SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Mrinal Thakur
E: mrinal_thakur@yahoo.com •M: 9331848384
ENGINEERING PROFESSIONAL
Projects Management •Procurement •Supply Chain •Logistics
Executive Summary
• Result oriented professional with hands on experience of managing the projects function as a profit
center, meeting challenging targets on all performance metrics.
• Experienced in executing large projects in industrial water treatment plants and setting up green-field
manufacturing facilities in industries like DG sets and automobiles.
• Skilled in independent management of project sites completing projects on time meeting all quality,
cost and safety objectives.
• Well versed in handling financial matters of projects including budgeting and cash flow management.
• Hands on experience in executing projects of a cumulative value of over Rs1500 crores,
dealing with all aspects like coordinating with clients and consultants, freezing of the technical
specifications, procurement erection installation and commissioning, tests and trial runs, project
handover and realization of payment as per order conditions.
• Good understanding of documentation for project financing and obtaining clearances like DGTD for
imports.
• Proactive leader skilled in mentoring and motivating teams in delivering consistent excellence.
• Outstanding committed professional with proven capabilities in effective communication, coordination,
strategising, planning and implementation.
Professional Experience
INDEPENDENT CONSULTANT, Kolkata, 2001 to date
• Procure minerals – iron ore, limestone and dolomite – from mines in Orissa and Jharkhand and supply
to clients in India and overseas in the steel and steel related industries.
• Procure and supply iron ore fines from various mines and supply to exporters for meeting demands of
international customers.
• The material were selected from various pits of quarries, sampled and then moved to the Rly. Siding in
case the material was to be transported by rakes. In case the material was to be supplied by road, the
,ot was sampled at the mine head and arrangements were made to load the material on trucks and
then move it to the designated ports.
• Handling of the material at the plot at port was also a part of the responsibility in case the order was
on FOB basis.
• Finally the collection of payments was done. In case of an L/C provided by the buyer, the relevant
documents were collected and submitted to the banks for encashment. In case of fund transfer, the
buyer were provided with the documents so that the RTGs could be done by the buyer.
• Provided Consultancy services to BLYTH METALS INDIA PVT LTD, Mumbai, 2004 to 2010.
• Assisted the company in trading in manganese and iron ores on a profit sharing basis, looking after
all techno-commercial aspects like locating suitable mines/suppliers and buyers, finalizing
contracts, execution of orders, collection of payments and statutory compliances.
• Identified suitable good and workable mines meeting the company’s budget and requirements, and
finalized contracts for operating the mines by negotiating terms and conditions, fulfilling all legal
requirements, ensuring quality of the mine’s reserves by assay and testing at reputed laboratories,
advising on infrastructure requirements like roads and weighbridges, assessing and advising on
comprehensive operational costs, ensuring statutory clearances and approvals with necessary
follow-up with government departments and providing continuing support in working the mines.
• Provided Consultancy services to HI TECH SPONGE and MAHINDRA SPONGE, Raipur from 2001 to
2004 in procuring iron ore meeting quality standards for making sponge iron and arranging for testing
of material at the loading point and movement of material by railway rakes to their works at Raipur.
Resume of Mrinal Thakur: Page 1 of 3
SNS MINERALS, Kolkata, 1999 to 2001
General Manager, Marketing
• Was responsible for the sales and marketing of sized limestone and dolomite to iron and steel
companies and burnt lime to aluminium companies.
• Looked after business development, sales, coordination of logistics with Railways for despatch of rake
loads and credit control including timely collection of payments.
• Here, part of the responsibility was also to develop the mines for location of proper pits for ensuring
the proper grade and deposits of material.
• The turnover of the company was to the tune of Rs. 150 to 200 Crores.
• Was reporting to the Managing Director.
VINAR SYSTEMS LTD, Pune, 1996 to 1999.
Project Manager
• Was in charge of the project for the installation of assembly facilities for the Indica car project
of Tata Motors consisting of floor, overhead and slat type conveyors.
• Installed and commissioned conveyors at assembly lines, weld shop, paint shop, under-body shop and
engine and car assembly shops.
• Independently managed the successful installation and commissioning including on-site modifications
as required.
• Coordination with TELCO management for timely execution and collection of payments. Was reporting
to the Director-Technical.
ION EXCHANGE INDIA LTD, Kolkata, 1994 to 1996.
Project Coordinator
• Coordinated the execution of various projects for industrial water treatment plants secured in
coordination with the marketing department.
• Liaised with consultants for freezing the technical parameters, procured erected installed and
commissioned the plants, conducted tests and trial runs, handed over projects to clients and realized
payments as per purchase order terms. This also included ordering of equipments, both fabricated and
bought outs, inspection during the stage wise manufacturing and testing before despatch of
equipments. The fabricated itens were tanks, piping. The boughts were valves indicators electronic
items etc. Finally the testing of the plant as whole after being installed and commissioned and giving a
trial run of the plant to the clients as per the contract. Cicil work was also a part of the project where
foundation and supports were to be made as per the design provided by the consultant and the OEM’s.
• The consultants with whom coordination was done was M.N. Dastur, MECON
• Here I was reporting the Regional Manager at Kolklata and Pune as intra office coordination was
part of the responsibility.
• The turnover of the company was to the tune of Rs. 150 Crores
MODI MIRRLEES BLACKSTONE LTD, Aurangabad (Maharashtra), 1987 to 1992.
Project Engineer
• Was involved the erection and commissioning of a plant to manufacture and assemble DG sets
of 1 to 10 MW capacities. This was a green field project. Initially the coordination was done with the
consultant for designing of civil works and release of drawings for procurement of fabricated and
bought items. This company was formed by Modi Rubber Ltd. In collaboration with Mirrlees Blackstone
of U.K.
• Once the parameters were fixed, floated tenders to various vendors and received and compared the
technical and commercial bids before ordering. Once the orders were placed, stage wise inspection of
these items was also done in coordination with the quality control department. Finally supervising the
despatch of material. Vendor development was also part of the responsibility.
• Looked after the erection and commissioning of EOT cranes, jib cranes, semi-goliath cranes,
compressed air system, water cooling system including pumps, cooling towers, heat exchangers, lube
oil and fuel oil purifiers, AHU and acoustic facilities, cables, panels etc. for testing DG sets.
• Actively participated in the preparation of documents for obtaining funding from financial institutions
and import licenses from DGTD.
Resume of Mrinal Thakur: Page 2 of 3
• Was reporting to the CEO of the company.
• The project was of Rs. 150 Crores.
• Worked with consultants Unitech, MN Dastur.
HINDUSTAN MOTORS LTD, Kolkata 1986 to 1987
Engineer, Corporate Project and Planning Division
• Was responsible for vendor development for establishing a base of local suppliers to progressively
indigenize the production of the company’s Contessa car, replacing imports from Isuzu, Japan.
• Vendor development was part of the responsibility for the indigenous components as per the phased
manufacturing programme.
• Was reporting to the G.M. Corporate Planning and Project department.
Education
• BE, Production Engineering, Birla Institute of Technology, Mesra, Ranchi, 1986, First Class.
Personal Profile
• Date of Birth: 8 January 1962
• Languages: English, Hindi, Bengali
• Preferred Posting: Kolkata
Resume of Mrinal Thakur: Page 3 of 3

Weitere ähnliche Inhalte

Was ist angesagt?

SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015ARUN MANGAL
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Muntazir Sheikh
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalMuntazir Sheikh
 
Philip_Murray_ CV 13-01-16
Philip_Murray_  CV 13-01-16Philip_Murray_  CV 13-01-16
Philip_Murray_ CV 13-01-16Phil Murray
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio datakalathil716
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Shaban Morsy
 

Was ist angesagt? (20)

Resume
ResumeResume
Resume
 
Ganga Raju Resume
Ganga Raju Resume Ganga Raju Resume
Ganga Raju Resume
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
Philip_Murray_ CV 13-01-16
Philip_Murray_  CV 13-01-16Philip_Murray_  CV 13-01-16
Philip_Murray_ CV 13-01-16
 
SHAKEEB UDDIN C.V
SHAKEEB UDDIN C.VSHAKEEB UDDIN C.V
SHAKEEB UDDIN C.V
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
Amit CV
Amit CVAmit CV
Amit CV
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
anis khayrallah cv .doc
anis khayrallah cv .docanis khayrallah cv .doc
anis khayrallah cv .doc
 
Shady Alakhal
Shady AlakhalShady Alakhal
Shady Alakhal
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 

Andere mochten auch

The Importance of Latin American Market | Maximo Cavazzani
The Importance of Latin American Market | Maximo CavazzaniThe Importance of Latin American Market | Maximo Cavazzani
The Importance of Latin American Market | Maximo CavazzaniEmily Baker
 
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastolla
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastollaKänkänen, Stolt, Enroos: Lapsi vankilan perheosastolla
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastollaLastensuojelun Keskusliitto
 
Karlene Stewart CV 1 211-2
Karlene Stewart CV 1 211-2Karlene Stewart CV 1 211-2
Karlene Stewart CV 1 211-2Karlene Stewart
 
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...Lastensuojelun Keskusliitto
 
Przedsiębiorstwo ARI (prezentacja biura projektów
Przedsiębiorstwo ARI (prezentacja biura projektówPrzedsiębiorstwo ARI (prezentacja biura projektów
Przedsiębiorstwo ARI (prezentacja biura projektówMarek Bogumil Krzyminski
 
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...Lastensuojelun Keskusliitto
 
Static/Dynamic Passbox & Air Curtains
Static/Dynamic Passbox  & Air Curtains Static/Dynamic Passbox  & Air Curtains
Static/Dynamic Passbox & Air Curtains PraneshNanda
 
2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover
2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover
2nd Qt 2016 Loveland-Northern Colorado RE Market Report CoverMichael Masciola
 
Архітектура та інтнрєр в готельному господарстві
Архітектура та інтнрєр в готельному господарствіАрхітектура та інтнрєр в готельному господарстві
Архітектура та інтнрєр в готельному господарствіNata_iv
 
Guide To Development Process In Fairfax County
Guide To Development Process In Fairfax CountyGuide To Development Process In Fairfax County
Guide To Development Process In Fairfax CountyMichael Masciola
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Marc Lepage, CPIR
 
Pt'iDéjWeb SEM de l'agence iStudio
Pt'iDéjWeb SEM de l'agence iStudio Pt'iDéjWeb SEM de l'agence iStudio
Pt'iDéjWeb SEM de l'agence iStudio Laurence Paul
 
ppt nursing audit - role of nurse manager
ppt nursing audit - role of nurse manager ppt nursing audit - role of nurse manager
ppt nursing audit - role of nurse manager Queen sankranti
 

Andere mochten auch (20)

Mikä on isämies & mihin häntä tarvitaan?
Mikä on isämies & mihin häntä tarvitaan?Mikä on isämies & mihin häntä tarvitaan?
Mikä on isämies & mihin häntä tarvitaan?
 
The Importance of Latin American Market | Maximo Cavazzani
The Importance of Latin American Market | Maximo CavazzaniThe Importance of Latin American Market | Maximo Cavazzani
The Importance of Latin American Market | Maximo Cavazzani
 
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastolla
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastollaKänkänen, Stolt, Enroos: Lapsi vankilan perheosastolla
Känkänen, Stolt, Enroos: Lapsi vankilan perheosastolla
 
Karlene Stewart CV 1 211-2
Karlene Stewart CV 1 211-2Karlene Stewart CV 1 211-2
Karlene Stewart CV 1 211-2
 
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...
Marja Heikkilä:Lasten ja perheiden palveluiden tulevaisuuden suunnitelmat Kes...
 
Przedsiębiorstwo ARI (prezentacja biura projektów
Przedsiębiorstwo ARI (prezentacja biura projektówPrzedsiębiorstwo ARI (prezentacja biura projektów
Przedsiębiorstwo ARI (prezentacja biura projektów
 
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...
Päivi Sinko: Lapsen erityisten tarpeiden huomioiminen lapsen sijaishuoltopaik...
 
Static/Dynamic Passbox & Air Curtains
Static/Dynamic Passbox  & Air Curtains Static/Dynamic Passbox  & Air Curtains
Static/Dynamic Passbox & Air Curtains
 
2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover
2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover
2nd Qt 2016 Loveland-Northern Colorado RE Market Report Cover
 
Архітектура та інтнрєр в готельному господарстві
Архітектура та інтнрєр в готельному господарствіАрхітектура та інтнрєр в готельному господарстві
Архітектура та інтнрєр в готельному господарстві
 
Guide To Development Process In Fairfax County
Guide To Development Process In Fairfax CountyGuide To Development Process In Fairfax County
Guide To Development Process In Fairfax County
 
Isyyden monet roolit
Isyyden monet roolitIsyyden monet roolit
Isyyden monet roolit
 
Isyyden tukeminen eron jälkeen
Isyyden tukeminen eron jälkeenIsyyden tukeminen eron jälkeen
Isyyden tukeminen eron jälkeen
 
ccTLD Infrastructure & IDN Operation
ccTLD Infrastructure & IDN OperationccTLD Infrastructure & IDN Operation
ccTLD Infrastructure & IDN Operation
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016
 
Pt'iDéjWeb SEM de l'agence iStudio
Pt'iDéjWeb SEM de l'agence iStudio Pt'iDéjWeb SEM de l'agence iStudio
Pt'iDéjWeb SEM de l'agence iStudio
 
Case Study - Informatica
Case Study - InformaticaCase Study - Informatica
Case Study - Informatica
 
F ca
F caF ca
F ca
 
RESUME_Ashish Dhuliya
RESUME_Ashish DhuliyaRESUME_Ashish Dhuliya
RESUME_Ashish Dhuliya
 
ppt nursing audit - role of nurse manager
ppt nursing audit - role of nurse manager ppt nursing audit - role of nurse manager
ppt nursing audit - role of nurse manager
 

Ähnlich wie Experienced Project Manager Resume

Ähnlich wie Experienced Project Manager Resume (20)

Resume New
Resume NewResume New
Resume New
 
Resume_mahim
Resume_mahimResume_mahim
Resume_mahim
 
Rupak das , Procurement Head
Rupak das , Procurement HeadRupak das , Procurement Head
Rupak das , Procurement Head
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Resume_Naveen_Kumar_15-09-16
Resume_Naveen_Kumar_15-09-16Resume_Naveen_Kumar_15-09-16
Resume_Naveen_Kumar_15-09-16
 
Resume_Naveen_Kumar_15-09-16
Resume_Naveen_Kumar_15-09-16Resume_Naveen_Kumar_15-09-16
Resume_Naveen_Kumar_15-09-16
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
seemaCV
seemaCVseemaCV
seemaCV
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Balamurugan CV Jan16
Balamurugan CV Jan16Balamurugan CV Jan16
Balamurugan CV Jan16
 
Balamurugan CV Jan16
Balamurugan CV Jan16Balamurugan CV Jan16
Balamurugan CV Jan16
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
Final - CV Gopal
Final - CV GopalFinal - CV Gopal
Final - CV Gopal
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Raj new resume 2015
Raj new resume 2015Raj new resume 2015
Raj new resume 2015
 

Experienced Project Manager Resume

  • 1. Mrinal Thakur E: mrinal_thakur@yahoo.com •M: 9331848384 ENGINEERING PROFESSIONAL Projects Management •Procurement •Supply Chain •Logistics Executive Summary • Result oriented professional with hands on experience of managing the projects function as a profit center, meeting challenging targets on all performance metrics. • Experienced in executing large projects in industrial water treatment plants and setting up green-field manufacturing facilities in industries like DG sets and automobiles. • Skilled in independent management of project sites completing projects on time meeting all quality, cost and safety objectives. • Well versed in handling financial matters of projects including budgeting and cash flow management. • Hands on experience in executing projects of a cumulative value of over Rs1500 crores, dealing with all aspects like coordinating with clients and consultants, freezing of the technical specifications, procurement erection installation and commissioning, tests and trial runs, project handover and realization of payment as per order conditions. • Good understanding of documentation for project financing and obtaining clearances like DGTD for imports. • Proactive leader skilled in mentoring and motivating teams in delivering consistent excellence. • Outstanding committed professional with proven capabilities in effective communication, coordination, strategising, planning and implementation. Professional Experience INDEPENDENT CONSULTANT, Kolkata, 2001 to date • Procure minerals – iron ore, limestone and dolomite – from mines in Orissa and Jharkhand and supply to clients in India and overseas in the steel and steel related industries. • Procure and supply iron ore fines from various mines and supply to exporters for meeting demands of international customers. • The material were selected from various pits of quarries, sampled and then moved to the Rly. Siding in case the material was to be transported by rakes. In case the material was to be supplied by road, the ,ot was sampled at the mine head and arrangements were made to load the material on trucks and then move it to the designated ports. • Handling of the material at the plot at port was also a part of the responsibility in case the order was on FOB basis. • Finally the collection of payments was done. In case of an L/C provided by the buyer, the relevant documents were collected and submitted to the banks for encashment. In case of fund transfer, the buyer were provided with the documents so that the RTGs could be done by the buyer. • Provided Consultancy services to BLYTH METALS INDIA PVT LTD, Mumbai, 2004 to 2010. • Assisted the company in trading in manganese and iron ores on a profit sharing basis, looking after all techno-commercial aspects like locating suitable mines/suppliers and buyers, finalizing contracts, execution of orders, collection of payments and statutory compliances. • Identified suitable good and workable mines meeting the company’s budget and requirements, and finalized contracts for operating the mines by negotiating terms and conditions, fulfilling all legal requirements, ensuring quality of the mine’s reserves by assay and testing at reputed laboratories, advising on infrastructure requirements like roads and weighbridges, assessing and advising on comprehensive operational costs, ensuring statutory clearances and approvals with necessary follow-up with government departments and providing continuing support in working the mines. • Provided Consultancy services to HI TECH SPONGE and MAHINDRA SPONGE, Raipur from 2001 to 2004 in procuring iron ore meeting quality standards for making sponge iron and arranging for testing of material at the loading point and movement of material by railway rakes to their works at Raipur. Resume of Mrinal Thakur: Page 1 of 3
  • 2. SNS MINERALS, Kolkata, 1999 to 2001 General Manager, Marketing • Was responsible for the sales and marketing of sized limestone and dolomite to iron and steel companies and burnt lime to aluminium companies. • Looked after business development, sales, coordination of logistics with Railways for despatch of rake loads and credit control including timely collection of payments. • Here, part of the responsibility was also to develop the mines for location of proper pits for ensuring the proper grade and deposits of material. • The turnover of the company was to the tune of Rs. 150 to 200 Crores. • Was reporting to the Managing Director. VINAR SYSTEMS LTD, Pune, 1996 to 1999. Project Manager • Was in charge of the project for the installation of assembly facilities for the Indica car project of Tata Motors consisting of floor, overhead and slat type conveyors. • Installed and commissioned conveyors at assembly lines, weld shop, paint shop, under-body shop and engine and car assembly shops. • Independently managed the successful installation and commissioning including on-site modifications as required. • Coordination with TELCO management for timely execution and collection of payments. Was reporting to the Director-Technical. ION EXCHANGE INDIA LTD, Kolkata, 1994 to 1996. Project Coordinator • Coordinated the execution of various projects for industrial water treatment plants secured in coordination with the marketing department. • Liaised with consultants for freezing the technical parameters, procured erected installed and commissioned the plants, conducted tests and trial runs, handed over projects to clients and realized payments as per purchase order terms. This also included ordering of equipments, both fabricated and bought outs, inspection during the stage wise manufacturing and testing before despatch of equipments. The fabricated itens were tanks, piping. The boughts were valves indicators electronic items etc. Finally the testing of the plant as whole after being installed and commissioned and giving a trial run of the plant to the clients as per the contract. Cicil work was also a part of the project where foundation and supports were to be made as per the design provided by the consultant and the OEM’s. • The consultants with whom coordination was done was M.N. Dastur, MECON • Here I was reporting the Regional Manager at Kolklata and Pune as intra office coordination was part of the responsibility. • The turnover of the company was to the tune of Rs. 150 Crores MODI MIRRLEES BLACKSTONE LTD, Aurangabad (Maharashtra), 1987 to 1992. Project Engineer • Was involved the erection and commissioning of a plant to manufacture and assemble DG sets of 1 to 10 MW capacities. This was a green field project. Initially the coordination was done with the consultant for designing of civil works and release of drawings for procurement of fabricated and bought items. This company was formed by Modi Rubber Ltd. In collaboration with Mirrlees Blackstone of U.K. • Once the parameters were fixed, floated tenders to various vendors and received and compared the technical and commercial bids before ordering. Once the orders were placed, stage wise inspection of these items was also done in coordination with the quality control department. Finally supervising the despatch of material. Vendor development was also part of the responsibility. • Looked after the erection and commissioning of EOT cranes, jib cranes, semi-goliath cranes, compressed air system, water cooling system including pumps, cooling towers, heat exchangers, lube oil and fuel oil purifiers, AHU and acoustic facilities, cables, panels etc. for testing DG sets. • Actively participated in the preparation of documents for obtaining funding from financial institutions and import licenses from DGTD. Resume of Mrinal Thakur: Page 2 of 3
  • 3. • Was reporting to the CEO of the company. • The project was of Rs. 150 Crores. • Worked with consultants Unitech, MN Dastur. HINDUSTAN MOTORS LTD, Kolkata 1986 to 1987 Engineer, Corporate Project and Planning Division • Was responsible for vendor development for establishing a base of local suppliers to progressively indigenize the production of the company’s Contessa car, replacing imports from Isuzu, Japan. • Vendor development was part of the responsibility for the indigenous components as per the phased manufacturing programme. • Was reporting to the G.M. Corporate Planning and Project department. Education • BE, Production Engineering, Birla Institute of Technology, Mesra, Ranchi, 1986, First Class. Personal Profile • Date of Birth: 8 January 1962 • Languages: English, Hindi, Bengali • Preferred Posting: Kolkata Resume of Mrinal Thakur: Page 3 of 3