SlideShare ist ein Scribd-Unternehmen logo
1 von 4
MOHAMED ROSHDI MIHAMED
ELSAYED
Project Manager
18th
Feb 1965
Cairo, Egypt
Current Project: Al-Burullus Combined
Cycle
Power Plant (CPP)
Mobile: +201018733999
+201206598787
E-mails: mimmonino@yahoo.com
mohamedroshdi18@yahoo.com
Nationality: Egyptian
Marital Status: Married
A trilingual Project Manager who’s never missed up the academic engineering and fundamentals with that long
career timeline and dozens of experiences, up to two decades of engineering national and international experience
in both power plants and oil & gas projects; troubleshooting any technical obstacles with a complete
consideration of safety and quality concepts, managing my team to the great milestones. And it still remains; a
new project, a new challenge.
EMPLOYMENT TIMELINE
IREAM SPA
Job Title: Site Manager
Project: AlBurullus Combined cycle [4800MW]
Category: Power Plants
Overall responsibility for the combined cycle
.Installation of GAS, Steam turbine, HRSG,
BOP.Responsible for the site constructions.
Managing the team to achieve the accurate milestones
designed for the project Responsible for the pre-
commissioning procedures first fire and commissioning
1Agoust 2016 To Jan 2017
Location : Alburullus , Egypt
GE / Orascom JV
Job Title: General Construction Manager
Project: Assiut Combined Cycle [8X125]MW.
Category: Power Plants
17th
January 2015 to June 2016
Location: Assiut, Egypt
 Responsible for the site constructions. pre-commissioning procedures first fire and commissioning
 Accomplishing the milestones in time. Outage calibration, functional checks Troubleshooting
 Disassembly, Inspection, Reassembly Procedure Writing
 Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic
supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control
System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System
Protection System
Al-Hashemiah International Contracting Group
(HICC)
Job Title: Project Manager
Project: Ain EL Sokhna super critical power plant
Category: coal-fired Power Plants
February 2013 to October 2014
Location: Benha, Egypt
 Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW
 Responsible for erection and commissioning of two boiler super critical
 Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate
pump cwp pump
 Travelling water screen and all Bop piping doing hydro test chemical clean
 Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and
commissioning
KahroMecha Misr for Mechanical & Electrical Projects
Job Title: Site Manager
Project: Ismailia Power Plant Gas Turbine GE Frame 9E
[8X125] MW
Category: Power Plants
August 2011 to December 2012
Location: Ismailia, Egypt
Responsible for all site constructions for the simple cycle PP under GE supervisor
Commissioning responsibility with received TOC .
. Outage calibration, functional checks Troubleshooting
•Disassembly, Inspection, Reassembly Procedure Writing
•Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic
supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control
System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System
Protection System
KahroMecha Misr for Mechanical & Electrical Projects
Job Title: Site Manager.
Project: Cairo west power plant [2X375]MW
Category: Coal Fire Power Plants
January 2009 to August 2011
Location: Cairo, Egypt
 Installation and commissioning of two steam turbine Mitsubishi oil flashing
 Responsible for erection and commissioning of two boiler Hitachi
 Installation piping critical noncritical SS pipe and all the hydro test
 Bop Equipment Feed water pump condensate pump cwp pump
 Travelling water screen and all Bop piping doing hydro test chemical clean
 Steam blow finishing until
Consolidated Contractors Company
Job Title: Section head engineer. Qatar
August 2008 to Jan 2009
Location: Cairo, Egypt
Project: Liquid Natural Gas Turbine for N2CU3 Mixer [6X125] MW
Category: Power Plants
 Installation of 6 turbines with all their auxiliaries in time under CTJV supervision.
 Installation of [1300-1500] P compressors coming up with all activities.
DEMAJ Italy August 2003 to November 2007
Location: Italy
 Workshop fabrication overhead crane.
 Responsible for all mechanical and electrical works.
 Responsible for maintenance procedures.
TECHINT CIMI MONTUBI
Job Title: Lead mechanical engineer.
Project: Franz Thermal Power Plant [2X650] MW
Category: Power Plants
July 2002 to July 2003
Location: Italy
 Installation of steam turbines.
 Responsibility of commissioning procedures
 Installation of all auxiliary pumps, feed water pumps, and pump hoses.
TECHINT CIMI MONTUBI
Job Title: Lead site engineer.
Project: Petrochemical Ain EL Sokhna.
Category: Oil & Gas
December 1999 to October 2001
Location: Ain sokhna, Egypt
 Installation of equipment pumps.
 Installation of gas compressors and static equipment.
 Commissioning all auxiliary pumps.
ACADEMIC BACKGROUND
B.Sc. in Mechanical Power Engineering 6th
of October University, Egypt
Graduation year: 1996 Overall Grade: Good
Graduation Project: Central Air Conditioning, Industrial water chiller Project Grade: Excellent
LANGUAGE SKILLS
ARABIC ENGLISH ITALY
Native Very Good Very Good
OVERALL MANAGING RESPONSIBILIES
• Managing and leading the project team.
• Recruiting project staff.
• Managing co-ordination of the partners and working groups engaged in project work.
• Detailed project planning and control budgeting.
• Developing and maintaining a detailed project plan.
• Managing project deliverables in line with the project plan.
• Recording and managing project issues and escalating where necessary.
• Resolving cross-functional issues at project level.
• Managing project scope and change control and escalating issues where necessary.
• Monitoring project progress and performance.
• Managing project training within the defined budget.  Liaises with, and updates progress to
management.
• Final approval of the design specification.
• Working closely with users to ensure the project meets business needs.
• Identifying user training needs and devising and managing user training programs.
• Field assistance and supervision in construction phase for equipment installation, Pre Commissioning,
Turn Over, Commissioning and Start Up.
OTHER INFORMATION
Fully conversant with European and American standards
Following engineering and supervisor’s instructions and typed procedures
EN ASME AP
I
AWS NACE AS
NT
ISO 9001:2008 OHSAS 18001
REFERENCES
Available upon request

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
CV6
CV6CV6
CV6
 
cv amr
cv amrcv amr
cv amr
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
EidHarb
EidHarbEidHarb
EidHarb
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Eng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correctEng.mahmoud salah c.v correct
Eng.mahmoud salah c.v correct
 
Ibrahim's Resume
Ibrahim's ResumeIbrahim's Resume
Ibrahim's Resume
 
MA CV
MA CVMA CV
MA CV
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
A_vivek
A_vivekA_vivek
A_vivek
 
CV
CVCV
CV
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Omni Job Openings Dec 2101
Omni Job Openings Dec 2101Omni Job Openings Dec 2101
Omni Job Openings Dec 2101
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 

Andere mochten auch

BernhardLieglresumeJan2017
BernhardLieglresumeJan2017BernhardLieglresumeJan2017
BernhardLieglresumeJan2017
Bernhard Liegl
 
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
Hanishkumar Lad
 

Andere mochten auch (15)

Co.incidir 37 marzo 2017
Co.incidir 37  marzo 2017Co.incidir 37  marzo 2017
Co.incidir 37 marzo 2017
 
Processo de venda ativa
Processo de venda ativaProcesso de venda ativa
Processo de venda ativa
 
¿Qué es el Aluminio?
¿Qué es el Aluminio? ¿Qué es el Aluminio?
¿Qué es el Aluminio?
 
Cash flow
Cash flowCash flow
Cash flow
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
BernhardLieglresumeJan2017
BernhardLieglresumeJan2017BernhardLieglresumeJan2017
BernhardLieglresumeJan2017
 
BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8BSAD 372 SPRING 2017 CH 8
BSAD 372 SPRING 2017 CH 8
 
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA URDU KAY RASAM-ul-KHAT KI TABDILI KA  MASLA
URDU KAY RASAM-ul-KHAT KI TABDILI KA MASLA
 
Cardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIVCardiopatías Congénitas en el Adulto - CIA y CIV
Cardiopatías Congénitas en el Adulto - CIA y CIV
 
Do DevOps Right with New Relic
Do DevOps Right with New RelicDo DevOps Right with New Relic
Do DevOps Right with New Relic
 
Haitham cv
Haitham cvHaitham cv
Haitham cv
 
Cv thierry maysounabe 022017
Cv thierry maysounabe 022017Cv thierry maysounabe 022017
Cv thierry maysounabe 022017
 
DevOps explained
DevOps explainedDevOps explained
DevOps explained
 
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
 

Ähnlich wie site manager /construction manager

Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
ahmed zain
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
mahmoud gaber
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
Mohamed El Banna
 

Ähnlich wie site manager /construction manager (20)

Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Mustafa_original CV
Mustafa_original CV Mustafa_original CV
Mustafa_original CV
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 

Kürzlich hochgeladen

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Kürzlich hochgeladen (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

site manager /construction manager

  • 1. MOHAMED ROSHDI MIHAMED ELSAYED Project Manager 18th Feb 1965 Cairo, Egypt Current Project: Al-Burullus Combined Cycle Power Plant (CPP) Mobile: +201018733999 +201206598787 E-mails: mimmonino@yahoo.com mohamedroshdi18@yahoo.com Nationality: Egyptian Marital Status: Married A trilingual Project Manager who’s never missed up the academic engineering and fundamentals with that long career timeline and dozens of experiences, up to two decades of engineering national and international experience in both power plants and oil & gas projects; troubleshooting any technical obstacles with a complete consideration of safety and quality concepts, managing my team to the great milestones. And it still remains; a new project, a new challenge. EMPLOYMENT TIMELINE IREAM SPA Job Title: Site Manager Project: AlBurullus Combined cycle [4800MW] Category: Power Plants Overall responsibility for the combined cycle .Installation of GAS, Steam turbine, HRSG, BOP.Responsible for the site constructions. Managing the team to achieve the accurate milestones designed for the project Responsible for the pre- commissioning procedures first fire and commissioning 1Agoust 2016 To Jan 2017 Location : Alburullus , Egypt GE / Orascom JV Job Title: General Construction Manager Project: Assiut Combined Cycle [8X125]MW. Category: Power Plants 17th January 2015 to June 2016 Location: Assiut, Egypt  Responsible for the site constructions. pre-commissioning procedures first fire and commissioning  Accomplishing the milestones in time. Outage calibration, functional checks Troubleshooting  Disassembly, Inspection, Reassembly Procedure Writing  Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System Al-Hashemiah International Contracting Group (HICC) Job Title: Project Manager Project: Ain EL Sokhna super critical power plant Category: coal-fired Power Plants February 2013 to October 2014 Location: Benha, Egypt
  • 2.  Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW  Responsible for erection and commissioning of two boiler super critical  Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate pump cwp pump  Travelling water screen and all Bop piping doing hydro test chemical clean  Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and commissioning KahroMecha Misr for Mechanical & Electrical Projects Job Title: Site Manager Project: Ismailia Power Plant Gas Turbine GE Frame 9E [8X125] MW Category: Power Plants August 2011 to December 2012 Location: Ismailia, Egypt Responsible for all site constructions for the simple cycle PP under GE supervisor Commissioning responsibility with received TOC . . Outage calibration, functional checks Troubleshooting •Disassembly, Inspection, Reassembly Procedure Writing •Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System KahroMecha Misr for Mechanical & Electrical Projects Job Title: Site Manager. Project: Cairo west power plant [2X375]MW Category: Coal Fire Power Plants January 2009 to August 2011 Location: Cairo, Egypt  Installation and commissioning of two steam turbine Mitsubishi oil flashing  Responsible for erection and commissioning of two boiler Hitachi  Installation piping critical noncritical SS pipe and all the hydro test  Bop Equipment Feed water pump condensate pump cwp pump  Travelling water screen and all Bop piping doing hydro test chemical clean  Steam blow finishing until Consolidated Contractors Company Job Title: Section head engineer. Qatar August 2008 to Jan 2009 Location: Cairo, Egypt
  • 3. Project: Liquid Natural Gas Turbine for N2CU3 Mixer [6X125] MW Category: Power Plants  Installation of 6 turbines with all their auxiliaries in time under CTJV supervision.  Installation of [1300-1500] P compressors coming up with all activities. DEMAJ Italy August 2003 to November 2007 Location: Italy  Workshop fabrication overhead crane.  Responsible for all mechanical and electrical works.  Responsible for maintenance procedures. TECHINT CIMI MONTUBI Job Title: Lead mechanical engineer. Project: Franz Thermal Power Plant [2X650] MW Category: Power Plants July 2002 to July 2003 Location: Italy  Installation of steam turbines.  Responsibility of commissioning procedures  Installation of all auxiliary pumps, feed water pumps, and pump hoses. TECHINT CIMI MONTUBI Job Title: Lead site engineer. Project: Petrochemical Ain EL Sokhna. Category: Oil & Gas December 1999 to October 2001 Location: Ain sokhna, Egypt  Installation of equipment pumps.  Installation of gas compressors and static equipment.  Commissioning all auxiliary pumps. ACADEMIC BACKGROUND B.Sc. in Mechanical Power Engineering 6th of October University, Egypt Graduation year: 1996 Overall Grade: Good Graduation Project: Central Air Conditioning, Industrial water chiller Project Grade: Excellent LANGUAGE SKILLS ARABIC ENGLISH ITALY Native Very Good Very Good OVERALL MANAGING RESPONSIBILIES • Managing and leading the project team.
  • 4. • Recruiting project staff. • Managing co-ordination of the partners and working groups engaged in project work. • Detailed project planning and control budgeting. • Developing and maintaining a detailed project plan. • Managing project deliverables in line with the project plan. • Recording and managing project issues and escalating where necessary. • Resolving cross-functional issues at project level. • Managing project scope and change control and escalating issues where necessary. • Monitoring project progress and performance. • Managing project training within the defined budget.  Liaises with, and updates progress to management. • Final approval of the design specification. • Working closely with users to ensure the project meets business needs. • Identifying user training needs and devising and managing user training programs. • Field assistance and supervision in construction phase for equipment installation, Pre Commissioning, Turn Over, Commissioning and Start Up. OTHER INFORMATION Fully conversant with European and American standards Following engineering and supervisor’s instructions and typed procedures EN ASME AP I AWS NACE AS NT ISO 9001:2008 OHSAS 18001 REFERENCES Available upon request