Chapter 1
Project Management Fundamentals
Definition
 A project is a sequence of unique,complex,and connected activities that have
one goal or purpose and that must be completed by a specific time,
within budget, and according to specification
 An activity is a defined chunk of work.
 The activities in a project must be unique.
 Connectedness implies that there is a logical or technical relationship
between pairs of activities.
 Projects must have a single goal.
 Projects have a specified completion date.
 Projects also have resource limits,such as a limited amount of people,
money,or machines that are dedicated to the project.
 A program is a collection of related projects.Unlike projects, programs can
have many goals.
Five Constraints
 The following five constraints operate on every project:
 Scope
 Quality
 Cost
 Time
 Resources
Scope
 Scope is a statement that defines the boundaries of the
project. It tells not only what will be done but also what will
not be done. In the information systems industry, scope is
often referred to as a functional specification.In the engineering
profession, it is generally called a statement of work.
Quality
 The following two types of quality are part of every project:
 Product Quality
 Process Quality
Cost
 The dollar cost of doing the project. It is best thought of as
the budget that has been established for the project.The first
consideration occurs at an early and informal stage in the life
of a project.
Time
 The client specifies a time frame or deadline date within
which the project must be completed.To a certain extent,
cost and time are inversely related to one another.The time a
project takes to be completed can be reduced, but costs
increase as a result.
 Time is an interesting resource. It can’t be inventoried. It is
consumed whether you use it or not.
Resources
 Resources are assets such as people,equipment,physical facilities,or
inventory that have limited availabilities, can be scheduled, or
can be leased from an outside party
Scope Triangle as a System in
Balance
Scope and
Quality
Resources
Managing the Creeps
 Scope Creep
Scope creep is the term that has come to mean any change in the project that was not in the
original plan. Change is constant.To expect otherwise is simply unrealistic.
 Hope Creep
Hope creep happens when a project team member falls behind schedule but reports that he or
she is on schedule, hoping to get back on schedule by the next report date.
 Effort Creep
Effort creep is the result of the team member working but not making progress proportionate
to the work expended.
 Feature Creep
Closely related to scope creep is feature creep.Feature creep results when team members
arbitrarily add features and functions to the deliverable that they think the client
would want to have.
Applying the Scope Triangle
 The scope triangle will have at least two major applications:
 Scope Change Impact Analysis
 The major application of the scope triangle is as an aid in the preparation
of the Project Impact Statement.This is a statement of the alternative
ways of accommodating a particular scope change request of the client.
 Problem Resolution
 The scope triangle enables you to ask the question,‘‘Who owns what?’’
The answer will give you an escalation pathway from project team to
resource manager to client.The client and senior management own time,
budget, and resources.The project team owns how time, budget, and
resources are used.
The Importance of Classifying Projects
 Establishing a Rule for Classifying Projects
 Characteristics
 Type
 Clarity and completeness of goal – (Not discussed now)
Characteristics
 Many organizations choose to define a classification of projects based on
such project characteristics as the following:
 Risk —Establish levels of risk (high, medium, and low).
 Business value— Establish levels (high, medium, and low).
 Length— Establish several categories (such as 3 months, 3 to 6
months,6 to 12 months, and so on).
 Complexity—Establish categories (high, medium, and low).
 Technology used— Establish several categories (well-established,
used occasionally, used rarely, never used).
 Number of departments affected— Establish some categories (such
as one, a few, several, and all).
 Cost
Example of Project Classes and
Definitions
Classification by Project Type
 There are many situations in which an organization repeats
projects that are of the same type. Following are some
examples of project types:
 Installing software
 Recruiting and hiring
 Setting up hardware in a field office
 Soliciting, evaluating, and selecting vendors
 Updating a corporate procedure
 Developing application systems
Questions
1. Suppose the scope triangle were modified as follows: Resource Availability occupies
the center, and the three sides are Scope, Cost, and Schedule. Interpret this triangle
as if it were a system in balance. What is likely to happen when a specific resource on
your project is concurrently allocated to more and more projects? As project
manager, how would you deal with these situations? Be specific.
2. Where would you be able to bring about cost savings as a program
manager for a company? Discuss these using the standard project constraints.
3. Discuss ways in which scope creep occurred on projects with which you have been
associated.Was the project manager able to reverse
scope creep? Is it possible to reverse scope creep? Defend your yes or no answer.

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsNishant Munjal
 
2.project lifecycle
2.project lifecycle2.project lifecycle
2.project lifecyclerlabsza
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimationLibra chudry
 
EVM of Project Management...
EVM of Project Management...EVM of Project Management...
EVM of Project Management...Fahad Ali
 
post project review
post project reviewpost project review
post project reviewVinold John
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Financial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptFinancial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptIndranilGanguly21
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners Shenin Hassan
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planningmfarbstein
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management toolsNathan Petralia
 

Was ist angesagt? (20)

Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
2.project lifecycle
2.project lifecycle2.project lifecycle
2.project lifecycle
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimation
 
EVM of Project Management...
EVM of Project Management...EVM of Project Management...
EVM of Project Management...
 
Project termination
Project terminationProject termination
Project termination
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
Chap 3 Organization Structure
Chap 3 Organization StructureChap 3 Organization Structure
Chap 3 Organization Structure
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
post project review
post project reviewpost project review
post project review
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Ms Project 2010
Ms Project 2010Ms Project 2010
Ms Project 2010
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Financial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptFinancial Analysis for Project Management.ppt
Financial Analysis for Project Management.ppt
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 

Andere mochten auch

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Project Mgmt Fundamentals
Project Mgmt FundamentalsProject Mgmt Fundamentals
Project Mgmt FundamentalsChris Miller
 
"Fundamentals of Project Management" book summary
"Fundamentals of Project Management" book summary"Fundamentals of Project Management" book summary
"Fundamentals of Project Management" book summaryHuyHuang
 
Digital Project Management Fundamentals 01
Digital Project Management Fundamentals 01Digital Project Management Fundamentals 01
Digital Project Management Fundamentals 01Mark Wilson
 
Project Management Fundamentals Certificate of Completion
Project Management Fundamentals Certificate of CompletionProject Management Fundamentals Certificate of Completion
Project Management Fundamentals Certificate of CompletionSteve Payne
 
Smart grids Netbeheer Nederland - 6 maart 2012 final2
Smart grids Netbeheer Nederland - 6 maart 2012 final2Smart grids Netbeheer Nederland - 6 maart 2012 final2
Smart grids Netbeheer Nederland - 6 maart 2012 final2SKA
 
Een introductie in Programmamanagement
Een introductie in ProgrammamanagementEen introductie in Programmamanagement
Een introductie in ProgrammamanagementSKA
 
Programmamanagement
ProgrammamanagementProgrammamanagement
Programmamanagementbecha038
 
MSP Overview Paradigm Consulting Group PCGI
MSP Overview Paradigm Consulting Group PCGIMSP Overview Paradigm Consulting Group PCGI
MSP Overview Paradigm Consulting Group PCGIPCGI
 
A Program Management Approach to Business Continuity
A Program Management Approach to Business ContinuityA Program Management Approach to Business Continuity
A Program Management Approach to Business ContinuityBryghtpath LLC
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Fida Karim 🇵🇰
 
Testing for Marketing Campaign Success
Testing for Marketing Campaign SuccessTesting for Marketing Campaign Success
Testing for Marketing Campaign SuccessTimothy Nordvedt
 

Andere mochten auch (17)

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Project Mgmt Fundamentals
Project Mgmt FundamentalsProject Mgmt Fundamentals
Project Mgmt Fundamentals
 
"Fundamentals of Project Management" book summary
"Fundamentals of Project Management" book summary"Fundamentals of Project Management" book summary
"Fundamentals of Project Management" book summary
 
Digital Project Management Fundamentals 01
Digital Project Management Fundamentals 01Digital Project Management Fundamentals 01
Digital Project Management Fundamentals 01
 
Project management
Project managementProject management
Project management
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project Management Fundamentals Certificate of Completion
Project Management Fundamentals Certificate of CompletionProject Management Fundamentals Certificate of Completion
Project Management Fundamentals Certificate of Completion
 
Smart grids Netbeheer Nederland - 6 maart 2012 final2
Smart grids Netbeheer Nederland - 6 maart 2012 final2Smart grids Netbeheer Nederland - 6 maart 2012 final2
Smart grids Netbeheer Nederland - 6 maart 2012 final2
 
Een introductie in Programmamanagement
Een introductie in ProgrammamanagementEen introductie in Programmamanagement
Een introductie in Programmamanagement
 
Programmamanagement
ProgrammamanagementProgrammamanagement
Programmamanagement
 
MSP Overview Paradigm Consulting Group PCGI
MSP Overview Paradigm Consulting Group PCGIMSP Overview Paradigm Consulting Group PCGI
MSP Overview Paradigm Consulting Group PCGI
 
A Program Management Approach to Business Continuity
A Program Management Approach to Business ContinuityA Program Management Approach to Business Continuity
A Program Management Approach to Business Continuity
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...
 
Testing for Marketing Campaign Success
Testing for Marketing Campaign SuccessTesting for Marketing Campaign Success
Testing for Marketing Campaign Success
 
Seed Funding Strategies
Seed Funding StrategiesSeed Funding Strategies
Seed Funding Strategies
 
Water Fall Model
Water Fall ModelWater Fall Model
Water Fall Model
 

Ähnlich wie project management fundamentals Chapter 1

1. project Management
1. project Management 1. project Management
1. project Management chhassan7
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your CruzIbarra161
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxAASTHA76
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project ManagementMostafa Ewees
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Cmgt410
Cmgt410Cmgt410
Cmgt4107Fase1
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 
PROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxPROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxBimsaraRotaract
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningAmr E. Mohamed
 
Software engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharmaSoftware engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharmaVishnu Sharma
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptxMIANMNADEEM
 

Ähnlich wie project management fundamentals Chapter 1 (20)

1. project Management
1. project Management 1. project Management
1. project Management
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project Management
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 
Project management
Project managementProject management
Project management
 
PROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxPROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptx
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Ch23
Ch23Ch23
Ch23
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project Planning
 
Software engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharmaSoftware engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharma
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
 

Mehr von Mazhar Poohlah

Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Orgnaization and controlling
Orgnaization and controllingOrgnaization and controlling
Orgnaization and controllingMazhar Poohlah
 
Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Research Method EMBA chapter 14
Research Method EMBA chapter 14Research Method EMBA chapter 14
Research Method EMBA chapter 14Mazhar Poohlah
 
Research Method EMBA chapter 12
Research Method EMBA chapter 12Research Method EMBA chapter 12
Research Method EMBA chapter 12Mazhar Poohlah
 
Research Method EMBA chapter 11
Research Method EMBA chapter 11Research Method EMBA chapter 11
Research Method EMBA chapter 11Mazhar Poohlah
 
Research Method EMBA chapter 10
Research Method EMBA chapter 10Research Method EMBA chapter 10
Research Method EMBA chapter 10Mazhar Poohlah
 
Research Method EMBA chapter 6
Research Method EMBA chapter 6Research Method EMBA chapter 6
Research Method EMBA chapter 6Mazhar Poohlah
 
Research Method EMBA chapter 5
Research Method EMBA chapter 5Research Method EMBA chapter 5
Research Method EMBA chapter 5Mazhar Poohlah
 
Research Method EMBA chapter 4
Research Method EMBA chapter 4Research Method EMBA chapter 4
Research Method EMBA chapter 4Mazhar Poohlah
 
Research method EMBA chapter 3
Research method EMBA chapter 3Research method EMBA chapter 3
Research method EMBA chapter 3Mazhar Poohlah
 
Research method EMBA chapter 2
Research method EMBA chapter 2Research method EMBA chapter 2
Research method EMBA chapter 2Mazhar Poohlah
 
Research method EMBA chapter 1
Research method EMBA  chapter 1Research method EMBA  chapter 1
Research method EMBA chapter 1Mazhar Poohlah
 
3. traditional project management - ch3
3. traditional project management - ch33. traditional project management - ch3
3. traditional project management - ch3Mazhar Poohlah
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2Mazhar Poohlah
 

Mehr von Mazhar Poohlah (20)

Market analysis
Market analysisMarket analysis
Market analysis
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Orgnaization and controlling
Orgnaization and controllingOrgnaization and controlling
Orgnaization and controlling
 
Marketing concept
Marketing conceptMarketing concept
Marketing concept
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Business enviornment
Business enviornmentBusiness enviornment
Business enviornment
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Research Method EMBA chapter 14
Research Method EMBA chapter 14Research Method EMBA chapter 14
Research Method EMBA chapter 14
 
Research Method EMBA chapter 12
Research Method EMBA chapter 12Research Method EMBA chapter 12
Research Method EMBA chapter 12
 
Research Method EMBA chapter 11
Research Method EMBA chapter 11Research Method EMBA chapter 11
Research Method EMBA chapter 11
 
Research Method EMBA chapter 10
Research Method EMBA chapter 10Research Method EMBA chapter 10
Research Method EMBA chapter 10
 
Research Method EMBA chapter 6
Research Method EMBA chapter 6Research Method EMBA chapter 6
Research Method EMBA chapter 6
 
Research Method EMBA chapter 5
Research Method EMBA chapter 5Research Method EMBA chapter 5
Research Method EMBA chapter 5
 
Research Method EMBA chapter 4
Research Method EMBA chapter 4Research Method EMBA chapter 4
Research Method EMBA chapter 4
 
Research method EMBA chapter 3
Research method EMBA chapter 3Research method EMBA chapter 3
Research method EMBA chapter 3
 
Research method EMBA chapter 2
Research method EMBA chapter 2Research method EMBA chapter 2
Research method EMBA chapter 2
 
Research method EMBA chapter 1
Research method EMBA  chapter 1Research method EMBA  chapter 1
Research method EMBA chapter 1
 
3. traditional project management - ch3
3. traditional project management - ch33. traditional project management - ch3
3. traditional project management - ch3
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 

Kürzlich hochgeladen

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 

Kürzlich hochgeladen (20)

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 

project management fundamentals Chapter 1

  • 2. Definition  A project is a sequence of unique,complex,and connected activities that have one goal or purpose and that must be completed by a specific time, within budget, and according to specification  An activity is a defined chunk of work.  The activities in a project must be unique.  Connectedness implies that there is a logical or technical relationship between pairs of activities.  Projects must have a single goal.  Projects have a specified completion date.  Projects also have resource limits,such as a limited amount of people, money,or machines that are dedicated to the project.  A program is a collection of related projects.Unlike projects, programs can have many goals.
  • 3. Five Constraints  The following five constraints operate on every project:  Scope  Quality  Cost  Time  Resources
  • 4. Scope  Scope is a statement that defines the boundaries of the project. It tells not only what will be done but also what will not be done. In the information systems industry, scope is often referred to as a functional specification.In the engineering profession, it is generally called a statement of work.
  • 5. Quality  The following two types of quality are part of every project:  Product Quality  Process Quality
  • 6. Cost  The dollar cost of doing the project. It is best thought of as the budget that has been established for the project.The first consideration occurs at an early and informal stage in the life of a project.
  • 7. Time  The client specifies a time frame or deadline date within which the project must be completed.To a certain extent, cost and time are inversely related to one another.The time a project takes to be completed can be reduced, but costs increase as a result.  Time is an interesting resource. It can’t be inventoried. It is consumed whether you use it or not.
  • 8. Resources  Resources are assets such as people,equipment,physical facilities,or inventory that have limited availabilities, can be scheduled, or can be leased from an outside party
  • 9. Scope Triangle as a System in Balance Scope and Quality Resources
  • 10. Managing the Creeps  Scope Creep Scope creep is the term that has come to mean any change in the project that was not in the original plan. Change is constant.To expect otherwise is simply unrealistic.  Hope Creep Hope creep happens when a project team member falls behind schedule but reports that he or she is on schedule, hoping to get back on schedule by the next report date.  Effort Creep Effort creep is the result of the team member working but not making progress proportionate to the work expended.  Feature Creep Closely related to scope creep is feature creep.Feature creep results when team members arbitrarily add features and functions to the deliverable that they think the client would want to have.
  • 11. Applying the Scope Triangle  The scope triangle will have at least two major applications:  Scope Change Impact Analysis  The major application of the scope triangle is as an aid in the preparation of the Project Impact Statement.This is a statement of the alternative ways of accommodating a particular scope change request of the client.  Problem Resolution  The scope triangle enables you to ask the question,‘‘Who owns what?’’ The answer will give you an escalation pathway from project team to resource manager to client.The client and senior management own time, budget, and resources.The project team owns how time, budget, and resources are used.
  • 12. The Importance of Classifying Projects  Establishing a Rule for Classifying Projects  Characteristics  Type  Clarity and completeness of goal – (Not discussed now)
  • 13. Characteristics  Many organizations choose to define a classification of projects based on such project characteristics as the following:  Risk —Establish levels of risk (high, medium, and low).  Business value— Establish levels (high, medium, and low).  Length— Establish several categories (such as 3 months, 3 to 6 months,6 to 12 months, and so on).  Complexity—Establish categories (high, medium, and low).  Technology used— Establish several categories (well-established, used occasionally, used rarely, never used).  Number of departments affected— Establish some categories (such as one, a few, several, and all).  Cost
  • 14. Example of Project Classes and Definitions
  • 15. Classification by Project Type  There are many situations in which an organization repeats projects that are of the same type. Following are some examples of project types:  Installing software  Recruiting and hiring  Setting up hardware in a field office  Soliciting, evaluating, and selecting vendors  Updating a corporate procedure  Developing application systems
  • 16. Questions 1. Suppose the scope triangle were modified as follows: Resource Availability occupies the center, and the three sides are Scope, Cost, and Schedule. Interpret this triangle as if it were a system in balance. What is likely to happen when a specific resource on your project is concurrently allocated to more and more projects? As project manager, how would you deal with these situations? Be specific. 2. Where would you be able to bring about cost savings as a program manager for a company? Discuss these using the standard project constraints. 3. Discuss ways in which scope creep occurred on projects with which you have been associated.Was the project manager able to reverse scope creep? Is it possible to reverse scope creep? Defend your yes or no answer.