Maintenance Work Order
Work Request “to be filled by Originator”
Work Type: (Breakdown BD, Corrective Maintenance CM, Projects)
Scheduling: (Planned / unplanned)
Line status: (Working / Stopped)
Shift:……… Originator:……….. Request dept:……… Date:…../…../…… Time:………
Cost Center:………… Location:………. Equipment name:……….. Equipment code:…………. Responsibility….
Problem description:……………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………………………………………
Problem Code:………….
SupervisorMaintenanceTo be filled by theSection
PhaseWork Order Execution
TimeCodeTechnicians
1.
2.
3.
Equipment Downtime:…………………….
Used Spare Parts:
QuantityCodeSpare Parts description
Used Tools:
QCodeNameQCodeName
Notes:______________________________________________________
__________________________________________________________________
WO Closing”Signatures”
Technician:…………… Supervisor:…………….. Originator:……………
Failure Code:Failure Description:
Cause Code:Cause:
Action Code:Remedy:
Clarification at the back of the paper!
Priority Check: Safety
High
Normal

Weitere ähnliche Inhalte

Was ist angesagt?

Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...
Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...
Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...Cendana Lestari Fathurrahman
 
11. analisis pengendalian persediaan bahan baku dengan metode economic order...
11. analisis pengendalian persediaan bahan baku  dengan metode economic order...11. analisis pengendalian persediaan bahan baku  dengan metode economic order...
11. analisis pengendalian persediaan bahan baku dengan metode economic order...ALANSEQUIERA
 
Studi gerakan
Studi gerakanStudi gerakan
Studi gerakanISTA
 
Teori pengelasan dan fabrikasi
Teori pengelasan dan fabrikasiTeori pengelasan dan fabrikasi
Teori pengelasan dan fabrikasiAmal Mulia
 
01 instruksi kerja pengelolaan laboratorium13 (1)
01 instruksi kerja pengelolaan laboratorium13 (1)01 instruksi kerja pengelolaan laboratorium13 (1)
01 instruksi kerja pengelolaan laboratorium13 (1)anita aprianti
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
DASAR PSIKROMETRIK
DASAR PSIKROMETRIKDASAR PSIKROMETRIK
DASAR PSIKROMETRIKKiki Amelia
 
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docx
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docxMAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docx
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docxfauzan83756
 
3 Type of contracts.pdf
3 Type of contracts.pdf3 Type of contracts.pdf
3 Type of contracts.pdfThanoonQasem
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouringBharatha Rathnayke
 
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...afifsalim
 

Was ist angesagt? (20)

Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...
Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...
Ergonomi dan Perancangan Sistem Kerja - Peta Kerja Keseluruhan dan Peta Kerja...
 
Klausul 8 iso 9001 2015
Klausul 8 iso 9001 2015Klausul 8 iso 9001 2015
Klausul 8 iso 9001 2015
 
11. analisis pengendalian persediaan bahan baku dengan metode economic order...
11. analisis pengendalian persediaan bahan baku  dengan metode economic order...11. analisis pengendalian persediaan bahan baku  dengan metode economic order...
11. analisis pengendalian persediaan bahan baku dengan metode economic order...
 
Standar Kerja
Standar KerjaStandar Kerja
Standar Kerja
 
Studi gerakan
Studi gerakanStudi gerakan
Studi gerakan
 
Teori pengelasan dan fabrikasi
Teori pengelasan dan fabrikasiTeori pengelasan dan fabrikasi
Teori pengelasan dan fabrikasi
 
01 instruksi kerja pengelolaan laboratorium13 (1)
01 instruksi kerja pengelolaan laboratorium13 (1)01 instruksi kerja pengelolaan laboratorium13 (1)
01 instruksi kerja pengelolaan laboratorium13 (1)
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Quality Training
Quality TrainingQuality Training
Quality Training
 
DASAR PSIKROMETRIK
DASAR PSIKROMETRIKDASAR PSIKROMETRIK
DASAR PSIKROMETRIK
 
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docx
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docxMAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docx
MAKALAH PERPINDAHAN PANAS MELALUI SIRIP .docx
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
 
3 Type of contracts.pdf
3 Type of contracts.pdf3 Type of contracts.pdf
3 Type of contracts.pdf
 
Mesin Water Chiller
Mesin Water ChillerMesin Water Chiller
Mesin Water Chiller
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
PRESS TOOL
PRESS TOOLPRESS TOOL
PRESS TOOL
 
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...
PRAKTIKUM MEKANIKA TANAH (di Posting : M. Afif Salim, ST, Mahasiswa Magister ...
 
Quality control
Quality controlQuality control
Quality control
 
MANAJEMEN REKAYASA
MANAJEMEN REKAYASAMANAJEMEN REKAYASA
MANAJEMEN REKAYASA
 
Uji tarik
Uji tarikUji tarik
Uji tarik
 

Ähnlich wie Maintenance work order

New project information sheet
New project information sheetNew project information sheet
New project information sheetMpho Seboane
 
Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2halfmann4
 
Worksheets for ass1 2011 12
Worksheets for ass1 2011 12Worksheets for ass1 2011 12
Worksheets for ass1 2011 12samuelgreen
 
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...Rod King, Ph.D.
 
Gate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsGate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsPasilo Drango
 
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....Rod King, Ph.D.
 
3.daftar isi
3.daftar isi3.daftar isi
3.daftar isiMamoit
 
Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Rushi Reddy
 
Gameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameGameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameRod King, Ph.D.
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_formatselvakumar g
 
Aix student guide system administrations part 2 problem determination
Aix student guide system administrations part 2   problem determinationAix student guide system administrations part 2   problem determination
Aix student guide system administrations part 2 problem determinationYogesh Sharma
 

Ähnlich wie Maintenance work order (20)

New project information sheet
New project information sheetNew project information sheet
New project information sheet
 
Key request form
Key request formKey request form
Key request form
 
Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2
 
4 contents
4 contents4 contents
4 contents
 
Worksheets for ass1 2011 12
Worksheets for ass1 2011 12Worksheets for ass1 2011 12
Worksheets for ass1 2011 12
 
4 contents
4 contents4 contents
4 contents
 
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
 
LEAVE APPLICATION.docx
LEAVE APPLICATION.docxLEAVE APPLICATION.docx
LEAVE APPLICATION.docx
 
Gate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsGate pass authorization for taking personal materials
Gate pass authorization for taking personal materials
 
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....
How Scalable Lean Startups Can Use the ROD Map to Inspire Today's Investors ....
 
3.daftar isi
3.daftar isi3.daftar isi
3.daftar isi
 
Agent's Guide to Contracting
Agent's Guide to ContractingAgent's Guide to Contracting
Agent's Guide to Contracting
 
Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)
 
Gameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameGameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST Game
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_format
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_format
 
Remedy
RemedyRemedy
Remedy
 
Aix student guide system administrations part 2 problem determination
Aix student guide system administrations part 2   problem determinationAix student guide system administrations part 2   problem determination
Aix student guide system administrations part 2 problem determination
 
Cs414 sheet3 f2014
Cs414 sheet3 f2014Cs414 sheet3 f2014
Cs414 sheet3 f2014
 
Sheet3
Sheet3Sheet3
Sheet3
 

Mehr von Mohammed Hamed Ahmed Soliman

Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsMohammed Hamed Ahmed Soliman
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Mohammed Hamed Ahmed Soliman
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

Mehr von Mohammed Hamed Ahmed Soliman (20)

Lean accounting VS Financial Management
Lean accounting VS Financial ManagementLean accounting VS Financial Management
Lean accounting VS Financial Management
 
Healthcare is ripe for lean
Healthcare is ripe for leanHealthcare is ripe for lean
Healthcare is ripe for lean
 
Pareto Analysis
Pareto AnalysisPareto Analysis
Pareto Analysis
 
Brainstorming Technique
Brainstorming TechniqueBrainstorming Technique
Brainstorming Technique
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...
 
Root Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case StudyRoot Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case Study
 
The Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business successThe Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business success
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
5S Complete Implementation Guide
5S Complete Implementation Guide 5S Complete Implementation Guide
5S Complete Implementation Guide
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Problems Solving Techniques
Problems Solving TechniquesProblems Solving Techniques
Problems Solving Techniques
 
Advanced Maintenance Management
Advanced Maintenance ManagementAdvanced Maintenance Management
Advanced Maintenance Management
 
Ultrasound Detection - Applications
Ultrasound Detection - ApplicationsUltrasound Detection - Applications
Ultrasound Detection - Applications
 
Machinery Oil Analysis
Machinery Oil AnalysisMachinery Oil Analysis
Machinery Oil Analysis
 

Maintenance work order

  • 1. Maintenance Work Order Work Request “to be filled by Originator” Work Type: (Breakdown BD, Corrective Maintenance CM, Projects) Scheduling: (Planned / unplanned) Line status: (Working / Stopped) Shift:……… Originator:……….. Request dept:……… Date:…../…../…… Time:……… Cost Center:………… Location:………. Equipment name:……….. Equipment code:…………. Responsibility…. Problem description:…………………………………………………………………………………………………………………………………………………….. ………………………………………………………………………………………………………………………………………………………………………………… Problem Code:…………. SupervisorMaintenanceTo be filled by theSection PhaseWork Order Execution TimeCodeTechnicians 1. 2. 3. Equipment Downtime:……………………. Used Spare Parts: QuantityCodeSpare Parts description Used Tools: QCodeNameQCodeName Notes:______________________________________________________ __________________________________________________________________ WO Closing”Signatures” Technician:…………… Supervisor:…………….. Originator:…………… Failure Code:Failure Description: Cause Code:Cause: Action Code:Remedy: Clarification at the back of the paper! Priority Check: Safety High Normal