3. ListofApplications ondrone data(Detailed)
Blast Design &
Optimization
Blasting
Predictors
Drilling & MWD
Blast Information
Management
Variance Analysis Utilities
Drill & Blast Design
Front row burden analysis
Predict blast outcome
Export drilling & charging sheet
Loading, Timing & Simulation
Air Vibration Prediction
Ground Vibration Prediction
Blast Clearance/ Flyrock Prediction
Fragmentation Prediction
Muckpile Prediction
Collect & Analyze Actual Drilling Data
Analyze drill logs
Plan explosive energy distribution as per drill logs
Variance analysis of planned vs actual drilling
Drill History
• Collect actual blast data –
blast outcome, blasting
parameters , blast
performance etc.
• Import vibration &
fragmentation results
• Blast History
Drilling Variance Analysis
Design Conformance
Fragmentation Image Analysis
Flyrock & Vibration Variance Analysis
Inventory Management
Infrastructure Management
Area & Volumetric Analysis
Slope & Elevation Heatmaps
* Some products are in beta
4. 3D BLADES USE CASES -1
SN CASES
1 Importing and Exporting multiple type of drone files.
2 Importing and Exporting Free Face profile.
3 Creating a Pattern on the imported blast block .
4 Importing & Exporting a pattern on the imported blast block.
5 Adding presplit, pilot holes.
6 Calculating the front row burden using the face profile.
7 Changing Hole details like burden, spacing, hole depth, hole diameter, stemming, inclination, etc.
8 Changing Hole type & colors.
9 Creating a Charge Rule and charging holes according to that.
10 Creating Charging sheet.
11 Assigning Delays and making manual & automated connections
12 Analyzing the pattern using Waverefront reinforcement diagram as per the given delay sequence.
13 Analyzing the pattern using Time window graph.
14 Showing Firing sequence as per the given delays.
15 Fragmentation Prediction.
5. 3D BLADES USE CASES -II
SN CASES
16 Air Vibration Predictions and contours.
17 Ground Vibration Predictions and contours.
18 Fly rock Predictions and contours.
19 Muck pile Prediction
20 Measure Distance between boreholes, two points, face length etc.
21 Measure the area via creating a rectangle.
22 Measure the Bench Height & Angle.
23 Calculate the volume of a the bench, muck etc.
24 Utilities - tools like compass, Views etc.
25 Changing the appearance of the imported drone file/blast block.
26 Changing the background and box view.
27 Clipping/Cropping the 3D Model
6. How dataisimported –Listofsupported fileformats
Below image shows the list of file formats that can be imported in our drone platform. These files once uploaded, gets
processed in our system to render a 3D view which is very similar to your mine site. There are more then 20 formats
that are supported.
7. BlastDesign &Optimization
This module is used to design the blast. It helps to predict the blast results, compare different designs and optimize the
design for desired outputs. (Please check screenshots in appendix)
Video Link - https://vimeo.com/543100347
8. Muckpile displacement prediction (based ondesign)
This shows muckpile displacement based on blast design parameters.
Video Link of the functionality : https://vimeo.com/560831923
9. Drilling &MWD
Ability to import drill
logs including actual
drill parameters, hole
coordinates, drill logs
etc. this includes taking
data directly from
smart drill rigs and high
precision drill
navigation systems.
It helps to analyze the
quality check the
drilling process,
generate drill analytics,
plan energy distribution
as per drill logs,
variance analysis etc.
10. BlastInformation Management
Similar to drilling module, blast information management module helps to keep record of actual blast parameters like actual
charging, timing, blast results, environmental factors, blast history etc.
19. Fragmentation Image Analysis
This module is used to study the variance in predicted vs actual blast parameters & outcome including analyse the
variance in designed & implemented blast, flyrock, fragmentation, muckpile, vibrations etc.
20. Utilities
This module includes other submodules which are very useful in mining but are not related to each other like inventory
management, infrastructure management, volumetric analysis etc.
27. CostSavings
5X Faster Data
Collection & Processing
of Results
12% Recovery in
Ore Loss
30% Improvement
in Drilling & Excavation
Accuracy
$4M Annual
Savings – Mine to Mill
28. Reduction inOverDrilling
Problem :
The customer was having
uneven floor issues after
blasting. On identifying the
root cause it was found that
this was due to additional
drilling of average 4 feet .
Solution :
Detecting floor elevation
issues and drill depth and
setting best practices for floor
control.
4 Feet
Over Drill
$2.00
Per feet
50 Holes
Per Blast
3 Blasts
Per Week
Estimated cost savings by reducing over drilling.-
$60,000 annually