Course 1: Problem Solving Techniques
Updated: 1 April 2013
Course Outline
What is Problem Solving?
Problem Solving Steps
l 1. Defining the Problem
–
5 Whys
–
Appreciation
–
Root Cause Analysis
–
Fishbone/Ishikawa diagram
–
Process-issue mapping
l 2. Generating “Probable” solutions
–
Round-robin Brainstorming
l 3. Evaluate and select the “best” solution
–
Decision Tree
–
Pareto analysis
l 4. Implement the solution
–
Project Management Basics
–
PM Process
10 characteristics of Effective Problem Solvers
IT Professional Services – DM Adhoc
What is Problem Solving?
IT Professional Services – DM Adhoc
“Is a key skill that makes a huge difference in one’s
career”
At work, we are solving problems everyday
Can be large or small, simple or complex, easy or
difficult to solve
Factor to solving a problem is having a well
defined process
Problem Solving Steps
1. Define the problem
2. Think of “probable” solutions
3. Evaluate and select the “best” solution
4. Implement the solution
IT Professional Services – DM Adhoc
Problem Solving Cycle
IT Professional Services – DM Adhoc
1. Defining the Problem
The key to a good problem definition is ensuring that you deal with the
real problem – not its symptoms
For example, if there is a quality issue in one of the jobs done by a
programmer, we might think that the problem is with the programmer or
the QA test analyst. However if you look a bit deeper, the real problem
might be lack of training, unreasonable workload, deviations from the
acceptable process, etc.
Tools available:
l 5 Why’s
l Appreciation
l Root cause analysis
IT Professional Services – DM Adhoc
5 Whys
is a simple problem-solving technique to get to the root of a problem
quickly.
Made popular in the 1970s by the Toyota Production System, the 5 Whys
strategy involves looking at any problem and asking: "Why?" and "What
caused this problem?"
IT Professional Services – DM Adhoc
Case Study: 5 Whys
Example 1: FXDMS AU is unhappy
Why is our client, FXDMS AU, unhappy? Because we didn't deliver our
services when we said we would.
Why were we unable to meet the agreed-upon timeline or schedule for
delivery? The job took much longer than we thought it would.
Why did it take so much longer? Because we underestimated the
complexity of the job.
Why did we underestimate the complexity of the job? Because we made
a quick estimate of the time needed to complete it, and didn't list the
individual stages needed to complete the project.
Why didn't we do this? Because we were running behind on other
projects. We clearly need to review our time estimation and specification
procedures.
IT Professional Services – DM Adhoc
Group Exercise: 5 Whys
Exercise #1: Productivity is LOW
Why #1:
Why #2:
Why #3:
Why #4:
Why #5:
IT Professional Services – DM Adhoc
Appreciation
simple but powerful technique for extracting the maximum amount of
information possible from a simple fact or statement.
helps us uncover factors that we might have ordinarily missed, and it can
be very useful for brainstorming solutions to problems.
Originally developed by the military to help commanders gain a
comprehensive understanding of any fact, problem or situation that it was
faced with in battle
IT Professional Services – DM Adhoc
Appreciation Steps & Example
1. Starting with a FACT, ask the 1st question: SO WHAT? in other words, what are the
implications of that fact? Why is this fact important?
2. Continue asking that question until you have drawn all possible conclusions from it.
Example 1:
Statement: Our department's budget is going to be cut 25 percent starting January 1.
So what?
So the only way to accommodate that cut is to reduce our spending dramatically.
So what?
So we're probably going to have to cut staff, and we'll definitely have to cut spending on
supplies, research, and staff parties.
So what?
So staff morale is probably going to drop, especially if I have to lay off members of our team.
So what?
So I'll need to come up with plenty of low-cost ways to boost morale without spending
money.
So what?
So I'll need to start thinking about this tomorrow, since the new budget will go into effect in
two months, and I want to be able to manage the consequences when I let the team
know.
IT Professional Services – DM Adhoc
Appreciation Group Exercise
Statement: R&R project zerro will be replaced by the Ikaw Na, Kanin
club, and other programs starting Jan 2012
So what?
So what?
So what?
So what?
So what?
IT Professional Services – DM Adhoc
Root Cause Analysis
is a popular and often-used technique that helps people answer the question of
why the problem occurred in the first place.
seeks to identify the origin of a problem. It uses a specific set of steps, with
associated tools, to find the primary cause of the problem, so that you can:
l Determine what happened.
l Determine why it happened.
l Prevent it from happening again.
Requires tracing back the actions from the series of events to discover where the
problem started and how it grew into the symptom now being faced
Looks at 3 basic types of causes:
1. Physical causes – Tangible, material items failed in some way (for example, a
team member got sick).
2. Human causes – People did something wrong, or did not doing something that
was needed. Human causes typically lead to physical causes (for example,
team leader was not able to disseminate information to test analyst for the
change request thus a quality issue was raised).
3. Organizational causes – A system, process, or policy that people use to make
decisions or do their work is faulty (for example, pre-pro programmer and
designer are separate individuals, and DCA assumed they were the same.
IT Professional Services – DM Adhoc
Root Cause Analysis
IT Professional Services – DM Adhoc
Root Cause Analysis process
Step One: Define the Problem
l What do you see happening?
l What are the specific symptoms?
Step Two:
l What proof do you have that the problem exists?
l How long has the problem existed?
l What is the impact of the problem?
Step Three: Identify Possible Causal Factors
l What sequence of events leads to the problem?
l What conditions allow the problem to occur?
l What other problems surround the occurrence of the central problem?
Step Four: Identify root cause
l Why does the causal factor exist?
l What is the real reason the problem occurred?
Step Five: recommend and implement solutions
l What can you do to prevent the problem from happening again?
l How will the solution be implemented?
l Who will be responsible for it?
l What are the risks of implementing the solution?
Root Cause Analysis: Fishbone/Ishikawa Diagrams
The cause and effect (fishbone) diagram will help you visually display the many
potential causes for a problem or effect.
To construct a fishbone, start with stating the problem in the form of a question,
such as ‘Why is the help desk’s abandon rate so high?’ Framing it as a ‘why’
question will help in brainstorming, as each root cause idea should answer the
question. The team should agree on the statement of the problem and then place
this question in a box at the ‘head’ of the fishbone.
The rest of the fishbone then consists of one line drawn across the page, attached
to the problem statement, and several lines, or ‘bones,’ coming out vertically from
the main line. These branches are labeled with different categories. The
categories you use are up to you to decide
IT Professional Services – DM Adhoc
Fishbone Example
IT Professional Services – DM Adhoc
Fishbone Exercise
IT Professional Services – DM Adhoc
2. Generating probable solutions through Brainstorming
Round-Robin Brainstorming allows team members to generate ideas
without being influenced by any one person. You can then take these
ideas into the next stages of the problem-solving process.
A cluster diagram is a good tool during brainstorming
IT Professional Services – DM Adhoc
Brainstorming process
To run a group brainstorming session effectively, do the following:
1. Find a comfortable meeting environment, and set it up ready for the session.
2. Appoint one person to record the ideas.
3. Use appropriate warm-up exercise or ice-breaker.
4. Define the problem you want solved clearly, and lay out any criteria to be met. Make it clear that
that the objective of the meeting is to generate as many ideas as possible.
5. Give people plenty of time on their own at the start of the session to generate as many ideas as
possible.
6. Ask people to give their ideas, making sure that you give everyone a fair opportunity to contribute.
7. Encourage people to develop other people's ideas, or to use other ideas to create new ones.
8. Encourage an enthusiastic, uncritical attitude among members of the group. Try to get everyone to
contribute and develop ideas.
9. Ensure that no one criticizes or evaluates ideas during the session. Criticism introduces an element
of risk for group members when putting forward an idea. This stifles creativity and cripples the free
running nature of a good brainstorming session.
10. Let people have fun brainstorming. Encourage them to come up with as many ideas as possible,
from solidly practical ones to wildly impractical ones. Welcome creativity!
11. Ensure that no train of thought is followed for too long. Make sure that you generate a sufficient
number of different ideas, as well as exploring individual ideas in detail.
12. In a long session, take plenty of breaks so that people can continue to concentrate.
IT Professional Services – DM Adhoc
3. Evaluate and select “Best” Solution
After the brainstorming session, solutions are evaluated for their “effectiviteness value”, and
a decision is made. In this part of the problem solving process, decision making techniques
are very useful.
Decision making tools include
l Grid Analysis / Decision Matrix Analysis
l Decision Tree
l Pareto Analysis
l Process of Elimination / Divide and Rule*
IT Professional Services – DM Adhoc
Pareto Analysis
Decision tree
are excellent tools for helping you to
choose between several courses of action.
provide a highly effective structure within
which you can lay out options and
investigate the possible outcomes of
choosing those options.
Help to form a balanced picture of the risks
and rewards associated with each possible
course of action.
IT Professional Services – DM Adhoc
Decision tree process
Start a Decision Tree with a decision that you need to
make
Draw a small square to represent this towards the left of
a large piece of paper
Draw out lines towards the right for each possible
solution, and write that solution along the line. Keep the
lines apart as far as possible so that you can expand
your thoughts. At the end of each line, consider the
results
If the result of taking that decision is uncertain, draw a
small circle. If the result is another decision that you
need to make, draw another square. Squares represent
decisions, and circles represent uncertain outcomes.
Write the decision or factor above the square or circle. If
you have completed the solution at the end of the line,
just leave it blank.
Starting from the new decision squares on your
diagram, draw out lines representing the options that
you could select. From the circles draw lines
representing possible outcomes. Again make a brief
note on the line saying what it means. Keep on doing
this until you have drawn out as many of the possible
outcomes and decisions as you can see leading on
from the original decisions.
IT Professional Services – DM Adhoc
Decision tree process
Start assigning a cash value or score to each possible outcome
Estimate how much you think it would be worth to you if that outcome came about.
Next look at each circle (representing an uncertainty point) and estimate the probability of each outcome.
If you use percentages, the total must come to 100% at each circle. If you use fractions, these must add
up to 1. If you have data on past events you may be able to make rigorous estimates of the probabilities.
Otherwise write down your best guess.
Once you have worked out the value of the outcomes, and have assessed the probability of the
outcomes of uncertainty, it is time to start calculating the values that will help you make your decision.
Start on the right hand side of the decision tree, and work back towards the left. As you complete a set of
calculations on a node (decision square or uncertainty circle), all you need to do is to record the result.
You can ignore all the calculations that lead to that result from then on.
IT Professional Services – DM Adhoc
Decision tree exercise
Statement: Your team has a requirement for a team leader. Options are:
Hire external candidate or Promote a team member
IT Professional Services – DM Adhoc
H
ire
external
candidate
Prom
ote
team
m
em
ber
Hire a Team
Leader
Pareto Analysis
is a simple technique for prioritizing
possible changes by identifying the
problems that will be resolved by making
these changes. By using this approach,
you can prioritize the individual changes
that will most improve the situation.
uses the Pareto Principle – also known as
the "80/20 Rule" – which is the idea that
20% of causes generate 80% of results.
With this tool, we're trying to find the 20%
of work that will generate 80% of the
results that doing all of the work would
deliver.
IT Professional Services – DM Adhoc
Pareto Exercise
# Problem (Step 1) Cause (Step 2)
Score
(Step 3)
1 Delay in deliver of
Job output
Data Related
2 DCA coordination
3 Hardware
Related
4 Programmer miss
5 Platform
Limitation
6 StreamServe
Limitation
7 Process Related
8 QA miss
IT Professional Services – DM Adhoc
Quality Issues
4. Implementing the solution
Once a decision has been made, it’s now time to implement the “best”
solution. A structured approach like having a project management
framework in place is the best and proven way to implement the solution
Project Management
is a well-established approach to managing and controlling the
introduction of new initiatives or organizational changes
Projects are finite in length, usually one-time pieces of work involving a
number of activities that must be completed within a given time frame,
and often on a fixed budget.
Managing projects well requires a great deal of time, skill, and finesse.
There are many sides to project management and this is what makes it
so interesting and demanding. Project managers are expected to take an
uncertain event and make a certain promise to deliver. They are also
expected to do this within a specified time and within a limited budget.
IT Professional Services – DM Adhoc
Project Management Basics
four basic elements of a project: resources,
time, money, and most importantly, scope.
Resources
l People, equipment, material
Time
l Task durations, dependencies, critical path
Money
l Costs, contingencies, profit
Scope
l Project size, goals, requirements
Source:
http://www.mindtools.com/pages/article/newPPM_Words.htm
http://management.about.com/cs/projectmanagement/a/PM101.htm
IT Professional Services – DM Adhoc
PM process
The key project management processes, which run though all of these
phases, are:
Phase management.
Planning.
Control.
Team management.
Communication.
Procurement.
Integration.
IT Professional Services – DM Adhoc
Planning Exercise
Come up with an implementation strategy for this problem and root cause
Programming Quality issues (Project Coordination between internal - PH and external - AU)
Come up with the scope of work / list of activities with corresponding schedules/timelines
The table below will serve as guide:
IT Professional Services – DM Adhoc
# Activity/Task Start Duration Responsible
1 <Activities> <DD/MM/YYYY> <X D/H> <group/
individual>
2
3
4
5
6
* For each target start date and duration, actual start date and duration should taken into account in order to assess
the project’s performance in terms of time component
Ten Characteristics of Effective Problem
Solvers
Source: http://realtytimes.com/rtpages/19981218_problemsolver.htm
1. They have a "can do" attitude!
2. They re-define the problem
3. They have a system
4. They consider every position as though it were their own
5. They avoid the experience trap
6. They recognize conflict as often a prerequisite to solution
7. They listen to their intuition
8. They invariably go beyond "solving the problem"
9. They seek permanent solutions
10. They gain commitment from all parties involved
IT Professional Services – DM Adhoc
References
http://www.mindtools.com/pages/article/newTMC_00.htm
http://www.isixsigma.com/tools-templates/cause-effect/cause-and-effect-aka-fishbone-diagram/
http://blog.iqmatrix.com/mind-map/awaken-your-problem-solver-from-within-mind-map
http://www.mindtools.com/pages/article/newTED_01.htm
http://www.mindtools.com/pages/article/newPPM_00.htm
http://realtytimes.com/rtpages/19981218_problemsolver.htm
www.google.com.ph
IT Professional Services – DM Adhoc
Thank you!!! 
-END OF SLIDES-
IT Professional Services – DM Adhoc

Weitere ähnliche Inhalte

Was ist angesagt?

Effective Problem Solving and Decision Making
Effective Problem Solving and Decision MakingEffective Problem Solving and Decision Making
Effective Problem Solving and Decision Making
Boom San Agustin, CSP, CC, CL
 
Problem solving skills
Problem solving skillsProblem solving skills
Problem solving skills
Binay Roy
 

Was ist angesagt? (20)

Problem Solving
Problem SolvingProblem Solving
Problem Solving
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Effective Problem Solving and Decision Making
Effective Problem Solving and Decision MakingEffective Problem Solving and Decision Making
Effective Problem Solving and Decision Making
 
Analytical Thinking Training
Analytical Thinking TrainingAnalytical Thinking Training
Analytical Thinking Training
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem Solving
Problem SolvingProblem Solving
Problem Solving
 
Problem solving& Decision Making
Problem solving& Decision MakingProblem solving& Decision Making
Problem solving& Decision Making
 
Problem Solving Process
Problem Solving ProcessProblem Solving Process
Problem Solving Process
 
Problem Solving - Concepts and Approach for Systems and Strategies
Problem Solving - Concepts and Approach for Systems and StrategiesProblem Solving - Concepts and Approach for Systems and Strategies
Problem Solving - Concepts and Approach for Systems and Strategies
 
Problem Solving Skills
Problem Solving SkillsProblem Solving Skills
Problem Solving Skills
 
Power point on creative problem solving
Power point on creative problem solvingPower point on creative problem solving
Power point on creative problem solving
 
Problem Solving and Decision Making
Problem Solving and Decision MakingProblem Solving and Decision Making
Problem Solving and Decision Making
 
developing problem solving skills
developing problem solving skillsdeveloping problem solving skills
developing problem solving skills
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem solving
Problem solvingProblem solving
Problem solving
 
M1 Problem Solving Techniques
M1 Problem Solving TechniquesM1 Problem Solving Techniques
M1 Problem Solving Techniques
 
Problem solving & decision making
Problem solving & decision makingProblem solving & decision making
Problem solving & decision making
 
Problem solving skills
Problem solving skillsProblem solving skills
Problem solving skills
 
Problem solving & Decision making
Problem solving & Decision makingProblem solving & Decision making
Problem solving & Decision making
 
Problem solving & decision making at the workplace
Problem solving & decision making at the workplaceProblem solving & decision making at the workplace
Problem solving & decision making at the workplace
 

Ähnlich wie Problem solving course

Ähnlich wie Problem solving course (20)

Engineering Career Paths.pdf
Engineering Career Paths.pdfEngineering Career Paths.pdf
Engineering Career Paths.pdf
 
Problem Management - Systematic Approach
Problem Management - Systematic ApproachProblem Management - Systematic Approach
Problem Management - Systematic Approach
 
Creating value out of SharePoint and getting your company to love you
Creating value out of SharePoint and getting your company to love youCreating value out of SharePoint and getting your company to love you
Creating value out of SharePoint and getting your company to love you
 
Accelerator Workshop "Before"
Accelerator Workshop "Before"Accelerator Workshop "Before"
Accelerator Workshop "Before"
 
Working together: Agile teams, developers, and product managers
Working together: Agile teams, developers, and product managersWorking together: Agile teams, developers, and product managers
Working together: Agile teams, developers, and product managers
 
Problem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and TechniquesProblem Solving and Decision Making Tools and Techniques
Problem Solving and Decision Making Tools and Techniques
 
Creating Value out of SharePoint
Creating Value out of SharePointCreating Value out of SharePoint
Creating Value out of SharePoint
 
Lean Service Design Workbook
Lean Service Design WorkbookLean Service Design Workbook
Lean Service Design Workbook
 
Accelerator Workshop "After"
Accelerator Workshop "After"Accelerator Workshop "After"
Accelerator Workshop "After"
 
PROBLEM SOLVING.pptx
PROBLEM SOLVING.pptxPROBLEM SOLVING.pptx
PROBLEM SOLVING.pptx
 
Getting started with UX research October 2017.pptx
Getting started with UX research October 2017.pptxGetting started with UX research October 2017.pptx
Getting started with UX research October 2017.pptx
 
Business analysis1.9 - business side
Business analysis1.9 - business sideBusiness analysis1.9 - business side
Business analysis1.9 - business side
 
Problem solving &amp; decision making
Problem solving &amp; decision makingProblem solving &amp; decision making
Problem solving &amp; decision making
 
OverView to PMP
OverView to PMPOverView to PMP
OverView to PMP
 
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Building innovation pipeline with service design methods
Building innovation pipeline with service design methodsBuilding innovation pipeline with service design methods
Building innovation pipeline with service design methods
 
Fishbone analysis
Fishbone analysisFishbone analysis
Fishbone analysis
 
Root Cause Analysis, The 5 Why’s, and The Fishbone Diagram
Root Cause Analysis, The 5 Why’s, and The Fishbone DiagramRoot Cause Analysis, The 5 Why’s, and The Fishbone Diagram
Root Cause Analysis, The 5 Why’s, and The Fishbone Diagram
 
Booklet for IT coaches
Booklet for IT coachesBooklet for IT coaches
Booklet for IT coaches
 

Kürzlich hochgeladen

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 

Kürzlich hochgeladen (20)

INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Problem solving course

  • 1. Course 1: Problem Solving Techniques Updated: 1 April 2013
  • 2. Course Outline What is Problem Solving? Problem Solving Steps l 1. Defining the Problem – 5 Whys – Appreciation – Root Cause Analysis – Fishbone/Ishikawa diagram – Process-issue mapping l 2. Generating “Probable” solutions – Round-robin Brainstorming l 3. Evaluate and select the “best” solution – Decision Tree – Pareto analysis l 4. Implement the solution – Project Management Basics – PM Process 10 characteristics of Effective Problem Solvers IT Professional Services – DM Adhoc
  • 3. What is Problem Solving? IT Professional Services – DM Adhoc “Is a key skill that makes a huge difference in one’s career” At work, we are solving problems everyday Can be large or small, simple or complex, easy or difficult to solve Factor to solving a problem is having a well defined process
  • 4. Problem Solving Steps 1. Define the problem 2. Think of “probable” solutions 3. Evaluate and select the “best” solution 4. Implement the solution IT Professional Services – DM Adhoc
  • 5. Problem Solving Cycle IT Professional Services – DM Adhoc
  • 6. 1. Defining the Problem The key to a good problem definition is ensuring that you deal with the real problem – not its symptoms For example, if there is a quality issue in one of the jobs done by a programmer, we might think that the problem is with the programmer or the QA test analyst. However if you look a bit deeper, the real problem might be lack of training, unreasonable workload, deviations from the acceptable process, etc. Tools available: l 5 Why’s l Appreciation l Root cause analysis IT Professional Services – DM Adhoc
  • 7. 5 Whys is a simple problem-solving technique to get to the root of a problem quickly. Made popular in the 1970s by the Toyota Production System, the 5 Whys strategy involves looking at any problem and asking: "Why?" and "What caused this problem?" IT Professional Services – DM Adhoc
  • 8. Case Study: 5 Whys Example 1: FXDMS AU is unhappy Why is our client, FXDMS AU, unhappy? Because we didn't deliver our services when we said we would. Why were we unable to meet the agreed-upon timeline or schedule for delivery? The job took much longer than we thought it would. Why did it take so much longer? Because we underestimated the complexity of the job. Why did we underestimate the complexity of the job? Because we made a quick estimate of the time needed to complete it, and didn't list the individual stages needed to complete the project. Why didn't we do this? Because we were running behind on other projects. We clearly need to review our time estimation and specification procedures. IT Professional Services – DM Adhoc
  • 9. Group Exercise: 5 Whys Exercise #1: Productivity is LOW Why #1: Why #2: Why #3: Why #4: Why #5: IT Professional Services – DM Adhoc
  • 10. Appreciation simple but powerful technique for extracting the maximum amount of information possible from a simple fact or statement. helps us uncover factors that we might have ordinarily missed, and it can be very useful for brainstorming solutions to problems. Originally developed by the military to help commanders gain a comprehensive understanding of any fact, problem or situation that it was faced with in battle IT Professional Services – DM Adhoc
  • 11. Appreciation Steps & Example 1. Starting with a FACT, ask the 1st question: SO WHAT? in other words, what are the implications of that fact? Why is this fact important? 2. Continue asking that question until you have drawn all possible conclusions from it. Example 1: Statement: Our department's budget is going to be cut 25 percent starting January 1. So what? So the only way to accommodate that cut is to reduce our spending dramatically. So what? So we're probably going to have to cut staff, and we'll definitely have to cut spending on supplies, research, and staff parties. So what? So staff morale is probably going to drop, especially if I have to lay off members of our team. So what? So I'll need to come up with plenty of low-cost ways to boost morale without spending money. So what? So I'll need to start thinking about this tomorrow, since the new budget will go into effect in two months, and I want to be able to manage the consequences when I let the team know. IT Professional Services – DM Adhoc
  • 12. Appreciation Group Exercise Statement: R&R project zerro will be replaced by the Ikaw Na, Kanin club, and other programs starting Jan 2012 So what? So what? So what? So what? So what? IT Professional Services – DM Adhoc
  • 13. Root Cause Analysis is a popular and often-used technique that helps people answer the question of why the problem occurred in the first place. seeks to identify the origin of a problem. It uses a specific set of steps, with associated tools, to find the primary cause of the problem, so that you can: l Determine what happened. l Determine why it happened. l Prevent it from happening again. Requires tracing back the actions from the series of events to discover where the problem started and how it grew into the symptom now being faced Looks at 3 basic types of causes: 1. Physical causes – Tangible, material items failed in some way (for example, a team member got sick). 2. Human causes – People did something wrong, or did not doing something that was needed. Human causes typically lead to physical causes (for example, team leader was not able to disseminate information to test analyst for the change request thus a quality issue was raised). 3. Organizational causes – A system, process, or policy that people use to make decisions or do their work is faulty (for example, pre-pro programmer and designer are separate individuals, and DCA assumed they were the same. IT Professional Services – DM Adhoc
  • 14. Root Cause Analysis IT Professional Services – DM Adhoc
  • 15. Root Cause Analysis process Step One: Define the Problem l What do you see happening? l What are the specific symptoms? Step Two: l What proof do you have that the problem exists? l How long has the problem existed? l What is the impact of the problem? Step Three: Identify Possible Causal Factors l What sequence of events leads to the problem? l What conditions allow the problem to occur? l What other problems surround the occurrence of the central problem? Step Four: Identify root cause l Why does the causal factor exist? l What is the real reason the problem occurred? Step Five: recommend and implement solutions l What can you do to prevent the problem from happening again? l How will the solution be implemented? l Who will be responsible for it? l What are the risks of implementing the solution?
  • 16. Root Cause Analysis: Fishbone/Ishikawa Diagrams The cause and effect (fishbone) diagram will help you visually display the many potential causes for a problem or effect. To construct a fishbone, start with stating the problem in the form of a question, such as ‘Why is the help desk’s abandon rate so high?’ Framing it as a ‘why’ question will help in brainstorming, as each root cause idea should answer the question. The team should agree on the statement of the problem and then place this question in a box at the ‘head’ of the fishbone. The rest of the fishbone then consists of one line drawn across the page, attached to the problem statement, and several lines, or ‘bones,’ coming out vertically from the main line. These branches are labeled with different categories. The categories you use are up to you to decide IT Professional Services – DM Adhoc
  • 17. Fishbone Example IT Professional Services – DM Adhoc
  • 18. Fishbone Exercise IT Professional Services – DM Adhoc
  • 19. 2. Generating probable solutions through Brainstorming Round-Robin Brainstorming allows team members to generate ideas without being influenced by any one person. You can then take these ideas into the next stages of the problem-solving process. A cluster diagram is a good tool during brainstorming IT Professional Services – DM Adhoc
  • 20. Brainstorming process To run a group brainstorming session effectively, do the following: 1. Find a comfortable meeting environment, and set it up ready for the session. 2. Appoint one person to record the ideas. 3. Use appropriate warm-up exercise or ice-breaker. 4. Define the problem you want solved clearly, and lay out any criteria to be met. Make it clear that that the objective of the meeting is to generate as many ideas as possible. 5. Give people plenty of time on their own at the start of the session to generate as many ideas as possible. 6. Ask people to give their ideas, making sure that you give everyone a fair opportunity to contribute. 7. Encourage people to develop other people's ideas, or to use other ideas to create new ones. 8. Encourage an enthusiastic, uncritical attitude among members of the group. Try to get everyone to contribute and develop ideas. 9. Ensure that no one criticizes or evaluates ideas during the session. Criticism introduces an element of risk for group members when putting forward an idea. This stifles creativity and cripples the free running nature of a good brainstorming session. 10. Let people have fun brainstorming. Encourage them to come up with as many ideas as possible, from solidly practical ones to wildly impractical ones. Welcome creativity! 11. Ensure that no train of thought is followed for too long. Make sure that you generate a sufficient number of different ideas, as well as exploring individual ideas in detail. 12. In a long session, take plenty of breaks so that people can continue to concentrate. IT Professional Services – DM Adhoc
  • 21. 3. Evaluate and select “Best” Solution After the brainstorming session, solutions are evaluated for their “effectiviteness value”, and a decision is made. In this part of the problem solving process, decision making techniques are very useful. Decision making tools include l Grid Analysis / Decision Matrix Analysis l Decision Tree l Pareto Analysis l Process of Elimination / Divide and Rule* IT Professional Services – DM Adhoc Pareto Analysis
  • 22. Decision tree are excellent tools for helping you to choose between several courses of action. provide a highly effective structure within which you can lay out options and investigate the possible outcomes of choosing those options. Help to form a balanced picture of the risks and rewards associated with each possible course of action. IT Professional Services – DM Adhoc
  • 23. Decision tree process Start a Decision Tree with a decision that you need to make Draw a small square to represent this towards the left of a large piece of paper Draw out lines towards the right for each possible solution, and write that solution along the line. Keep the lines apart as far as possible so that you can expand your thoughts. At the end of each line, consider the results If the result of taking that decision is uncertain, draw a small circle. If the result is another decision that you need to make, draw another square. Squares represent decisions, and circles represent uncertain outcomes. Write the decision or factor above the square or circle. If you have completed the solution at the end of the line, just leave it blank. Starting from the new decision squares on your diagram, draw out lines representing the options that you could select. From the circles draw lines representing possible outcomes. Again make a brief note on the line saying what it means. Keep on doing this until you have drawn out as many of the possible outcomes and decisions as you can see leading on from the original decisions. IT Professional Services – DM Adhoc
  • 24. Decision tree process Start assigning a cash value or score to each possible outcome Estimate how much you think it would be worth to you if that outcome came about. Next look at each circle (representing an uncertainty point) and estimate the probability of each outcome. If you use percentages, the total must come to 100% at each circle. If you use fractions, these must add up to 1. If you have data on past events you may be able to make rigorous estimates of the probabilities. Otherwise write down your best guess. Once you have worked out the value of the outcomes, and have assessed the probability of the outcomes of uncertainty, it is time to start calculating the values that will help you make your decision. Start on the right hand side of the decision tree, and work back towards the left. As you complete a set of calculations on a node (decision square or uncertainty circle), all you need to do is to record the result. You can ignore all the calculations that lead to that result from then on. IT Professional Services – DM Adhoc
  • 25. Decision tree exercise Statement: Your team has a requirement for a team leader. Options are: Hire external candidate or Promote a team member IT Professional Services – DM Adhoc H ire external candidate Prom ote team m em ber Hire a Team Leader
  • 26. Pareto Analysis is a simple technique for prioritizing possible changes by identifying the problems that will be resolved by making these changes. By using this approach, you can prioritize the individual changes that will most improve the situation. uses the Pareto Principle – also known as the "80/20 Rule" – which is the idea that 20% of causes generate 80% of results. With this tool, we're trying to find the 20% of work that will generate 80% of the results that doing all of the work would deliver. IT Professional Services – DM Adhoc
  • 27. Pareto Exercise # Problem (Step 1) Cause (Step 2) Score (Step 3) 1 Delay in deliver of Job output Data Related 2 DCA coordination 3 Hardware Related 4 Programmer miss 5 Platform Limitation 6 StreamServe Limitation 7 Process Related 8 QA miss IT Professional Services – DM Adhoc Quality Issues
  • 28. 4. Implementing the solution Once a decision has been made, it’s now time to implement the “best” solution. A structured approach like having a project management framework in place is the best and proven way to implement the solution Project Management is a well-established approach to managing and controlling the introduction of new initiatives or organizational changes Projects are finite in length, usually one-time pieces of work involving a number of activities that must be completed within a given time frame, and often on a fixed budget. Managing projects well requires a great deal of time, skill, and finesse. There are many sides to project management and this is what makes it so interesting and demanding. Project managers are expected to take an uncertain event and make a certain promise to deliver. They are also expected to do this within a specified time and within a limited budget. IT Professional Services – DM Adhoc
  • 29. Project Management Basics four basic elements of a project: resources, time, money, and most importantly, scope. Resources l People, equipment, material Time l Task durations, dependencies, critical path Money l Costs, contingencies, profit Scope l Project size, goals, requirements Source: http://www.mindtools.com/pages/article/newPPM_Words.htm http://management.about.com/cs/projectmanagement/a/PM101.htm IT Professional Services – DM Adhoc
  • 30. PM process The key project management processes, which run though all of these phases, are: Phase management. Planning. Control. Team management. Communication. Procurement. Integration. IT Professional Services – DM Adhoc
  • 31. Planning Exercise Come up with an implementation strategy for this problem and root cause Programming Quality issues (Project Coordination between internal - PH and external - AU) Come up with the scope of work / list of activities with corresponding schedules/timelines The table below will serve as guide: IT Professional Services – DM Adhoc # Activity/Task Start Duration Responsible 1 <Activities> <DD/MM/YYYY> <X D/H> <group/ individual> 2 3 4 5 6 * For each target start date and duration, actual start date and duration should taken into account in order to assess the project’s performance in terms of time component
  • 32. Ten Characteristics of Effective Problem Solvers Source: http://realtytimes.com/rtpages/19981218_problemsolver.htm 1. They have a "can do" attitude! 2. They re-define the problem 3. They have a system 4. They consider every position as though it were their own 5. They avoid the experience trap 6. They recognize conflict as often a prerequisite to solution 7. They listen to their intuition 8. They invariably go beyond "solving the problem" 9. They seek permanent solutions 10. They gain commitment from all parties involved IT Professional Services – DM Adhoc
  • 34. Thank you!!!  -END OF SLIDES- IT Professional Services – DM Adhoc