SlideShare ist ein Scribd-Unternehmen logo
1 von 31
Project Kick-off for <project name>
at <customer name>
Department, Board Area or Team
Date
Project Kick-off for <project name>
at <customer name>
© 2011 SAP AG. All rights reserved. 3
Agenda
 Introduction and Welcome All 00:00 – 00:00
 Project Goals <Name>, Management 00:00 – 00:00
 Project Success Factors <Name>, DM/CoE Lead, CEM 00:00 – 00:00
 Presentation of the Project <Name>, Customer PM 00:00 – 00:00
 Introduction to Project Work <Name>, SAP PM 00:00 – 00:00
 Next Steps <Name>, Customer PM 00:00 – 00:00
 ...
Guest Brand
© 2011 SAP AG. All rights reserved. 4
Goals
The project goals are…
The main goals are
…
…
…
Please find on following slides proposals on content for
Kickoff-event information.
© 2011 SAP AG. All rights reserved. 5
What Does Project Success Really Mean?
Business Goals
Achieving the requested
modifications or improvements
in the business
Budget Compliance
Schedule Compliance
Functional Goals
Project Goals
© 2011 SAP AG. All rights reserved. 6
Processes
TechnologyTeam
Organization
Management
Project
Key User
Project success is the sum of everybody‘s daily work and decisions.
Success Depends on Everybody Involved
We look forward to realize a successful project with you.
© 2011 SAP AG. All rights reserved. 7
Project Organization
Project Management
Project Management SAP
Steering Committee
Information:Reporting to/Escalating to:
Business Design
Board
Project Team Members SAPProject Team Members <Client>
Project Management <Client>
Project
Team
Board of Architects
Project Sponsor
Quality Assuranc
Risk Manageme
© 2011 SAP AG. All rights reserved. 8
Responsibilities of the Steering Committee
The SC is responsible for project control and project coordination as well as
the efficient bringing about of technical and organizational decisions.
In SC meetings, project management reports on the project status and
introduces relevant issues that have to be decided by the SC.
The SC assures that resources necessary for the project‘s success are
available.
The SC is the last escalation level for problems (conflict management).
The SC assumes highest-level control on costs and budget, and is
responsible for budget release.
The SC is responsible for inspection and approval of results and of the
overall project.
© 2011 SAP AG. All rights reserved. 9
Responsibilities of the Project Manager
The project manager is responsible for the overall project and particularly
attends to the following tasks:
Technical and commercial project management
Coordination of interfaces
Risk Management
Organization of project meetings
Controlling of the overall project
Controlling of project progress and results (including project reporting)
Contact and reporting to the SC
…
© 2011 SAP AG. All rights reserved. 10
Responsibilities of the Sub Project Manager
The sub project manager is responsible for the respective sub project and
particularly attends to the following tasks:
Technical contact for the customer
Definition of the sub project‘s scope taking into account the goals of the
overall project
Answerable coordination of the sub project
Coordination of requirements on business processes
Creation of the detailed concept in cooperation with the respective
departments/teams
Assuring the sub project‘s progress to be on schedule and in budget
Reporting to project management
Planning and allocation of resources
…
© 2011 SAP AG. All rights reserved. 11
Responsibilities of Key Users
Key users are the contact for the consultants:
They provide the project with indispensable technical input.
They see beyond their own needs and design a system for THEIR company
– a system that all employees can identify with
If necessary, they refer to other experts for detailed information or study
the subject beforehand.
They bring along, for instance, activity descriptions or screenshots of the
existing system to the Blueprint workshops.
In tutorials, they learn how to customize the new system.
© 2011 SAP AG. All rights reserved. 12
<year>
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Project Schedule
 DoneMilestone Go Livehase
Legend:
 Project Preparation
 Blueprint Creation
 Blueprint Approval
 Implementation 1
 Integration Test 1
 Implementation 2
 Integration Test 2
 Production Preparation
 Production Approval
 Go-Live
Legend: Duration Milestone today
© 2011 SAP AG. All rights reserved. 13
The Solution‘s Principles in the Project
SAP Standard Processes
This guarantees full SAP support and the
system‘s future reliability.
Release reliability
individual,
release-reliable
processes
The realization of the solution is based on the following principles:
Optimal use of SAP standard modules und processes
Extension of SAP modules for representing customer-specific processes
takes place without modifications
© 2011 SAP AG. All rights reserved. 14
Standards of Project Communication
Information
Element
Information
Sender
Information
Recipient
Frequency Form
Status Report SPM SPM PM monthly Project Report
Status Report PM PM SPM, SC monthly Project Report
Workshop Protocol SPM SAP Key User after each meeting Result Protocol
SC Protocol SC PM, SPM, Board milestone
(min. 6-8 weeks)
Result Protocol
Agenda/Invitation PM, SPM SPM, PM, SC if necessary …
Phase-related modifications in frequency
SPM - Sub-Project Management
PM - Project Management
SC - Steering Committee
© 2011 SAP AG. All rights reserved. 15
SAP Sub-Project
Managers
 Weekly Jour-Fixe
Steering Committee
 SC meetings take place every six weeks,
1. Date:
Project Management  …
Meetings
No meeting without agenda and protocol!
© 2011 SAP AG. All rights reserved. 16
Communication via Outlook
E-Mail
Electronic exchange of information
and documents:
 Within the SAP project, the exchange of
information and documents generally takes
place without paper.
 Exceptions consist of approved concepts,
data transfers, etc that must be signed by the
respective person in charge.
 Attachments generally have to be sent as
shortcuts/links.
Calendar
Project members manage their
appointments/absence via the
calendar feature:
Each project member records their personal
appointments in the electronic calendar.
The same goes for absence, e.g. vacation.
Using the calendar for planning meetings
facilitates effective scheduling and sending of
invitations.
© 2011 SAP AG. All rights reserved. 17
Project Documentation
Saving in the project documentation directory
Project documentation not saved in the project documentation
directory is classified as non-existent.
Project members‘ duty to gather information
Every project member is obliged to actively gather the needed
information.
Naming conventions
All project documentation has to follow the naming
conventions and must be saved in the specified directory
folders.
Templates
Providing for the project documentation uniformity, the given
templates have to be used.
© 2011 SAP AG. All rights reserved. 18
Project Controlling
The achieved labor time of SAP employees is registered in an activity report
which will be delivered to the customer on a weekly basis for signing.
Reporting and filing takes place at project management.
© 2011 SAP AG. All rights reserved. 19
Changes in Project Scope
During the Business Blueprint phase the project scope is defined. That means
that all relevant processes and functions are listed in a document. In case there
are modifications during the project, for instance regarding the business model,
they can be handled with so-called Change Requests.
Change Requests can be used in exceptional cases to modify the project
scope.
Change Requests will automatically generate additional costs and increase
the overall project risk as they, for instance, may challenge the project
schedule.
Change Requests are subject to a dedicated authorization procedure.
© 2011 SAP AG. All rights reserved. 20
Adjusted Resource Plan,
Budget Plan, Project Plan, ...
Assessment regarding
project budget, schedule, ...
Effort, follow-up efforts, tentative
proposal for implementation
Is an implementation feasible, can it
be included at this point in time?
Procedure – Change Request Management
Requirement is on hand
Decision on verification
o.k.
Verification and assessment
by experts
Estimation of impacts
on the project
Decision on implementation
1
2
3
4
5
© 2011 SAP AG. All rights reserved. 21
Decision-Making Templates Formalize Processes
Key users are acquainted with the business of their company.
But in case there is a need for decision that, for instance, exceeds their area of
responsibility, they can use decision-making templates to balance advantages
and drawbacks in order to make a recommendation.
© 2011 SAP AG. All rights reserved. 22
Project Manual
A project manual will be compiled and is binding for the entire team. Manual
contents:
Project assignment
Description of project phases
Project contents
Communication structure and reporting
Project controlling
Provision of material
Management (Change Request Process, Quality Assurance)
Documentation guidelines and naming conventions
© 2011 SAP AG. All rights reserved. 23
SAP Project Stages
 Set-up of project planning
 Project procedures
 Training
 Project kick-off
 Technical infrastructure planning
 Quality assurance
 Corporate change management
 Develop system environment
 Training
 Define business structure
 Business process definition
 User roles and authorizations
 Quality assurance
 Corporate change management
 Training
 Baseline configuration and approval
 System management
 Detailed configuration and its approval
 Development of programs, interfaces, etc.
 Final integration test
 Quality assurance
 Training
 System management
 Detailed project planning
 Handover
 Quality assurance
 Production support
 Continuous KPI
management
 Project close-out
© 2011 SAP AG. All rights reserved. 24
 Results
Project planning
Project organization
 Result documents
Open Issue List
 Roles involved
Project manager
Key user
SAP consultant
 Activities
Preparation of Business Blueprint
workshops
Kick-off preparation and execution
System landscape set-up
Detailed planning of Business
Blueprint creation
Design of best-practice system
ResultsRoles involved/Activities
Project Preparation
© 2011 SAP AG. All rights reserved. 25
 Results
Business Blueprint
Final process scope
 Result documents
Open Issue List
 To-Do List/Next Steps
Blueprint document creation
Blueprint presentation
Blueprint approval
 Roles involved
Project manager
Key user
SAP consultant
 Activities
Acquainting key users with SAP
Best Practice
Business Blueprint workshops with
key users
Interface design
Business Blueprint
ResultsRoles involved/Activities
© 2011 SAP AG. All rights reserved. 26
 Results
Acceptance protocol
Detailed planning of Go-Live
preparation
Approved test scenarios
Final preparation approval
 Result Documents
Open Issue List
Authorization Concept
 To-Do List/Next Steps
System handover planning
User support planning for live
operations (Hotline)
 Roles involved
Project manager
Key user
End user (selection)
SAP consultant
 Activities
System configuration
Acquainting key users with SAP Best
Practice
Master data cleansing
Functional test processes
Integration test
End user training concept
End user documentation creation
Realization
ResultsRoles involved/Activities
© 2011 SAP AG. All rights reserved. 27
 Results
Detailed system handover plan
Going-live approval
 Roles involved
Project manager
Key user
End user
SAP consultant
 Activities
Set-up of productive system
Master and transaction data import
End user training
Customizing of forms and reporting
Customizing of end user
documentation
Final Preparation
ResultsRoles involved/Activities
© 2011 SAP AG. All rights reserved. 28
 Result documents
Project Close-out Report
Acceptance Protocol
 To-Do List/Next Steps
Working through the Open Issue List
Handover to live operation
 Roles involved
Project manager
Key user
End user
SAP consultant
 Activities
Monitoring of productive system
Follow-up end user training
Hotline
Go-Live und Support
ResultsRoles involved/Activities
© 2011 SAP AG. All rights reserved. 29
Principles of Availability Planning
Adherence to the budget
Project days are generally Monday to Friday
Depending on the sub project, possibly less than five days a week but starting on
Monday
On Tuesdays, there is compulsory attendance for consultants on the customer‘s site.
Generally, tasks will be planned for the entire work week, regardless of whether the
consultant is on location every day.
© 2011 SAP AG. All rights reserved. 30
Open Issues
Are there any questions or proposals?
…
…
Thank you for your attention.
Thank You!
Contact information:
F name MI. L name
Title
Address
Phone number

Weitere ähnliche Inhalte

Was ist angesagt?

Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSoumya De
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABluefin Solutions
 
Kickoff Meeting PowerPoint Presentation Slides
Kickoff Meeting PowerPoint Presentation SlidesKickoff Meeting PowerPoint Presentation Slides
Kickoff Meeting PowerPoint Presentation SlidesSlideTeam
 
SAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsSAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsCapgemini
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptCarlosRodriguez703287
 
Migrating to the SAP Cloud
Migrating to the SAP Cloud Migrating to the SAP Cloud
Migrating to the SAP Cloud Capgemini
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkDemand Metric
 
Sap basics (SAP Modules)
Sap basics (SAP Modules)Sap basics (SAP Modules)
Sap basics (SAP Modules)Kamal Joshi
 
projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation templatedadiiskandar4
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantagesanjalirao366
 
SAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital CoreSAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital CoreSAP Technology
 
Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting Hari Krishna
 
SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationBluefin Solutions
 
B1AIP30 - Kickoff Meeting Template.pptx
B1AIP30 - Kickoff Meeting Template.pptxB1AIP30 - Kickoff Meeting Template.pptx
B1AIP30 - Kickoff Meeting Template.pptxssuser97c2dc
 
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation SlidesProject Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation SlidesSlideTeam
 
Activate Methodology
Activate MethodologyActivate Methodology
Activate MethodologySoumya De
 

Was ist angesagt? (20)

Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New Implementation
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANA
 
Kickoff Meeting PowerPoint Presentation Slides
Kickoff Meeting PowerPoint Presentation SlidesKickoff Meeting PowerPoint Presentation Slides
Kickoff Meeting PowerPoint Presentation Slides
 
SAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked QuestionsSAP S/4HANA: Finance Capability and Frequently Asked Questions
SAP S/4HANA: Finance Capability and Frequently Asked Questions
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
 
Migrating to the SAP Cloud
Migrating to the SAP Cloud Migrating to the SAP Cloud
Migrating to the SAP Cloud
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
SAP Project Systems with Success Factors
SAP Project Systems with Success FactorsSAP Project Systems with Success Factors
SAP Project Systems with Success Factors
 
Sap basics (SAP Modules)
Sap basics (SAP Modules)Sap basics (SAP Modules)
Sap basics (SAP Modules)
 
projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation template
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantages
 
SAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital CoreSAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital Core
 
Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting
 
SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementation
 
Sap introduction
Sap introductionSap introduction
Sap introduction
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 
B1AIP30 - Kickoff Meeting Template.pptx
B1AIP30 - Kickoff Meeting Template.pptxB1AIP30 - Kickoff Meeting Template.pptx
B1AIP30 - Kickoff Meeting Template.pptx
 
SAP S/4HANA Cloud
SAP S/4HANA CloudSAP S/4HANA Cloud
SAP S/4HANA Cloud
 
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation SlidesProject Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
 
Activate Methodology
Activate MethodologyActivate Methodology
Activate Methodology
 

Andere mochten auch

Agile project kick off from the trenches
Agile project kick off from the trenchesAgile project kick off from the trenches
Agile project kick off from the trenchesGeorge Stamos
 
Hyper Island Kick-Off 28 oct 2013
Hyper Island Kick-Off 28 oct 2013Hyper Island Kick-Off 28 oct 2013
Hyper Island Kick-Off 28 oct 2013Mick Cordero
 
1st greetings, farewells, introductions
1st greetings, farewells, introductions1st greetings, farewells, introductions
1st greetings, farewells, introductionsprimaryenglishggm
 
The Hair Center at Helendale
The Hair Center at Helendale The Hair Center at Helendale
The Hair Center at Helendale hair-center
 
Media question 7
Media question 7Media question 7
Media question 7liaambowen
 
Classroom management plan
Classroom management planClassroom management plan
Classroom management planbabygoalie
 
Building Sustainable Safety Processes with SafetyNet
Building Sustainable Safety Processes with SafetyNetBuilding Sustainable Safety Processes with SafetyNet
Building Sustainable Safety Processes with SafetyNetPredictive Solutions
 
AppDays Pordenone 2014: Web App Engineering With Dart
AppDays Pordenone 2014: Web App Engineering With DartAppDays Pordenone 2014: Web App Engineering With Dart
AppDays Pordenone 2014: Web App Engineering With DartClaudio d'Angelis
 
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)Hideto Ishibashi
 
Join the dart side of webdevelopment reloaded
Join the dart side of webdevelopment reloadedJoin the dart side of webdevelopment reloaded
Join the dart side of webdevelopment reloadedClaudio d'Angelis
 

Andere mochten auch (20)

Kick Off Meeting Presentation
Kick Off Meeting PresentationKick Off Meeting Presentation
Kick Off Meeting Presentation
 
Kickoff Meeting
Kickoff MeetingKickoff Meeting
Kickoff Meeting
 
Agile project kick off from the trenches
Agile project kick off from the trenchesAgile project kick off from the trenches
Agile project kick off from the trenches
 
DPVFLEX | Kick-off
DPVFLEX | Kick-off DPVFLEX | Kick-off
DPVFLEX | Kick-off
 
Hyper Island Kick-Off 28 oct 2013
Hyper Island Kick-Off 28 oct 2013Hyper Island Kick-Off 28 oct 2013
Hyper Island Kick-Off 28 oct 2013
 
1st greetings, farewells, introductions
1st greetings, farewells, introductions1st greetings, farewells, introductions
1st greetings, farewells, introductions
 
The Hair Center at Helendale
The Hair Center at Helendale The Hair Center at Helendale
The Hair Center at Helendale
 
Media question 7
Media question 7Media question 7
Media question 7
 
What's Hot in Events for 2015
What's Hot in Events for 2015What's Hot in Events for 2015
What's Hot in Events for 2015
 
مركز مصادر التعلم
مركز مصادر التعلممركز مصادر التعلم
مركز مصادر التعلم
 
Mi hija Carla
Mi hija CarlaMi hija Carla
Mi hija Carla
 
Presentation
PresentationPresentation
Presentation
 
SafetyNet 9.0 - Regional Training
SafetyNet 9.0 - Regional TrainingSafetyNet 9.0 - Regional Training
SafetyNet 9.0 - Regional Training
 
Classroom management plan
Classroom management planClassroom management plan
Classroom management plan
 
Building Sustainable Safety Processes with SafetyNet
Building Sustainable Safety Processes with SafetyNetBuilding Sustainable Safety Processes with SafetyNet
Building Sustainable Safety Processes with SafetyNet
 
مركز مصادر التعلم
مركز مصادر التعلممركز مصادر التعلم
مركز مصادر التعلم
 
AppDays Pordenone 2014: Web App Engineering With Dart
AppDays Pordenone 2014: Web App Engineering With DartAppDays Pordenone 2014: Web App Engineering With Dart
AppDays Pordenone 2014: Web App Engineering With Dart
 
Stress mgmt 1
Stress mgmt 1Stress mgmt 1
Stress mgmt 1
 
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)
2020年東京五輪に向けたハイパーピクトグラム構想 (Rough Ideas on Hyper Pictogram for Tokyo 2020)
 
Join the dart side of webdevelopment reloaded
Join the dart side of webdevelopment reloadedJoin the dart side of webdevelopment reloaded
Join the dart side of webdevelopment reloaded
 

Ähnlich wie Project kick off

Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
AbdelRahman Ahmed - Sr.Functional Consultant - Finance
AbdelRahman Ahmed - Sr.Functional Consultant - FinanceAbdelRahman Ahmed - Sr.Functional Consultant - Finance
AbdelRahman Ahmed - Sr.Functional Consultant - FinanceAbdelRahman Ahmed
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani Shekhar
 
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdf
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdfASAP_Business_One___Project_Kickoff_Presentation.ppt.pdf
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdfJoewelDRamirez
 
Enterprise Project Management Essential (2009)
Enterprise Project Management Essential (2009)Enterprise Project Management Essential (2009)
Enterprise Project Management Essential (2009)Nah Wee Yang
 
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...Bernhard Luecke
 
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsSAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsRoberto Carlos Roldán
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxAshraf206702
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPMshravansam
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approachJames (JD) Dimas
 

Ähnlich wie Project kick off (20)

Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
AbdelRahman Ahmed - Sr.Functional Consultant - Finance
AbdelRahman Ahmed - Sr.Functional Consultant - FinanceAbdelRahman Ahmed - Sr.Functional Consultant - Finance
AbdelRahman Ahmed - Sr.Functional Consultant - Finance
 
SAP PS Intro
SAP PS IntroSAP PS Intro
SAP PS Intro
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_Consultant
 
Adi CV Tech Manager
Adi CV Tech ManagerAdi CV Tech Manager
Adi CV Tech Manager
 
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdf
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdfASAP_Business_One___Project_Kickoff_Presentation.ppt.pdf
ASAP_Business_One___Project_Kickoff_Presentation.ppt.pdf
 
Enterprise Project Management Essential (2009)
Enterprise Project Management Essential (2009)Enterprise Project Management Essential (2009)
Enterprise Project Management Essential (2009)
 
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
SAP Active Global Support - Support for Innovation - Quality Assurance at Cus...
 
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactorsSAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactors
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
Presentation_1373778041831
Presentation_1373778041831Presentation_1373778041831
Presentation_1373778041831
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPM
 
Gopinath_CVP
Gopinath_CVPGopinath_CVP
Gopinath_CVP
 
PlanENDoc
PlanENDocPlanENDoc
PlanENDoc
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
Agile pgm
Agile pgmAgile pgm
Agile pgm
 
Shivani_CV
Shivani_CVShivani_CV
Shivani_CV
 

Kürzlich hochgeladen

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptxnandhinijagan9867
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 

Kürzlich hochgeladen (20)

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Project kick off

  • 1. Project Kick-off for <project name> at <customer name>
  • 2. Department, Board Area or Team Date Project Kick-off for <project name> at <customer name>
  • 3. © 2011 SAP AG. All rights reserved. 3 Agenda  Introduction and Welcome All 00:00 – 00:00  Project Goals <Name>, Management 00:00 – 00:00  Project Success Factors <Name>, DM/CoE Lead, CEM 00:00 – 00:00  Presentation of the Project <Name>, Customer PM 00:00 – 00:00  Introduction to Project Work <Name>, SAP PM 00:00 – 00:00  Next Steps <Name>, Customer PM 00:00 – 00:00  ... Guest Brand
  • 4. © 2011 SAP AG. All rights reserved. 4 Goals The project goals are… The main goals are … … … Please find on following slides proposals on content for Kickoff-event information.
  • 5. © 2011 SAP AG. All rights reserved. 5 What Does Project Success Really Mean? Business Goals Achieving the requested modifications or improvements in the business Budget Compliance Schedule Compliance Functional Goals Project Goals
  • 6. © 2011 SAP AG. All rights reserved. 6 Processes TechnologyTeam Organization Management Project Key User Project success is the sum of everybody‘s daily work and decisions. Success Depends on Everybody Involved We look forward to realize a successful project with you.
  • 7. © 2011 SAP AG. All rights reserved. 7 Project Organization Project Management Project Management SAP Steering Committee Information:Reporting to/Escalating to: Business Design Board Project Team Members SAPProject Team Members <Client> Project Management <Client> Project Team Board of Architects Project Sponsor Quality Assuranc Risk Manageme
  • 8. © 2011 SAP AG. All rights reserved. 8 Responsibilities of the Steering Committee The SC is responsible for project control and project coordination as well as the efficient bringing about of technical and organizational decisions. In SC meetings, project management reports on the project status and introduces relevant issues that have to be decided by the SC. The SC assures that resources necessary for the project‘s success are available. The SC is the last escalation level for problems (conflict management). The SC assumes highest-level control on costs and budget, and is responsible for budget release. The SC is responsible for inspection and approval of results and of the overall project.
  • 9. © 2011 SAP AG. All rights reserved. 9 Responsibilities of the Project Manager The project manager is responsible for the overall project and particularly attends to the following tasks: Technical and commercial project management Coordination of interfaces Risk Management Organization of project meetings Controlling of the overall project Controlling of project progress and results (including project reporting) Contact and reporting to the SC …
  • 10. © 2011 SAP AG. All rights reserved. 10 Responsibilities of the Sub Project Manager The sub project manager is responsible for the respective sub project and particularly attends to the following tasks: Technical contact for the customer Definition of the sub project‘s scope taking into account the goals of the overall project Answerable coordination of the sub project Coordination of requirements on business processes Creation of the detailed concept in cooperation with the respective departments/teams Assuring the sub project‘s progress to be on schedule and in budget Reporting to project management Planning and allocation of resources …
  • 11. © 2011 SAP AG. All rights reserved. 11 Responsibilities of Key Users Key users are the contact for the consultants: They provide the project with indispensable technical input. They see beyond their own needs and design a system for THEIR company – a system that all employees can identify with If necessary, they refer to other experts for detailed information or study the subject beforehand. They bring along, for instance, activity descriptions or screenshots of the existing system to the Blueprint workshops. In tutorials, they learn how to customize the new system.
  • 12. © 2011 SAP AG. All rights reserved. 12 <year> Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Project Schedule  DoneMilestone Go Livehase Legend:  Project Preparation  Blueprint Creation  Blueprint Approval  Implementation 1  Integration Test 1  Implementation 2  Integration Test 2  Production Preparation  Production Approval  Go-Live Legend: Duration Milestone today
  • 13. © 2011 SAP AG. All rights reserved. 13 The Solution‘s Principles in the Project SAP Standard Processes This guarantees full SAP support and the system‘s future reliability. Release reliability individual, release-reliable processes The realization of the solution is based on the following principles: Optimal use of SAP standard modules und processes Extension of SAP modules for representing customer-specific processes takes place without modifications
  • 14. © 2011 SAP AG. All rights reserved. 14 Standards of Project Communication Information Element Information Sender Information Recipient Frequency Form Status Report SPM SPM PM monthly Project Report Status Report PM PM SPM, SC monthly Project Report Workshop Protocol SPM SAP Key User after each meeting Result Protocol SC Protocol SC PM, SPM, Board milestone (min. 6-8 weeks) Result Protocol Agenda/Invitation PM, SPM SPM, PM, SC if necessary … Phase-related modifications in frequency SPM - Sub-Project Management PM - Project Management SC - Steering Committee
  • 15. © 2011 SAP AG. All rights reserved. 15 SAP Sub-Project Managers  Weekly Jour-Fixe Steering Committee  SC meetings take place every six weeks, 1. Date: Project Management  … Meetings No meeting without agenda and protocol!
  • 16. © 2011 SAP AG. All rights reserved. 16 Communication via Outlook E-Mail Electronic exchange of information and documents:  Within the SAP project, the exchange of information and documents generally takes place without paper.  Exceptions consist of approved concepts, data transfers, etc that must be signed by the respective person in charge.  Attachments generally have to be sent as shortcuts/links. Calendar Project members manage their appointments/absence via the calendar feature: Each project member records their personal appointments in the electronic calendar. The same goes for absence, e.g. vacation. Using the calendar for planning meetings facilitates effective scheduling and sending of invitations.
  • 17. © 2011 SAP AG. All rights reserved. 17 Project Documentation Saving in the project documentation directory Project documentation not saved in the project documentation directory is classified as non-existent. Project members‘ duty to gather information Every project member is obliged to actively gather the needed information. Naming conventions All project documentation has to follow the naming conventions and must be saved in the specified directory folders. Templates Providing for the project documentation uniformity, the given templates have to be used.
  • 18. © 2011 SAP AG. All rights reserved. 18 Project Controlling The achieved labor time of SAP employees is registered in an activity report which will be delivered to the customer on a weekly basis for signing. Reporting and filing takes place at project management.
  • 19. © 2011 SAP AG. All rights reserved. 19 Changes in Project Scope During the Business Blueprint phase the project scope is defined. That means that all relevant processes and functions are listed in a document. In case there are modifications during the project, for instance regarding the business model, they can be handled with so-called Change Requests. Change Requests can be used in exceptional cases to modify the project scope. Change Requests will automatically generate additional costs and increase the overall project risk as they, for instance, may challenge the project schedule. Change Requests are subject to a dedicated authorization procedure.
  • 20. © 2011 SAP AG. All rights reserved. 20 Adjusted Resource Plan, Budget Plan, Project Plan, ... Assessment regarding project budget, schedule, ... Effort, follow-up efforts, tentative proposal for implementation Is an implementation feasible, can it be included at this point in time? Procedure – Change Request Management Requirement is on hand Decision on verification o.k. Verification and assessment by experts Estimation of impacts on the project Decision on implementation 1 2 3 4 5
  • 21. © 2011 SAP AG. All rights reserved. 21 Decision-Making Templates Formalize Processes Key users are acquainted with the business of their company. But in case there is a need for decision that, for instance, exceeds their area of responsibility, they can use decision-making templates to balance advantages and drawbacks in order to make a recommendation.
  • 22. © 2011 SAP AG. All rights reserved. 22 Project Manual A project manual will be compiled and is binding for the entire team. Manual contents: Project assignment Description of project phases Project contents Communication structure and reporting Project controlling Provision of material Management (Change Request Process, Quality Assurance) Documentation guidelines and naming conventions
  • 23. © 2011 SAP AG. All rights reserved. 23 SAP Project Stages  Set-up of project planning  Project procedures  Training  Project kick-off  Technical infrastructure planning  Quality assurance  Corporate change management  Develop system environment  Training  Define business structure  Business process definition  User roles and authorizations  Quality assurance  Corporate change management  Training  Baseline configuration and approval  System management  Detailed configuration and its approval  Development of programs, interfaces, etc.  Final integration test  Quality assurance  Training  System management  Detailed project planning  Handover  Quality assurance  Production support  Continuous KPI management  Project close-out
  • 24. © 2011 SAP AG. All rights reserved. 24  Results Project planning Project organization  Result documents Open Issue List  Roles involved Project manager Key user SAP consultant  Activities Preparation of Business Blueprint workshops Kick-off preparation and execution System landscape set-up Detailed planning of Business Blueprint creation Design of best-practice system ResultsRoles involved/Activities Project Preparation
  • 25. © 2011 SAP AG. All rights reserved. 25  Results Business Blueprint Final process scope  Result documents Open Issue List  To-Do List/Next Steps Blueprint document creation Blueprint presentation Blueprint approval  Roles involved Project manager Key user SAP consultant  Activities Acquainting key users with SAP Best Practice Business Blueprint workshops with key users Interface design Business Blueprint ResultsRoles involved/Activities
  • 26. © 2011 SAP AG. All rights reserved. 26  Results Acceptance protocol Detailed planning of Go-Live preparation Approved test scenarios Final preparation approval  Result Documents Open Issue List Authorization Concept  To-Do List/Next Steps System handover planning User support planning for live operations (Hotline)  Roles involved Project manager Key user End user (selection) SAP consultant  Activities System configuration Acquainting key users with SAP Best Practice Master data cleansing Functional test processes Integration test End user training concept End user documentation creation Realization ResultsRoles involved/Activities
  • 27. © 2011 SAP AG. All rights reserved. 27  Results Detailed system handover plan Going-live approval  Roles involved Project manager Key user End user SAP consultant  Activities Set-up of productive system Master and transaction data import End user training Customizing of forms and reporting Customizing of end user documentation Final Preparation ResultsRoles involved/Activities
  • 28. © 2011 SAP AG. All rights reserved. 28  Result documents Project Close-out Report Acceptance Protocol  To-Do List/Next Steps Working through the Open Issue List Handover to live operation  Roles involved Project manager Key user End user SAP consultant  Activities Monitoring of productive system Follow-up end user training Hotline Go-Live und Support ResultsRoles involved/Activities
  • 29. © 2011 SAP AG. All rights reserved. 29 Principles of Availability Planning Adherence to the budget Project days are generally Monday to Friday Depending on the sub project, possibly less than five days a week but starting on Monday On Tuesdays, there is compulsory attendance for consultants on the customer‘s site. Generally, tasks will be planned for the entire work week, regardless of whether the consultant is on location every day.
  • 30. © 2011 SAP AG. All rights reserved. 30 Open Issues Are there any questions or proposals? … … Thank you for your attention.
  • 31. Thank You! Contact information: F name MI. L name Title Address Phone number