1. RESUME
MATIAS NOYOLA MORAN
Villa Yarana 3150, Col. Villas Loreto
Cd. Juárez 32465, Chih.
RFC: NOMM 630201 493
Tel. 682 07 81.
Cel. 044 656 299 99 91.
e-mail: nuevosolterode48@gmail.com
WORKING EXPERIENCE
Jul 2015 to date IIMCO/Davol Surgical.
Automation Engineer.
Responsible of
Installation of automation equipment for:
Cateter Production Line.
Mix Preparation Room
Distillation Unit
Tank Farm.
Sensors, drives, motors, transmitters, control panels. All of them in
Class1 Div1 Explsion proof area
Mar 2014 to Jun 2015 FEDERAL MOGUL LIGHTING
Manufacturing - Process Engineer
Startup for LED automotive ambient illumination project
Responsible for first runs to validate: Product, tooling, processes,
and Technical and operative personal training
Responsible for automated equipment start up
Develop visual, aids, procedures, Lay out, PFMEA, assembly
boards, test tables, work instructions, setup records, measuring
devices calibration, consumables requirement definition.
Manufacturing Engineer
Resposible for:
Avilla, In. Plant transfer to Juarez, automated assembly machines
Machine startup and optimation.
Acceptance for machine, processes and products.
Develop work and maintenance instructions
Setup for spare parts and maintenance plans.
Training technical and operating personell responsible
Dec 2012 to March 2014 GRUPO DEKKO MEXICO S.A. DE C.V
Process Engineer – Controls Specialist
Problem Solving
New process or test station design and acquisition.
Process and test stations improvement
Responsible to keep all automated equipment running by keeping
the back up files, programs, interfaces, spares and training for
support technicians.
Problem solving to attend critical conditions regarding Scrap,
Downtime, Cycle time, (KPI), by investigating and root causes
elimination.
Create specifications for new test or process stations.
Acquisition, preaceptance and production floor delivery for new
stations.
M. Noyola Resume 1 of 6
2. Poka yoke design and installation
Safety Issues solving by stations modification
Saving proyects development
May 2012 to Nov 2012 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
Electromechanical Process Engineer
Specialist in the following processes
Laser welding, Screwing, Depaneling
Responsible for maintenance, develop specifications, purchase new
equipment, process improvement, installation for new equipoment.
Responsible to get results based on yearly plant target regarding:
Cycle Time.
Scrap.
Down Time.
Spare parts spending.
Lines attended: Air Bag (AB) and Ultrasonic Sensors (USS)
Jul 2010 to Apr 2012 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
Electromechanical Process Engineer in four IBOLT SENSOR
LINES
Responsible for maintenance, quality, continous improvement,
failure root causes elimination, lines optimizatoin develop.
Shainin specialist.
To achieve savings by detecting and eliminating root cause for the
main quality problem saving:
MAIN SAVINGS
Voltaje calibration: 70 K Usd
Venturi cleaning system implementation: 107 K Usd
Ball Plungers elimination: 32 K Usd
Jun 2009 to Jun 2010 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
Electromechanical Process Engineer
Responsible for specify, select & purchase equipment for a high
automated assembly line to build Peripherical Acceleration
Sensors.
Develop test and preaceptation for the process stations and the
whole line.
Installation, setup and tune up for line.
Design and manage validation production runs.
Release and deliver the line for production.
Continuos improving
Maintenance managing
Jan 2008 to May 2009 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
Controls Engineer.
Management for control software and hardware on automation
manufacturing equipment.
Improving for running automated manufacturing machines.
Supply the first response in the event of controls failure.
Work in cooperation with other departments to attend automation
needs.
Developing projects about automation stations.
Sep 2006 to Dec 2007 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
New and Transfer Lines Engineer
New Lines acquisition and transferring.
Design, specification purchasing, validation for new
electromechanical process stations.
Lines transferring.
On supplier site pre-aceptance inspection, test and validation for
lines or stations.
Installing, starting, tuning up, validation and improving for new
and transferred lines.
Technical documentation developing for line delivery to
M. Noyola Resume 2 of 6
3. maintenance department.
Jan 2006 to Aug 2006 ROBERT BOSCH SISTEMAS AUTOMOTRICES SA, DE CV.
Electromechanical Process Engineer.
New process workstations specification and selection.
New workstation process validation.
Running workstations improving
Nov 99 to Dec 2005 INSTRUMENTACIÓN Y CONTROL
Juárez Chih.
Self employee.
Automation projects development involving the following roles:
Design, supply, engineering, commissioning and start up, after
sales service, training and maintenance.
Most relevant developed jobs relation attached.
SCHOOL
81-85 ELECTRICAL ENGINEERING
Specialty: Control and Automation
Escuela Superior de Ingeniería Mecánica y Eléctrica
INSTITUTO POLITÉCNICO NACIONAL
México D.F.
78-81 CECYT 2 / I.P.N.
Bachillerato en Ciencias Físico Matemáticas
Specialty: Industrial Drawing Middle Technician
2004-2005 FEDERACION MEXICANA DE FUTBOL
Professional Soccer Technical Director
TRAINING COURSES
Mzo 2012 Thermoplastic Laser Welding
Laser Welding plastic to plastic
Robert Bosch Fabrica madrid
Feb 2012 Trumpf Metal Laser Welding
Laser Welding Metak to Metal
Trumpf Laser Systems.
Schramberg Germany
Mar 2011 Shainin Solving Problems Technics.
Problem solving and root cause elimination based in Shainin
Method
Robert Bosch
Juarez, Mex
Ene 2011 Analisis de Causa Raiz
Deteccion y eliminacion de la cauda raiz de fallas en
mantenimiento.
Juarez Mexico
Jun 2010 Measuring Systems Analisys
Diseño de estudios de capacidad para sistemas de capacidad.
Juarez Mexico
Feb 2010 Tolerancias Geometricas.
Lectura de planos y comprensión de tolerancias mecanicas en
M. Noyola Resume 3 of 6
4. diseño
Feb 2008 Rho 4 Cartesian Robot Controller
Programming for Robot Systems
Juarez, Chih.
Feb 2008 B&R PLC Programming Basics
Programming for B & R PLC.
Atlanta Ga.
Jan 2008 Roofin Laser Marking.
Maintenance for Laser Marking Machines.
Juarez ,Mexico
Dec 2007 Opcon Information System Management
Programming Development for information tracing systems.
Stuttgart Germany.
Nov 2007 Siemens Simatic Step 7 Basics
Siemens Simatic PLC Training Systems
Cd. Juarez, Chih.
Sep 2007 Opcon Station Development Advanced Programming
Automated Stations Building & Programming
Bosch Rexroth PLC’s
Cd. Juarez, Chih.
Jun 2007 Opcon Stations Development Basic Programming
Automated Stations Building & Programming
Bosch Rexroth PLC’s
Madrid Spain.
Feb 2007 Basic Training for Bosch Rexroth PC based PLC’s and HMI
programming
An introduction to IEC 61131 standard.
Stuttgart Germany
Jun 2006 Bosch Rexroth System 300 Screwdrivers.
Programming and debugging.
Cd. Juarez, Chih.
May 2006 Bosch Rexroth Indraworks & Indralogic for L40 PLC and
VCP20 Operator Interface.
Cd. Juarez Chih.
Sep 2000 MITSUBISHI Fx 2n
Programmable Logic Controller
Mexico D.F.
Jan 2000 PRAXAIR RED BALL SECURITY
Juárez, Chih.
Nov 98 CALIBRATION FUNDAMENTALS
Querétaro Qro.
Jan 98 GENESIS FOR WINDOWS PROCESS CONTROL
SOFTWARE
Foxborough MA. USA
Mar 96
ISO 9000 QUALITY STANDARD.
External Audit
México D.F.
Nov 94 MOD 300 DISTRIBUTED CONTROL FAMILY SYSTEMS
Rochester N. Y.
Nov 89 SOLID STATE MOTOR DRIVES FUNDAMENTALS
México D.F.
Jun 88 ELECTRICAL INSTALLATION AUDIT
México D.F.
M. Noyola Resume 4 of 6
5. GENERALS
Single, 2 sons
Birth 01 Feb 1963
Laser visa and passport available
Weight 54 kg, height 1.58 m.
Languages: English 95 % Write & Speak
Deutch: 2 Levels
Sport: Cyclist
High computer skills
Programming languages capable.
High interpersonal skills
OTHER SKILLS
Automation projects management, PLC’s programming (several
languages), variable speed drives, pneumatics, sensors, hydraulics,
servomechanism, mechanical test and assembly stations design,
laser machines background (welding, marking), electrical
equipment maintenance, continuous variable process control
software, vision systems, oven and heat chambers knowledge,
conformal applying, Robot based machines stations (dispensing,
selective soldering, cutting, inspection, plasma cleaning), bar code
and data matrix code scanners, conveyors knowledge, press in
process knowledge.
MAIN WORKS
Customer Time Description
FANOSA DEL PACIFICO
S.A. DE C.V.
Jan 06 Polystyrene foam contour machine maintenance.
VICTORY PACKAGING
DE MÉXICO S.A. DE C.V.
Jan 05 Different automated production machinery Installation and
maintenance.
DIMAQ Jan 05 Automated testers for wire harnesses design and construction.
MAQUINADOS RIVERA. Jan 05 Test and assembly tools for vacuum harnesses design and
development
DEGREMONT DE
MEXICO S.A. DE C.V.
Oct to Nov
2005
Electrical installation rebuilding for south municipally waste water
treatment plant.
CADIMEX S.A. DE C.V. Jan 03 to
Nov 04
Supply, installation and programming for 20 automated test units
for vacuum harnesses
CRONI S.A. DE C.V Oct to Nov
04
Aluminum hard anodized production facility control system
installation and start up
FANOSA DEL PACIFICO
S.A. DE C.V.
Jul to Nov 02 Polystyrene block molding unit control system rebuilding.
CRONI S.A. DE C.V Nov 01 to
Mar 02
Process waste water treatment plant control system supply,
installation and Start up.
Apr to May Deionized water plant control system supply, installation and Start
M. Noyola Resume 5 of 6
6. 01 up.
Dec 2000 1500 KVA electrical substation preventive maintenance.
Oct to Nov
2000
Hardware installation and software development for niquel chrome
electroplating plant expansion
PRAXAIR S.A. DE C.V. Jan 01 Maintenance and expansion for emergency alarm and plant shut
down system.
01 to 02 Digital temperature and pressure gauges maintenance and
calibration
DEGREMONT DE
MEXICO S.A. DE C.V.
Apr 01 Electrical substations general maintenance for both south and north
municipally waste water plants
Mar 2001 18 process electrical motors installation and start up
Nov 2000 8 AC variable speed drivers installation and start up
Advance Transformer Co.
S.A. DE C.V.
Apr 2001 Design, supply installation and start up for coil stamping
IG MEX S.A. DE C.V.
Div. A.O. Smith
Sep 01 to
Jan 02
Design, supply installation and start up for six vertical lifting arms
160 pounds capable for electrical motors assembly line.
PEMEX Gas y
Petroquímica Básica
Terminal de Gas Licuado
Dec 03 to Jan
04
In line Chromatograph combustible gas analyzer installation and
start up.
Feb 01 Air Dryer maintenance
M. Noyola Resume 6 of 6
7. 01 up.
Dec 2000 1500 KVA electrical substation preventive maintenance.
Oct to Nov
2000
Hardware installation and software development for niquel chrome
electroplating plant expansion
PRAXAIR S.A. DE C.V. Jan 01 Maintenance and expansion for emergency alarm and plant shut
down system.
01 to 02 Digital temperature and pressure gauges maintenance and
calibration
DEGREMONT DE
MEXICO S.A. DE C.V.
Apr 01 Electrical substations general maintenance for both south and north
municipally waste water plants
Mar 2001 18 process electrical motors installation and start up
Nov 2000 8 AC variable speed drivers installation and start up
Advance Transformer Co.
S.A. DE C.V.
Apr 2001 Design, supply installation and start up for coil stamping
IG MEX S.A. DE C.V.
Div. A.O. Smith
Sep 01 to
Jan 02
Design, supply installation and start up for six vertical lifting arms
160 pounds capable for electrical motors assembly line.
PEMEX Gas y
Petroquímica Básica
Terminal de Gas Licuado
Dec 03 to Jan
04
In line Chromatograph combustible gas analyzer installation and
start up.
Feb 01 Air Dryer maintenance
M. Noyola Resume 6 of 6