SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Railway
Reservation
System
2
Group
Members
 Masumer Rahman (151-15-
5040)
 Shamsunnabi Taqib(151-
15-4802)
 Faysal Hossain
Mridha(151-15-5301)
 Abdullah Al Imran(142-
15-3690)
 .Shifat Rahman
Minar(151-15-5426)
2
3
 This system is basically concerned
with the reservation of railway
tickets to the passengers.
 In this we are discussing that how the
reservation is done.
 What are the rules and regulations
and procedure for reservation?
 In this project we are going to include
all the entities related to reservation.
Introduction
4
Motivation
4
o Search for Train
o Booking of a selected Train
o Payment
o Cancellation
o Freight Revenue enhancement
o Passenger Revenue enhancement
o Improved & optimized service
5 5
Features
1) Searching of data is easy
2) Passengers don’t have to
wait for a long time.
3) Information is accurate
4) It is a fast process
5) Data efficiency is more
8
Scope &
Objective
8
 Employees should decrease.
 Stored in computer rather than in register/manually.
 Easy to store information.
 Accurate and timely control program.
 To make it easy for fast processing and modification.
 List of accounts of all customers is available.
 Easy retrieval of accounts.
 To make the Railway system is interactive.
 Quick feed back.
“
9
E-R
Diagram
9
 Our project is only the gist of the
online reservation system.
 Due to time constraints it was not
possible to incorporate all the
 concepts related to the topic.
 So the program created is just an
instance of the Original Online
Railway Reservation System.
9
Graphic
User
Interface10
11 11
Train Table
Train Status
Registration
12
GUI
Continue
12
Login
Page
Payment
13
Testing
13
The types of the testing are as follows:
1.Unit testing
2.System testing
3.Validation testing and etc.
But however due to the time constraint we could not perform various
types of testing. Hence we just applied alpha testing which is a part
of validation test to our project
@Alpha Testing
Conclusion
14
 Our project is only the gist of the
online reservation system.
 Due to time constraints it was not
possible to incorporate all the
 concepts related to the topic.
 So the program created is just an
instance of the Original Online
Railway Reservation System.
THANKS!
Any questions?
15

Weitere ähnliche Inhalte

Was ist angesagt?

Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation system
Sandip Murari
 
Online Bus Ticket Reservation System
Online Bus Ticket Reservation SystemOnline Bus Ticket Reservation System
Online Bus Ticket Reservation System
Tuvshinbayar Davaa
 
Presentation on Railway Reservation System
Presentation on Railway Reservation SystemPresentation on Railway Reservation System
Presentation on Railway Reservation System
Priyanka Sharma
 
Railway reservation management by sandip murari
Railway reservation management by sandip murariRailway reservation management by sandip murari
Railway reservation management by sandip murari
Sandip Murari
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
satyaragha786
 
Hard copy of proj doc
Hard copy of proj docHard copy of proj doc
Hard copy of proj doc
nawaldiatm
 

Was ist angesagt? (20)

Railway Reservation system
Railway Reservation systemRailway Reservation system
Railway Reservation system
 
Online railway reservation system
Online railway reservation systemOnline railway reservation system
Online railway reservation system
 
Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation system
 
Railway booking & management system
Railway booking & management systemRailway booking & management system
Railway booking & management system
 
SRS for Railways Reservation System
SRS for Railways Reservation System SRS for Railways Reservation System
SRS for Railways Reservation System
 
Indian railway reservation problems rsdo report file
Indian railway reservation problems rsdo report fileIndian railway reservation problems rsdo report file
Indian railway reservation problems rsdo report file
 
Online Bus Ticket Reservation System
Online Bus Ticket Reservation SystemOnline Bus Ticket Reservation System
Online Bus Ticket Reservation System
 
Presentation on Railway Reservation System
Presentation on Railway Reservation SystemPresentation on Railway Reservation System
Presentation on Railway Reservation System
 
Railway Reservation Documentation
Railway Reservation DocumentationRailway Reservation Documentation
Railway Reservation Documentation
 
Railway reservation management by sandip murari
Railway reservation management by sandip murariRailway reservation management by sandip murari
Railway reservation management by sandip murari
 
Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
 
ER diagrams for Railway reservation system
ER diagrams for Railway reservation systemER diagrams for Railway reservation system
ER diagrams for Railway reservation system
 
Railway Management PPT.pptx
Railway Management PPT.pptxRailway Management PPT.pptx
Railway Management PPT.pptx
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
Hard copy of proj doc
Hard copy of proj docHard copy of proj doc
Hard copy of proj doc
 
Online Bus Service
Online Bus ServiceOnline Bus Service
Online Bus Service
 
Dbms presentation!!
Dbms presentation!!Dbms presentation!!
Dbms presentation!!
 
Project Report Format College Project
 Project Report Format College Project Project Report Format College Project
Project Report Format College Project
 
ONLINE BUS BOOKING SYSTEM
ONLINE BUS BOOKING SYSTEMONLINE BUS BOOKING SYSTEM
ONLINE BUS BOOKING SYSTEM
 
Railway Reservation System
Railway Reservation SystemRailway Reservation System
Railway Reservation System
 

Ähnlich wie Railway Reservation system

Train ticket reservation
Train ticket reservationTrain ticket reservation
Train ticket reservation
sazzadur rahman
 
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptxinternpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
GaganaGowda31
 
Case study of spiral process model
Case study of spiral process  modelCase study of spiral process  model
Case study of spiral process model
minal kumar soni
 

Ähnlich wie Railway Reservation system (20)

Railway tracking system
Railway tracking systemRailway tracking system
Railway tracking system
 
Multi Sensor Railway Track Geometry surveying system Abstract 2107
Multi Sensor Railway Track Geometry surveying system Abstract 2107Multi Sensor Railway Track Geometry surveying system Abstract 2107
Multi Sensor Railway Track Geometry surveying system Abstract 2107
 
Online Tours and travel
Online Tours and travelOnline Tours and travel
Online Tours and travel
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
 
Train ticket reservation
Train ticket reservationTrain ticket reservation
Train ticket reservation
 
IRJET- Railway Reservation and Route Optimization System with Implementation
IRJET-  	  Railway Reservation and Route Optimization System with ImplementationIRJET-  	  Railway Reservation and Route Optimization System with Implementation
IRJET- Railway Reservation and Route Optimization System with Implementation
 
Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
 
RTO Management System
RTO Management SystemRTO Management System
RTO Management System
 
Rrs
RrsRrs
Rrs
 
Nilim kumar nath
Nilim kumar nathNilim kumar nath
Nilim kumar nath
 
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptxinternpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
internpptPPPPPPPPPPPPPPPPPPPPPPPPPPPPP1.pptx
 
AU-Project-Report-Fulltext-132299.PDF
AU-Project-Report-Fulltext-132299.PDFAU-Project-Report-Fulltext-132299.PDF
AU-Project-Report-Fulltext-132299.PDF
 
System Modeling And Achitecture Design
System Modeling And Achitecture DesignSystem Modeling And Achitecture Design
System Modeling And Achitecture Design
 
Case study of spiral process model
Case study of spiral process  modelCase study of spiral process  model
Case study of spiral process model
 
Railway Reservation system Case study of oracle db by cj date
Railway Reservation system Case study of oracle db by cj dateRailway Reservation system Case study of oracle db by cj date
Railway Reservation system Case study of oracle db by cj date
 
Implementation of Public Transport Sytem with Journey Planner
Implementation of Public Transport Sytem with Journey PlannerImplementation of Public Transport Sytem with Journey Planner
Implementation of Public Transport Sytem with Journey Planner
 
Smart Transport for benefit of employees, logistics & freight carriers
Smart Transport for benefit of employees, logistics & freight carriersSmart Transport for benefit of employees, logistics & freight carriers
Smart Transport for benefit of employees, logistics & freight carriers
 
MIS report
MIS reportMIS report
MIS report
 
Team5_-_Final_Report
Team5_-_Final_ReportTeam5_-_Final_Report
Team5_-_Final_Report
 
Online vehicle renting website
Online vehicle renting websiteOnline vehicle renting website
Online vehicle renting website
 

Kürzlich hochgeladen

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Kürzlich hochgeladen (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

Railway Reservation system

  • 2. 2 Group Members  Masumer Rahman (151-15- 5040)  Shamsunnabi Taqib(151- 15-4802)  Faysal Hossain Mridha(151-15-5301)  Abdullah Al Imran(142- 15-3690)  .Shifat Rahman Minar(151-15-5426) 2
  • 3. 3  This system is basically concerned with the reservation of railway tickets to the passengers.  In this we are discussing that how the reservation is done.  What are the rules and regulations and procedure for reservation?  In this project we are going to include all the entities related to reservation. Introduction
  • 4. 4 Motivation 4 o Search for Train o Booking of a selected Train o Payment o Cancellation o Freight Revenue enhancement o Passenger Revenue enhancement o Improved & optimized service
  • 5. 5 5 Features 1) Searching of data is easy 2) Passengers don’t have to wait for a long time. 3) Information is accurate 4) It is a fast process 5) Data efficiency is more
  • 6.
  • 7.
  • 8. 8 Scope & Objective 8  Employees should decrease.  Stored in computer rather than in register/manually.  Easy to store information.  Accurate and timely control program.  To make it easy for fast processing and modification.  List of accounts of all customers is available.  Easy retrieval of accounts.  To make the Railway system is interactive.  Quick feed back.
  • 9. “ 9 E-R Diagram 9  Our project is only the gist of the online reservation system.  Due to time constraints it was not possible to incorporate all the  concepts related to the topic.  So the program created is just an instance of the Original Online Railway Reservation System. 9
  • 11. 11 11 Train Table Train Status Registration
  • 13. 13 Testing 13 The types of the testing are as follows: 1.Unit testing 2.System testing 3.Validation testing and etc. But however due to the time constraint we could not perform various types of testing. Hence we just applied alpha testing which is a part of validation test to our project @Alpha Testing
  • 14. Conclusion 14  Our project is only the gist of the online reservation system.  Due to time constraints it was not possible to incorporate all the  concepts related to the topic.  So the program created is just an instance of the Original Online Railway Reservation System.