FISH MARKET DEVELOPMENT - DRAINAGE OF
EXISTING FISH MARKET AT ABU HAMOUR CIVIL
PROJECT CP-726/5
Presented By:
Mohamed ElSirsy Senior Design Engineer (Hyder)
Laith Al Saadi Associate Business Director (Hyder)
WHAT DOES THIS PRESENTATION COVER?
• Introduction
• Purpose of The Project
• Objective
Introduction
MMUP
“The Owner”
Ashghal Hyder
Introduction
• The Fish Market Development plans are divided into two parts:
Ashghal’s part :
• Connecting the Fish Market wastewater to the public foul drainage
network.
• Developing the Stormwater drainage system for the Fish Market.
MMUP part :
• Renovation of the Wholesale area to improve the services of the Fish
market, the Buildings inside the Fish Market & Internal design of the foul
network system inside the Fish Market.
• Isolation of the high-salt source that comes along with the Sardine fish
from sultanate of Oman. Discharge of the salty wash water is not
acceptable to into the public foul sewerage network.
• Introduce Effective screening of Fish Market wastewater to 3 mm
aperture to ensure solids are captured prior to disposal into the new foul
collection line.
Introduction (Cont’d)
Purpose of the Project
Why ?
Purpose of the Project (Cont’d)
The commission will address only the works identified with Ashghal
Part.
Hyder is to develop Drainage Systems for the Fish Market
A. The Fish Market foul drainage system is not connected to the public
sewerage network.
B. There is no Stormwater Drainage System for the Fish Market
Objective
A. Current Foul System:
The current foul is system is collected into two main Septic Tanks ;
Septic Tank (1) which is located at the Main Entrance of the Fish
Market and Septic Tank (2) which is located at the back side of the Fish
Market.
Septic Tank (1) Septic Tank (2)
Objective (Cont’d)
• Current Disposal System:
• The wastewater from the septic tanks is collected by mean of tankers as
shown in the previous picture. These tankers make 5-6 daily trips from
each :
• Septic Tank (1): 6:00 a.m. to 2 p.m.
• Septic Tank (2): 1:00 a.m. to 4:00 a.m.
• Total average Design Flow = 86 m3/day and the Total peak design Flow
is 516 m3/day.
• The Septic Tanks are in a very bad condition. (Leaking)
• Proposed Methodology:
• Hyder proposed a whole new foul collection system by means of a sewer
line and manholes connected to the existing pumping station (PS-CM).
The existing Septic Tanks will be demolished.
Objective (Cont’d)
Objective (Cont’d)
• Upgrade of the Existing Pump Station (PS-CM)
• Optimize the appropriate Treatment Technology in order to treat the
wastewater from the Fish Market Prior disposal to the nearest Manhole.
• The following high contaminant levels produced at the Fish Market:
• Chemical Oxygen Demand (COD)
• Total Nitrogen (TN)
• Phosphorous (P)
Objective (Cont’d)
Objective (Cont’d)
• To meet the standard target level for effluent treatment will require
physical (e.g. screens), biological (e.g. MBR, SBR or else) and chemical
treatment (e.g. Polymers, Hypochlorite, Powdered Activated Carbon
“PAC”…etc.).
• In regards to the level of treatment requirements shown in previous table,
the Biological treatment technology is probably the most efficient
treatment process that is capable to reach that high level of effluent
requirements to be safely disposed into the public foul sewerage system.
• Many parameters affect the selection of technical and economic
comparison of the different alternatives (DAF, SBR and MBR) of the
treatment systems. The relevant evaluation parameters in our case
include:
Objective (Cont’d)
• Operation Treatment Stages.
• Sludge Treatment. Treated Sewage Quality.
• Consumed Power. Maintenance.
• Land Requirement. Nitrogen Removal
• Phosphorous Removal
• Trusted Technology
• Construction Costs.
• The (DAF) plant is not efficient in reducing the Nitrogen (TKN) and the
Phosphorous (P) when compared to the CAS (Conventional Activated
Sludge) and therefore it is not recommended. The(MBR) gives slightly
higher effluent quality at a higher operating and maintenance cost than
the SBR which will be recommended.
Objective (Cont’d)
B. Stormwater Drainage System:
• Current Situation:
• There is no existing Stormwater drainage system at the Fish Market.
• Hyder is assessing the feasibility of constructing a non positive system
in the form of Soakaways or Soakaway trenches for stormwater
drainage. This will necessitate drilling boreholes and soak
away/infiltration tests by determining the groundwater level and the soil
permeability.
The End
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

Case study on lou ruvo center for brain health
Case study on lou ruvo center for brain healthCase study on lou ruvo center for brain health
Case study on lou ruvo center for brain healthAabhika Samantaray
 
urban design Amritsar the heritage street
urban design Amritsar the heritage streeturban design Amritsar the heritage street
urban design Amritsar the heritage streetPriyanka Sagar
 
Strategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsStrategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsHazreena Hussein
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hubhrudai11
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYSumit Ranjan
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial ComplexRemisha Maharjan
 
Hathigaon -the_elephant_village
Hathigaon  -the_elephant_villageHathigaon  -the_elephant_village
Hathigaon -the_elephant_villageNishaMathewGhosh
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projectsDhanya Pravin
 
Marinas and its importance
Marinas and its importanceMarinas and its importance
Marinas and its importanceSarabindhGManoj
 
Panvel- town planning ppt b-arch
Panvel- town planning ppt b-archPanvel- town planning ppt b-arch
Panvel- town planning ppt b-archKelly Cucoo
 
Resort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnResort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnKrushnaDhokale
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdfSuhanaSb
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYAmit Majumdar
 

Was ist angesagt? (20)

Case study on lou ruvo center for brain health
Case study on lou ruvo center for brain healthCase study on lou ruvo center for brain health
Case study on lou ruvo center for brain health
 
urban design Amritsar the heritage street
urban design Amritsar the heritage streeturban design Amritsar the heritage street
urban design Amritsar the heritage street
 
Strategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsStrategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront Developments
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
 
Shaam e-sarhad
Shaam e-sarhadShaam e-sarhad
Shaam e-sarhad
 
Amphitheatre.pptx
 Amphitheatre.pptx Amphitheatre.pptx
Amphitheatre.pptx
 
Resort case study
Resort case studyResort case study
Resort case study
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
 
Architectural programming
Architectural programmingArchitectural programming
Architectural programming
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial Complex
 
Hathigaon -the_elephant_village
Hathigaon  -the_elephant_villageHathigaon  -the_elephant_village
Hathigaon -the_elephant_village
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projects
 
Marinas and its importance
Marinas and its importanceMarinas and its importance
Marinas and its importance
 
Panvel- town planning ppt b-arch
Panvel- town planning ppt b-archPanvel- town planning ppt b-arch
Panvel- town planning ppt b-arch
 
Resort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnResort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawn
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdf
 
Resort casestudy
Resort casestudyResort casestudy
Resort casestudy
 
Data collaction of resort
Data collaction of resortData collaction of resort
Data collaction of resort
 
Plumbing plan
Plumbing planPlumbing plan
Plumbing plan
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDY
 

Andere mochten auch

05 fishing port2009
05 fishing port200905 fishing port2009
05 fishing port2009herdianam
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualsyedfaisalali_50
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
FISH FARM - DESIGN & CONSTRUCTION
FISH FARM - DESIGN & CONSTRUCTIONFISH FARM - DESIGN & CONSTRUCTION
FISH FARM - DESIGN & CONSTRUCTIONMUHAMMED ANZEER F
 

Andere mochten auch (6)

REGULATIONS OF FISH MARKET
REGULATIONS OF FISH MARKETREGULATIONS OF FISH MARKET
REGULATIONS OF FISH MARKET
 
05 fishing port2009
05 fishing port200905 fishing port2009
05 fishing port2009
 
Expert Author
Expert AuthorExpert Author
Expert Author
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
FISH FARM - DESIGN & CONSTRUCTION
FISH FARM - DESIGN & CONSTRUCTIONFISH FARM - DESIGN & CONSTRUCTION
FISH FARM - DESIGN & CONSTRUCTION
 

Ähnlich wie Fish Market Drainage At Abu Hamour

Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment PlantDeepak Samal
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalManuel Hidalgo
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...IRJET Journal
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...IRJET Journal
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWGLA University
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...dun yang
 
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]Frank Costanzo Connelly
 
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...IRJET Journal
 
Domestic Waste water treatment
 Domestic Waste water treatment   Domestic Waste water treatment
Domestic Waste water treatment Ghassan Hadi
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewaterArpit Budania
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfPRITI CHHATOI
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management planFrank Costanzo Connelly
 
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET Journal
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentA.T.E. Private Limited
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 

Ähnlich wie Fish Market Drainage At Abu Hamour (20)

Ccccc
CccccCcccc
Ccccc
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment Plant
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
 
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
 
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...
IRJET- Applications of Anaerobic Baffled Reactor in Wastewater Treatment usin...
 
Domestic Waste water treatment
 Domestic Waste water treatment   Domestic Waste water treatment
Domestic Waste water treatment
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
 
Emerging Technologies in Onsite Wastewater Treatment
Emerging Technologies in Onsite Wastewater TreatmentEmerging Technologies in Onsite Wastewater Treatment
Emerging Technologies in Onsite Wastewater Treatment
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management plan
 
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Ppt assgn 1
Ppt assgn  1Ppt assgn  1
Ppt assgn 1
 

Mehr von Mohamed ElSirsy (20)

IG-UTP_English_1
IG-UTP_English_1IG-UTP_English_1
IG-UTP_English_1
 
Lab Design Presentation
Lab Design PresentationLab Design Presentation
Lab Design Presentation
 
TSE SCADA Design presentation new
TSE SCADA Design presentation newTSE SCADA Design presentation new
TSE SCADA Design presentation new
 
DAM
DAMDAM
DAM
 
post graduate
post graduatepost graduate
post graduate
 
Lateral leadership vs change
Lateral leadership vs changeLateral leadership vs change
Lateral leadership vs change
 
PRINCE2-Foundation-e-Cert
PRINCE2-Foundation-e-CertPRINCE2-Foundation-e-Cert
PRINCE2-Foundation-e-Cert
 
PRINCE2-Practitioner-e-Cert
PRINCE2-Practitioner-e-CertPRINCE2-Practitioner-e-Cert
PRINCE2-Practitioner-e-Cert
 
CSci.PDF
CSci.PDFCSci.PDF
CSci.PDF
 
'Coursera 3FVZSJU83QS2.pdf'
'Coursera 3FVZSJU83QS2.pdf''Coursera 3FVZSJU83QS2.pdf'
'Coursera 3FVZSJU83QS2.pdf'
 
The Certificate.PDF
The Certificate.PDFThe Certificate.PDF
The Certificate.PDF
 
Grade A
Grade A Grade A
Grade A
 
The certificate
The certificateThe certificate
The certificate
 
C sci
C sciC sci
C sci
 
CEng-Certificate.PDF
CEng-Certificate.PDFCEng-Certificate.PDF
CEng-Certificate.PDF
 
C eng certificate
C eng certificateC eng certificate
C eng certificate
 
C.wem certificate
C.wem certificateC.wem certificate
C.wem certificate
 
Grade "A"
Grade "A"Grade "A"
Grade "A"
 
Prince2 practitioner-e-cert
Prince2 practitioner-e-certPrince2 practitioner-e-cert
Prince2 practitioner-e-cert
 
Prince2 foundation-e-cert
Prince2 foundation-e-certPrince2 foundation-e-cert
Prince2 foundation-e-cert
 

Fish Market Drainage At Abu Hamour

  • 1. FISH MARKET DEVELOPMENT - DRAINAGE OF EXISTING FISH MARKET AT ABU HAMOUR CIVIL PROJECT CP-726/5
  • 2. Presented By: Mohamed ElSirsy Senior Design Engineer (Hyder) Laith Al Saadi Associate Business Director (Hyder)
  • 3. WHAT DOES THIS PRESENTATION COVER? • Introduction • Purpose of The Project • Objective
  • 5. Introduction • The Fish Market Development plans are divided into two parts: Ashghal’s part : • Connecting the Fish Market wastewater to the public foul drainage network. • Developing the Stormwater drainage system for the Fish Market. MMUP part : • Renovation of the Wholesale area to improve the services of the Fish market, the Buildings inside the Fish Market & Internal design of the foul network system inside the Fish Market. • Isolation of the high-salt source that comes along with the Sardine fish from sultanate of Oman. Discharge of the salty wash water is not acceptable to into the public foul sewerage network. • Introduce Effective screening of Fish Market wastewater to 3 mm aperture to ensure solids are captured prior to disposal into the new foul collection line.
  • 7. Purpose of the Project Why ?
  • 8. Purpose of the Project (Cont’d) The commission will address only the works identified with Ashghal Part. Hyder is to develop Drainage Systems for the Fish Market A. The Fish Market foul drainage system is not connected to the public sewerage network. B. There is no Stormwater Drainage System for the Fish Market
  • 9. Objective A. Current Foul System: The current foul is system is collected into two main Septic Tanks ; Septic Tank (1) which is located at the Main Entrance of the Fish Market and Septic Tank (2) which is located at the back side of the Fish Market. Septic Tank (1) Septic Tank (2)
  • 10. Objective (Cont’d) • Current Disposal System: • The wastewater from the septic tanks is collected by mean of tankers as shown in the previous picture. These tankers make 5-6 daily trips from each : • Septic Tank (1): 6:00 a.m. to 2 p.m. • Septic Tank (2): 1:00 a.m. to 4:00 a.m. • Total average Design Flow = 86 m3/day and the Total peak design Flow is 516 m3/day. • The Septic Tanks are in a very bad condition. (Leaking) • Proposed Methodology: • Hyder proposed a whole new foul collection system by means of a sewer line and manholes connected to the existing pumping station (PS-CM). The existing Septic Tanks will be demolished.
  • 12. Objective (Cont’d) • Upgrade of the Existing Pump Station (PS-CM) • Optimize the appropriate Treatment Technology in order to treat the wastewater from the Fish Market Prior disposal to the nearest Manhole. • The following high contaminant levels produced at the Fish Market: • Chemical Oxygen Demand (COD) • Total Nitrogen (TN) • Phosphorous (P)
  • 14. Objective (Cont’d) • To meet the standard target level for effluent treatment will require physical (e.g. screens), biological (e.g. MBR, SBR or else) and chemical treatment (e.g. Polymers, Hypochlorite, Powdered Activated Carbon “PAC”…etc.). • In regards to the level of treatment requirements shown in previous table, the Biological treatment technology is probably the most efficient treatment process that is capable to reach that high level of effluent requirements to be safely disposed into the public foul sewerage system. • Many parameters affect the selection of technical and economic comparison of the different alternatives (DAF, SBR and MBR) of the treatment systems. The relevant evaluation parameters in our case include:
  • 15. Objective (Cont’d) • Operation Treatment Stages. • Sludge Treatment. Treated Sewage Quality. • Consumed Power. Maintenance. • Land Requirement. Nitrogen Removal • Phosphorous Removal • Trusted Technology • Construction Costs. • The (DAF) plant is not efficient in reducing the Nitrogen (TKN) and the Phosphorous (P) when compared to the CAS (Conventional Activated Sludge) and therefore it is not recommended. The(MBR) gives slightly higher effluent quality at a higher operating and maintenance cost than the SBR which will be recommended.
  • 16. Objective (Cont’d) B. Stormwater Drainage System: • Current Situation: • There is no existing Stormwater drainage system at the Fish Market. • Hyder is assessing the feasibility of constructing a non positive system in the form of Soakaways or Soakaway trenches for stormwater drainage. This will necessitate drilling boreholes and soak away/infiltration tests by determining the groundwater level and the soil permeability.