES МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 72.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
  • 35. SEOL BOULEVARD ТИП ЗДАНИЯ: УМНЫЙ ГОРОД ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.550 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: SMART CITY PROJECT YEAR: 2020-ONGOING MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT LOCATION: TASHKENT/ UZBEKISTAN PROJECT AREA: 42.550 M² SERVICES GIVEN: CONSTRUCTION WORKS TASHKENT CITY LOT 2 ТИП ЗДАНИЯ: ПРОЕКТ СМЕШАННОГО ТИПА ПРОЕКТНЫЙ ПЕРИОД: 2019-2020 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ГАЗ ИНВЕСТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ ЖИЛЫХ ЗДАНИЙ БЛОКИ А,Б,С, ОТЕЛЬ РАДИССОН БЛОК Д CATEGORY: MIXED USED PROJECT PROJECT YEAR: 2019-2020 MAIN CONTRACTOR: LOTUS GAZ INVEST PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 220.000 M² SERVICES GIVEN: CONSTRUCTION OF RESIDENTIAL BUILDINGS BLOCKS A,B,C, SHOPPING MALL BLOCK D
  • 36. LOT-1 SOCIAL FACILITY ТИП ЗДАНИЯ: СОЦИАЛЬНЫЙ ОБЪЕКТ ПРОЕКТНЫЙ ПЕРИОД: 2020-2021 КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ПОД КЛЮЧ CATEGORY: SOCIAL FACILITY PROJECT YEAR: 2020-2021 MAIN CONTRACTOR: DISCOVER INVEST PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 2000 M² SERVICES GIVEN: TURNKEY TEMIR BUSINESS CENTER ТИП ЗДАНИЯ : БИЗНЕС ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД : 2021-2022 КОМПАНИЯ -РАБОТОДАТЕЛЬ: IMP NEW PAY МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 25.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ : ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: BUSINESS CENTER PROJECT YEAR: 2021-2022 MAIN CONTRACTOR: IMP NEW PAY PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 25.000 M² SERVICES GIVEN: CONSTRUCTION
  • 37. BUKHARA GOVERNORSHIP’S HOTEL ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2018-2019 КОМПАНИЯ-РАБОТОДАТЕЛЬ: УПРАВЛЕНИЕ СТРОИТЕЛЬСТВА ОБЛАСТИ БУХАРА МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: HOTEL PROJECT YEAR: 2018-2019 MAIN CONTRACTOR: BUKHARA REGION CONSTRUCTION DIRECTORATE PROJECT LOCATION: BUKHARA / UZBEKISTAN PROJECT AREA: 1500 M² SERVICES GIVEN: TURNKEY CONSTRUCTION MEGA BUKHARA SHOPPING MALL ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2019 КОМПАНИЯ -РАБОТОДАТЕЛЬ: МУСТАХКАМ КУРИЛИШ ДЕВЕЛОПМЕНТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 100.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: SHOPPING MALL PROJECT YEAR: 2019 MAIN CONTRACTOR: MUSTAHKAM QURILISH DEVELOPMENT PROJECT LOCATION: BUKHARA / UZBEKİSTAN PROJECT AREA: 100.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 38. PRESIDENT SCHOOL ТИП ЗДАНИЯ: ШКОЛА ПРОЕКТНЫЙ ПЕРИОД: 2021-2021 КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: SCHOOL PROJECT YEAR: 2021-2021 MAIN CONTRACTOR: DISCOVER INVEST PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 9000 M² SERVICES GIVEN: CONSTRUCTION HUAWEI OFFICE ТИП ЗДАНИЯ: РЕНОВАЦИЯ ПРОЕКТНЫЙ ПЕРИОД: 2020 - КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: RENOVATION PROJECT YEAR: 2020 - MAIN CONTRACTOR: HUAWEİ PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 1600 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 39. ALAKA VAZIRLIGI VILLAS ТИП ЗДАНИЯ : ВИЛЛЫ ПРОЕКТНЫЙ ПЕРИОД : 2021-2021 КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ : ПОД КЛЮЧ CATEGORY: VILLAS PROJECT YEAR: 2021-2021 MAIN CONTRACTOR: DISCOVER PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 17.000 M² SERVICES GIVEN: TURNKEY UNIVERSITY PROJECT ТИП ЗДАНИЯ: УНИВЕРСИТЕТ ПРОЕКТНЫЙ ПЕРИОД: 2021-2022 КОМПАНИЯ -РАБОТОДАТЕЛЬ: MIMAR DEVELOPMENT МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 250.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: UNIVERSITY PROJECT YEAR: 2021-2022 MAIN CONTRACTOR: MIMAR DEVELOPMENT PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 250.000 M² SERVICES GIVEN: CONSTRUCTION
  • 40. HAMPTON BY HILTON ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2020 - КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: TASHKENT / UZBEKİSTAN ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 12.000 м2 ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: HOTEL PROJECT YEAR: 2020 - MAIN CONTRACTOR: AKFA PROJECT LOCATION: TASHKENT / UZBEKİSTAN PROJECT AREA: 12.000 M2 SERVICES GIVEN: TURNKEY CONSTRUCTION BUKHARA WYNDHAM HOTEL ТИП ЗДАНИЯ: WYNDHAM ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: WYNDHAM HOTEL PROJECT YEAR: 2020-ONGOING MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT PROJECT LOCATION: BUKHARA / UZBEKISTAN PROJECT AREA: 33.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 41. MASLAK 1453 SHERATON HOTEL ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2018-2020 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДОРУК ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 75.000 м2 ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2015 MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY PROJECT AREA: 800.000 M² SERVICES GIVEN: CONSTRUCTION WORKS CATEGORY: HOTEL PROJECT YEAR: 2018-2020 MAIN CONTRACTOR: DORUK CONSTRUCTION PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 75.000 M2 SERVICES GIVEN: CONSTRUCTION
  • 42. NUROL LIFE TOWER SINPAS BOSPHORUS CITY ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2011-2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИЛЬХАН ЙИЛДИРИМ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ, ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м2 ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2009 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУПП МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м2 ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2011-2014 MAIN CONTRACTOR: ILHAN YILDIRIM INSAAT PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 220.000 M2 SERVICES GIVEN: CONSTRUCTION CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2009 MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO PROJECT LOCATION: İSTANBUL / TURKEY PROJECT AREA: 46.000 M2 SERVICES GIVEN: CONSTRUCTION
  • 43. ARZUW HOTEL PUBLIC PROJECT ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2010 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 50.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6400 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: HOTEL PROJECT YEAR: 2010 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 50.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: PUBLIC PROJECT PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 6400 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON
  • 44. SOWDA CENTER SHOPPING MALL 48 RESIDENTIAL BUILDING ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.400 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY : SHOPPING MALL PROJECT YEAR : 2017 MAIN CONTRACTOR : POLAT CONSTRUCTION PROJECT LOCATION :TURKMENISTAN PROJECT AREA : 2500 M² SERVICES GIVEN : TURNKEY CONSTRUCTİON CATEGORY: RESIDENTIAL BUILDING PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 16.400 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON
  • 45. NURSERY PROJECT BUSINESS CENTER ONE PROJECT ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3600 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3450 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: PUBLIC PROJECT PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 3600 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON CATEGORY: BUSINESS CENTRE PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 3450 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON
  • 46. 72 RESIDENTIAL BUILDING VILLA PROJECT ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.800 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: RESIDENTIAL BUILDING PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 20.800 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON CATEGORY: RESIDENTIAL BUILDING PROJECT YEAR: 2017 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION:TURKMENISTAN PROJECT AREA: 1600 M² SERVICES GIVEN: TURNKEY CONSTRUCTİON
  • 47. KUWWAT HOTEL KERWEN HOTEL ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2011 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 30.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2012 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 35.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: HOTEL PROJECT YEAR: 2011 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 30.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: HOTEL PROJECT YEAR: 2012 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 35.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 48. WATANCY HOTEL ICE MANSION SPORT CENTER ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 40.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 40.000 M’ SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 49. PRESIDENT PALACE CHECKPOINT CENTER AKAYLA STATION ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ ПРОЕКТНЫЙ ПЕРИОД: 2009 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 7000 М² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: КОНТРОЛЬНО ПРОПУСКНОЙ ПУНКТ ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.063 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: ADMINISTRATIVE BUILDING PROJECT YEAR: 2009 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 7000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: CHECKPOINT PROJECT YEAR: 2014 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 18.063 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 50. MILITARY ACADEMY HOTEL OGUZKENT ТИП ЗДАНИЯ: ОБЩЕСТВЕННОЕ ЗДАНИЕ ПРОЕКТНЫЙ ПЕРИОД: 2010 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 5000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2009 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: PUBLIC BUILDING PROJECT YEAR: 2010 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 5000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: HOTEL PROJECT YEAR: 2009 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 40.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 51. ASHGABAT CITY RESIDENTIAL BUILDING AWAZA SOWHUN COTTAGES ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: RESIDENTIAL BUILDING PROJECT YEAR: 2013 MAIN CONTRACTOR: POLAT CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 16.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 18.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION
  • 52. TURKMENBASHI 420 STUDENTS SCHOOL AND NURSERY ТИП ЗДАНИЯ: ШКОЛА И ДЕТСКИЙ САД ПРОЕКТНЫЙ ПЕРИОД: 2011 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 11.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ CATEGORY: SCHOOL / NURSERY PROJECT YEAR: 2011 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 11.000 M² SERVICES GIVEN: TURNKEY CONSTRUCTION CHEKMEKOY STATE HOSPITAL ТИП ЗДАНИЯ: БОЛЬНИЦА ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: МИНЗДРАВ ТУРЦИИ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 48.896,92 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: HOSPITAL PROJECT YEAR: 2015 MAIN CONTRACTOR: MINISTRY OF HEALTH OF TURKEY PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 48.896,92 M²
  • 53. GURPINAR FISHERIES CENTER IFF AROMA FACTORY ТИП ЗДАНИЯ: ЦЕНТР МОРЕПРОДУКТОВ ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШААТ / НУХОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЮРПЫНАР / СТАМБУЛ/ ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 85.703 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИФФ АРОМА ЭСАНС МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЕБЗЕ / КОДЖАЭЛИ/ ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 21.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: FISHERIES ESTATE PROJECT YEAR: 2015 MAIN CONTRACTOR: NAS CONSTRUCT’ON NUHOGLU CONSTRUCTION PROJECT LOCATION: GURPINAR / ISTANBUL / TURKEY PROJECT AREA: 85.703 M² CATEGORY: INDUSTRIAL FACILITY PROJECT YEAR: 2014 MAIN CONTRACTOR: IFF AROMA ESANS PROJECT LOCATION: GEBZE / KOCAELI / TURKEY PROJECT AREA: 21.000 M²
  • 54. ISTANBUL PALACES SULTANGAZI SCHOOL ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУП МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ХАЛКАЛЫ / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 125.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ШКОЛА ПРОЕКТНЫЙ ПЕРИОД: 2016 КОМПАНИЯ -РАБОТОДАТЕЛЬ: БИСКОН ЯПЫ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.734 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: RESIDENTIAL BUILDINGS PROJECT YEAR: 2013 MAIN CONTRACTOR: CIHAN CONSTRUCTION/SINPAS GYO PROJECT LOCATION: HALKALI / ISTANBUL / TURKEY PROJECT AREA: 125.000 M² CATEGORY: SCHOOL PROJECT YEAR: 2016 MAIN CONTRACTOR: BISCON YAPI PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 16.734 M²
  • 55. SANKO HOLDING STORAGE AND ADMINISTRATIVE BUILDING SULTANGAZI CULTURAL CENTER ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2007 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШ / ТАШЯПЫ ИНШ / НУХОГЛУ ИНШ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СУЛТАНГАЗИ / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: BUSINESS CENTER PROJECT YEAR: 2007 MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 42.500 M² CATEGORY: CULTURAL CENTER PROJECT YEAR: 2014 MAIN CONTRACTOR: NAS CONSTRUCTION/TASYAPI CONSTRUCTION / NUHOGLU CONSTRUCTION PROJECT LOCATION: SULTANGAZI / ISTANBUL / TURKEY PROJECT AREA: 46.000 M²
  • 56. DAP IST MARINA VIAPORT VENEZIA ТИП ЗДАНИЯ: ЖИЛЫЕ ДОМА / ТРЦ / ПРИСТАНЬ ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДАП ЯПЫ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 480.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPİNG MALL / MARİNA PROJECT YEAR: 2015 MAIN CONTRACTOR: DAP YAPI PROJECT LOCATION: İSTANBUL / TURKEY PROJECT AREA: 480.000 M² CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL PROJECT YEAR: 2013 MAIN CONTRACTOR: FERYAPI PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY PROJECT AREA: 210.000 M²
  • 57. ISTWEST EGE VALLEY ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2017-2018 КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL PROJECT YEAR: 2013 MAIN CONTRACTOR: FERYAPI PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY PROJECT AREA: 210.000 M² CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2017-2018 MAIN CONTRACTOR: SINPAS GYO PROJECT LOCATION: ANKARA / TURKEY PROJECT AREA: 171.500 M²
  • 58. KUYUMCU KENT SINPAS BOSPHORUS CITY ТИП ЗДАНИЯ: ОФИС ПРОЕКТНЫЙ ПЕРИОД: 2010 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 82.400 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2009 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУПП МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: OFFICE PROJECT YEAR: 2010 MAIN CONTRACTOR: CIHAN CONSTRUCTION PROJECT LOCATION: İSTANBUL / TURKEY PROJECT AREA: 82.400 M² CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2009 MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO PROJECT LOCATION: İSTANBUL / TURKEY PROJECT AREA: 46.000 M²
  • 59. MASLAK 1453 ARÇELIK TV FACTORY ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ТВ ФАБРИКА ПРОЕКТНЫЙ ПЕРИОД: 2017-2018 КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТЕКИРДАГ/ ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 76.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2015 MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY PROJECT AREA: 800.000 M² CATEGORY: TV FACTORY PROJECT YEAR: 2017-2018 MAIN CONTRACTOR: ARK CONSTRUCTION PROJECT LOCATION: TEKIRDAG / TURKEY PROJECT AREA: 76.000 M²
  • 60. TURK TRACTOR FACTORY TUZLA VIAPORT MARINA ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ ОБЪЕКТ ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН / КОЧ ХОЛДИНГ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САКАРЯ/ ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 110.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ПРИСТАНЬ ДЛЯ ЯХТ / ОТЕЛЬ / ТЦ/ ТЕМАТИЧЕСКИЙ ПАРК ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: БАЙРАКТАР А..Ш. МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ/ ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 600.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: İNDUSTRIAL FACILITY PROJECT YEAR: 2014 MAIN CONTRACTOR: ARK CONSTRUCTION / KOÇ HOLDING PROJECT LOCATION: SAKARYA / TURKEY PROJECT AREA: 110.000 M² CATEGORY: MARİNA / HOTEL / SHOPPİNG MALL / THEMEPARK PROJECT YEAR: 2015 MAIN CONTRACTOR: BAYRAKTAR INC. PROJECT LOCATION: İSTANBUL / TURKEY PROJECT AREA: 600.000 M²
  • 61. EGE SIDE MURATBEY CUSTOM ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2017-2018 КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ТАМОЖЕННЫЙ ТЕРМИНАЛ ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИНТЕС А.Ш. МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЧАТАЛДЖА / СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 200.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: RESİDENTİAL BUİLDİNGS PROJECT YEAR: 2017-2018 MAIN CONTRACTOR: SINPAS GYO PROJECT LOCATION: ANKARA / TURKEY PROJECT AREA: 171.500 M² CATEGORY: CUSTOMS DIRECTORATE PROJECT YEAR: 2014 MAIN CONTRACTOR: INTEL INC. PROJECT LOCATION: CHATALDJA / ISTANBUL / TURKEY PROJECT AREA: 200.000 M²
  • 62. MARMARAY HIGH SPEED TRAIN STATIONS TURKMENISTAN INTERNATIONAL SEAPORT ТИП ЗДАНИЯ: ВЫСОКОСКОРОСТНЫЕ ЖЕЛЕЗНОДОРОЖНЫЕ СТАНЦИИ ПРОЕКТНЫЙ ПЕРИОД: 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ОХЛ КОНСТРАКШН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 23.500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ И ИНЖЕНЕРНЫЕ СИСТЕМЫ ТИП ЗДАНИЯ: МЕЖДУНАРОДНЫЙ ПОРТ ПРОЕКТНЫЙ ПЕРИОД: 2017 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНБАШИ / БАЛКАН / ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: НАРУЖНОЕ ОСВЕЩЕНИЕ ПОРТА, ЗДАНИЕ ЛОТА4 И ЛОТА5 РАБОТЫ НВ И СН ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: HIGH SPEED TRAIN STATION PROJECT YEAR: 2014 MAIN CONTRACTOR: OHL CONSTRUCTION PROJECT LOCATION: ISTANBUL / TURKEY PROJECT AREA: 23.500 M² SERVICES GIVEN: ELECTROMECHANICAL WORKS CATEGORY: INTERNATIONAL PORT PROJECT YEAR: 2017 MAIN CONTRACTOR: GAP CONSTRUCTION PROJECT LOCATION: TURKMENBASHI / BALKANABAD / TURKMENISTAN PROJECT AREA: PORT LIGHTNING SYSTEM AND LOT 4, LOT 5 M.V./L.V. SYSTEMS
  • 63. ASHGABAT SHOPPING MALL FANTAN ТИП ЗДАНИЯ : ТРЦ ПРОЕКТНЫЙ ПЕРИОД : 2014 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГУДЖУРЛУ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 180.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ : ДЕКОРАТИВНЫЙ БАССЕЙН ПРОЕКТНЫЙ ПЕРИОД : 2011-2012 МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: SHOPPING MALL PROJECT YEAR: 2014 MAIN CONTRACTOR: GUJURLU PROJECT LOCATION: ASHGABAT / TURKMENISTAN PROJECT AREA: 180.000 M² CATEGORY: DECORATIVE POOL PROJECT YEAR: 2011-2012 PROJECT LOCATION: ASHGABAT / TURKMENISTAN PROJECT AREA: 20.000 M2
  • 64. DASOGUZ HOTEL BALKAN HOTEL ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2010 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.200 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: HOTEL PROJECT YEAR: 2010 MAIN CONTRACTOR: ALPARSLAN CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 18.000 M² CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: TEMA CONSTRUCTİON PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 18.200 M²
  • 65. AWAZA HOTEL LEBAP AWAZA HOTEL MARY ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: КАЙЫ КОНСТРАКШН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЧАКЫР ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: KAYI CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 18.000 M² CATEGORY: HOTEL PROJECT YEAR: 2013 MAIN CONTRACTOR: CAKIR CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 17.000 M²
  • 66. IZGANT SPOR CENTER DASOGUZ CULTURAL CENTER ТИП ЗДАНИЯ: СПОРТИВНЫЙ КОМПЛЕКС ПРОЕКТНЫЙ ПЕРИОД: 2012 КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2013 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТУРКМЕН БИНА МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: SPORT CENTER PROJECT YEAR: 2012 MAIN CONTRACTOR: MERV CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 6000 M² CATEGORY: CULTURAL CENTER PROJECT YEAR: 2013 MAIN CONTRACTOR: TURKMEN BINA PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 8500 M²
  • 67. BALKANABAD NEBITDAG MUSEUM IZGANT CULTURAL CENTER ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2011 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР ПРОЕКТНЫЙ ПЕРИОД: 2010 КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ CATEGORY: MUSEUM PROJECT YEAR: 2011 MAIN CONTRACTOR: TEMA CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 9000 M² CATEGORY: CULTURAL CENTER PROJECT YEAR: 2010 MAIN CONTRACTOR: MERV CONSTRUCTION PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 8500 M²
  • 68. HOTEL ARCHABIL HOTEL BALKAN ТИП ЗДАНИЯ: ОТЕЛЬ ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТАЗЕДЖАЙ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АШГАБАТ / ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ ПРОЕКТНЫЙ ПЕРИОД: 2015 КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГЛАВНОЕ УПРАВЛЕНИЕ АВТОМОБИЛЬНЫХ ДОРОГ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 58.000 м² ВЫПОЛНЕННЫЕ РАБОТЫ: РАБОТЫ ПО ИНЖЕНЕРНЫМ СИСТЕМАМ CATEGORY: HOTEL PROJECT YEAR: 2015 MAIN CONTRACTOR: TAZE JAY CONSTRUCTION PROJECT LOCATION: ASHGABAT / TURKMENISTAN PROJECT AREA: 33.000 M² CATEGORY: ADMINISTRATIVE BUILDING PROJECT YEAR: 2015 MAIN CONTRACTOR: GENERAL DIRECTORATE OF HIGHWAYS PROJECT LOCATION: TURKMENISTAN PROJECT AREA: 58.000 M² SERVICES GIVEN: MECHANICAL WORKS
  • 70. TURKEY SPP PROJECT YEAR: 2017 CITY: AFYONKARAHISAR 5,763 MW PROJECT YEAR: 2017 CITY: ANKARA 6 MW PROJECT YEAR: 2017 CITY: ANKARA 8,3 MW PROJECT YEAR: 2017 CITY: AYDIN 5,5 MW PROJECT YEAR: 2016 CITY: AFYONKARAHISAR 5 MW
  • 71. TURKEY SPP PROJECT YEAR : 2016 CITY: ELAZIĞ 8 MW PROJECT YEAR: 2015 CITY: NEVŞEHİR 10,8 MW PROJECT YEAR: 2016 CITY: AFYONKARAHISAR 11 MW PROJECT YEAR: 2016 CITY: UŞAK 5,5 MW PROJECT YEAR: 2016 CITY: ÇANAKKALE 4,235 MW PROJECT YEAR: 2017 CITY: YOZGAT 6,5 MW
  • 72. PROJECT YEAR: 2019 COUNTRY: UKRAINE 12 MW UKRANIE SPP PROJECT YEAR: 2018 COUNTRY: UKRAINE 10 MW PROJECT YEAR: 2019 COUNTRY: UKRAINE 24 MW PROJECT YEAR: 2019 COUNTRY: UKRAINE 14 MW PROJECT YEAR: 2019 COUNTRY: UKRAINE 12 MW PROJECT YEAR: 2018 COUNTRY: UKRAINE 19 MW
  • 75. DISTRIBUTION SUBSTATIONS OF THE TASHKENT CITY PROJECT TURKMENBASHI INTERNATIONAL SEAPORT 2 CIRCUIT 100 KV POWER TRANSMISSION LINE ТИП ПРОЕКТА: РАСПРЕДЕЛИТЕЛНЫЕ ПОДСТАНЦИИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: УЗБЕКИСТАН ОПИСАНИЕ ПРОЕКТА: ДВА ТРАНСФОРМАТОРНЫХ И ДВА РАСПРЕДЕЛИТЕЛЬНЫХ ПОДСТАНЦИЙ ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 2-Х ЦЕПНАЯ ЛИНИЯ ЭЛЕКТРОПЕРЕДАЧИ 100 КВ CATEGORY: DISTRIBUTION SUBSTATIONS MAIN CONTRACTOR: AKFA PROJECT LOCATION: UZBEKISTAN PROJECT EXPLANATION: TWO TRANSFORMER AND TWO DISTRIBUTION SUBSTATIONS CATEGORY: POWER TRANSMISSION LINE MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 2 CIRCUIT POWER TRANSMISSION LINE 100 KV
  • 76. TURKMENBASHI 110 KV OPEN SWITCHYARD TURKMENBASHI INTERNATIONAL SEAPORT GIS CENTER ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛНАЯ ПОДСТАНЦИЯ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ ПОДСТАНЦИЯ 110 кВ ТИП ПРОЕКТА: ГАЗОПОРШНЕВАЯ УСТАНОВКА КОМПАНИЯ -РАБОТОДАТЕЛЬ: АББ ФИНЛЯНДИЯ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 110/35/10 (2*40mVA) УСТАНОВКА И ПУСКОНАЛАДКА ГПУ CATEGORY: OPEN SWITCHYARD MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 110KV OPEN SWICHYARD CATEGORY: GAS INSULATED SWITCHGEAR MAIN CONTRACTOR: ABB FINLAND PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION 110/35/10 (2*40MVA) GIS MONTAGE AND COMMISSIONG
  • 77. TURKMENBASI TRANSFORMER SUBSTATIONS AWAZA ROAD LIGHTING AND TRAFFIC SIGNALIZATION SYSTEM ТИП ПРОЕКТА: ЭЛЕКТРИЧЕСКАЯ ИНФРАСТРУКТУРА КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ ДУЮПЛУ / РАЙОНА БАЛКАН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 35-10 КВ ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ 2 ШТ. ТИП ПРОЕКТА: ДОРОЖНОЕ ОСВЕЩЕНИЕ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 34 km РАБОТЫ ПО ДОРОЖНОМУ ОСВЕЩЕНИЮ И СИГНАЛИЗАЦИИ CATEGORY: ELECTRICAL INFRASTRUCTURE MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF DUYUPLU/BALKAN DISTRICT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION 2 PCS 35-10KV TRANSFORMER SUBSTATIONS CATEGORY: ROAD LIGHTING SYSTEM MAIN CONTRACTOR: HATIPOGLU PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 34 KM ROADS LIGHTING AND TRAFFIC SIGNALLING WORKS
  • 78. AWAZA OPEN SWITCHYARD AND POWER TRANSMISSION LINE AWAZA 110 KV POWER TRANSMISSION LINE ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ ПОДСТАНЦИЯ И ЛИНИЯ ЭЛЕКТРОПЕРЕДАЧИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ЭЛЕКТРОПЕРЕДАЧИ 220/110 КВ ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ВЛ-110кв ЛAН-1 и ЛAН- 2 от «Аваза ДЭС» до подстанции «Новруз» 110/10кВ CATEGORY: OPEN SWITCHYARD AND POWER TRANSMISSION LINE MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE 220/110 KV CATEGORY: POWER TRANSMISSION LINES MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE - 110KV LAN-1 AND LAN-2 FROM AVAZA DES TO THE 110/10 KV NOVRUZ SUBSTATION
  • 79. GARABOGAZ FERTILIZER FACTORY GIS CENTER GARABOGAZ FERTILIZER FACTORY POWER TRANSMISSION LINE ТИП ПРОЕКТА: ГАЗОПОРШНЕВЫЕ УСТАНОВКИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 110 KV ГПУ С ТРАНСФОРМАТОРАМИ 110/11KV 2X25 MVA ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 110 КВ CATEGORY: GAS INSULATED SWITCHGEAR MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 110 KV GIS WITH 110/11KV 2X25 MVA TRANSFORMERS CATEGORY: POWER TRANSMISSION LINE MAIN CONTRACTOR: GAP INSHAAT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 110 KV TRANSMISSION LINE
  • 80. TURKMENBASHI TRANSFORMER SUBSTATIONS BEKTAS TRANSFORMER SUBSTATIONS ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ ДУЮПЛУ / РАЙОНА БАЛКАН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 6/0,4КВ КТП 8 ШТ. ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ ДУЮПЛУ / РАЙОНА БАЛКАН МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 10/0,4КВ КТП 15 ШТ. CATEGORY: TRANSFORMER SUBSTATIONS MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF DUYUPLU/BALKAN DISTRICT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 2X630 KVA 6/0,4KV TRANSFORMER SUBSTATIONS 8 PCS. CATEGORY: TRANSFORMER SUBSTATIONS MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF DUYUPLU/BALKAN DISTRICT PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 2X630 KVA 10/0,4KV TRANSFORMER SUBSTATIONS 15 PCS
  • 81. BALKAN 35 KV CLOSED SWITCHGEAR 500 KV DOUBLE CIRCUIT POWER TRANSMISSION LINE ТИП ПРОЕКТА: ЗАКРЫТОЕ РАСПРЕДЕЛИТЕЛЬНОЕ УСТРОЙСТВО 35 КВ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: Распределительный центр с трансформатором 2x6,3 кВА 35/6 кВ. Ячейки 35 кВ 11 шт., ячейки 6 кВ 22 шт., сервисные трансформаторы, аккумулятор и выпрямительная группа, НВ и панели управления, кабели управления и питания ТИП ПРОЕКТА: ВОЗДУШНЫЕ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН ОПИСАНИЕ ПРОЕКТА: 90 КМ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 500 КВ CATEGORY: 35 KV CLOSED SWITCHGEAR MAIN CONTRACTOR: TEMA ENGINEERING PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: ENERGY DISTRIBUTION CENTER WITH 2X6,3KVA 35 / 6KV TRANSFORMER. 35KV CELLS 11 UNITS, 6KV CELLS 22 UNITS, SERVICE TRANSFORMERS, BATTERY AND RECTIFIER GROUP, LV AND CONTROL PANELS, CONTROL AND POWER CABLES CATEGORY: POWER TRANSMISSION LINE MAIN CONTRACTOR: LOTUS ENERGY PROJECT LOCATION: TURKMENISTAN PROJECT EXPLANATION: 90 KM 500 KV TRANSMISSION LINE
  • 83.
  • 84. KOÇ GROUP HEAD OFFICE İSTANBUL/TURKEY KOC CONSTRUCTION 53 B SHOTA RUSTAVELI STREET YAKKASARAY DISTRICT TASHKENT, UZBEKISTAN