GROUNDWATER CONTROL TECHNIQUES
Synopsis
• Background and definitions
• Groundwater control techniques:
– by pumping
– by exclusion
• Guidelines for selecting the best technique
• Some tunnelling and shaft sinking problems
• A bit of dewatering design and philosophy
www.preene.com
PRACTICE PROFILE
Preene Groundwater Consulting is the Professional Practice
of Dr Martin Preene and provides specialist advice and design
services in the fields of dewatering, groundwater engineering
and hydrogeology to clients worldwide
Dr Martin Preene has more than 25 years’ experience on
projects worldwide in the investigation, design, installation
and operation of groundwater control and dewatering
systems. He is widely published on dewatering and
groundwater control and is the author of the UK industry
guidance on dewatering (CIRIA Report C515 Groundwater
Control Design and Practice) as well as a dewatering text book
(Groundwater Lowering in Construction: A Practical Guide to
Dewatering)
www.preene.com
GROUNDWATER CONTROL
Definition
Groundwater Control
“The process of temporarily dealing with groundwater, to allow
excavations to be made in dry and stable conditions below natural
groundwater level”
May be known as Dewatering or Construction Dewatering or
Groundwater Lowering
www.preene.com
GROUNDWATER CONTROL
Additional Definitions:
Permeability = coefficient of permeability = hydraulic conductivity
(units of m/s). Typically given the symbol k
High to moderate permeability:
Gravel, sand and gravel, sand, silty sand
Porous and fractured rock
Low to very low permeability:
Silt, clay
Unfissured and ‘tight’ rock
Drawdown = amount of vertical lowering of groundwater level due to
pumping (units of metres)
www.preene.com
GROUNDWATER CONTROL
Two main philosophies of groundwater control:
• Pumping: Arrays of wells or sumps (construction
dewatering)
• Exclusion: Physical cut-off walls
www.preene.com
GROUNDWATER CONTROL BY PUMPING
• Typically relies on
arrays or groups of
pumped wells and/or
sumps, acting
together, to lower
groundwater levels
over a wide area
• Commonly known as
dewatering
www.preene.com
GROUNDWATER CONTROL BY PUMPING
Available Techniques
• Sump pumping
• Wellpoints
• Deepwells
• Ejector wells
• Relief wells
• Horizontal wells
• Collector wells
• Electro-osmosis
• Artificial recharge
www.preene.com
SUMP PUMPING
Sump pumping
during construction
of a large diameter
shaft in Sherwood
Sandstone
www.preene.com
WELLPOINTS
From CIRIA Report
C515 (2000):
Groundwater Control:
Design and Practice
www.preene.com
DEEPWELLS
From CIRIA Report
C515 (2000):
Groundwater Control:
Design and Practice
www.preene.com
EJECTOR WELLS
From CIRIA Report
C515 (2000):
Groundwater Control:
Design and Practice
www.preene.com
RELIEF WELLS
www.preene.com
HORIZONTAL (HDD) WELLS
www.preene.com
• Shaft or caisson
constructed
• Perforated ‘laterals’
driven out from
shaft
• One pump (located
in the shaft) can
achieve high yields,
can be much more
widely spaced than
conventional
deepwells
COLLECTOR WELLS
www.preene.com
ELECTRO-OSMOSIS
From CIRIA Report C515
(2000): Groundwater
Control: Design and
Practice
www.preene.com
ARTIFICIAL RECHARGE
www.preene.com
EXCLUSION: VERTICAL CUT-OFF WALLS
Cut-off walls penetrate
into underlying low
permeability stratum
www.preene.com
EXCLUSION: CUT-OFF WALLS AND PUMPED WELLS
Cut-off walls do not reach deep
impermeable stratum: dewatering
wells are needed
www.preene.com
EXCLUSION: VERTICAL CUT-OFF AND HORIZONTAL BARRIERS
Cut-off walls do not reach deep
impermeable stratum:
horizontal barrier is used to exclude
groundwater from base
www.preene.com
JOINTS AND LEAKS IN CUT-OFF WALLS
Walls installed as panels or sections
Walls installed
as line of
overlapping
columns
Walls or barriers installed
as multiple line of
overlapping columns
www.preene.com
ALTERNATIVE GEOMETRIES OF GROUNDWATER BARRIERS
www.preene.com
EXCLUSION TECHNIQUES
• Displacement barriers
– Steel sheet-piles
• Excavated barriers
– Concrete diaphragm walls
– Bored pile walls (secant pile walls and contiguous pile walls)
– Bentonite slurry walls and trenches
• Injected barriers
– Permeation grouting
– Rock grouting
– Jet grouting
– Mix-in-place methods
• Artificial ground freezing
• Compressed air (for tunnels and shafts) and full face TBMs
www.preene.com
STEEL SHEET-PILING
Circular sheet-
pile cofferdam
with concrete
walings
www.preene.com
CONCRETE DIAPHRAGM WALLS
Circular
concrete
diaphragm
wall
www.preene.com
CONCRETE DIAPHRAGM WALLS
Rope operated
diaphragm wall grab
Construction sequence for diaphragm walls
from Woodward (2005): An Introduction to
Geotechnical Processes
Source: Bachy Soletanche
Rockmill diaphragm
wall cutter (hydromill
or Hydrofraise)
Source: Cementation Skanska
www.preene.com
BORED PILE WALLS
Contiguous pile wall – concrete piles installed at a spacing of more than one pile diameter
Secant pile wall – overlapping concrete piles installed at a spacing of less than one pile diameter
www.preene.com
BENTONITE SLURRY WALLS
Excavation of slurry trenches can be by long
reach backhoe down to 15 to 25 m.
Deeper trenches are typically excavated by
clamshell grabs or hydromills
www.preene.com
BENTONITE SLURRY WALLS
Bentonite-cement slurry wall
constructed by long reach
excavator
Common European practice
Soil-bentonite slurry wall
constructed by long reach
excavator
Common North American
practice
www.preene.com
GROUTING
Definition:
• Grouting is the process of controlled injection of a
fluid (grout) into the pores (in soil) or fissures (in
rock) of the ground, where the grout sets and
changes the properties of the in-situ material,
typically by reducing permeability and increasing
strength
www.preene.com
GROUTING IN SOILS AND ROCKS
Permeation grouting
(in soils) – little or no
disturbance of
soil structure
Rock
grouting –
little or no
disturbance of
rock structure
www.preene.com
GROUTING
• Most grouts are suspensions of particles in water (with
other additives). Cement-based grouts are the most
common type used for groundwater control
• The penetration distance of grout into soil and rock is
controlled by the relative sizes of the grout particles
and the soil or rock openings. Distance of penetration
is often very limited, unless the soil is very porous or
the rock fissures are very open
www.preene.com
GROUTING
Indicative grout types
For different types of soil
www.preene.com
JET GROUTING
Structure of
soils or soft
rocks is
disrupted to
create
overlapping
columns of
mixed grout
and disturbed
in-situ material
www.preene.com
JET GROUTING
Jet grouting rig operating with jetting
head above ground level
Source: Keller Geotechnique
Jet grouting systems from
Woodward (2005): An
Introduction to
Geotechnical Processes
www.preene.com
ARTIFICIAL GROUND FREEZING
www.preene.com
ARTIFICIAL GROUND FREEZING
Artificial ground
freezing system around
a shaft
Source: British
Drilling and
Freezing Co. Ltd
www.preene.com
ARTIFICIAL GROUND FREEZING (BRINE)
AGF using brine circulation Portable brine freeze plant – This freeze plant is driven by a
180-kW electric motor. The output is 166 320 kcal/h when
evaporating at −37.5°C
Source: British Drilling and Freezing Co. Ltd
www.preene.com
ARTIFICIAL GROUND FREEZING (LN)
Schematic diagram of
liquid nitrogen (LN) freezing
system
On-site liquid nitrogen (LN) storage tank
receiving a LN delivery by road tanker
www.preene.com
RANGE OF APPLICATION OF METHODS
Amount of
lowering of
groundwater
level
Low permeability (silts) High permeability (gravels)
From CIRIA Report
C515 (2000):
Groundwater
Control: Design
and Practice
www.preene.com
RANGE OF APPLICATION OF METHODS
Low permeability (silts) High permeability (gravels)
From CIRIA Report
C515 (2000):
Groundwater
Control: Design
and Practice
www.preene.com
SOME TUNNELLING AND SHAFT SINKING PROBLEMS
There are some interesting problems and challenges associated
with tunnelling and shaft sinking projects:
• The tunnel as a drain
• Running sand
• Tunnelling without ‘dewatering’
• Advance dewatering of tunnels
• Cross-passage construction
www.preene.com
THE TUNNEL AS A DRAIN
• A tunnel being constructed
with an open face will act as a
drain and water will enter the
tunnel
• If rates of groundwater inflow
are manageable, and face
instability is not a concern (e.g.
in rock) then this can be a
viable method of ‘groundwater
control’
• Inflows can be reduced by
grouting ahead of the tunnel
www.preene.com
THE TUNNEL AS A DRAIN
• Geometry of the groundwater flow regime can be more
complex in long section
Example of segmentally lined tunnel with open face shield
Direction of progress
Groundwater flow
Groundwater level lowered
above working face
www.preene.com
RUNNING SAND
• Running sand is often mentioned
in relation to ‘bad ground’ in
tunnelling and shaft sinking
• It is not a type of material, it is a
state in which a granular material
can exist, when pore water
pressures are high and the
material strength becomes very
low
• Dewatering can lower pore water
pressures and transform material
into more stable ground
Running sand in the base of a shaft
www.preene.com
RUNNING SAND
s‘ = s - u
Soil shear strength
t = s’tanf’
Effective stress = total stress - pore water pressure
Groundwater
flow
Sump pumping
within an
underpinned shaft
www.preene.com
RUNNING SAND
Dewatering used to lower groundwater levels and
prevent running sand during shaft construction in
Glacial Sand deposits
Groundwater
flow
Underpinned shaft
with advance
dewatering by
external wells
www.preene.com
TUNNELLING WITHOUT DEWATERING
• On many projects shafts or vertical structures may be
dewatered, but the tunnel itself is not dewatered
directly, even where it is below groundwater level
• Tunnelling can still be carried out in a ‘shirt sleeve
environment’
• This is the result of a groundwater exclusion
approach
• This can be achieved by compressed air working or
full face TBMs (EPB or slurry)
www.preene.com
COMPRESSED AIR WORKING
1 bar air pressure
approximates to
10 m head of water
www.preene.com
COMPRESSED AIR WORKING
• Compressed air working for tunnelling was developed in the
late 19th century
• Up until the 1980s and 1990s compressed air was used
relatively widely in the UK to allow hand or mechanised
excavation below groundwater level using open face shields
• There are health risks associated with compressed air working
(decompression sickness, bone necrosis)
• Compressed air working is now largely limited to short term
use such as interventions to access the front of a TBM to
change cutters mid-drive or to deal with obstructions
www.preene.com
FULL FACE TBMS
TBM exposed
in cofferdam
www.preene.com
ADVANCE DEWATERING OF TUNNELS
• While shafts and tunnel portals are routinely dewatered, it is rare to
carry out advance dewatering for tunnel drives themselves
• This may be due to lack of surface access for wells, or because
tunnelling methods (e.g. TBMs) do not require it
• However, even if dewatering of tunnel drives is not ‘necessary’
there can be operational and efficiency advantages from
dewatering (or depressurisation) of tunnel drives:
– Improved production rates
– Reduced moisture content of spoil
– Easier (depressurised) conditions for cross-passage construction and
TBM cutter head maintenance
www.preene.com
ADVANCE DEWATERING OF TUNNELS
• On the Jubilee Line Extension (JLE) project in London
in the late 1990s a de-facto advance dewatering
system in the Chalk and Basal Sands was adopted
when the drawdown effect of dewatered
neighbouring shafts interacted
• This allowed the existing TBMs to operate in open
mode (rather than closed mode), thereby improving
tunnel production
www.preene.com
ADVANCE DEWATERING OF TUNNELS
• The Channel Tunnel Rail Link (CTRL) London Running Tunnels took this
a stage further in the early 2000s and developed a planned advance
dewatering system to depressurise the Chalk and Basal Sands.
• 39 wells at 22 locations, pumping up to 700 l/s
• This highlighted some of the challenges of advance dewatering:
– The Project Client had to purchase parcels of land on which to locate the
wells
– The local sewer network could not cope with the pumped dewatering flow
rate, so a 3.5 km long water disposal main (up to 600 mm diameter) had to
be constructed below the streets
• Some of the wells were installed to water industry standards and were
subsequently adopted by Thames Water
www.preene.com
CROSS-PASSAGE CONSTRUCTION
• Many transportation tunnels are twin bore, and
require cross-passages to be constructed periodically
along the route for access, maintenance and
ventilation
• Other headings or tunnel enlargements may be
needed at shafts and stations
• If the tunnels are constructed by full-face TBMs, then
the cross-passages may be the only explicit
groundwater control required for the tunnels
www.preene.com
CROSS-PASSAGE CONSTRUCTION
• The geometry can be difficult, short drives between
tunnels, often in poorly investigated areas
• Groundwater exclusion strategies can be attractive –
grouting, artificial ground freezing
• Groundwater depressurisation – radial wells – can also
be used. The wells will flow naturally into the tunnel, but
usually need to be pumped
• Challenges relate to drilling out through tunnel lining for
wells, including sub-horizontally and upwards
www.preene.com
CROSS-PASSAGE CONSTRUCTION
Plan view
Section
www.preene.com
CROSS-PASSAGE CONSTRUCTION
Examples of wellpoints or drains penetrating
through segmental tunnel linings
www.preene.com
CROSS-PASSAGE CONSTRUCTION
Wellpoint pump
For tunnel
cross-passage
dewatering system
www.preene.com
GROUNDWATER CONTROL TECHNIQUES FOR
TUNNELLING AND SHAFT SINKING
Dr Martin Preene
Preene Groundwater Consulting
May 2015

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Dewatering
DewateringDewatering
Dewatering
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarries
 
Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...
 
Rock testing
Rock testingRock testing
Rock testing
 
Civil Engineering-Dewatering
Civil Engineering-DewateringCivil Engineering-Dewatering
Civil Engineering-Dewatering
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
 
Dewatering by well point system
Dewatering by well point systemDewatering by well point system
Dewatering by well point system
 
1.6 caisson
1.6 caisson1.6 caisson
1.6 caisson
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Quarrying of stones
Quarrying of stonesQuarrying of stones
Quarrying of stones
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
 
Mine dewatering technology data sheet
Mine dewatering technology data sheetMine dewatering technology data sheet
Mine dewatering technology data sheet
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Blasting
BlastingBlasting
Blasting
 
Compaction equipment
Compaction equipmentCompaction equipment
Compaction equipment
 

Ähnlich wie Groundwater Control Techniques for Tunnelling and Shaft Sinking

Groundwater Control for Construction
Groundwater Control for ConstructionGroundwater Control for Construction
Groundwater Control for ConstructionMartin Preene
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement techniqueSatish Kambaliya
 
Lec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.pptLec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.ppthassanakhar
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalIEI GSC
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringMartin Preene
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailraceRakesh Sunari Magar
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sitesMartin Preene
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptxssusercbae26
 
2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvssMaria Cahill
 
DEWATERING METHODS IN EXCAVATION
DEWATERING METHODS IN EXCAVATIONDEWATERING METHODS IN EXCAVATION
DEWATERING METHODS IN EXCAVATIONShivananda Roy
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)William Godwin
 

Ähnlich wie Groundwater Control Techniques for Tunnelling and Shaft Sinking (20)

Groundwater Control for Construction
Groundwater Control for ConstructionGroundwater Control for Construction
Groundwater Control for Construction
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
Lec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.pptLec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.ppt
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
Construction dewatering technology data sheet
Construction dewatering technology data sheetConstruction dewatering technology data sheet
Construction dewatering technology data sheet
 
5. Dewatering.pdf
5. Dewatering.pdf5. Dewatering.pdf
5. Dewatering.pdf
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canal
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptx
 
2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss
 
DEWATERING METHODS IN EXCAVATION
DEWATERING METHODS IN EXCAVATIONDEWATERING METHODS IN EXCAVATION
DEWATERING METHODS IN EXCAVATION
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)
 
DEWATERING (1).pptx
DEWATERING (1).pptxDEWATERING (1).pptx
DEWATERING (1).pptx
 
5. Dewatering F1.pdf
5. Dewatering F1.pdf5. Dewatering F1.pdf
5. Dewatering F1.pdf
 

Mehr von Martin Preene

Preene Groundwater Consulting - Practice Profile
Preene Groundwater Consulting  - Practice ProfilePreene Groundwater Consulting  - Practice Profile
Preene Groundwater Consulting - Practice ProfileMartin Preene
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasMartin Preene
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systemsMartin Preene
 
Managing the clogging of groundwater wells
Managing the clogging of groundwater wellsManaging the clogging of groundwater wells
Managing the clogging of groundwater wellsMartin Preene
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systemsMartin Preene
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in miningMartin Preene
 
In situ permeability testing in boreholes
In situ permeability testing in boreholesIn situ permeability testing in boreholes
In situ permeability testing in boreholesMartin Preene
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systemsMartin Preene
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction SitesMartin Preene
 

Mehr von Martin Preene (9)

Preene Groundwater Consulting - Practice Profile
Preene Groundwater Consulting  - Practice ProfilePreene Groundwater Consulting  - Practice Profile
Preene Groundwater Consulting - Practice Profile
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areas
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 
Managing the clogging of groundwater wells
Managing the clogging of groundwater wellsManaging the clogging of groundwater wells
Managing the clogging of groundwater wells
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in mining
 
In situ permeability testing in boreholes
In situ permeability testing in boreholesIn situ permeability testing in boreholes
In situ permeability testing in boreholes
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systems
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction Sites
 

Kürzlich hochgeladen

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Kürzlich hochgeladen (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Groundwater Control Techniques for Tunnelling and Shaft Sinking

  • 1. www.preene.com GROUNDWATER CONTROL TECHNIQUES FOR TUNNELLING AND SHAFT SINKING Dr Martin Preene Preene Groundwater Consulting May 2015
  • 2. www.preene.com GROUNDWATER CONTROL TECHNIQUES Synopsis • Background and definitions • Groundwater control techniques: – by pumping – by exclusion • Guidelines for selecting the best technique • Some tunnelling and shaft sinking problems • A bit of dewatering design and philosophy
  • 3. www.preene.com PRACTICE PROFILE Preene Groundwater Consulting is the Professional Practice of Dr Martin Preene and provides specialist advice and design services in the fields of dewatering, groundwater engineering and hydrogeology to clients worldwide Dr Martin Preene has more than 25 years’ experience on projects worldwide in the investigation, design, installation and operation of groundwater control and dewatering systems. He is widely published on dewatering and groundwater control and is the author of the UK industry guidance on dewatering (CIRIA Report C515 Groundwater Control Design and Practice) as well as a dewatering text book (Groundwater Lowering in Construction: A Practical Guide to Dewatering)
  • 4. www.preene.com GROUNDWATER CONTROL Definition Groundwater Control “The process of temporarily dealing with groundwater, to allow excavations to be made in dry and stable conditions below natural groundwater level” May be known as Dewatering or Construction Dewatering or Groundwater Lowering
  • 5. www.preene.com GROUNDWATER CONTROL Additional Definitions: Permeability = coefficient of permeability = hydraulic conductivity (units of m/s). Typically given the symbol k High to moderate permeability: Gravel, sand and gravel, sand, silty sand Porous and fractured rock Low to very low permeability: Silt, clay Unfissured and ‘tight’ rock Drawdown = amount of vertical lowering of groundwater level due to pumping (units of metres)
  • 6. www.preene.com GROUNDWATER CONTROL Two main philosophies of groundwater control: • Pumping: Arrays of wells or sumps (construction dewatering) • Exclusion: Physical cut-off walls
  • 7. www.preene.com GROUNDWATER CONTROL BY PUMPING • Typically relies on arrays or groups of pumped wells and/or sumps, acting together, to lower groundwater levels over a wide area • Commonly known as dewatering
  • 8. www.preene.com GROUNDWATER CONTROL BY PUMPING Available Techniques • Sump pumping • Wellpoints • Deepwells • Ejector wells • Relief wells • Horizontal wells • Collector wells • Electro-osmosis • Artificial recharge
  • 9. www.preene.com SUMP PUMPING Sump pumping during construction of a large diameter shaft in Sherwood Sandstone
  • 10. www.preene.com WELLPOINTS From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 11. www.preene.com DEEPWELLS From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 12. www.preene.com EJECTOR WELLS From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 15. www.preene.com • Shaft or caisson constructed • Perforated ‘laterals’ driven out from shaft • One pump (located in the shaft) can achieve high yields, can be much more widely spaced than conventional deepwells COLLECTOR WELLS
  • 16. www.preene.com ELECTRO-OSMOSIS From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 18. www.preene.com EXCLUSION: VERTICAL CUT-OFF WALLS Cut-off walls penetrate into underlying low permeability stratum
  • 19. www.preene.com EXCLUSION: CUT-OFF WALLS AND PUMPED WELLS Cut-off walls do not reach deep impermeable stratum: dewatering wells are needed
  • 20. www.preene.com EXCLUSION: VERTICAL CUT-OFF AND HORIZONTAL BARRIERS Cut-off walls do not reach deep impermeable stratum: horizontal barrier is used to exclude groundwater from base
  • 21. www.preene.com JOINTS AND LEAKS IN CUT-OFF WALLS Walls installed as panels or sections Walls installed as line of overlapping columns Walls or barriers installed as multiple line of overlapping columns
  • 23. www.preene.com EXCLUSION TECHNIQUES • Displacement barriers – Steel sheet-piles • Excavated barriers – Concrete diaphragm walls – Bored pile walls (secant pile walls and contiguous pile walls) – Bentonite slurry walls and trenches • Injected barriers – Permeation grouting – Rock grouting – Jet grouting – Mix-in-place methods • Artificial ground freezing • Compressed air (for tunnels and shafts) and full face TBMs
  • 26. www.preene.com CONCRETE DIAPHRAGM WALLS Rope operated diaphragm wall grab Construction sequence for diaphragm walls from Woodward (2005): An Introduction to Geotechnical Processes Source: Bachy Soletanche Rockmill diaphragm wall cutter (hydromill or Hydrofraise) Source: Cementation Skanska
  • 27. www.preene.com BORED PILE WALLS Contiguous pile wall – concrete piles installed at a spacing of more than one pile diameter Secant pile wall – overlapping concrete piles installed at a spacing of less than one pile diameter
  • 28. www.preene.com BENTONITE SLURRY WALLS Excavation of slurry trenches can be by long reach backhoe down to 15 to 25 m. Deeper trenches are typically excavated by clamshell grabs or hydromills
  • 29. www.preene.com BENTONITE SLURRY WALLS Bentonite-cement slurry wall constructed by long reach excavator Common European practice Soil-bentonite slurry wall constructed by long reach excavator Common North American practice
  • 30. www.preene.com GROUTING Definition: • Grouting is the process of controlled injection of a fluid (grout) into the pores (in soil) or fissures (in rock) of the ground, where the grout sets and changes the properties of the in-situ material, typically by reducing permeability and increasing strength
  • 31. www.preene.com GROUTING IN SOILS AND ROCKS Permeation grouting (in soils) – little or no disturbance of soil structure Rock grouting – little or no disturbance of rock structure
  • 32. www.preene.com GROUTING • Most grouts are suspensions of particles in water (with other additives). Cement-based grouts are the most common type used for groundwater control • The penetration distance of grout into soil and rock is controlled by the relative sizes of the grout particles and the soil or rock openings. Distance of penetration is often very limited, unless the soil is very porous or the rock fissures are very open
  • 34. www.preene.com JET GROUTING Structure of soils or soft rocks is disrupted to create overlapping columns of mixed grout and disturbed in-situ material
  • 35. www.preene.com JET GROUTING Jet grouting rig operating with jetting head above ground level Source: Keller Geotechnique Jet grouting systems from Woodward (2005): An Introduction to Geotechnical Processes
  • 37. www.preene.com ARTIFICIAL GROUND FREEZING Artificial ground freezing system around a shaft Source: British Drilling and Freezing Co. Ltd
  • 38. www.preene.com ARTIFICIAL GROUND FREEZING (BRINE) AGF using brine circulation Portable brine freeze plant – This freeze plant is driven by a 180-kW electric motor. The output is 166 320 kcal/h when evaporating at −37.5°C Source: British Drilling and Freezing Co. Ltd
  • 39. www.preene.com ARTIFICIAL GROUND FREEZING (LN) Schematic diagram of liquid nitrogen (LN) freezing system On-site liquid nitrogen (LN) storage tank receiving a LN delivery by road tanker
  • 40. www.preene.com RANGE OF APPLICATION OF METHODS Amount of lowering of groundwater level Low permeability (silts) High permeability (gravels) From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 41. www.preene.com RANGE OF APPLICATION OF METHODS Low permeability (silts) High permeability (gravels) From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
  • 42. www.preene.com SOME TUNNELLING AND SHAFT SINKING PROBLEMS There are some interesting problems and challenges associated with tunnelling and shaft sinking projects: • The tunnel as a drain • Running sand • Tunnelling without ‘dewatering’ • Advance dewatering of tunnels • Cross-passage construction
  • 43. www.preene.com THE TUNNEL AS A DRAIN • A tunnel being constructed with an open face will act as a drain and water will enter the tunnel • If rates of groundwater inflow are manageable, and face instability is not a concern (e.g. in rock) then this can be a viable method of ‘groundwater control’ • Inflows can be reduced by grouting ahead of the tunnel
  • 44. www.preene.com THE TUNNEL AS A DRAIN • Geometry of the groundwater flow regime can be more complex in long section Example of segmentally lined tunnel with open face shield Direction of progress Groundwater flow Groundwater level lowered above working face
  • 45. www.preene.com RUNNING SAND • Running sand is often mentioned in relation to ‘bad ground’ in tunnelling and shaft sinking • It is not a type of material, it is a state in which a granular material can exist, when pore water pressures are high and the material strength becomes very low • Dewatering can lower pore water pressures and transform material into more stable ground Running sand in the base of a shaft
  • 46. www.preene.com RUNNING SAND s‘ = s - u Soil shear strength t = s’tanf’ Effective stress = total stress - pore water pressure Groundwater flow Sump pumping within an underpinned shaft
  • 47. www.preene.com RUNNING SAND Dewatering used to lower groundwater levels and prevent running sand during shaft construction in Glacial Sand deposits Groundwater flow Underpinned shaft with advance dewatering by external wells
  • 48. www.preene.com TUNNELLING WITHOUT DEWATERING • On many projects shafts or vertical structures may be dewatered, but the tunnel itself is not dewatered directly, even where it is below groundwater level • Tunnelling can still be carried out in a ‘shirt sleeve environment’ • This is the result of a groundwater exclusion approach • This can be achieved by compressed air working or full face TBMs (EPB or slurry)
  • 49. www.preene.com COMPRESSED AIR WORKING 1 bar air pressure approximates to 10 m head of water
  • 50. www.preene.com COMPRESSED AIR WORKING • Compressed air working for tunnelling was developed in the late 19th century • Up until the 1980s and 1990s compressed air was used relatively widely in the UK to allow hand or mechanised excavation below groundwater level using open face shields • There are health risks associated with compressed air working (decompression sickness, bone necrosis) • Compressed air working is now largely limited to short term use such as interventions to access the front of a TBM to change cutters mid-drive or to deal with obstructions
  • 51. www.preene.com FULL FACE TBMS TBM exposed in cofferdam
  • 52. www.preene.com ADVANCE DEWATERING OF TUNNELS • While shafts and tunnel portals are routinely dewatered, it is rare to carry out advance dewatering for tunnel drives themselves • This may be due to lack of surface access for wells, or because tunnelling methods (e.g. TBMs) do not require it • However, even if dewatering of tunnel drives is not ‘necessary’ there can be operational and efficiency advantages from dewatering (or depressurisation) of tunnel drives: – Improved production rates – Reduced moisture content of spoil – Easier (depressurised) conditions for cross-passage construction and TBM cutter head maintenance
  • 53. www.preene.com ADVANCE DEWATERING OF TUNNELS • On the Jubilee Line Extension (JLE) project in London in the late 1990s a de-facto advance dewatering system in the Chalk and Basal Sands was adopted when the drawdown effect of dewatered neighbouring shafts interacted • This allowed the existing TBMs to operate in open mode (rather than closed mode), thereby improving tunnel production
  • 54. www.preene.com ADVANCE DEWATERING OF TUNNELS • The Channel Tunnel Rail Link (CTRL) London Running Tunnels took this a stage further in the early 2000s and developed a planned advance dewatering system to depressurise the Chalk and Basal Sands. • 39 wells at 22 locations, pumping up to 700 l/s • This highlighted some of the challenges of advance dewatering: – The Project Client had to purchase parcels of land on which to locate the wells – The local sewer network could not cope with the pumped dewatering flow rate, so a 3.5 km long water disposal main (up to 600 mm diameter) had to be constructed below the streets • Some of the wells were installed to water industry standards and were subsequently adopted by Thames Water
  • 55. www.preene.com CROSS-PASSAGE CONSTRUCTION • Many transportation tunnels are twin bore, and require cross-passages to be constructed periodically along the route for access, maintenance and ventilation • Other headings or tunnel enlargements may be needed at shafts and stations • If the tunnels are constructed by full-face TBMs, then the cross-passages may be the only explicit groundwater control required for the tunnels
  • 56. www.preene.com CROSS-PASSAGE CONSTRUCTION • The geometry can be difficult, short drives between tunnels, often in poorly investigated areas • Groundwater exclusion strategies can be attractive – grouting, artificial ground freezing • Groundwater depressurisation – radial wells – can also be used. The wells will flow naturally into the tunnel, but usually need to be pumped • Challenges relate to drilling out through tunnel lining for wells, including sub-horizontally and upwards
  • 58. www.preene.com CROSS-PASSAGE CONSTRUCTION Examples of wellpoints or drains penetrating through segmental tunnel linings
  • 59. www.preene.com CROSS-PASSAGE CONSTRUCTION Wellpoint pump For tunnel cross-passage dewatering system
  • 60. www.preene.com GROUNDWATER CONTROL TECHNIQUES FOR TUNNELLING AND SHAFT SINKING Dr Martin Preene Preene Groundwater Consulting May 2015