Six Alternative 
Construction Project 
Delivery Methods 
NOW AVAILABLE TO PUBLIC SECTOR OWNERS 
By Bo Calbert 
McCarthy Southwest Region President 
mccarthy.com 
bcalbert@mccarthy.com
THE WAY PUBLIC WORKS PROJECTS CAN 
BE BUILT AND FINANCED IS CHANGING.
Traditionally, the three stages — planning, design, and 
construction — have been independent and sequential. 
Builders bid on jobs based on designs already set in stone, and owners 
selected the lowest-bidder to bring the project to life.
But revised procurement laws adopted over 
the last few years have opened up new 
delivery methods for public projects like: 
SCHOOLS 
WATER/WASTEWATER 
TREATMENT PLANTS 
ROADS 
HIGHWAYS 
CORRECTIONS 
FACILITIES
… the new, alternative delivery methods 
include new benefits, such as: 
• Solutions for project 
financing 
• Cost guarantees earlier 
in the project 
• Efficiencies through 
collaboration between 
planners, designers and 
builders 
• Reduced financial risk 
• Building without 
needing to secure 
traditional financing 
• Building without using 
tax dollars at all
As a general contractor, 
one of the most critical 
roles McCarthy assumes 
is working together with 
our project owners to 
review all options when 
planning for the design 
and construction of 
new projects.
Here are alternative options 
FOR DELIVERY OF PUBLIC WORKS AND OTHER 
CONSTRUCTION PROJECTS
ONE Design-Build-Finance 
The hiring of a single builder that 
acts as a stand-alone designer, 
builder and financial lender.
ONE Design-Build-Finance 
Design-Build-Finance gives municipal 
institutions a viable financing alternative 
without the huge capital investment typically 
associated with plant construction.
ONE Design-Build-Finance 
Design-Build-Finance is the most preferred 
project delivery option for an owner who 
doesn’t qualify for traditional bond financing.
ONE Design-Build-Finance 
A common adopter: A municipal institution that 
operates a water/wastewater treatment plant. 
Design-Build: owner hires 
a builder that acts as the 
designer and the builder, 
with financing coming from 
a third party. Includes 
performance guarantees 
that help secure traditional 
funding. 
Design-Build-Operate: 
owner hires a builder that 
acts as the designer, builder 
and the ongoing operator 
of the plant/project, with 
financing coming from a 
third party. Includes pricing 
and performance guarantees 
that help attract traditional 
financing. 
TWO VARIATIONS:
ONE Design-Build-Finance 
Potential downsides to Design- 
Build-Finance, Design-Build, and 
Design-Build-Operate: Can result 
in difficulties for the owner to align 
the bridging documents and the 
design-builder proposal documents 
to best meet end-user needs.
TWO Public-Private Partnership (the toll-road model) 
Also known as P3, this is the method where a 
public-sector authority, say a state’s department 
of transportation, partners with a private party 
that assumes substantial financial, technical and 
operational risk of the project.
TWO Public-Private Partnership (the toll-road model) 
In some cases, like in a toll road, tax money is 
not used to build it, but rather the users of the 
facility pay to use it, leaving the public-sector 
party without the need to incur any borrowing.
TWO Public-Private Partnership (the toll-road model) 
Therefore, P3 is an “off-balance sheet” method 
of financing the delivery of new or refurbished 
public-sector assets.
Of all the delivery methods 
available today, P3 has the 
most potential to solve more 
problems and deal with the 
challenges associated with 
complex public projects. The 
challenge with P3s is that 
users often don’t like paying 
tolls and elected officials 
tend to avoid what can be 
seen as contrived financing.
THREE Job Order Contracting (JOC) 
Downsized public entities sometimes no longer 
have the manpower or resources to complete 
the kind of public infrastructure maintenance 
and repair work they once tackled in-house.
THREE Job Order Contracting (JOC) 
Job Order Contracting 
offers public owners 
an efficient way to 
outsource these types 
of projects that include 
work of a recurring 
nature, with indefinite 
delivery times, types 
and quantities of work.
FOUR Integrated Project Delivery (IPD) 
ONE OF THE NEWEST DELIVERY METHODS AVAILABLE TODAY… 
Integrated Project Delivery calls for significant 
collaboration early on in the project between 
the three major stakeholders — owner, designer 
and builder — where most value is created 
through the planning of efficiencies.
FOUR Integrated Project Delivery (IPD) 
IPD eliminates volumes of waste and promotes 
productivity by allowing for data sharing directly 
between the design and construction team.
Potential downside: there 
can be murky legal 
conundrums involved with 
intellectual property, 
ownership of collaboration 
software files, and issues 
surrounding team conflict 
on projects utilizing this 
delivery method.
FIVE Design-Assist 
Where design professionals work along-side 
construction contractors on the job 
site, to collaborate on the best solutions 
to meet all the owner’s needs.
FIVE Design-Assist 
The cooperation in the field between designers 
and builders streamlines the construction process 
and provides cost certainty earlier in the project.
SIX Construction Management-at-Risk (CM-at-Risk) 
With the CM-at-Risk model, the 
builder (the CM-at-Risk firm) is 
hired before the design phase is 
completed, and works with the 
separately hired design firm to 
provide constructive solutions 
that may be more cost effective, 
provide a better delivery schedule, 
and provide for the best long-term 
maintenance and 
operability of the facility.
SIX Construction Management-at-Risk (CM-at-Risk) 
The builder provides cost-estimating that matches 
the design and construction to the project budget.
CONCLUSION: 
Traditionally, builders bid on jobs based 
on designs already set in stone, and public 
owners selected the lowest responsive 
bidder, not the most qualified builder.
CONCLUSION 
BUT TODAY 
The construction industry is providing public 
owners with flexible alternative delivery methods.
CONCLUSION 
There is no “one size fits all” prescription 
when it comes to construction delivery. Each 
project is unique and often has a complex set 
of circumstances to consider before selecting a 
delivery method.
It takes a lot of 
training, insight 
and experience 
to get it right.
Owners should not be averse to opening up a 
dialogue with contractors and learning from their 
varied experiences — good and bad — with the 
wide array of delivery options.
We work with owners to explore available 
delivery methods and identify the best options 
for each unique project. We also work together 
with all parties in mastering the complexities 
involved in each delivery method.
Would you like to talk about alternative delivery 
methods that might be right for your project? 
CONTACT McCARTHY TODAY. 
A presentation by Robert “Bo” Calbert, President of McCarthy’s Southwest Region, 
based in Phoenix. Bo can be reached at bcalbert@mccarthy.com

Weitere ähnliche Inhalte

Was ist angesagt?

Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
Stacy Abernathy
 
Coutour & topography
Coutour & topographyCoutour & topography
Coutour & topography
JoyeeLee0131
 

Was ist angesagt? (20)

Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
Housing Policies- Lalit kumar
Housing Policies- Lalit kumarHousing Policies- Lalit kumar
Housing Policies- Lalit kumar
 
Thesis Orientation for Architecture Students (B. Arch.)
Thesis Orientation for Architecture Students (B. Arch.)Thesis Orientation for Architecture Students (B. Arch.)
Thesis Orientation for Architecture Students (B. Arch.)
 
Roman town planning
Roman town planningRoman town planning
Roman town planning
 
BELAPUR HOUSING
BELAPUR HOUSINGBELAPUR HOUSING
BELAPUR HOUSING
 
Indian Green Building Council Green Schools Rating
Indian Green Building Council Green Schools RatingIndian Green Building Council Green Schools Rating
Indian Green Building Council Green Schools Rating
 
Wall house
Wall houseWall house
Wall house
 
Changing of land use in wall city
Changing of land use in wall cityChanging of land use in wall city
Changing of land use in wall city
 
Lesson 2 town planning concepts
Lesson  2 town planning conceptsLesson  2 town planning concepts
Lesson 2 town planning concepts
 
Sustainable Architecture and Sustainable Cities
Sustainable Architecture and Sustainable CitiesSustainable Architecture and Sustainable Cities
Sustainable Architecture and Sustainable Cities
 
Coutour & topography
Coutour & topographyCoutour & topography
Coutour & topography
 
Garden city
Garden city Garden city
Garden city
 
Open system (open building)
Open system (open building)Open system (open building)
Open system (open building)
 
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & MaintainComparison of Design Bid Build vs. Design Build Finance Operate & Maintain
Comparison of Design Bid Build vs. Design Build Finance Operate & Maintain
 
STUDY NET ZERO ENERGY BUILDING
STUDY NET ZERO ENERGY BUILDINGSTUDY NET ZERO ENERGY BUILDING
STUDY NET ZERO ENERGY BUILDING
 
Low cost housing India
Low cost housing IndiaLow cost housing India
Low cost housing India
 
Case study
Case studyCase study
Case study
 
Plotted housing aniruddh jain 2.5
Plotted housing aniruddh jain 2.5Plotted housing aniruddh jain 2.5
Plotted housing aniruddh jain 2.5
 

Andere mochten auch

project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 
Integrated Project Delivery
Integrated Project DeliveryIntegrated Project Delivery
Integrated Project Delivery
Mike Purdy
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
jamesrobinsonjnr
 
Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)
Mwiza Helen
 
User interface – client / portal by Tor Gunnar Øverli
User interface – client / portal by Tor Gunnar ØverliUser interface – client / portal by Tor Gunnar Øverli
User interface – client / portal by Tor Gunnar Øverli
plan4business
 

Andere mochten auch (19)

project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Project delivery, what good looks like
Project delivery, what good looks likeProject delivery, what good looks like
Project delivery, what good looks like
 
Integrated Project Delivery
Integrated Project DeliveryIntegrated Project Delivery
Integrated Project Delivery
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Integrated Project and Solution Delivery And Business Engagement Model
Integrated Project and Solution Delivery And Business Engagement ModelIntegrated Project and Solution Delivery And Business Engagement Model
Integrated Project and Solution Delivery And Business Engagement Model
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
 
SMA presentation
SMA presentationSMA presentation
SMA presentation
 
Alternative Project Delivery Methods - OCPW
Alternative Project Delivery Methods - OCPWAlternative Project Delivery Methods - OCPW
Alternative Project Delivery Methods - OCPW
 
Innovative Design and Delivery Strategies
Innovative Design and Delivery StrategiesInnovative Design and Delivery Strategies
Innovative Design and Delivery Strategies
 
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
EN - SEGIS
EN - SEGISEN - SEGIS
EN - SEGIS
 
Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
 
Integrated project delivery for more effective development
Integrated project delivery for more effective developmentIntegrated project delivery for more effective development
Integrated project delivery for more effective development
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
User interface – client / portal by Tor Gunnar Øverli
User interface – client / portal by Tor Gunnar ØverliUser interface – client / portal by Tor Gunnar Øverli
User interface – client / portal by Tor Gunnar Øverli
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 

Ähnlich wie 6 Alternative Construction Project Delivery Methods

CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
ChassyTesoro1
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
Chris Nash
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
Tim McManus
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
Lilian Nwachukwu
 
Construction economic
Construction economicConstruction economic
Construction economic
fauziani
 

Ähnlich wie 6 Alternative Construction Project Delivery Methods (20)

Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Private and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamPrivate and Public Partnerships Move Mainstream
Private and Public Partnerships Move Mainstream
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
 
integrated-project-delivery-constru
integrated-project-delivery-construintegrated-project-delivery-constru
integrated-project-delivery-constru
 
ACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD PresentationACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD Presentation
 
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy pptCON_CONTRACTS_all_till_mid. bgf uggttyy ppt
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
Procurement in Focus - the pros and cons of various project delivery models
Procurement in Focus - the pros and cons of various project delivery modelsProcurement in Focus - the pros and cons of various project delivery models
Procurement in Focus - the pros and cons of various project delivery models
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
public private partnership
public private partnershippublic private partnership
public private partnership
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
M6 Toll Road Construction
M6 Toll Road ConstructionM6 Toll Road Construction
M6 Toll Road Construction
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
Construction economic
Construction economicConstruction economic
Construction economic
 

Kürzlich hochgeladen

👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
Sheetaleventcompany
 
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Laiba Pari
 
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
Apsara Of India
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Ifra Zohaib
 
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
rajveerescorts2022
 

Kürzlich hochgeladen (20)

chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...chittorgarh 💋  Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
chittorgarh 💋 Call Girl 9748763073 Call Girls in Chittorgarh Escort service ...
 
👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
👉 Amritsar Call Girls 👉📞 8725944379 👉📞 Just📲 Call Ruhi Call Girl Near Me Amri...
 
Vadodara 💋 Call Girl 9748763073 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 9748763073 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 9748763073 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 9748763073 Call Girls in Vadodara Escort service book now
 
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
 
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICEULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
 
Sri Ganganagar 💋 Call Girl 9748763073 Call Girls Escort service Ganganagar b...
Sri Ganganagar 💋 Call Girl 9748763073 Call Girls  Escort service Ganganagar b...Sri Ganganagar 💋 Call Girl 9748763073 Call Girls  Escort service Ganganagar b...
Sri Ganganagar 💋 Call Girl 9748763073 Call Girls Escort service Ganganagar b...
 
Call Girls Nagpur 💋Just Call WhatsApp 7870993772 Top Class Call Girl Service ...
Call Girls Nagpur 💋Just Call WhatsApp 7870993772 Top Class Call Girl Service ...Call Girls Nagpur 💋Just Call WhatsApp 7870993772 Top Class Call Girl Service ...
Call Girls Nagpur 💋Just Call WhatsApp 7870993772 Top Class Call Girl Service ...
 
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In motihari ❤ Low ...
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In motihari ❤ Low ...Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In motihari ❤ Low ...
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In motihari ❤ Low ...
 
Prince Armahs(Tinky) Brochure, for Funeral service
Prince Armahs(Tinky) Brochure, for Funeral servicePrince Armahs(Tinky) Brochure, for Funeral service
Prince Armahs(Tinky) Brochure, for Funeral service
 
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
 
AGARTALA CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
AGARTALA CALL GIRL 7857803690 LOW PRICE ESCORT SERVICEAGARTALA CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
AGARTALA CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
 
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Best Genuine Call Girl in Udaipur Escort Ser...
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
 
❤️Amritsar Call Girl☎️9815674956☎️ Call Girl service in Amritsar☎️ Amritsar C...
❤️Amritsar Call Girl☎️9815674956☎️ Call Girl service in Amritsar☎️ Amritsar C...❤️Amritsar Call Girl☎️9815674956☎️ Call Girl service in Amritsar☎️ Amritsar C...
❤️Amritsar Call Girl☎️9815674956☎️ Call Girl service in Amritsar☎️ Amritsar C...
 
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
Chandigarh Call Girls ☎ 9878799926✅ Just Genuine Call Call Girls Mohali 🧿Elit...
 
KANNUR CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE KANNUR
KANNUR CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE KANNURKANNUR CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE KANNUR
KANNUR CALL GIRL 9661985112 LOW PRICE ESCORT SERVICE KANNUR
 
NO ADVANCE PAYMENT ONLY CASH PAYMENT DIRECT MEETING GENUINE
NO ADVANCE PAYMENT ONLY CASH PAYMENT DIRECT MEETING GENUINENO ADVANCE PAYMENT ONLY CASH PAYMENT DIRECT MEETING GENUINE
NO ADVANCE PAYMENT ONLY CASH PAYMENT DIRECT MEETING GENUINE
 
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book nowJamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
 
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
❤️Zirakpur Escort Service☎️7837612180☎️ Call Girl service in Zirakpur☎️ Zirak...
 
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICENAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
NAGPUR ESCORT SERVICE 9262871154 LOW PRICE NAGPUR ESCORT SERVICE
 

6 Alternative Construction Project Delivery Methods

  • 1. Six Alternative Construction Project Delivery Methods NOW AVAILABLE TO PUBLIC SECTOR OWNERS By Bo Calbert McCarthy Southwest Region President mccarthy.com bcalbert@mccarthy.com
  • 2. THE WAY PUBLIC WORKS PROJECTS CAN BE BUILT AND FINANCED IS CHANGING.
  • 3. Traditionally, the three stages — planning, design, and construction — have been independent and sequential. Builders bid on jobs based on designs already set in stone, and owners selected the lowest-bidder to bring the project to life.
  • 4. But revised procurement laws adopted over the last few years have opened up new delivery methods for public projects like: SCHOOLS WATER/WASTEWATER TREATMENT PLANTS ROADS HIGHWAYS CORRECTIONS FACILITIES
  • 5. … the new, alternative delivery methods include new benefits, such as: • Solutions for project financing • Cost guarantees earlier in the project • Efficiencies through collaboration between planners, designers and builders • Reduced financial risk • Building without needing to secure traditional financing • Building without using tax dollars at all
  • 6. As a general contractor, one of the most critical roles McCarthy assumes is working together with our project owners to review all options when planning for the design and construction of new projects.
  • 7. Here are alternative options FOR DELIVERY OF PUBLIC WORKS AND OTHER CONSTRUCTION PROJECTS
  • 8. ONE Design-Build-Finance The hiring of a single builder that acts as a stand-alone designer, builder and financial lender.
  • 9. ONE Design-Build-Finance Design-Build-Finance gives municipal institutions a viable financing alternative without the huge capital investment typically associated with plant construction.
  • 10. ONE Design-Build-Finance Design-Build-Finance is the most preferred project delivery option for an owner who doesn’t qualify for traditional bond financing.
  • 11. ONE Design-Build-Finance A common adopter: A municipal institution that operates a water/wastewater treatment plant. Design-Build: owner hires a builder that acts as the designer and the builder, with financing coming from a third party. Includes performance guarantees that help secure traditional funding. Design-Build-Operate: owner hires a builder that acts as the designer, builder and the ongoing operator of the plant/project, with financing coming from a third party. Includes pricing and performance guarantees that help attract traditional financing. TWO VARIATIONS:
  • 12. ONE Design-Build-Finance Potential downsides to Design- Build-Finance, Design-Build, and Design-Build-Operate: Can result in difficulties for the owner to align the bridging documents and the design-builder proposal documents to best meet end-user needs.
  • 13. TWO Public-Private Partnership (the toll-road model) Also known as P3, this is the method where a public-sector authority, say a state’s department of transportation, partners with a private party that assumes substantial financial, technical and operational risk of the project.
  • 14. TWO Public-Private Partnership (the toll-road model) In some cases, like in a toll road, tax money is not used to build it, but rather the users of the facility pay to use it, leaving the public-sector party without the need to incur any borrowing.
  • 15. TWO Public-Private Partnership (the toll-road model) Therefore, P3 is an “off-balance sheet” method of financing the delivery of new or refurbished public-sector assets.
  • 16. Of all the delivery methods available today, P3 has the most potential to solve more problems and deal with the challenges associated with complex public projects. The challenge with P3s is that users often don’t like paying tolls and elected officials tend to avoid what can be seen as contrived financing.
  • 17. THREE Job Order Contracting (JOC) Downsized public entities sometimes no longer have the manpower or resources to complete the kind of public infrastructure maintenance and repair work they once tackled in-house.
  • 18. THREE Job Order Contracting (JOC) Job Order Contracting offers public owners an efficient way to outsource these types of projects that include work of a recurring nature, with indefinite delivery times, types and quantities of work.
  • 19. FOUR Integrated Project Delivery (IPD) ONE OF THE NEWEST DELIVERY METHODS AVAILABLE TODAY… Integrated Project Delivery calls for significant collaboration early on in the project between the three major stakeholders — owner, designer and builder — where most value is created through the planning of efficiencies.
  • 20. FOUR Integrated Project Delivery (IPD) IPD eliminates volumes of waste and promotes productivity by allowing for data sharing directly between the design and construction team.
  • 21. Potential downside: there can be murky legal conundrums involved with intellectual property, ownership of collaboration software files, and issues surrounding team conflict on projects utilizing this delivery method.
  • 22. FIVE Design-Assist Where design professionals work along-side construction contractors on the job site, to collaborate on the best solutions to meet all the owner’s needs.
  • 23. FIVE Design-Assist The cooperation in the field between designers and builders streamlines the construction process and provides cost certainty earlier in the project.
  • 24. SIX Construction Management-at-Risk (CM-at-Risk) With the CM-at-Risk model, the builder (the CM-at-Risk firm) is hired before the design phase is completed, and works with the separately hired design firm to provide constructive solutions that may be more cost effective, provide a better delivery schedule, and provide for the best long-term maintenance and operability of the facility.
  • 25. SIX Construction Management-at-Risk (CM-at-Risk) The builder provides cost-estimating that matches the design and construction to the project budget.
  • 26. CONCLUSION: Traditionally, builders bid on jobs based on designs already set in stone, and public owners selected the lowest responsive bidder, not the most qualified builder.
  • 27. CONCLUSION BUT TODAY The construction industry is providing public owners with flexible alternative delivery methods.
  • 28. CONCLUSION There is no “one size fits all” prescription when it comes to construction delivery. Each project is unique and often has a complex set of circumstances to consider before selecting a delivery method.
  • 29. It takes a lot of training, insight and experience to get it right.
  • 30. Owners should not be averse to opening up a dialogue with contractors and learning from their varied experiences — good and bad — with the wide array of delivery options.
  • 31. We work with owners to explore available delivery methods and identify the best options for each unique project. We also work together with all parties in mastering the complexities involved in each delivery method.
  • 32. Would you like to talk about alternative delivery methods that might be right for your project? CONTACT McCARTHY TODAY. A presentation by Robert “Bo” Calbert, President of McCarthy’s Southwest Region, based in Phoenix. Bo can be reached at bcalbert@mccarthy.com