1. Page 1 of 4
MOSTAFA SAYED SAYED
Location: Qatar ● Contacts: +974 33775654 / +974 31580619● E-mail: mostafaennno@gmail.com
Presenting 9 years’ comprehensive experience in building MEP project management both
in EPC Contractor domain, and aspiring for the role of ………
SENIOR MEP COORDINATOR / SENIOR TECHNICAL OFFICE ENGINEER / MEP PROJECT MANAGER
Construction industry professional capable of independently managing construction of building MEP
services for high rise and low rise buildings in residential and commercial space, through first stages till
successful handover. Well versed with project management, and hands on experience in
coordinating/controlling/delivering projects within deadlines with technical and commercial success, closely
working with client and project participants, while proactively managing external deliverables. Areas of
Expertise include……
Planning & Organization
Project Programming
Activities Scheduling
Design & Engineering
Procurement Planning
Tendering & Contracting
Submittals Management
Construction Management
Contracts & Claims Mgmt
Cost & Quality Controls
Site Administration
Progress
Monitoring/Control
Team Building & Leadership
Estimation
Documentation
Management
PROFILE SNAPSHOTS.
Working with Ghantoot Construction & Transport Development, since Jan 2016, currently as Senior
MEP Coordinator.
Extensive experience in HVAC, Firefighting, Plumbing, Electrical systems for buildings.
Proven ability anchor all MEP activities of projects in terms of resources mobilization, project equipment
& logistics, planning, risk management, design, engineering, estimation, subcontracting, procurement,
MEP coordination, execution, QA/QC, interface management, cash flow management, as-built
documentation, handover and commercial closeout
Skilled in preparation and review of technical submittals e.g. material submittals, method statements,
shop drawings, Quality procedures, etc., and preparing/replying to RFIs as required from time to time
Highly effective in maintaining and enhancing project productivity by developing work procedures,
streamlining workflow, supervising & controlling work performance, and optimizing resources
(manpower/material/equipment) utilization.
Influencing & decisive leader and strong team player with excellent communications, relationship
management and problem solving skills, and ability to manage team performance and work with people
at all levels.
2. Page 2 of 4
WORKING EXPERIENCE
Ghantoot Construction & Transport Development (Main Contractor) Jan 2016– Present
Sr. MEP Coordinator
Projects & Roles
Project : Al Matar Showroom Project
Client: MR: Adel Abdulla Al Naemi
Consultant: Arabian Architectural Group (AAG)
Roles: Senior MEP Coordinator
Attending regular meetings (on work progress, coordination, design, etc. ) with Main Contractor
and Consultant to discuss key issues related to the project and take effective corrective actions.
Monitoring project budgets and schedule and oversee performance to ensure on time, quality and
on budget project execution.
Coordinate with the design team on all aspects of the design for MEP Systems to insure meeting
specification, standards and Authorities requirement.
Coordinate with Authorities and Consultant to meet all requirements.
Prepare periodic reports for management including status of budgets, variance/change claims,
schedules, disputes, up-coming activities & safety records.
Ensure all technical aspects of the projects are strictly complied with and in conformity with
Conditions of Contract, Particular Specifications, General Specifications, Contract Drawings & BOQ.
Evaluate the requirement of project resources (material, machinery, manpower) as per schedule
and arrange for the availability of the same.
Plans and coordinate all on-site MEP activities in conformance with project specifications
Follow up and monitor technical submission schedules and review weekly progress report
Prepare/review all technical submittals prior to approval by client/consultant
Ensure that MEP systems satisfy client objectives, and criteria for design, installation, commissioning,
and O&M
Monitor design progress and development of tracking documents
Attend meetings as required, and follow up project Schedule and look ahead program
Review tender documents and report deficiencies and recommendation
Monitor and control site work performance and the subcontractor’s activities, inspect quality and
report non-conformances.
Attend Consultant's material & work inspections, local factory visits and Authorities Inspections
Process RFIs and change order requests through appropriate parties on a timely basis
Ensure works are planned and executed strictly as per MEP coordination drawings to avoid any
conflicts
Set up and manage documents and checking / auditing the documentation system
Participate in reviewing purchase documents against approved BOQ & specs, and ensure materials
received meet specs
Assist MEP manager in preparing periodical reports and other reports
Review, analyze and process subcontractor/vendor invoices against actual work or supplies
Develop action and recovery plans to support project delivery on time.
3. Page 3 of 4
(Cooling Technology by Natural Gas – GAS CHILL) – (Kharafi National K.S.C). Oct 2011– Jan 2016
MEP Project Manager ( Oct 2011 to Jan 2014 )
Technical Office Engineer ( Jan 2014 to Jan 2016 )
Projects & Roles
Projects.
Execute for Cairo Festival City Project at (New Cairo City).
Execute for Americana Plaza Village Project at (Sheikh Zayed City).
Execute for cooling water Plant by natural gas at (Sheikh Zayed City).
Execute for General Authority For Investment Project (GAFI) at (Cairo City).
Execute for Cleopatra Plaza Mall Project at (Alexandria City).
Execute for Neuron Spine Hospital Project at (6 of October City).
Execute for Americana Plaza Village Project at (New Cairo City).
Execute for Hanimex Mall Project at (New Cairo City).
Roles: MEP Project Manager
Fully in-charge of an Electro/Mechanical Project.
Evaluate the requirement of project resources (material, machinery, manpower) as per schedule and
arrange for the availability of the same.
Maintain and manage all purchase and delivery schedules, change order processes, shop drawings,
document control logs, Owner, Architect and Subcontractor correspondence.
Work with Purchasing in setting up/executing trade buyout including: defining scope of work, ensuring
scope coverage, coordinating buy and project schedules.
Monitoring project budgets and schedule and oversee performance to ensure on time, quality and on
budget project execution.
Ensure timely delivery of equipment, material & systems to support site installation works as
per approved work program.
Working at (HORSE COMPANY FOR ENGINEERING WORKS ALEX) August 2008 – Sep 2011
MEP Executive Engineer
Projects & Roles.
Projects.
Execute and start up for Elmaadi water treatment plant.
Execute and start up for Abo Elnomres water treatment plant.
Project Description: The project consists of main building with external landscape and external
services areas (chiller yard, underground tanks, and sewerage treatment plant) with total building area
of 19607 m2. The main building consists of Basement, Ground, two floors and service floor with total
built up area 18092 m2. Facilities include Data Center, Substation, Generator Room, District Cooling
Plant, Sewage Treatment Plant, Elevators, AHU’s Room, Pump Rooms (fire and domestic water),
Submersible Pumps, FCC Room, UBS Rooms, Irrigation system, 11KV Work infrastructure and Fiber
Optic infrastructure works.
4. Page 4 of 4
Roles: MEP Executive Engineer.
Supervise Installation of HVAC & Chilled Water system, Plumbing system, Swimming Pool and irrigation
system
Supervise Installation of firefighting system according to NFPA.
Review and comment on material submittals, and ensure these meet project specifications.
Check sub-contractor’s documents, shop drawings, material submittals and method of statements.
Adhere to mechanical concepts on site and ensure that nominated sub- contractor is following the
right procedures.
Implement the engineering practice, specification requirements, local rules and regulations.
Monitor site work progress as per Baseline program.
Preparation of snag list before commissioning.
Education.
-Bachelor (B.Sc.) in Electrical Engineering from Engineering College, Helwan University, 2008.
-Department: Electrical power and machines Department.
-Graduation Year: May 2008.
-Applied to master in utilization (generation and usage the electrical power) in Cairo University.
Personal Particulars.
Full Name: Mostafa Sayed Sayed
Date of Birth: 26th Sep 1983
Nationality: Egyptian
Marital Status: Married
No. of Dependents: Two
Driving License: Qatar-Egypt
Courses.
Design of Distribution system course including.
Lighting System.
Wiring accessories.
Panel Board & Panel Schedule.
Cables & Circuit Breakers.
Earthing System.
Light Current (Fire Alarm System- Data and Telephone System- Sound System).
AutoCAD distribution course. Out, in 2009.
All references Available upon request