SlideShare ist ein Scribd-Unternehmen logo
1 von 24
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
11th European Conference on Product and Process Modelling
eWork and eBusiness in Architecture, Engineering and Construction
Delivering COBie data
focus on curtain wall and building envelopes
Jan Karlshøj
Technical University of Denmark (DTU), Kongens Lyngby, Denmark
Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta
University of Padova, Padova, Italy
2
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Index
Subject of the research
State of the art
Getting COBie
IDM development
Conclusions
Future developments
1
2
3
4
5
6
3
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Subject of the research
BIM
model
i
i
i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
i
i
i
i
i
i
i
i
ii
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
Facility
ManagerINFORMATION
EXCHANGE
Project lifecycle
4
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Subject of the research
i
i
i
i i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i i
i
i
i
i
i
i
i
i
ii
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
Facility
Manager
information exchange:
MODEL VIEW DEFINITION
(MVD)
IFC BIM model
(ISO16739:2013)
=
COBie
Construction (to) Operations Building
information exchange
curtain
walls
*Project lifecycle
Production of
hundred of papers
and files difficult to be
used by Facility
Managers.
5
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
Nowadays, the delivery of handover information
is still based on paper documents and PDF files.
RESULTS
Information often
available months
or years after
occupancy.
Time wasted
in recreating
information already
specified during
the project.
Manual inclusion
of information
in maintenance
management
software.
=
we need something else!
6
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
COBie
aims to be a unique container able
to collect those pieces of
information needed for FM,
across the different project stages
can be delivered in
electronic format (.ifc,
.ifcxml, .xml)
standard, open and reusable
data structure, based on
the IFC schema.
it is a MVD since it represents
a subset of the entire IFC data
set.
7
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
COBie’s data structure
8
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
Two different behaviours can be internationally recognized:
all the equipments that need preventive maintenance plan, have consumable parts and require
management and regular inspections, are supposed to be included in COBie.
(as stated by Bill East, original developer of COBie)
COBie’s content:
U.S.A.
NBIMS-US v.3 - Chapter 2.4
July 2013, National BIM Standard
U.K.
BS 1192-4:2014
Sep. 2014, British Standard Institute
........................
……………………..
IfcCurtainWall
IfcPlate
IfcMember
……………………..
……………………..
IFC entities
exclusion list
COBie for all
(in UK COBie is
mandatory for all
central procured project
since April 2016)
9
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
State of the art
This research focused
on the UK scenario, since:
• the UK Goverment’s initiatives could become a
framework for the European States which
do not yet submit a BIM policy;
• the importance of the UK construction
business in Europe, especially regarding
private housing and commercial, where curtain
walls are commonly used;
Moreover, curtain walls are products that typically
require to be maintained during the project life-
cycle:
it could be useful to
check COBie against passive products!
How to obtain COBie?
10
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
Create with
Autodesk Revit 2014
COBie
.xml
- The data format for
COBie required by the
UK Government
- It is just a mapping of the
COBie MVD: the
information content is the
same.
direct exportation
through an internal plug-in
indirect exportation
via IFC + external app.
1
2
11
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
unitized
curtain walling system
=
Pre-assembled curtain cells,
composed by sub-elements,
which are installed on site.
stick
curtain walling system
=
All the elements are installed on site.
Curtain panels
(IfcPlate)
Curtain mullions
(IfcMember)
Curtain cell
sub-elements
Curtain cell
(IfcPlate)
Curtain system
(IfcCurtainWall)=
Curtain system
(IfcCurtainWall)
12
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
COBie
.xml
direct exportation
COBie Extension for Revit
indirect exportation
via IFC + external app.
1
2
Non-collaborative procedure based on COBie .xml:
there could be several issue in aligning information
produced by the different stakeholders.
Automatic exportation of all the information included in the model,
relating to Contact, Facility, Floor, Space, Zone, Type,
Component, System, Attribute and Coordinate worksheets.
13
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
Curtain wall
BIM model
COBie
.xml
direct exportation
COBie Extension for Revit
exporting the model
in IFC format
1
2
It is not possible to choose
COBie as MVD in Revit
while exporting in IFC format;
the Extended FM handover View
was used, but it is not approved by
buildingSMART International,
therefore not stable.
transforming the IFC model
in COBie .xml
Issues in the definition of mullions
(naming and Type association),
because of the IFC Exporter of
Revit.
Results:
Cobie Toolkit, BimService.
Chanche to modify the exclusion list
introduced by the US COBie spec.
No results:
BIMserver, BimService (old version).
No chanche to modify the exclusion list
introduced by the US COBie
specification.
14
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Getting COBie
COBie
.xml
direct exportation
COBie Extension for Revit
indirect exportation
via IFC + external app.
1
2
Spare Resource Job Document
Revit, as a design software, is not able to handle information
that are typically exchanged during the construction phase.
Impact Connection Assembly Issue Coordinate System
Type
√
Component
√
Attribute
√
What is modeled as a family type in Revit, is also exported as
a Type in COBie. All the attributes included in the model can be
associated to the relevant COBie cell.
Optional content (BS 1192-4)Content expected not exactly defined Project-specific indications required
Same results!
Results evaluated considering the specific stakeholder and product
on which this research focused (and the related COBie worksheets).
:
15
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Industry Foundation Classes
IFC:
establishes the language
Model View Definition
MVD:
selects words and syntax constructions for a certain purpose
Information Delivery Manual
IDM:
defines how the speech occurs
Objective:
define a standardized methodology
for existing or new processes, in
order to assist the different
stakeholders in their tasks
=
16
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
IDMs based on the approach described by Mondrup, Treldal, Karlshøj, Vestergaard (2014):
it is possible to define IDM packages that specify the information exchanges that
occur at a specific life-cycle stage involving specific actors of the process
A B
A
Cobie-related life-cycle stages, taken
from the BIM task Group (UK)
B
Actors’ roles taken from the British
regulation BS1192:2007
IDM 1
COBie Data Drop 3 - Specialist Designer
IDM 2
COBie Data Drop 4 - Subcontractor
Re-definition of the existing COBie IDM
(NBIMS-US v.3) in consideration of:
- BS 1192-4 and Uniclass;
17
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
IDM components:
Business
Use Case
Process
Map
Exchange
Requirements
Exchange
Requirement
Models
Textual description of the
analyzed process
Graphic translation of
the Business Use Case
Description of the information
to be exchanged (who, when
and what)
technical specification of
the Exchange Requirement
(needed to develop a MVD)
Out of the boundaries
of this research
The COBie Responsibility Matrix
(projects.buildingsmartalliance.org) allows to link:
COBie Exchange Requirements  COBie .xml cells
18
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Main problem: what should be considered manageable assets?
premise:
curtain wall
complexity
Ontological complexity
of the considered product
• Design information, at various stages
• Construction information
• Operation & Maintenance information
• Manufacturing-based information
Huge variability of elements
if dimensions are considered
The entire curtain wall can be seen
• as unique object;
• as an assembly composed by several subsystems (cells);
• as an association of single elements.
E.g. in buildings like skyscrapers the hundreds of panels that
constitutes the facade could seem the same panel repeated for
hundreds of times, but they often differs for dimensions.
Different sources
of information
Interferences with
other disciplines components
Typical electrical and mechanical systems
COBie Assembly
specifies the elements Type
included in a cell Type
19
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Main problem: what should be considered manageable assets?
• No project-specific indications
• No stable practice on COBie
• Curtain wall complexity
 chosen criteria:
Every element:
• which needs specific maintenance operations
• for which replacement parts are provided
• that requires to be specified by additional
documents
• that requires to be specifically described by
those properties expected by the Type
worksheet (e.g. warranty information)
Every curtain wall cell*
is described by a specific
COBie Type
(regardless dimensions)
is exported as a
COBie
Component
*In the general case where
curtain walls are not subdivided
in cells, each element must be
exported as a Component too.
20
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
IDM development
Result: Exchange Requirement example
The ERs used by the COBie
specification included in
NBIMS-US v.3 were used.
Sub-ERs related to the COBie
worksheets were defined.
The specific IFC entity which
compiles a precise COBie cell
(taken from the COBie MVD).
Information to be exchanged is
defined in relation to the COBie
columns.
21
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Conclusions
impossibility to reach the actual objective:
exchange of the entire set of information
needed for Facility Management
The best solution if the
purpose is just deliver COBie
data in .xml format, in order
to fulfil a contractual
requirement:
- Easy to use;
- No additional application
needed: all happens within
the Revit environment
Considered scenario:
22
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Conclusions
Hopeful scenario:
using IFC is the only way to
enable interoperability
between the different actors
A MVD for Facility Management which
clearly defines the content of the exchange
and standardizes data flow (also for curtain
walls) is strongly needed.
23
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
Delivering COBie data - focus on curtain wall and building envelopes
J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta
Future developments
Consideration on how BIM tools translate in IFC format
the complex relations that charachterize curtain walls.
Application of the developed IDMs to different case studies,
in order to verify the validity of the proposal.
A
B
ECPPM 2016
07/09 to 09/09 | Limassol, Cyprus
11th European Conference on Product and Process Modelling
eWork and eBusiness in Architecture, Engineering and Construction
Delivering COBie data - focus on curtain wall and building envelopes
Jan Karlshøj
Technical University of Denmark (DTU), Kongens Lyngby, Denmark
Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta
University of Padova, Padova, Italy
Thank you for attention

Weitere ähnliche Inhalte

Ähnlich wie Delivering COBie data - Focus on curtain walls and building envelopes

Digital Pathways 2011 BBC Final
Digital Pathways 2011 BBC FinalDigital Pathways 2011 BBC Final
Digital Pathways 2011 BBC Final
BBC
 

Ähnlich wie Delivering COBie data - Focus on curtain walls and building envelopes (20)

PI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of ThingsPI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of Things
 
On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...On the relation between Model View Definitions (MVDs) and Linked Data technol...
On the relation between Model View Definitions (MVDs) and Linked Data technol...
 
To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?To BIM4fm or not to BIM4fm?
To BIM4fm or not to BIM4fm?
 
The Glass House V1 Building with Synthesis
The Glass House V1 Building with SynthesisThe Glass House V1 Building with Synthesis
The Glass House V1 Building with Synthesis
 
COBie
COBieCOBie
COBie
 
24 pvpm bipv_supsi_20170331
24 pvpm bipv_supsi_2017033124 pvpm bipv_supsi_20170331
24 pvpm bipv_supsi_20170331
 
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
 
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016The Impact of Digital Engineering – Tim Broyd (ICE)  #COMIT2016
The Impact of Digital Engineering – Tim Broyd (ICE) #COMIT2016
 
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
Making Sigillographic Material Accessible to Researchers – Digitising, Catalo...
 
Intech template
Intech templateIntech template
Intech template
 
Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019Video Browser Showdown (VBS) 2012-2019
Video Browser Showdown (VBS) 2012-2019
 
Digital Pathways 2011 BBC Final
Digital Pathways 2011 BBC FinalDigital Pathways 2011 BBC Final
Digital Pathways 2011 BBC Final
 
Irish Building Magazine[1]
Irish Building Magazine[1]Irish Building Magazine[1]
Irish Building Magazine[1]
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award Ceremony
 
Archiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award CeremonyArchiver pilot phase kick off Award Ceremony
Archiver pilot phase kick off Award Ceremony
 
건설 스타트업과 오픈소스
건설 스타트업과 오픈소스건설 스타트업과 오픈소스
건설 스타트업과 오픈소스
 
Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1Adrian Woolard Beyond Digital V1
Adrian Woolard Beyond Digital V1
 
Application Of BIM Design Manuals A Case Study
Application Of BIM Design Manuals  A Case StudyApplication Of BIM Design Manuals  A Case Study
Application Of BIM Design Manuals A Case Study
 
Relim open bim_20160330_1-2
Relim open bim_20160330_1-2Relim open bim_20160330_1-2
Relim open bim_20160330_1-2
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 

Kürzlich hochgeladen

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 

Kürzlich hochgeladen (20)

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

Delivering COBie data - Focus on curtain walls and building envelopes

  • 1. ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus 11th European Conference on Product and Process Modelling eWork and eBusiness in Architecture, Engineering and Construction Delivering COBie data focus on curtain wall and building envelopes Jan Karlshøj Technical University of Denmark (DTU), Kongens Lyngby, Denmark Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta University of Padova, Padova, Italy
  • 2. 2 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Index Subject of the research State of the art Getting COBie IDM development Conclusions Future developments 1 2 3 4 5 6
  • 3. 3 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Subject of the research BIM model i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i ii i i i i i i i i i i i i i i i i i i i Facility ManagerINFORMATION EXCHANGE Project lifecycle
  • 4. 4 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Subject of the research i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i ii i i i i i i i i i i i i i i i i i i i Facility Manager information exchange: MODEL VIEW DEFINITION (MVD) IFC BIM model (ISO16739:2013) = COBie Construction (to) Operations Building information exchange curtain walls *Project lifecycle
  • 5. Production of hundred of papers and files difficult to be used by Facility Managers. 5 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art Nowadays, the delivery of handover information is still based on paper documents and PDF files. RESULTS Information often available months or years after occupancy. Time wasted in recreating information already specified during the project. Manual inclusion of information in maintenance management software. = we need something else!
  • 6. 6 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art COBie aims to be a unique container able to collect those pieces of information needed for FM, across the different project stages can be delivered in electronic format (.ifc, .ifcxml, .xml) standard, open and reusable data structure, based on the IFC schema. it is a MVD since it represents a subset of the entire IFC data set.
  • 7. 7 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art COBie’s data structure
  • 8. 8 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art Two different behaviours can be internationally recognized: all the equipments that need preventive maintenance plan, have consumable parts and require management and regular inspections, are supposed to be included in COBie. (as stated by Bill East, original developer of COBie) COBie’s content: U.S.A. NBIMS-US v.3 - Chapter 2.4 July 2013, National BIM Standard U.K. BS 1192-4:2014 Sep. 2014, British Standard Institute ........................ …………………….. IfcCurtainWall IfcPlate IfcMember …………………….. …………………….. IFC entities exclusion list COBie for all (in UK COBie is mandatory for all central procured project since April 2016)
  • 9. 9 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta State of the art This research focused on the UK scenario, since: • the UK Goverment’s initiatives could become a framework for the European States which do not yet submit a BIM policy; • the importance of the UK construction business in Europe, especially regarding private housing and commercial, where curtain walls are commonly used; Moreover, curtain walls are products that typically require to be maintained during the project life- cycle: it could be useful to check COBie against passive products!
  • 10. How to obtain COBie? 10 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model Create with Autodesk Revit 2014 COBie .xml - The data format for COBie required by the UK Government - It is just a mapping of the COBie MVD: the information content is the same. direct exportation through an internal plug-in indirect exportation via IFC + external app. 1 2
  • 11. 11 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model unitized curtain walling system = Pre-assembled curtain cells, composed by sub-elements, which are installed on site. stick curtain walling system = All the elements are installed on site. Curtain panels (IfcPlate) Curtain mullions (IfcMember) Curtain cell sub-elements Curtain cell (IfcPlate) Curtain system (IfcCurtainWall)= Curtain system (IfcCurtainWall)
  • 12. 12 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model COBie .xml direct exportation COBie Extension for Revit indirect exportation via IFC + external app. 1 2 Non-collaborative procedure based on COBie .xml: there could be several issue in aligning information produced by the different stakeholders. Automatic exportation of all the information included in the model, relating to Contact, Facility, Floor, Space, Zone, Type, Component, System, Attribute and Coordinate worksheets.
  • 13. 13 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie Curtain wall BIM model COBie .xml direct exportation COBie Extension for Revit exporting the model in IFC format 1 2 It is not possible to choose COBie as MVD in Revit while exporting in IFC format; the Extended FM handover View was used, but it is not approved by buildingSMART International, therefore not stable. transforming the IFC model in COBie .xml Issues in the definition of mullions (naming and Type association), because of the IFC Exporter of Revit. Results: Cobie Toolkit, BimService. Chanche to modify the exclusion list introduced by the US COBie spec. No results: BIMserver, BimService (old version). No chanche to modify the exclusion list introduced by the US COBie specification.
  • 14. 14 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Getting COBie COBie .xml direct exportation COBie Extension for Revit indirect exportation via IFC + external app. 1 2 Spare Resource Job Document Revit, as a design software, is not able to handle information that are typically exchanged during the construction phase. Impact Connection Assembly Issue Coordinate System Type √ Component √ Attribute √ What is modeled as a family type in Revit, is also exported as a Type in COBie. All the attributes included in the model can be associated to the relevant COBie cell. Optional content (BS 1192-4)Content expected not exactly defined Project-specific indications required Same results! Results evaluated considering the specific stakeholder and product on which this research focused (and the related COBie worksheets). :
  • 15. 15 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Industry Foundation Classes IFC: establishes the language Model View Definition MVD: selects words and syntax constructions for a certain purpose Information Delivery Manual IDM: defines how the speech occurs Objective: define a standardized methodology for existing or new processes, in order to assist the different stakeholders in their tasks =
  • 16. 16 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development IDMs based on the approach described by Mondrup, Treldal, Karlshøj, Vestergaard (2014): it is possible to define IDM packages that specify the information exchanges that occur at a specific life-cycle stage involving specific actors of the process A B A Cobie-related life-cycle stages, taken from the BIM task Group (UK) B Actors’ roles taken from the British regulation BS1192:2007 IDM 1 COBie Data Drop 3 - Specialist Designer IDM 2 COBie Data Drop 4 - Subcontractor Re-definition of the existing COBie IDM (NBIMS-US v.3) in consideration of: - BS 1192-4 and Uniclass;
  • 17. 17 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development IDM components: Business Use Case Process Map Exchange Requirements Exchange Requirement Models Textual description of the analyzed process Graphic translation of the Business Use Case Description of the information to be exchanged (who, when and what) technical specification of the Exchange Requirement (needed to develop a MVD) Out of the boundaries of this research The COBie Responsibility Matrix (projects.buildingsmartalliance.org) allows to link: COBie Exchange Requirements  COBie .xml cells
  • 18. 18 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Main problem: what should be considered manageable assets? premise: curtain wall complexity Ontological complexity of the considered product • Design information, at various stages • Construction information • Operation & Maintenance information • Manufacturing-based information Huge variability of elements if dimensions are considered The entire curtain wall can be seen • as unique object; • as an assembly composed by several subsystems (cells); • as an association of single elements. E.g. in buildings like skyscrapers the hundreds of panels that constitutes the facade could seem the same panel repeated for hundreds of times, but they often differs for dimensions. Different sources of information Interferences with other disciplines components Typical electrical and mechanical systems
  • 19. COBie Assembly specifies the elements Type included in a cell Type 19 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Main problem: what should be considered manageable assets? • No project-specific indications • No stable practice on COBie • Curtain wall complexity  chosen criteria: Every element: • which needs specific maintenance operations • for which replacement parts are provided • that requires to be specified by additional documents • that requires to be specifically described by those properties expected by the Type worksheet (e.g. warranty information) Every curtain wall cell* is described by a specific COBie Type (regardless dimensions) is exported as a COBie Component *In the general case where curtain walls are not subdivided in cells, each element must be exported as a Component too.
  • 20. 20 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta IDM development Result: Exchange Requirement example The ERs used by the COBie specification included in NBIMS-US v.3 were used. Sub-ERs related to the COBie worksheets were defined. The specific IFC entity which compiles a precise COBie cell (taken from the COBie MVD). Information to be exchanged is defined in relation to the COBie columns.
  • 21. 21 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Conclusions impossibility to reach the actual objective: exchange of the entire set of information needed for Facility Management The best solution if the purpose is just deliver COBie data in .xml format, in order to fulfil a contractual requirement: - Easy to use; - No additional application needed: all happens within the Revit environment Considered scenario:
  • 22. 22 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Conclusions Hopeful scenario: using IFC is the only way to enable interoperability between the different actors A MVD for Facility Management which clearly defines the content of the exchange and standardizes data flow (also for curtain walls) is strongly needed.
  • 23. 23 ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus Delivering COBie data - focus on curtain wall and building envelopes J.Karlshøj, P. Borin, M. Carradori, M. Scotton, C. Zanchetta Future developments Consideration on how BIM tools translate in IFC format the complex relations that charachterize curtain walls. Application of the developed IDMs to different case studies, in order to verify the validity of the proposal. A B
  • 24. ECPPM 2016 07/09 to 09/09 | Limassol, Cyprus 11th European Conference on Product and Process Modelling eWork and eBusiness in Architecture, Engineering and Construction Delivering COBie data - focus on curtain wall and building envelopes Jan Karlshøj Technical University of Denmark (DTU), Kongens Lyngby, Denmark Paolo Borin, Michele Carradori, Michele Scotton, Carlo Zanchetta University of Padova, Padova, Italy Thank you for attention