PMP - Procurement
revision and questions
Prepared by:
Engr. Mohamed Maged, PMP
Admin of:
https://www.facebook.com/Prof.Planner
Instructor: Mohamed Maged
Senior Project Control Engineer, B.Sc. of Civil engineering – Ain Shams
University, with experience in MENA region of (construction, infrastructure,
and roads) Mega projects, in professions of Contract administration, Procurement,
Tender estimating, Cost control, Planning & Claim analysis.
Instructor of Planning & Project Management:
- Construction Management Planning and Control (CMPC).
- Delay, Claim and Dispute Resolution (DCDR) in PMBOK, FIDIC & SCL protocol.
- Project Management Professional (PMP).
- Free lectures with cooperation of Egyptian Engineers Association in Saudi:
- Product oriented construction management
- Top 10 planning fundamentals
- Scope creep – cases and preventive actions
- Claims and dispute resolution in FIDIC
Mohamed Maged (Professional Certificates)
PMP Project Management Professional (PMI – USA)
SFC Scrum Fundamentals Certified (SCRUM study)
Associate of Chartered Institute of Arbitrators (CIArb - London)
Fellow of Association of International Arbitration (AIA - Brussels)
FIDIC Contracts Consultant: International academy of mediation and
arbitration - Egypt.
Six Sigma Yellow Belt Professional (6 Sigma Study- PMI)
Mohamed Maged (Prof. Planner)
Admin of the biggest online community of Arab Planners (10,000+)
(Facebook Page: to be prof. planner, related group: Best Advice for
Planners – Public group)
SlideShare: www.slideshare.net/MohamedMaged8/
Planning fundamentals: http://www.slideshare.net/Mohamed
Maged8/50qts-of-planning-fundamentals-ver04
YouTube Channel: https://www.youtube.com/ArabPlanners.
Arranged Two Annual Conferences of Planning and
Project Management (Anniversary of Facebook Page: Prof.Planner)-
American University in Cairo, August 2014 & 2015.
A GUIDE TO THE PROJECT MANAGEMENT BODY OF
KNOWLEDGE (PMBOK® Guide) – Fifth Edition
• Procurement (chapter 12) Review
• Exam - test questions
5
6
Procurement
Management in
PMBOK
12.1. Plan Procurement Management
Plan Procurement
Management. The
process of
documenting project
procurement decisions,
specifying the
approach, and
identifying potential
sellers.
7
Definitions
Make-or-Buy Analysis. The process of gathering and organizing data about product
requirements and analyzing them against available alternatives including the purchase or
internal manufacture of the product (consider risk for this strategic decision).
Market Research. The process of gathering information at conferences, online reviews,
and a variety of sources to identify market capabilities.
Source Selection Criteria. required attributes of seller,
objective or subjective (Risk, Capability/ Capacity,
Warranty, Past performance,..) may use screening or
weighting systems- (sole source the only provider available,
single source a preferred vendor).
Make-or-Buy Decisions. Decisions made regarding the
external purchase or internal manufacture of a product
(depends on the duration of use).
8
Make-or-Buy Example
9
Procurement
documents
The documents in bid and
proposal include: buyer’s
Invitation for Bid (IFB),
Invitation for Negotiations,
Request for Information (RFI),
Request for Quotation (RFQ),
Request for Proposal (RFP),
and seller’s responses.
10
What’s Contract
Legally binding relationship between parties to define procurement statement
of work, requirements of reporting, payment, roles, responsibilities, and risk
allocation (helps in better communication, clear responsibilities, good change
management mechanisms).
11
Contractual
relationships in
projects
Contract Types:
1- Fixed Price
2- Cost Plus
3- Time & Material
Buyer Vs Seller
Employer Contractor
Contractor Subcontractor
Purchaser Supplier
Pays money Offers service
12
Fixed price
- Contract Types
13
Cost-Reimbursable
- Contract Types
14
Time and Material
- Contract Type
15
Contract type
selection
16
Incentive contracts
examples
17
Contract type and
risk assessment
The project manager has the
identified project risks.
PM needs to make sure
provisions are included in the
contract to address these risks.
18
-Agreement -Particular Conditions
-General Conditions -Special Specs.
-General Specs. -Drawings
-B.O.Q.
Words are binding more than no.s
Contract priority
of documents
Good terms are easy to understand: plain language & visual aids.
19
12.2. Conduct Procurements
Conduct
Procurements. The
process of obtaining
seller responses,
selecting a seller,
and awarding a
contract.
Conduct
Procurements
20
OUTPUTS:
Selected Sellers. The sellers selected to
provide a contracted set.
Agreements. the initial intentions of a project
after (LOI: letter of intent) if used. This can
take the form of a contract, memorandum of
understanding (MOU), letters of agreement,
verbal agreements, a purchase order, email,
etc. (include terms and conditions).
Conduct
Procurements
21
12.3. Control Procurements
Control
Procurements
Organizational
Process Assets
Updates.
(Correspondence,
Payment schedules
and requests, Seller
performance
evaluation
documentation).
22
Control
Procurements
Contract Change Control System. The system used to collect, track, adjudicate, and communicate
changes (CCB might review and approve, but only the procurement manager has the authority to sign a
change).
Procurement Performance Reviews. A structured review of the seller’s progress to deliver project scope
and quality, within cost and on schedule, as compared to the contract.
Inspections and Audits. A process to observe performance of contracted work or a promised product
against agreed-upon requirements, any breach happens (Privity: no contractual relationship between
client and subcontractors, so he has to deal with him through the main contractor).
Performance Reporting. See work performance reports (Integration – Control).
Payment Systems. The system used to provide and track supplier’s invoices and payments.
Claims Administration. The process of processing, adjudicating, and communicating contract claims
(contested or potential constructive changes: requested change can’t reach agreement between
buyer and seller).
Records Management System. A specific set of processes, related control functions, and tools that are
consolidated and combined to record and retain information about the project.
23
12.4. Close Procurements
Close Procurements. The
process of completing each
project procurement
(completion or termination),
also involves administrative
activities such as finalizing
open claims, updating
records to reflect final
results, and archiving such
information for future use.
Close
Procurements
24
Tools & Techniques:
Procurement Audits. The review of contracts and contracting processes for completeness,
accuracy, and effectiveness (audits are used to improve processes and learn from
success).
Records Management System. by the project manager to manage, archive contract and
procurement documentation , correspondence and records.
OUTPUTS:
Closed Procurements. Project contracts or other procurement agreements that have been
formally acknowledged by the proper authorizing agent as being finalized and signed off.
Organizational Process Assets Updates. (Procurement file, Deliverable acceptance,
Lessons learned documentation).
Close
Procurements
25
Pre-contract: clarify the structure, requirements,
and other terms of the purchases so that mutual
agreement can be reached prior to signing the
contract. Final contract language reflects all
agreements reached (in order: performance,
scope, schedule, price).
Post contract: the final equitable settlement of
all outstanding issues, claims, and disputes by
negotiation is preferred. Otherwise some form
of alternative dispute resolution (ADR) including
mediation or arbitration may be explored.
When all else fails, litigation in courts is the least
desirable option.
Procurement
Negotiations
26
You may refer to any of these tactics:
• Fait Accompli - Standard contract terms that are nonnegotiable. (In reality, anything in the contract is negotiable
although your adversary will never admit it).
• Deadline - Make it clear that this is the time by which they must do. As the deadline approaches, increase the
emotional pressure, talking more about what will happen if the deadline is missed.
• Good guy /bad guy - One person acts in an aggressive and pushy way, making unreasonable demands and requiring
compliance. The other person acts in kind and friendly, asking nicely - and getting compliance.
• Missing man - The person who can actually make the decision is missing from the negotiation. The negotiator can then
negotiate for a lower price or more favorable terms which they claim they can agree to.
• Limited authority - Refusing to give in on items because you have no authority to do what is being requested.
• Fair and reasonable - You can engage the other person by asking them 'what is fair'. You can also bring something
into the negotiation that is, by definition, fair. You can also reject criteria from the adversary on the grounds that it is not
fair.
• Unreasonable - Stating that the other side is making unreasonable demands of you in the negotiation.
• Delay - Stretching out the negotiation, especially at critical moments.
• Attack - A direct attack on your integrity, trustworthiness, competence, or other such bullying bombast designed to
force compliance out of you.
Negotiation
tactics
Procurement test questions
27
28
29
30
31
32
33
34
35
36
37
38
39
Thank You
Don’t Hesitate to contact….
M.Maged
magedkom@gmail.com
mobile : 00966-580264968

Weitere ähnliche Inhalte

Was ist angesagt?

أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسM Maged Hegazy, LLM, MBA, CCP, P3O
 
مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةM Maged Hegazy, LLM, MBA, CCP, P3O
 
Project management using Primavera 6.x by Karim Ragab
Project management using Primavera 6.x by Karim RagabProject management using Primavera 6.x by Karim Ragab
Project management using Primavera 6.x by Karim RagabKarim Ragab
 
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotمحاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotKhaled M. Al Kolfat MS.Eng,MoP,P3O,PMOC,PMP,M.ASCE
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioKose Jumnichi
 
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail  2017 _ lec. 1Ss training fidic moustafa ismail  2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1Moustafa Ismail Abu Dief
 

Was ist angesagt? (20)

Contracts classification
Contracts classificationContracts classification
Contracts classification
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
 
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
 
Top10 planning fundamentals...
Top10 planning fundamentals...Top10 planning fundamentals...
Top10 planning fundamentals...
 
مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافية
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Project management using Primavera 6.x by Karim Ragab
Project management using Primavera 6.x by Karim RagabProject management using Primavera 6.x by Karim Ragab
Project management using Primavera 6.x by Karim Ragab
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotمحاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
Ppt on fidic claims
Ppt on fidic claimsPpt on fidic claims
Ppt on fidic claims
 
Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
 
Plan Risk responses
Plan Risk responsesPlan Risk responses
Plan Risk responses
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visio
 
Contract Risks
Contract RisksContract Risks
Contract Risks
 
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail  2017 _ lec. 1Ss training fidic moustafa ismail  2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1
 
Claims
ClaimsClaims
Claims
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 

Andere mochten auch

PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementAhmed Higazi, PMP CSM
 
Ms project
Ms projectMs project
Ms projectu083125
 
Calynn's story
Calynn's storyCalynn's story
Calynn's storyReed Quinn
 
4.1 finding content mod4_slideshow_ppt
4.1 finding content mod4_slideshow_ppt4.1 finding content mod4_slideshow_ppt
4.1 finding content mod4_slideshow_pptbrucemortland
 
台北市觀光一日行
台北市觀光一日行台北市觀光一日行
台北市觀光一日行政凱 吳
 
3.2 teachers who make slideshow_final
3.2 teachers who make slideshow_final3.2 teachers who make slideshow_final
3.2 teachers who make slideshow_finalbrucemortland
 
порядок обращения в еспч
порядок обращения в еспчпорядок обращения в еспч
порядок обращения в еспчotkrytyzal
 
Are Robots going to destroy the Financial Function?
Are Robots going to destroy the Financial Function?Are Robots going to destroy the Financial Function?
Are Robots going to destroy the Financial Function?Ton Dobbe
 
2.0 nine elements_slideshow
2.0 nine elements_slideshow2.0 nine elements_slideshow
2.0 nine elements_slideshowbrucemortland
 
Taste of the future
Taste of the future Taste of the future
Taste of the future Ton Dobbe
 
Original KT TAPE BUSINESS PLAN - 2008
Original KT TAPE BUSINESS PLAN - 2008Original KT TAPE BUSINESS PLAN - 2008
Original KT TAPE BUSINESS PLAN - 2008Reed Quinn
 
MSEP14CMM02_PSM2_ASSIGNMENT
MSEP14CMM02_PSM2_ASSIGNMENTMSEP14CMM02_PSM2_ASSIGNMENT
MSEP14CMM02_PSM2_ASSIGNMENTAmeya Sonkusale
 
Tazizu 2013
Tazizu 2013Tazizu 2013
Tazizu 2013tazizu
 
If 'impact' equals 'engagement'..., there is a lot to fix
If 'impact' equals 'engagement'..., there is a lot to fixIf 'impact' equals 'engagement'..., there is a lot to fix
If 'impact' equals 'engagement'..., there is a lot to fixTon Dobbe
 
4.2 how making connects to new learning standards slideshow_final
4.2  how making connects to new learning standards slideshow_final4.2  how making connects to new learning standards slideshow_final
4.2 how making connects to new learning standards slideshow_finalbrucemortland
 
4.0 finding content mod4_slideshow
4.0 finding content mod4_slideshow4.0 finding content mod4_slideshow
4.0 finding content mod4_slideshowbrucemortland
 

Andere mochten auch (20)

Scope creep - cylfe campain
Scope creep - cylfe campainScope creep - cylfe campain
Scope creep - cylfe campain
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement Management
 
Ms project
Ms projectMs project
Ms project
 
Jack welch --tuncer
Jack welch --tuncerJack welch --tuncer
Jack welch --tuncer
 
Calynn's story
Calynn's storyCalynn's story
Calynn's story
 
Kids
KidsKids
Kids
 
4.1 finding content mod4_slideshow_ppt
4.1 finding content mod4_slideshow_ppt4.1 finding content mod4_slideshow_ppt
4.1 finding content mod4_slideshow_ppt
 
台北市觀光一日行
台北市觀光一日行台北市觀光一日行
台北市觀光一日行
 
3.2 teachers who make slideshow_final
3.2 teachers who make slideshow_final3.2 teachers who make slideshow_final
3.2 teachers who make slideshow_final
 
порядок обращения в еспч
порядок обращения в еспчпорядок обращения в еспч
порядок обращения в еспч
 
Are Robots going to destroy the Financial Function?
Are Robots going to destroy the Financial Function?Are Robots going to destroy the Financial Function?
Are Robots going to destroy the Financial Function?
 
2.0 nine elements_slideshow
2.0 nine elements_slideshow2.0 nine elements_slideshow
2.0 nine elements_slideshow
 
Taste of the future
Taste of the future Taste of the future
Taste of the future
 
Original KT TAPE BUSINESS PLAN - 2008
Original KT TAPE BUSINESS PLAN - 2008Original KT TAPE BUSINESS PLAN - 2008
Original KT TAPE BUSINESS PLAN - 2008
 
MSEP14CMM02_PSM2_ASSIGNMENT
MSEP14CMM02_PSM2_ASSIGNMENTMSEP14CMM02_PSM2_ASSIGNMENT
MSEP14CMM02_PSM2_ASSIGNMENT
 
VLN Channel Service
VLN Channel ServiceVLN Channel Service
VLN Channel Service
 
Tazizu 2013
Tazizu 2013Tazizu 2013
Tazizu 2013
 
If 'impact' equals 'engagement'..., there is a lot to fix
If 'impact' equals 'engagement'..., there is a lot to fixIf 'impact' equals 'engagement'..., there is a lot to fix
If 'impact' equals 'engagement'..., there is a lot to fix
 
4.2 how making connects to new learning standards slideshow_final
4.2  how making connects to new learning standards slideshow_final4.2  how making connects to new learning standards slideshow_final
4.2 how making connects to new learning standards slideshow_final
 
4.0 finding content mod4_slideshow
4.0 finding content mod4_slideshow4.0 finding content mod4_slideshow
4.0 finding content mod4_slideshow
 

Ähnlich wie Pmp procurement rev

Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements Shereef Sabri
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxssuserc0bf9b
 
Part Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxPart Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxGetanehMulualemGelaw
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid Daoud
 
Control procurement
Control procurement Control procurement
Control procurement Shereef Sabri
 
Plan procurement management
Plan procurement management Plan procurement management
Plan procurement management Shereef Sabri
 
Contracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxContracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxRebeccaEdwards88
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015SONU61709
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management OverviewDavidMcLachlan1
 
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxaidaclewer
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan templateVivek Srivastava
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptxLecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptxMuhammadAftab89
 
2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]Firly Zulkifli
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plantVikram Bakshi
 

Ähnlich wie Pmp procurement rev (20)

Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
12 procurement
12 procurement12 procurement
12 procurement
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
Part Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxPart Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptx
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
Control procurement
Control procurement Control procurement
Control procurement
 
Plan procurement management
Plan procurement management Plan procurement management
Plan procurement management
 
Contracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxContracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docx
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview
 
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptxLecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
 
2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
 
Green field making of production plant.ppt2
Green field making of production plant.ppt2Green field making of production plant.ppt2
Green field making of production plant.ppt2
 

Mehr von M Maged Hegazy, LLM, MBA, CCP, P3O

خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأول
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأولخمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأول
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأولM Maged Hegazy, LLM, MBA, CCP, P3O
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations managementM Maged Hegazy, LLM, MBA, CCP, P3O
 
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best AdviceM Maged Hegazy, LLM, MBA, CCP, P3O
 

Mehr von M Maged Hegazy, LLM, MBA, CCP, P3O (16)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Concurrent Delay in Construction
Concurrent Delay in ConstructionConcurrent Delay in Construction
Concurrent Delay in Construction
 
Essentials of EOT Claims
Essentials of EOT ClaimsEssentials of EOT Claims
Essentials of EOT Claims
 
CCP Course - Introduction.pdf
CCP Course - Introduction.pdfCCP Course - Introduction.pdf
CCP Course - Introduction.pdf
 
Performance Measurement and Weightage Systems
Performance Measurement and Weightage SystemsPerformance Measurement and Weightage Systems
Performance Measurement and Weightage Systems
 
International Delay Analysis Approaches
International Delay Analysis ApproachesInternational Delay Analysis Approaches
International Delay Analysis Approaches
 
CCP Technical Paper and Application
CCP Technical Paper and ApplicationCCP Technical Paper and Application
CCP Technical Paper and Application
 
Missing and modern necessary skills
Missing and modern necessary skillsMissing and modern necessary skills
Missing and modern necessary skills
 
Introduction to construction contracts fundamentals
Introduction to construction contracts fundamentalsIntroduction to construction contracts fundamentals
Introduction to construction contracts fundamentals
 
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأول
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأولخمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأول
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الأول
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
 
5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management
 
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
 
3 years acheivements
3 years acheivements3 years acheivements
3 years acheivements
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 

Kürzlich hochgeladen

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Kürzlich hochgeladen (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Pmp procurement rev

  • 1. PMP - Procurement revision and questions Prepared by: Engr. Mohamed Maged, PMP Admin of: https://www.facebook.com/Prof.Planner
  • 2. Instructor: Mohamed Maged Senior Project Control Engineer, B.Sc. of Civil engineering – Ain Shams University, with experience in MENA region of (construction, infrastructure, and roads) Mega projects, in professions of Contract administration, Procurement, Tender estimating, Cost control, Planning & Claim analysis. Instructor of Planning & Project Management: - Construction Management Planning and Control (CMPC). - Delay, Claim and Dispute Resolution (DCDR) in PMBOK, FIDIC & SCL protocol. - Project Management Professional (PMP). - Free lectures with cooperation of Egyptian Engineers Association in Saudi: - Product oriented construction management - Top 10 planning fundamentals - Scope creep – cases and preventive actions - Claims and dispute resolution in FIDIC
  • 3. Mohamed Maged (Professional Certificates) PMP Project Management Professional (PMI – USA) SFC Scrum Fundamentals Certified (SCRUM study) Associate of Chartered Institute of Arbitrators (CIArb - London) Fellow of Association of International Arbitration (AIA - Brussels) FIDIC Contracts Consultant: International academy of mediation and arbitration - Egypt. Six Sigma Yellow Belt Professional (6 Sigma Study- PMI)
  • 4. Mohamed Maged (Prof. Planner) Admin of the biggest online community of Arab Planners (10,000+) (Facebook Page: to be prof. planner, related group: Best Advice for Planners – Public group) SlideShare: www.slideshare.net/MohamedMaged8/ Planning fundamentals: http://www.slideshare.net/Mohamed Maged8/50qts-of-planning-fundamentals-ver04 YouTube Channel: https://www.youtube.com/ArabPlanners. Arranged Two Annual Conferences of Planning and Project Management (Anniversary of Facebook Page: Prof.Planner)- American University in Cairo, August 2014 & 2015.
  • 5. A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK® Guide) – Fifth Edition • Procurement (chapter 12) Review • Exam - test questions 5
  • 6. 6 Procurement Management in PMBOK 12.1. Plan Procurement Management Plan Procurement Management. The process of documenting project procurement decisions, specifying the approach, and identifying potential sellers.
  • 7. 7 Definitions Make-or-Buy Analysis. The process of gathering and organizing data about product requirements and analyzing them against available alternatives including the purchase or internal manufacture of the product (consider risk for this strategic decision). Market Research. The process of gathering information at conferences, online reviews, and a variety of sources to identify market capabilities. Source Selection Criteria. required attributes of seller, objective or subjective (Risk, Capability/ Capacity, Warranty, Past performance,..) may use screening or weighting systems- (sole source the only provider available, single source a preferred vendor). Make-or-Buy Decisions. Decisions made regarding the external purchase or internal manufacture of a product (depends on the duration of use).
  • 9. 9 Procurement documents The documents in bid and proposal include: buyer’s Invitation for Bid (IFB), Invitation for Negotiations, Request for Information (RFI), Request for Quotation (RFQ), Request for Proposal (RFP), and seller’s responses.
  • 10. 10 What’s Contract Legally binding relationship between parties to define procurement statement of work, requirements of reporting, payment, roles, responsibilities, and risk allocation (helps in better communication, clear responsibilities, good change management mechanisms).
  • 11. 11 Contractual relationships in projects Contract Types: 1- Fixed Price 2- Cost Plus 3- Time & Material Buyer Vs Seller Employer Contractor Contractor Subcontractor Purchaser Supplier Pays money Offers service
  • 14. 14 Time and Material - Contract Type
  • 17. 17 Contract type and risk assessment The project manager has the identified project risks. PM needs to make sure provisions are included in the contract to address these risks.
  • 18. 18 -Agreement -Particular Conditions -General Conditions -Special Specs. -General Specs. -Drawings -B.O.Q. Words are binding more than no.s Contract priority of documents Good terms are easy to understand: plain language & visual aids.
  • 19. 19 12.2. Conduct Procurements Conduct Procurements. The process of obtaining seller responses, selecting a seller, and awarding a contract. Conduct Procurements
  • 20. 20 OUTPUTS: Selected Sellers. The sellers selected to provide a contracted set. Agreements. the initial intentions of a project after (LOI: letter of intent) if used. This can take the form of a contract, memorandum of understanding (MOU), letters of agreement, verbal agreements, a purchase order, email, etc. (include terms and conditions). Conduct Procurements
  • 21. 21 12.3. Control Procurements Control Procurements Organizational Process Assets Updates. (Correspondence, Payment schedules and requests, Seller performance evaluation documentation).
  • 22. 22 Control Procurements Contract Change Control System. The system used to collect, track, adjudicate, and communicate changes (CCB might review and approve, but only the procurement manager has the authority to sign a change). Procurement Performance Reviews. A structured review of the seller’s progress to deliver project scope and quality, within cost and on schedule, as compared to the contract. Inspections and Audits. A process to observe performance of contracted work or a promised product against agreed-upon requirements, any breach happens (Privity: no contractual relationship between client and subcontractors, so he has to deal with him through the main contractor). Performance Reporting. See work performance reports (Integration – Control). Payment Systems. The system used to provide and track supplier’s invoices and payments. Claims Administration. The process of processing, adjudicating, and communicating contract claims (contested or potential constructive changes: requested change can’t reach agreement between buyer and seller). Records Management System. A specific set of processes, related control functions, and tools that are consolidated and combined to record and retain information about the project.
  • 23. 23 12.4. Close Procurements Close Procurements. The process of completing each project procurement (completion or termination), also involves administrative activities such as finalizing open claims, updating records to reflect final results, and archiving such information for future use. Close Procurements
  • 24. 24 Tools & Techniques: Procurement Audits. The review of contracts and contracting processes for completeness, accuracy, and effectiveness (audits are used to improve processes and learn from success). Records Management System. by the project manager to manage, archive contract and procurement documentation , correspondence and records. OUTPUTS: Closed Procurements. Project contracts or other procurement agreements that have been formally acknowledged by the proper authorizing agent as being finalized and signed off. Organizational Process Assets Updates. (Procurement file, Deliverable acceptance, Lessons learned documentation). Close Procurements
  • 25. 25 Pre-contract: clarify the structure, requirements, and other terms of the purchases so that mutual agreement can be reached prior to signing the contract. Final contract language reflects all agreements reached (in order: performance, scope, schedule, price). Post contract: the final equitable settlement of all outstanding issues, claims, and disputes by negotiation is preferred. Otherwise some form of alternative dispute resolution (ADR) including mediation or arbitration may be explored. When all else fails, litigation in courts is the least desirable option. Procurement Negotiations
  • 26. 26 You may refer to any of these tactics: • Fait Accompli - Standard contract terms that are nonnegotiable. (In reality, anything in the contract is negotiable although your adversary will never admit it). • Deadline - Make it clear that this is the time by which they must do. As the deadline approaches, increase the emotional pressure, talking more about what will happen if the deadline is missed. • Good guy /bad guy - One person acts in an aggressive and pushy way, making unreasonable demands and requiring compliance. The other person acts in kind and friendly, asking nicely - and getting compliance. • Missing man - The person who can actually make the decision is missing from the negotiation. The negotiator can then negotiate for a lower price or more favorable terms which they claim they can agree to. • Limited authority - Refusing to give in on items because you have no authority to do what is being requested. • Fair and reasonable - You can engage the other person by asking them 'what is fair'. You can also bring something into the negotiation that is, by definition, fair. You can also reject criteria from the adversary on the grounds that it is not fair. • Unreasonable - Stating that the other side is making unreasonable demands of you in the negotiation. • Delay - Stretching out the negotiation, especially at critical moments. • Attack - A direct attack on your integrity, trustworthiness, competence, or other such bullying bombast designed to force compliance out of you. Negotiation tactics
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. 36
  • 37. 37
  • 38. 38
  • 39. 39
  • 40. Thank You Don’t Hesitate to contact…. M.Maged magedkom@gmail.com mobile : 00966-580264968