Title of Presentation :- Steel Structures (Trusses)
• Location – Badnera Railway Junction
 By Mayur .U. Rahangdale
Department Of Civil Engineering
PRMIT &R, Badnera,
Amravati
Steel Structural :-
• The aim of design of steel structure consists of framing and
proportioning its various members in such a way that the required
strength ,stiffness and stability are obtained at minimum possible
cost.
• The steel members posses high strength. These can resist high loads
with comparatively light weight and smaller dimensions.
Roof Truss :-
• Roof trusses are supposed to resist in a plane loading by developing axial
forces i.e., tension and compression in the component members.
• All joints are assumed to be hinged and loads are applied at joints only.
King Post Truss:-
Components of king post truss:-
1.Principle Rafter
2.Strut
3.Tie beam
4.Gusset plate
5.Purlin
6.King post
Principle Rafter :-
• It is defined as the upper diagonal member of roof truss supporting
the purlins and common rafters or those joint to which the roof
boarding is secured.
• It supports to the purlins on which the common rafters rest.
• They are mainly compression member and may be subjected to shear
and bending moment, if the purlins are not placed at nodal points.
Strut:-
• It is a forming member of a framework design to resist compression.
• It is generally inclined member of truss which connect to the tie
beam.
Tie beam:-
• It is defined as a horizontal beam connecting two rafters of a roof
truss.
• It helps to resist the spreading of the rafters.
Gusset plate :-
• It is a plate provided to make connections at the place where more than
one members is to be jointed.
• Eg. Joint of truss , truss girders etc
• The size and shape of the gusset plate are usually decided from the
direction of member meeting at the joint.
• Minimum thickness of gusset plate is 12 mm
Purlins:-
• Purlins are beams provided over trusses to support the roofing
between the adjacent trusses.
• These are placed in a tilted position over the principle rafters of the
trusses.
• Channel and angle section are commonly used as purlins.
King Post :-
• It is defined as upright post in centre of the roof truss ,extending from
the tie beam to the apex of truss.
• It is the vertical member of the truss, occupying the central position
of truss.
Connections:-
• Connection are used to connect the various elements of steel
structure.
• The ultimate aim of connection design is to produce a joint.
• Connections can be classified as,
1. Riveted Connections
2. Bolted Connections
3. Welded Connections
Riveted Connections:-
• Rivet is made up of round ductile steel bar piece called shank, with a head at
one end. The head can be of different shapes.
• Sizes of rivet is the diameter of shank.
• Nominal diameter of rivet= diameter of shank.
Bolted Connections:-
• A bolt is a metal pin with a head at one end and a shank threaded at
the other end to receive a nut.
• The holes made for placing the bolts in the joints may be either
drilled or punched.
Welded Connections:-
• Welding is the process of joining two pieces of metals by creating a
strong metallurgical bond between them by heating or pressure.
• Welding offers many advantages over bolting and riveting. When two
structural member are joined by means of welds, the connection is
called the welded connections.
Pinned Joint:-
• A pinned joint is one degree of freedom kinematics pair used in
mechanisms.
• It provide single axis rotation function used in many places such as
door hinges, folding mechanism, foot bridge and other uniaxial
rotation devices.
• It is also known as revolute joint or hinged joint.
Laced Column:-
• To achieve maximum value of minimum radius of gyration, without
increasing the area of section, number of element {i.e., channels} are placed
away from the principal axis using suitable lateral systems.
• This lateral systems are lacing.
• In bolted connection ,the minimum width of lacing bars shall be three times
the nominal diameter of bolt.
Battens Column:-
• Batten column have same strength as laced column, but are uneconomical
and are used therefore rarely.
• Battens are plates used to connect the main components of compression
members.
Column Bases:-
• Steel column are normally supported over concrete blocks. However, when
the loads supported by these column are large and the bearing pressure of
concrete from below is insufficient to resist the loads, they may fail.
• Therefore, it is a normal practice to distribute the column loads to steel
base plates which are placed over these concrete blocks, column bases are
primarily subjected bearing pressure from below and bending moment and
shear force.
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

footing
footingfooting
footing
illpa
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
9833356555
 

Was ist angesagt? (20)

footing
footingfooting
footing
 
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
DESIGN OF CONNECTIONS IN STEEL  STRUCTURE   DESIGN OF CONNECTIONS IN STEEL  STRUCTURE
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
Pre stressed concrete construction
Pre stressed concrete constructionPre stressed concrete construction
Pre stressed concrete construction
 
Design of steel structures Introduction
Design of steel structures IntroductionDesign of steel structures Introduction
Design of steel structures Introduction
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
 
UNIT-1 PSC.pptx
UNIT-1 PSC.pptxUNIT-1 PSC.pptx
UNIT-1 PSC.pptx
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
various connection of steel structure
various connection of steel structurevarious connection of steel structure
various connection of steel structure
 
L- beams or flanged beams
L- beams or flanged beamsL- beams or flanged beams
L- beams or flanged beams
 
Losses in prestressed concrete
Losses in prestressed concreteLosses in prestressed concrete
Losses in prestressed concrete
 
Roof truss
Roof trussRoof truss
Roof truss
 
Prestressed Concrete Structures
Prestressed Concrete Structures Prestressed Concrete Structures
Prestressed Concrete Structures
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURES
 
Steel structures
Steel structuresSteel structures
Steel structures
 

Ähnlich wie Steel Structure Design

Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignment
hailnur1794
 
BCM VI Market survey.pdf
BCM VI Market survey.pdfBCM VI Market survey.pdf
BCM VI Market survey.pdf
SrushtiKitukale
 

Ähnlich wie Steel Structure Design (20)

Presentation 4 - Bolted and Welded Connections.pptx
Presentation 4 - Bolted and Welded Connections.pptxPresentation 4 - Bolted and Welded Connections.pptx
Presentation 4 - Bolted and Welded Connections.pptx
 
TRUSS 2020.pptx
TRUSS 2020.pptxTRUSS 2020.pptx
TRUSS 2020.pptx
 
Item of work truss
Item of work truss Item of work truss
Item of work truss
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Steel connections in steel structure
Steel connections in steel structureSteel connections in steel structure
Steel connections in steel structure
 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Type Of Connection
Type Of Connection Type Of Connection
Type Of Connection
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Steel Roof Truss
Steel Roof TrussSteel Roof Truss
Steel Roof Truss
 
Multi storey frames
Multi storey framesMulti storey frames
Multi storey frames
 
CIV3004_v02 Modulem modules download ppt 1.pptx
CIV3004_v02 Modulem modules download ppt 1.pptxCIV3004_v02 Modulem modules download ppt 1.pptx
CIV3004_v02 Modulem modules download ppt 1.pptx
 
Ppt
PptPpt
Ppt
 
Ms frame and truss ppt
Ms frame and truss pptMs frame and truss ppt
Ms frame and truss ppt
 
Industrial construction
Industrial constructionIndustrial construction
Industrial construction
 
Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignment
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Steel framed building Shrilkant
Steel framed building  ShrilkantSteel framed building  Shrilkant
Steel framed building Shrilkant
 
Structural steel
Structural steelStructural steel
Structural steel
 
BCM VI Market survey.pdf
BCM VI Market survey.pdfBCM VI Market survey.pdf
BCM VI Market survey.pdf
 

Mehr von Mayur Rahangdale

Update Project Progress (MS PROJECT)
Update Project Progress (MS PROJECT)Update Project Progress (MS PROJECT)
Update Project Progress (MS PROJECT)
Mayur Rahangdale
 
RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)
Mayur Rahangdale
 
Water Absorption of Bricks
Water Absorption of BricksWater Absorption of Bricks
Water Absorption of Bricks
Mayur Rahangdale
 
Tests on Plywood (Tensile Test)
Tests on Plywood (Tensile Test)Tests on Plywood (Tensile Test)
Tests on Plywood (Tensile Test)
Mayur Rahangdale
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Mayur Rahangdale
 

Mehr von Mayur Rahangdale (20)

Update Project Progress (MS PROJECT)
Update Project Progress (MS PROJECT)Update Project Progress (MS PROJECT)
Update Project Progress (MS PROJECT)
 
RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)
 
Linear Equation in one variable.pptx
Linear Equation in one variable.pptxLinear Equation in one variable.pptx
Linear Equation in one variable.pptx
 
Water Absorption of Bricks
Water Absorption of BricksWater Absorption of Bricks
Water Absorption of Bricks
 
Tests on Plywood (Tensile Test)
Tests on Plywood (Tensile Test)Tests on Plywood (Tensile Test)
Tests on Plywood (Tensile Test)
 
Water quality monitoring in a smart city based on IOT
Water quality monitoring in a smart city based on IOTWater quality monitoring in a smart city based on IOT
Water quality monitoring in a smart city based on IOT
 
Gps and its use in vehicle movement study in earthquake disaster management r...
Gps and its use in vehicle movement study in earthquake disaster management r...Gps and its use in vehicle movement study in earthquake disaster management r...
Gps and its use in vehicle movement study in earthquake disaster management r...
 
GPS and its use in vehicle movement study in Earthquake Disaster Management
GPS and its use in vehicle movement study in Earthquake Disaster ManagementGPS and its use in vehicle movement study in Earthquake Disaster Management
GPS and its use in vehicle movement study in Earthquake Disaster Management
 
Gannt chart of building by MS Project (VJTI MUMBAI)
Gannt chart of building by MS Project (VJTI MUMBAI)Gannt chart of building by MS Project (VJTI MUMBAI)
Gannt chart of building by MS Project (VJTI MUMBAI)
 
Planning and scheduling of industrial building (VJTI MUMBAI)
Planning and scheduling of industrial building (VJTI MUMBAI)Planning and scheduling of industrial building (VJTI MUMBAI)
Planning and scheduling of industrial building (VJTI MUMBAI)
 
Project Management Information System (VJTI MUMBAI)
Project Management Information System (VJTI MUMBAI)Project Management Information System (VJTI MUMBAI)
Project Management Information System (VJTI MUMBAI)
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
 
Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
 
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
A Case Study of Existing Institutional Building for Assessment and Repair (VJ...
 
Organization structure tata Steel (VJTI MUMBAI)
Organization structure tata Steel (VJTI MUMBAI)Organization structure tata Steel (VJTI MUMBAI)
Organization structure tata Steel (VJTI MUMBAI)
 
Linear Regression Analysis method of Forecasting ,:- Management principle and...
Linear Regression Analysis method of Forecasting ,:- Management principle and...Linear Regression Analysis method of Forecasting ,:- Management principle and...
Linear Regression Analysis method of Forecasting ,:- Management principle and...
 
G cans project report
G cans project reportG cans project report
G cans project report
 
Civil engineering Seminar on G cans project japan.
Civil engineering Seminar on G cans project japan.Civil engineering Seminar on G cans project japan.
Civil engineering Seminar on G cans project japan.
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Steel Structure Design

  • 1. Title of Presentation :- Steel Structures (Trusses) • Location – Badnera Railway Junction  By Mayur .U. Rahangdale Department Of Civil Engineering PRMIT &R, Badnera, Amravati
  • 2. Steel Structural :- • The aim of design of steel structure consists of framing and proportioning its various members in such a way that the required strength ,stiffness and stability are obtained at minimum possible cost. • The steel members posses high strength. These can resist high loads with comparatively light weight and smaller dimensions.
  • 3. Roof Truss :- • Roof trusses are supposed to resist in a plane loading by developing axial forces i.e., tension and compression in the component members. • All joints are assumed to be hinged and loads are applied at joints only.
  • 4. King Post Truss:- Components of king post truss:- 1.Principle Rafter 2.Strut 3.Tie beam 4.Gusset plate 5.Purlin 6.King post
  • 5. Principle Rafter :- • It is defined as the upper diagonal member of roof truss supporting the purlins and common rafters or those joint to which the roof boarding is secured. • It supports to the purlins on which the common rafters rest. • They are mainly compression member and may be subjected to shear and bending moment, if the purlins are not placed at nodal points.
  • 6. Strut:- • It is a forming member of a framework design to resist compression. • It is generally inclined member of truss which connect to the tie beam.
  • 7. Tie beam:- • It is defined as a horizontal beam connecting two rafters of a roof truss. • It helps to resist the spreading of the rafters.
  • 8. Gusset plate :- • It is a plate provided to make connections at the place where more than one members is to be jointed. • Eg. Joint of truss , truss girders etc • The size and shape of the gusset plate are usually decided from the direction of member meeting at the joint. • Minimum thickness of gusset plate is 12 mm
  • 9. Purlins:- • Purlins are beams provided over trusses to support the roofing between the adjacent trusses. • These are placed in a tilted position over the principle rafters of the trusses. • Channel and angle section are commonly used as purlins.
  • 10. King Post :- • It is defined as upright post in centre of the roof truss ,extending from the tie beam to the apex of truss. • It is the vertical member of the truss, occupying the central position of truss.
  • 11. Connections:- • Connection are used to connect the various elements of steel structure. • The ultimate aim of connection design is to produce a joint. • Connections can be classified as, 1. Riveted Connections 2. Bolted Connections 3. Welded Connections
  • 12. Riveted Connections:- • Rivet is made up of round ductile steel bar piece called shank, with a head at one end. The head can be of different shapes. • Sizes of rivet is the diameter of shank. • Nominal diameter of rivet= diameter of shank.
  • 13. Bolted Connections:- • A bolt is a metal pin with a head at one end and a shank threaded at the other end to receive a nut. • The holes made for placing the bolts in the joints may be either drilled or punched.
  • 14. Welded Connections:- • Welding is the process of joining two pieces of metals by creating a strong metallurgical bond between them by heating or pressure. • Welding offers many advantages over bolting and riveting. When two structural member are joined by means of welds, the connection is called the welded connections.
  • 15. Pinned Joint:- • A pinned joint is one degree of freedom kinematics pair used in mechanisms. • It provide single axis rotation function used in many places such as door hinges, folding mechanism, foot bridge and other uniaxial rotation devices. • It is also known as revolute joint or hinged joint.
  • 16. Laced Column:- • To achieve maximum value of minimum radius of gyration, without increasing the area of section, number of element {i.e., channels} are placed away from the principal axis using suitable lateral systems. • This lateral systems are lacing. • In bolted connection ,the minimum width of lacing bars shall be three times the nominal diameter of bolt.
  • 17. Battens Column:- • Batten column have same strength as laced column, but are uneconomical and are used therefore rarely. • Battens are plates used to connect the main components of compression members.
  • 18. Column Bases:- • Steel column are normally supported over concrete blocks. However, when the loads supported by these column are large and the bearing pressure of concrete from below is insufficient to resist the loads, they may fail. • Therefore, it is a normal practice to distribute the column loads to steel base plates which are placed over these concrete blocks, column bases are primarily subjected bearing pressure from below and bending moment and shear force.