• Draw up Kaizen sheet and then confirm the result of loss reduction
with comparison between before and after kaizen.
• Revise Kaizen point of drawing, standard and working procedure
• Draw up one point lessons about operator’s skill what was be clear
through kaizen activity.
• After kaizen activity, it needs to install visual control to necessary point.
Productivity Management Office @
Why – Why Analysis
• This is an analysis that repeat why about 4M root causes of problem several
times. 4M (Machine, Material, Method, Man)
• First of all, investigate phenomenon and scene to find out cause of problem and
then try to do why-why analysis.
• It is useful not only for production field but also different field.
• The important point for analysis is to be clear what is problem.
• Examine human cause at the end of analysis.
Productivity Management Office @
PM Analysis
phenomenon
Contributing condition
Physical viewing
F3 is not zero
4M cause
Vacuum area is
small
Vacuum power is
small
F1 is small less
than standard
Vacuum power is
small less than
falling power
Lift aim can not
pick up tray
Gap of vacuum
position
Tray is heavy
F2 is heavy more
than standard
Lifting power is small
Part 5 Consulting Experience sharing
Productivity Management Office @
Zero concept and model
Productivity Management Office @
• Zero model machine
• Zero model line
• Zero model area
Zero machine failure
Zero minor stops
Zero quality defect
Zero cleaning etc.
Relationship between AM and others
Autonomous maintenance 7steps
• Step 0 Preparation
• Step1 Initial cleaning
• Step2 Countermeasures for source of
contamination and hard to access.
• Step3 Tentative CIL standard
• Step4 General inspection
• Step5 Autonomous inspection
• Step6 Standardization
• Step7 Autonomous management
Planed maintenance for Zero failure
Planed maintenance 7 Steps
Step1 Recognition of current maintenance system
Step2 Set up purpose, policy, target.
Step3 Organization formation and clarification
Step4 Clarification of implementation activities
Step5 Study of specific implementation for each activity
Step6 Plan farming for implementation with autonomous maintenance
Stpep7 Result verification and establishment of maintenance system
Productivity Management Office @
Example of implementation activities
1. Support activity of Autonomous maintenance
2. Zero failure activity
3. Lubrication management activity
4. Spare parts management activity
5. Maintenance skill up and new technology activity
6. Maintenance cost down activity
7. Maintenance management system activity
8. Maintenance project management activity
Visualize maintenance procedure
Productivity Management Office @
Kaizen scenario of sales growth
• Cooperation is significant between sales and manufacturing
• Can make but can not sale, can sale but can not make
• Which production system is better A or B?
• Which product is better for kaizen A or B?
Sales
Sales P2
P1
a
b
s
0 1 2 3 4
Productivity Management Office @
Contrary
For cost
Contrary
For profit
Opportunity loss
Volume
Opportunity loss
Kaizen scenario of cost down
• It should be improved difference of cost and aimed for Real standard cost.
• It should be considered ideal standard cost (long term) and real standard cost
(short term).
Actual cost
Productivity Management Office @
Standard cost
Present standard cost
Real standard cost
Ideal standard cost Level3 : Target cost in future
Level2n : Target cost after kaizen
Target1 : Target cost at present
= Actual cost – standard cost
Actual loss (difference of cost)
Loss analysis ( Loss tree )
• It makes clear loss structure and plan strategy.
Productivity Management Office @
Past loss
Forecast loss
Past
Opportunity
loss
Opportunity
loss
Production cost
loss
Production losses
Production
cost loss
Indirect
Production loss
Claim loss
Stock loss
Sales
Management loss
Past loss
Management of Kaizen theme
• Team leader manages individual kaizen theme and Focused improvement
subcommittee manage whole themes by matrix as below.
Productivity Management Office @
Large theme Middle theme Small theme Initial Target Actual Parson
Date of
begin
Date of
end
Achievement
Theme 1
Theme1-1
Theme1-1-1
Theme1-1-2
Theme1-2
Theme1-2-1
Theme1-2-2
Theme1-2-3
Theme1-2-4
Theme1-3
Theme1-3-1
Theme1-3-2
Part 6 overall Program Summary
Productivity Management Office @
Key of success
1. Clear TPM policy of top management
2. Alignment between Business plan and TPM plan
3. Management of plan, target and results
4. Priority themes and model activities
5. Incentive for full participation
6. Leadership of each level
7. Budget for TPM activity.
Productivity Management Office @
Tangible result of TPM ( Example)
• P Value-added Productivity x1.5~
Number of Unexpected break down 1/100~
Overall equipment efficiency x1.5~
• Q Quality defect in process 1/10~
• Customer claim ¼~
• C Valuable cost down 30%~
• D Inventory ½ ~
• S Zero accident zero
• Environmental pollution zero
• M Turnover ½~
TPM Award
1) Award for TPM Excellence, Category B
The applicant must score a minimum of 70 points on 100-point Checklist C.
2) Award for TPM excellence category A
The applicant must score minimum 70 points on 100 point checklist c
3) Award for excellence in consistent TPM commitment
The applicant must score minimum 80 points on 100 point checklist c
4) Special award for TPM achievement
The applicant must score minimum 70 points on 100 point checklist B
5) Advanced special awards for TPM achievement
The applicant must score minimum 80 points on 100 point checklist A
6) Award for world class TPM achievement
The applicant must score minimum 80 points on 100 point checklist S
1st Stage Assessment : May-July 201x 2nd Stage Assessment : October-December 201x
+
• Checklist C example
TPM policies and objectives
1.
1. TPM policies are planned in relation between company policies and plant/factory policy
2. The relation between TPM target values and management target results are clear
3. The master plan is in an appropriate order as an action plan to achieve TPM
4. TPM policies and objectives are checked using method such as benchmarking that all sections of PQCDSME are
displayed corresponding to 8 pillars
5. TPM policies and objectives are have been set forth and observed by all the departments

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (19)

Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
TPM Overview and AM Workshop
TPM Overview and AM WorkshopTPM Overview and AM Workshop
TPM Overview and AM Workshop
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Lean TPM Autonomous Maintenance 2
Lean TPM Autonomous Maintenance 2Lean TPM Autonomous Maintenance 2
Lean TPM Autonomous Maintenance 2
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Tpm
TpmTpm
Tpm
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 

Andere mochten auch

7 ways of reducing tpm cost
7 ways of reducing tpm cost 7 ways of reducing tpm cost
7 ways of reducing tpm cost
TradeInsight
 
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing OperationsTPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
Marcelo Costa
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
Kyle Bakken
 

Andere mochten auch (20)

M shop pres_updated_2_2012
M shop pres_updated_2_2012M shop pres_updated_2_2012
M shop pres_updated_2_2012
 
7 ways of reducing tpm cost
7 ways of reducing tpm cost 7 ways of reducing tpm cost
7 ways of reducing tpm cost
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
 
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing OperationsTPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
 
Quality of electronic products for the automotive
Quality of electronic products for the automotiveQuality of electronic products for the automotive
Quality of electronic products for the automotive
 
Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016Nesmyslné promoakce - Retail Summit 2016
Nesmyslné promoakce - Retail Summit 2016
 
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
 
Training with ROI
Training with ROITraining with ROI
Training with ROI
 
Case Study of Herrestad Clinic, Sweden
Case Study of Herrestad Clinic, SwedenCase Study of Herrestad Clinic, Sweden
Case Study of Herrestad Clinic, Sweden
 
Insuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be LeanInsuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be Lean
 
問題解決方法
問題解決方法 問題解決方法
問題解決方法
 
KEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENTKEY TO PROFITABILITY: SPARE PART MANAGEMENT
KEY TO PROFITABILITY: SPARE PART MANAGEMENT
 
Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013
 
Housing Repairs
Housing RepairsHousing Repairs
Housing Repairs
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
 
Gemba Kaizen for lean manufacturing chap3 | kaizen present guide | lean tools
Gemba Kaizen for lean manufacturing chap3 |  kaizen  present guide | lean tools Gemba Kaizen for lean manufacturing chap3 |  kaizen  present guide | lean tools
Gemba Kaizen for lean manufacturing chap3 | kaizen present guide | lean tools
 
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityReliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
 
Gemba Kaizen for lean manufacturing chap2 | kaizen collection of cases | lea...
Gemba Kaizen for lean manufacturing chap2  | kaizen collection of cases | lea...Gemba Kaizen for lean manufacturing chap2  | kaizen collection of cases | lea...
Gemba Kaizen for lean manufacturing chap2 | kaizen collection of cases | lea...
 
SPARE PARTS
SPARE PARTSSPARE PARTS
SPARE PARTS
 
Spare parts control for maintenance purposes
Spare parts control for maintenance purposesSpare parts control for maintenance purposes
Spare parts control for maintenance purposes
 

Ähnlich wie Tpm 02

Benchmarking for Superior Performance
Benchmarking for Superior PerformanceBenchmarking for Superior Performance
Benchmarking for Superior Performance
Operational Excellence Consulting
 
Continuous improvement smaic model
Continuous improvement smaic modelContinuous improvement smaic model
Continuous improvement smaic model
Mohit Singla
 
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Tim Kasse
 
Parts Engineering Grade Standard.pptx
Parts Engineering Grade Standard.pptxParts Engineering Grade Standard.pptx
Parts Engineering Grade Standard.pptx
riski164923
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
Guddu Ali
 

Ähnlich wie Tpm 02 (20)

Module 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations ManagementModule 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations Management
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...The metrics that matter using scalability metrics for project planning of a d...
The metrics that matter using scalability metrics for project planning of a d...
 
Om ibs-2
Om ibs-2Om ibs-2
Om ibs-2
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Benchmarking for Superior Performance
Benchmarking for Superior PerformanceBenchmarking for Superior Performance
Benchmarking for Superior Performance
 
Continuous improvement smaic model
Continuous improvement smaic modelContinuous improvement smaic model
Continuous improvement smaic model
 
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
 
Slides 2015 for contact 2
Slides 2015 for contact 2Slides 2015 for contact 2
Slides 2015 for contact 2
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
Tech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.pptTech 031 Unit 5pp.ppt
Tech 031 Unit 5pp.ppt
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
Parts Engineering Grade Standard.pptx
Parts Engineering Grade Standard.pptxParts Engineering Grade Standard.pptx
Parts Engineering Grade Standard.pptx
 
Six sigma
Six sigma Six sigma
Six sigma
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
chapter 7.ppt
chapter 7.pptchapter 7.ppt
chapter 7.ppt
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 

Mehr von PRAN-RFL Group (10)

Bangladesh All Mobile operators query short code.
Bangladesh All Mobile operators query short code.Bangladesh All Mobile operators query short code.
Bangladesh All Mobile operators query short code.
 
Ramadan management
Ramadan managementRamadan management
Ramadan management
 
PRAN AMCL COMPRESSED AIR SYSTEM
PRAN AMCL COMPRESSED AIR SYSTEMPRAN AMCL COMPRESSED AIR SYSTEM
PRAN AMCL COMPRESSED AIR SYSTEM
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Word order
Word orderWord order
Word order
 
Noun verses Verb
Noun verses Verb  Noun verses Verb
Noun verses Verb
 
N vs v
N vs vN vs v
N vs v
 
Fork lift training on 21th sep 13
Fork lift training on 21th sep 13Fork lift training on 21th sep 13
Fork lift training on 21th sep 13
 
Forklift training
Forklift trainingForklift training
Forklift training
 

Kürzlich hochgeladen

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Kürzlich hochgeladen (20)

Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

Tpm 02

  • 1. • Draw up Kaizen sheet and then confirm the result of loss reduction with comparison between before and after kaizen. • Revise Kaizen point of drawing, standard and working procedure • Draw up one point lessons about operator’s skill what was be clear through kaizen activity. • After kaizen activity, it needs to install visual control to necessary point. Productivity Management Office @
  • 2. Why – Why Analysis • This is an analysis that repeat why about 4M root causes of problem several times. 4M (Machine, Material, Method, Man) • First of all, investigate phenomenon and scene to find out cause of problem and then try to do why-why analysis. • It is useful not only for production field but also different field. • The important point for analysis is to be clear what is problem. • Examine human cause at the end of analysis. Productivity Management Office @
  • 3. PM Analysis phenomenon Contributing condition Physical viewing F3 is not zero 4M cause Vacuum area is small Vacuum power is small F1 is small less than standard Vacuum power is small less than falling power Lift aim can not pick up tray Gap of vacuum position Tray is heavy F2 is heavy more than standard Lifting power is small
  • 4. Part 5 Consulting Experience sharing Productivity Management Office @
  • 5. Zero concept and model Productivity Management Office @ • Zero model machine • Zero model line • Zero model area Zero machine failure Zero minor stops Zero quality defect Zero cleaning etc.
  • 6. Relationship between AM and others Autonomous maintenance 7steps • Step 0 Preparation • Step1 Initial cleaning • Step2 Countermeasures for source of contamination and hard to access. • Step3 Tentative CIL standard • Step4 General inspection • Step5 Autonomous inspection • Step6 Standardization • Step7 Autonomous management
  • 7. Planed maintenance for Zero failure Planed maintenance 7 Steps Step1 Recognition of current maintenance system Step2 Set up purpose, policy, target. Step3 Organization formation and clarification Step4 Clarification of implementation activities Step5 Study of specific implementation for each activity Step6 Plan farming for implementation with autonomous maintenance Stpep7 Result verification and establishment of maintenance system Productivity Management Office @
  • 8. Example of implementation activities 1. Support activity of Autonomous maintenance 2. Zero failure activity 3. Lubrication management activity 4. Spare parts management activity 5. Maintenance skill up and new technology activity 6. Maintenance cost down activity 7. Maintenance management system activity 8. Maintenance project management activity Visualize maintenance procedure Productivity Management Office @
  • 9. Kaizen scenario of sales growth • Cooperation is significant between sales and manufacturing • Can make but can not sale, can sale but can not make • Which production system is better A or B? • Which product is better for kaizen A or B? Sales Sales P2 P1 a b s 0 1 2 3 4 Productivity Management Office @ Contrary For cost Contrary For profit Opportunity loss Volume Opportunity loss
  • 10. Kaizen scenario of cost down • It should be improved difference of cost and aimed for Real standard cost. • It should be considered ideal standard cost (long term) and real standard cost (short term). Actual cost Productivity Management Office @ Standard cost Present standard cost Real standard cost Ideal standard cost Level3 : Target cost in future Level2n : Target cost after kaizen Target1 : Target cost at present = Actual cost – standard cost Actual loss (difference of cost)
  • 11. Loss analysis ( Loss tree ) • It makes clear loss structure and plan strategy. Productivity Management Office @ Past loss Forecast loss Past Opportunity loss Opportunity loss Production cost loss Production losses Production cost loss Indirect Production loss Claim loss Stock loss Sales Management loss Past loss
  • 12. Management of Kaizen theme • Team leader manages individual kaizen theme and Focused improvement subcommittee manage whole themes by matrix as below. Productivity Management Office @ Large theme Middle theme Small theme Initial Target Actual Parson Date of begin Date of end Achievement Theme 1 Theme1-1 Theme1-1-1 Theme1-1-2 Theme1-2 Theme1-2-1 Theme1-2-2 Theme1-2-3 Theme1-2-4 Theme1-3 Theme1-3-1 Theme1-3-2
  • 13. Part 6 overall Program Summary Productivity Management Office @
  • 14. Key of success 1. Clear TPM policy of top management 2. Alignment between Business plan and TPM plan 3. Management of plan, target and results 4. Priority themes and model activities 5. Incentive for full participation 6. Leadership of each level 7. Budget for TPM activity. Productivity Management Office @
  • 15. Tangible result of TPM ( Example) • P Value-added Productivity x1.5~ Number of Unexpected break down 1/100~ Overall equipment efficiency x1.5~ • Q Quality defect in process 1/10~ • Customer claim ¼~ • C Valuable cost down 30%~ • D Inventory ½ ~ • S Zero accident zero • Environmental pollution zero • M Turnover ½~
  • 16. TPM Award 1) Award for TPM Excellence, Category B The applicant must score a minimum of 70 points on 100-point Checklist C. 2) Award for TPM excellence category A The applicant must score minimum 70 points on 100 point checklist c 3) Award for excellence in consistent TPM commitment The applicant must score minimum 80 points on 100 point checklist c 4) Special award for TPM achievement The applicant must score minimum 70 points on 100 point checklist B 5) Advanced special awards for TPM achievement The applicant must score minimum 80 points on 100 point checklist A 6) Award for world class TPM achievement The applicant must score minimum 80 points on 100 point checklist S 1st Stage Assessment : May-July 201x 2nd Stage Assessment : October-December 201x +
  • 17. • Checklist C example TPM policies and objectives 1. 1. TPM policies are planned in relation between company policies and plant/factory policy 2. The relation between TPM target values and management target results are clear 3. The master plan is in an appropriate order as an action plan to achieve TPM 4. TPM policies and objectives are checked using method such as benchmarking that all sections of PQCDSME are displayed corresponding to 8 pillars 5. TPM policies and objectives are have been set forth and observed by all the departments