SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Data
collection
Architectural
Model
Structural
Model
Quantity
Takeoff & Cost
Estimation
Model Render
• Data collected: Drawings and site information gathered
• Architectural model: Constructed using Autodesk Revit
architecture
• Structural model: Model using Autodesk Revit architecture
• Material quantities: Calculated and recorded
• Renders of the model: Captured for visualization purposes
Architectural Model Design
• Unit, level, and grid setup
• Material assignment
• Element installation
• Normal weight structure modeling
• Constructing walls
• Laying floors and roofs
• Materials used for walls, floors, and roofs
Architectural Model
Lightweight Structure Model-I:
• Material for walls
• Material for floor finishing and roof finishing
Lightweight Structure Model-II:
• Material for walls
• Material for floor finishing and roof finishing
Structural Model
• Modeling of structural members
• Concrete used as material
• Laying of all the members
• Providing reinforcement to elements
Quantity Takeoff and Cost Estimation
Normal Weight material
Wall Material Volume ( cft ) Vol of Mat. No. of Mat.
Cost per
unit
Amount Rs/-
4" Solid Blocks 11743.88 0.074074074 158542.3802 25 3963559.504
6" Solid Blocks 11946.4 0.444444444 26879.40003 40 1075176.001
6" Hollow Blocks 27715.6 0.444444444 62360.10006 30 1870803.002
8" Solid Blocks 36194.91 0.592592593 61078.91058 70 4275523.741
Total 87600.79 308860.7908 11185062.25
Quantity Takeoff and Cost Estimation
Floors
Materials Measurement Amount Rs/-
Total Floor Area (sq ft) 109465
Total floor Volume (cft) 18244.16
2" PCC slab (1:2:4) 18244.16
Cement (Bags) 2606.31 2606310
Sand(cft) 5212.62 547325.1
Crush(cft) 10425.23 1355279.9
Total 4508915
Roof
Materials Measurement Amount Rs/-
No of Marble 11260 563000
50MM Quarto L 1023.636364 2083100
2xcoats Velosit CW
111(1.5kg/m2)
3136.490251 1568245.125
Total 4214345.125
Quantity Takeoff and Cost Estimation
Concrete Volume
Concrete Beam Concrete Column
Volume
(cft)
Cost per cft
(3000psi)
Total Cost
(RS)
Volume
(cft)
Cost per
cft
(4000psi)
Total
Cost
(RS)
Original 34350.44 394 13534073.36 Original 22070.63 470 10373196
.1
Optimized 34310.96 394 13518518.24 Optimized 18105.78 470 8509716.
6
CLC 27210.56 394 10720960.64 CLC 17418.5 470 8186695
EPS 19148.55 394 7544528.7 EPS 16534.38 470 7771158.
6
Quantity Takeoff and Cost Estimation
Weight of steel
Beam (Ton) Column (Ton) Total (Ton) Cost/ton Total
96.3 81.01 177.31 154000 27305740
96.3 75.33 171.63 154000 26431020
84.36 72.91 157.27 154000 24219580
78.66 68.86 147.52 154000 22718080
Quantity Takeoff and Cost Estimation
Lightweight Weight material
Wall Material
Volume
(c. ft)
Vol of Mat. No. of Mat.
Cost per
unit
Amount Rs/-
CLC 4" x 8" x
24 "
11743.88 0.444444444 26423.73 68 1796813.64
CLC 6" x 8" x
24 "
39662.05 0.666666667 59493.075 81 4818939.075
CLC 8" x 8" x
24 "
36194.91 0.888888889 40719.27375 95 3868331.006
Total 126636.078 10484083.7
Wall Material Area (sq. ft) Vol of Mat. No. of Mat. Cost per ft Amount Rs/-
EPS Panels 107152.1007 8 - 137 14679837.79
Quantity Takeoff and Cost Estimation
Roof
Materials Measurement Amount Rs/-
No. of 300x150x38mm brick
tiles
23387 1870960
100mm mud 25mm mud plaster 486 694008
PVC membrane 0.25 (sq.ft) 11260 450400
one coat of H bitumen 1459 2083452
Total 5098820
Floors
Materials Measurement Amount Rs/-
50MM Ozonil Quarto (L) 22 kg
with 1kg
PU Beads
1684.7 3428364.5
Comparison of Wall Cost
Comparison of Floor
Cost
Quantity Amount Rs/-
Old Floor 4508915
New Floor 3428364.5
Difference 1080550.5
Percentage 23.9
Comparison of Roof
Cost
Quantity Amount Rs/-
Old Roof 5098820
New Roof 4214345.125
Difference 884474.875
Percentage 17.35
Comparison of Wall Cost
Walls
Quantity Amount Rs/- Quantity Amount Rs/-
Solid & Hollow
Block Wall
11185062.25 Solid & Hollow Block Wall 11185062.25
CLC Block 10484083.72 EPS 14679837.79
Difference 700978.5265 Difference 3494775.542
Percentage 6.267095443 Percentage 23.80663596
Model Renders
• Enscape Rendering
• Revit Rendering
Ahras PPT (2).pptx
Ahras PPT (2).pptx
Ahras PPT (2).pptx

Weitere ähnliche Inhalte

Ähnlich wie Ahras PPT (2).pptx

OIP presentation 2
OIP presentation 2OIP presentation 2
OIP presentation 2
tresor Kumba
 
UNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
UNIT 3.4_ESTIMATION OF MATERIAL COST.pptUNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
UNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
MrKumarKM
 

Ähnlich wie Ahras PPT (2).pptx (20)

Rate analysis vansheika
Rate analysis   vansheikaRate analysis   vansheika
Rate analysis vansheika
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
PPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxPPCE UNIT- 4.pptx
PPCE UNIT- 4.pptx
 
PPCE Unit-4.pptx
PPCE Unit-4.pptxPPCE Unit-4.pptx
PPCE Unit-4.pptx
 
PPCE Unit-4.pptx
PPCE Unit-4.pptxPPCE Unit-4.pptx
PPCE Unit-4.pptx
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
PPCE Unit 4
PPCE Unit 4PPCE Unit 4
PPCE Unit 4
 
Etabs BY Subash Pathak
Etabs BY Subash PathakEtabs BY Subash Pathak
Etabs BY Subash Pathak
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
 
3D final
3D final3D final
3D final
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentation
 
Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Therm...
Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Therm...Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Therm...
Avonmouth/Severnside Forum March 2014 - Paul Albone, Brunel Industries, Therm...
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
3D Design DCP – What Are The Benefits.pdf
3D Design DCP – What Are The Benefits.pdf3D Design DCP – What Are The Benefits.pdf
3D Design DCP – What Are The Benefits.pdf
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
 
OIP presentation 2
OIP presentation 2OIP presentation 2
OIP presentation 2
 
IES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L ClinicIES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L Clinic
 
UNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
UNIT 3.4_ESTIMATION OF MATERIAL COST.pptUNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
UNIT 3.4_ESTIMATION OF MATERIAL COST.ppt
 
Municipal Presentation Sarad Dahal.pptx
Municipal Presentation Sarad Dahal.pptxMunicipal Presentation Sarad Dahal.pptx
Municipal Presentation Sarad Dahal.pptx
 

Kürzlich hochgeladen

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Kürzlich hochgeladen (20)

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Ahras PPT (2).pptx

  • 2. • Data collected: Drawings and site information gathered • Architectural model: Constructed using Autodesk Revit architecture • Structural model: Model using Autodesk Revit architecture • Material quantities: Calculated and recorded • Renders of the model: Captured for visualization purposes
  • 3. Architectural Model Design • Unit, level, and grid setup • Material assignment • Element installation • Normal weight structure modeling • Constructing walls • Laying floors and roofs • Materials used for walls, floors, and roofs
  • 4. Architectural Model Lightweight Structure Model-I: • Material for walls • Material for floor finishing and roof finishing Lightweight Structure Model-II: • Material for walls • Material for floor finishing and roof finishing
  • 5. Structural Model • Modeling of structural members • Concrete used as material • Laying of all the members • Providing reinforcement to elements
  • 6.
  • 7. Quantity Takeoff and Cost Estimation Normal Weight material Wall Material Volume ( cft ) Vol of Mat. No. of Mat. Cost per unit Amount Rs/- 4" Solid Blocks 11743.88 0.074074074 158542.3802 25 3963559.504 6" Solid Blocks 11946.4 0.444444444 26879.40003 40 1075176.001 6" Hollow Blocks 27715.6 0.444444444 62360.10006 30 1870803.002 8" Solid Blocks 36194.91 0.592592593 61078.91058 70 4275523.741 Total 87600.79 308860.7908 11185062.25
  • 8. Quantity Takeoff and Cost Estimation Floors Materials Measurement Amount Rs/- Total Floor Area (sq ft) 109465 Total floor Volume (cft) 18244.16 2" PCC slab (1:2:4) 18244.16 Cement (Bags) 2606.31 2606310 Sand(cft) 5212.62 547325.1 Crush(cft) 10425.23 1355279.9 Total 4508915 Roof Materials Measurement Amount Rs/- No of Marble 11260 563000 50MM Quarto L 1023.636364 2083100 2xcoats Velosit CW 111(1.5kg/m2) 3136.490251 1568245.125 Total 4214345.125
  • 9. Quantity Takeoff and Cost Estimation Concrete Volume Concrete Beam Concrete Column Volume (cft) Cost per cft (3000psi) Total Cost (RS) Volume (cft) Cost per cft (4000psi) Total Cost (RS) Original 34350.44 394 13534073.36 Original 22070.63 470 10373196 .1 Optimized 34310.96 394 13518518.24 Optimized 18105.78 470 8509716. 6 CLC 27210.56 394 10720960.64 CLC 17418.5 470 8186695 EPS 19148.55 394 7544528.7 EPS 16534.38 470 7771158. 6
  • 10. Quantity Takeoff and Cost Estimation Weight of steel Beam (Ton) Column (Ton) Total (Ton) Cost/ton Total 96.3 81.01 177.31 154000 27305740 96.3 75.33 171.63 154000 26431020 84.36 72.91 157.27 154000 24219580 78.66 68.86 147.52 154000 22718080
  • 11. Quantity Takeoff and Cost Estimation Lightweight Weight material Wall Material Volume (c. ft) Vol of Mat. No. of Mat. Cost per unit Amount Rs/- CLC 4" x 8" x 24 " 11743.88 0.444444444 26423.73 68 1796813.64 CLC 6" x 8" x 24 " 39662.05 0.666666667 59493.075 81 4818939.075 CLC 8" x 8" x 24 " 36194.91 0.888888889 40719.27375 95 3868331.006 Total 126636.078 10484083.7 Wall Material Area (sq. ft) Vol of Mat. No. of Mat. Cost per ft Amount Rs/- EPS Panels 107152.1007 8 - 137 14679837.79
  • 12. Quantity Takeoff and Cost Estimation Roof Materials Measurement Amount Rs/- No. of 300x150x38mm brick tiles 23387 1870960 100mm mud 25mm mud plaster 486 694008 PVC membrane 0.25 (sq.ft) 11260 450400 one coat of H bitumen 1459 2083452 Total 5098820 Floors Materials Measurement Amount Rs/- 50MM Ozonil Quarto (L) 22 kg with 1kg PU Beads 1684.7 3428364.5
  • 13. Comparison of Wall Cost Comparison of Floor Cost Quantity Amount Rs/- Old Floor 4508915 New Floor 3428364.5 Difference 1080550.5 Percentage 23.9 Comparison of Roof Cost Quantity Amount Rs/- Old Roof 5098820 New Roof 4214345.125 Difference 884474.875 Percentage 17.35
  • 14. Comparison of Wall Cost Walls Quantity Amount Rs/- Quantity Amount Rs/- Solid & Hollow Block Wall 11185062.25 Solid & Hollow Block Wall 11185062.25 CLC Block 10484083.72 EPS 14679837.79 Difference 700978.5265 Difference 3494775.542 Percentage 6.267095443 Percentage 23.80663596
  • 15. Model Renders • Enscape Rendering • Revit Rendering