2. Metaguise started as a modular metal architectural firm in India in
2019, and is built on a sustainable model. We are an impact driven,
rapidly evolving ecosystem with branches in new age architectural
technology and innovation.
We offer a seamless experience through a meticulous tech consult
and deliver flawlessly crafted modular metal art and architecture.
The Metagusie engine runs on Trust, Transparency and Technical
Expertise.
3. âąOur products, developed in aluminum and its alloys are engineered to perfection; retaining an
accuracy of up to 3 mm.
âąDesigned in AutoCAD/Solid works/3DS MAX/Rhino and Grasshopper, the facades are
uniquely customized for every building. In addition to the extensive variety of forms, we also
build Kinetic and Parametric structures.
âąOver 1000 completed projects since 2019.
âąIn collaboration with Decoral Italy, our products come in an astounding variety of VOC free
surface finishes that include textures like wood, corten steel and concrete.
âąThe surface coatings come with a warranty from 15 to 35 years
âą24 hour After Sale Services in Delhi, NCR and 72 hour After Sale Services Pan India.
5. PROCESS FLOW SHEET
Enquiry Brief
Drawings ( 1 Day )
Site Inspection before Estimate (
1 Day )
Estimate to Client (2 Days )
Commercial Closure
Project Brief (1day) Civil Assessment(2days)
Site Measurement (2 Days )
Solid Module (5 Days)
Approval of Drawing and Frame
Frame Coating (3 Days )
Frame Delivery (3 Days )
Site Brief and H/Wissue
Approval (1 Day )
Frame Installation
Panel
Measurement/Drawing/Resize (3
Days)
Approval of FinalPanel
Final BOQ/Yield/Efficiency
Production Docket (1 Day ) Panel InspectionReport
Stiffener Installation on Panel
and Dispatch for Coating
Approval of Coating and Sheet
Proper Packaging for Dispatch
Site Receiving and Inspection
Inspection of work in process on
site
Snag Removal (1 Day )
Inspection of FinalProduct
Installed (1 Day)
Inspection Report and Invoice ( 1
Day)
Protective Film Removal ( 1 Day )
Customer Testimonial ( 1 Day )
6. 3D RENDER AND ELEVATIONS - A COMPARATIVE STUDY
Exterior installations can be an excellent opportunity for experimenting with
colors, cladding materials, and finishes (e.g., elevation cladding). It's
advisable to determine the high-level finishes or cladding materials during
the design phase so that construction is as smooth as possible.