Exterior installations can be an excellent opportunity for experimenting with colors, cladding materials, and finishes (e.g., elevation cladding). It's advisable to determine the high-level finishes or cladding materials during the design phase so that construction is as smooth as possible.
Call Now â9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
Â
elevation cladding.pptx
1.
2. Metaguise started as a modular metal architectural firm in India
in 2019, and is built on a sustainable model. We are an impact
driven, rapidly evolving ecosystem with branches in new age
architectural technology and innovation.
We offer a seamless experience through a meticulous tech
consult and deliver flawlessly crafted modular metal art and
architecture. The Metagusie engine runs on Trust,
Transparency and Technical Expertise.
3. â˘Our products, developed in aluminum and its alloys are engineered to perfection;
retaining an
accuracy of up to 3 mm.
â˘Designed in AutoCAD/Solid works/3DS MAX/Rhino and Grasshopper, the
facades are uniquely customized for every building. In addition to the extensive
variety of forms, we also build Kinetic and Parametric structures.
â˘Over 1000 completed projects since 2019.
â˘In collaboration with Decoral Italy, our products come in an astounding variety of
VOC free surface finishes that include textures like wood, corten steel and
concrete.
â˘The surface coatings come with a warranty from 15 to 35 years
â˘24 hour After Sale Services in Delhi, NCR and 72 hour After Sale Services Pan
India.
5. PROCESS FLOW
SHEET
Enquiry
Brief
Drawings ( 1 Day
)
Site Inspection before
Estimate ( 1 Day
)
Estimate to Client (2
Days )
Commercial
Closure
Project Brief
(1day)
Civil
Assessment(2days)
Site Measurement (2
Days )
Solid Module (5
Days )
Approval of Drawing and
Frame
Frame Coating (3
Days )
Frame Delivery (3
Days )
Site Brief and H/W
issue
Approval (1 Day
)
Frame
Installation
Pane
l
Measurement/Drawing/Resize
(3 Days
)
Approval of Final
Panel
Final
BOQ/Yield/Efficiency
Production Docket (1
Day )
Panel Inspection
Report
Stiffener Installation on
Panel
and Dispatch for
Coating
Approval of Coating and
Sheet
Proper Packaging for
Dispatch
Site Receiving and
Inspection
Inspection of work in process
on site
Snag Removal (1
Day )
Inspection of Final
Product
Installed (1 Day
)
Inspection Report and Invoice
( 1 Day
)
Protective Film Removal ( 1
Day )
Customer Testimonial ( 1
Day )
6. 3D RENDER AND ELEVATIONS - A
COMPARATIVE STUDY
Exterior installations can be an excellent opportunity for experimenting with
colors, cladding materials, and finishes (e.g., elevation cladding). It's
advisable to determine the high-level finishes or cladding materials during
the design phase so that construction is as smooth as possible.