1. CURRICULAM VITAE
Name : Mohsin Iqubal
Position Applied : HVAC QC INSPECTOR / WELDING INSPECTOR
Mobile : +966-515098202/+91-507246083
Email: connect2mohsin85@gmail.com
CAREER OBJECTIVE
Seeking assignments in the domain of Mechanical Engineering to obtain a responsible and
challenging position in an organization where I could leverage my background of technical study to
contribute to the Organizational growth and development.
WORK SUMMARY
A Mechanical Engineer having over 6 years of independent rich work experience in HVAC
(Heating Ventilation Air-conditioning) & Welding in large commercial and Industrial Projects in
India and Saudi Arabia.
Knowledge of major industry Codes and Standards like ASHRAE, SMACNA, NFPA,
UMC,ARAMCO,SADARA, ASME Sec IX,V,II,B31.3 etc.
EDUCATIONAL QUALIFICATION
First class Graduate Mechanical Engineer from MACET, Patna in 2010.
ADDITIONAL PROFESSIONAL QUALIFICATION
CSWIP 3.1 WELDING INSPECTOR.( Certificate No-97323)
ASNT LEVEL II,(PT ,UT ,MT, RT, VT).
HVAC (Heating ventilation air conditioning) Designing and draughting.
PROFESSIONAL WORK EXPERIENCE
DAELIM SAUDI ARABIA LTD.
Client :SADARA ( Saudi Aramco and Dow)
Project : Sadara Isocynates Project
Position : HVAC QC INSPECTOR
Period : May 2014 to till date.
JOB PROFILE
• Reviewed quality related documents, i.e. approved project procedures, applicable drawings,
vendors, manual and instructions, technical specifications and standard codes such as
SMACNA,ASHRAE,UMC for inspect ability and acceptability.
• Understand clearly HVAC system drawing of the project.
• Checked and understand the HVAC equipment schedule plan, to know the equipment specification
and identification of location ,where to be install.
• During the receiving inspection RFI must be checked the documents like approved P.O, Delivery
note, certificate from the vendor of quality test, vendor approval and carefully check the equipment
from any damage during the transport delivery or factory damage.
2. • Air handling Unit (AHU)
AHU receiving inspection.
Handling, storage and preservation inspection (weekly inspection).
Essential operating facilities HVAC requirements inspection.
Pressurized building HVAC requirements inspection.
Communication facilities HVAC requirements inspection.
Battery room HVAC requirements inspection.
• Packaged Air conditioning unit (PACU) system
PACU receiving inspection
Handling, storage and preservation inspection (weekly inspection)
drain lay-out inspection.
• Air Cool Condensing Unit(ACCU)
ACCU receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Essential operating facilities HVAC requirements inspection.
Communication facilities HVAC requirements inspection
Battery room HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
Condensate drain lay-out inspection.
• Exhaust fan
Material receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Exhaust and supply fan installation inspection
Battery room HVAC requirements inspection
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection.
• Air filtration devices and grease filter
Filter receiving inspection.
Filter handling, storage and preservation inspection (weekly inspection).
Pre-filter and final filter installation inspection.
Chemical filter, grease filter installation inspection (if notified).
• HVAC metal Duct system
Duct hangers and supports, metal ducts, duct insulation, duct accessories, Air terminal devices&
flexible connector, fire damper receiving inspection. Handling, storage and preservation inspection
(weekly inspection).
Duct hangers and supports ,metal duct ,grease duct (serving type l hood or as Applicable
inspection)duct insulation, duct accessories Air terminal devices & flexible connector, fire
damper installation inspection.
• Refrigerant piping system
Winess of Pneumatic test and Evacuation test of refrigerant piping.
Witness of refrigerant gas charging.
• Regular visit to lay down yard for assess the health of equipment and materials.
3. Company : JAIN INFRAPROJECT LTD.
Position : MECHANICAL INSPECTOR.
Clint : SAIL.Durgapur.
Project : Compressed Air Station & Inter Plant Pipe line Projects.
Period : Feb 2012 to March 2014,
Location : DURGAPUR.
JOB PROFILE
• Conduct inspection of received materials of duct and accessories and all HVAC
equipments.
• Review of Material Test Certificates & random physical verification of material prior to
commencement of fabrication activities
• Inspection of orientation, Installation of all HVAC equipment.
• Inspection of ducts and accessories installed prior to insulation and rapping.
• Ensure proper supporting and elevation of ducts installed.
• Inspection of duct insulation and wrapping.
• Verifying all the welding activities is in compliance with the applicable code
& standard and project specification.
• Verifying the welding consumables against WPS, maintaining inventory of stock,
issuance and return records.
• Verification of calibration records for all inspection tools, welding machines,
baking oven, holding oven and quivers.
• Fit up inspection of chilled water piping and condenser water piping.
• Visual inspection of weld joint of chilled water and condenser water piping.
• Monitor and witness for PT.
• Monitor and inspect erection of fire water pipeline across the pipeline corridor.
• Ensure the issuance of appropriate IFC drawings and submittal of final As-built
drawings.
• Conduct quality related meetings with client, vendors and contractors to ensure that quality is
maintained on site.
• Ensure calibration of any tools and equipments used at site or workshop.
• Follow up and implementation for short and long term vendor recommended preservation for
equipments and witness it periodically.
• Fit up and dimensional Inspection prior to welding as required by the approved “Inspection and
Test Plan.
• Witnessing NDE activities like PT, MPT, RT, UT, PMI and Hardness Test.
• Witnessing PQR and performance qualification test.
• Inspection of welding consumables and ensuring the proper storage and handling.
• Verifying/Maintaining consumable control records..
• Verification of welding machines, baking ovens, measuring instruments and pressure gauge
calibration etc
• Dimensional& Visual Inspection Of spool Prior to Painting and preparing Reports
• Witnessing of hydro testing.
• Witness of Pressure and leak testing.
4. • Co-ordination with client inspectors for all inspection activities.
Company - Randhawa Construction Company
Position - Welding QC Engineer
Period - 20th
2011 april to 2nd
feb 2012.
Location - JAMNAGAR.
JOB PROFILE
• Competency to witness the welding activities in accordance with the Code, Standards and
Specification.
• Review the WPS and welder performance qualification record to assure they are acceptable
for work.
• Reviewing all shop drawings prior to fabrication.
• Confirm welding equipment and instruments are calibrated and operative.
• Ensure all filler metals, base materials are properly marked as specified and acceptable.
• Confirm proper handling of consumables, Weather protection and wind break requirements.
• Confirm weld preparation, Joint fit-up and dimensions are acceptable and correct.
• Confirm welding parameters and techniques are supported by the WPS & WPQ.
• Conducting routine surveillance at field and shop to monitor welding and NDE activities.
• Review of quality documents (RFI) before submitting to client for final inspection.
• Checking revision of latest IFC Drawings used at site for construction. Coordinate with field
engineering Department for latest revision, Design Modification, as built drawings &
Technical Queries etc.
• Ensuring implementation of Quality Plan (ITP), specification, Code and Standards throughout
the project.
• Submitting the RFI for client’s inspection and assist the client inspector during inspection.
• Witnessing PQR and performance qualification test.
• Witnessing and signing of Joint fit-up prior to start welding.
• Performing visual inspection of completed welds.
• Conducting Welders Qualification Test (WQT) and Preparing Welder Qualification Test
records and JCC.
• Evaluating the Welder Performance on weekly basis and conducting the root cause analysis
survey.
• Conducting welders training programs based on rejection rate ratio.
• Verification of welding machines, baking ovens, measuring instruments and pressure gauge
calibration etc.
• Inspection of welding consumables and ensuring the proper storage and handling.
• Verifying/Maintaining consumable control records..
• Witnessing NDE activities like PT, MPT, RT, UT, PMI and Hardness Test.
• Ensuring Pre-heating and Post Weld Heat Treatment as per the WPS.
• Review and Evaluate third party reports.
Company - Vishal Ref & Air conditioning Works
Position - Mechanical Engineer.
Period - 3rd
Jul 2010 – 9th
April 2011
Location - NEW DELHI.
• Plant room chiller pumps installation as per drawing & capacity.
• Execution of chilled water piping hot water piping installation.
• Look into the fabrication and installation of duct as per drawing.
• To prepare Bills of quantity and bill of materials from approved AUTO CAD drawing.
• Execution of installation of VRV system and Ductable splite system.
5. • Materials take off (MTO) from approved engineering drawings.
• Support Procurement for major Equipments and Materials.
• To ensure that the work is completed in time with the given specifications and standards
• Co-ordinate with subordinates and settles the dispute on site peacefully.
• Attend appraisal meetings with the project engineers / managers in case of delay / change in
drawings / work / unavailability of material and suggest suitably.
• Ensuring execution and completion of the projects well within the financial budget and
allocated manpower.
• Maintained proper documentation of all the daily work being carried out.
SKILL SUMMARY
• Good Inter-Personal and Public Relation Skill
• Excellent ability to lead a team of Foreman, Charge Hands and Skilled /Unskilled Workers.
• Can Work Effectively as an Individual or In a Team..
• Successful Execution of Projects at the Post of Site Mechanical Engineer for Complete HVAC
Services.
SOFTWARE SKILL
• HAP.
• McQuay ductsizer.
• McQuay pipesizer.
• Auto CAD.
• MS Office.
Personal Details
Nationality Indian
Marital status Un married
Passport no H9769867
Date of expiry 7 Jan 2020
AL- JUBAIL,SAUDI ARABIA. Mohsin Iqubal
6. • Materials take off (MTO) from approved engineering drawings.
• Support Procurement for major Equipments and Materials.
• To ensure that the work is completed in time with the given specifications and standards
• Co-ordinate with subordinates and settles the dispute on site peacefully.
• Attend appraisal meetings with the project engineers / managers in case of delay / change in
drawings / work / unavailability of material and suggest suitably.
• Ensuring execution and completion of the projects well within the financial budget and
allocated manpower.
• Maintained proper documentation of all the daily work being carried out.
SKILL SUMMARY
• Good Inter-Personal and Public Relation Skill
• Excellent ability to lead a team of Foreman, Charge Hands and Skilled /Unskilled Workers.
• Can Work Effectively as an Individual or In a Team..
• Successful Execution of Projects at the Post of Site Mechanical Engineer for Complete HVAC
Services.
SOFTWARE SKILL
• HAP.
• McQuay ductsizer.
• McQuay pipesizer.
• Auto CAD.
• MS Office.
Personal Details
Nationality Indian
Marital status Un married
Passport no H9769867
Date of expiry 7 Jan 2020
AL- JUBAIL,SAUDI ARABIA. Mohsin Iqubal