SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Downloaden Sie, um offline zu lesen
THE SCOPE OF GLASS
PROJECTS
Componentization and Supply Chain Mechanics of Ark Design
MDIA
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
Comments
Part I Benchmarking
Part I Benchmarking
Glass Design Series

The Scope of Glass Projects
LOAD ARRAYS STRAT THE MAT AGILE DESIGN
11/12/2022 Brij Consulting, LLC Jean Marshall 2
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
New Scope Definition
System Tables
Small Form>>>Glass
Table Maps
Component>>>Supply
Chain
Forward >>>Market Forward
Component
Interior
Margin
Matrix
Small Form
(Table)
Interior
Margin
New Facts
Decision
Market
Ready?
Component
Specified
System
Table
Media
All Other
Y
N
Y
N
Y
N
We will begin to
plot an agile
delivery from our
waterfall tasking
The generation of
IP, New System
Facts and Market
Strategy are
already timed
Lifecycle changes in
our project are agile
once tasked and
engineered events
are compiled
New Facts related
to the table are
already mapped
IMF IMC IMS
Sum of IM = Low level carriage burden
Review for New Facts
Prep. For Market Ready
Events: part of the distributive cycle
Are the outcome of Tasks IP
11/12/2022 Brij Consulting, LLC Jean Marshall 3
Engineers interact with managers and analysts involved in the
Justification, Financial, Planning and Implementation process of new
systems. They need to assess the environmental, economic,
regulatory and other requirements of a manufacturing or construction
process. Next to gather and analyze the process or a portion of it in
order help plan the implementation. And then find the optimum
approach to the implementation. Paraphrasing Engineering BOK
Engineers use economic analysis to design a process and to prepare a
justification among complex design alternatives, using an assessment
of the initial capital costs, annual operation, maintenance, and repair
costs, periodic upgrade and determination of the remaining
economic value at the end of the valuation period. The iterative
value of the Revenue cycle and the scope associated with the project
operation help to deliver a justification to accept or reject a
proposal. If a process is cost reductive or if it is utility necessary, an
appropriate justification is used. The quantification of the risk may
make the outcome less likely in comparison to other viable
alternatives. Paraphrasing Engineering BOK
New Facts on T&M
11/12/2022 Brij Consulting, LLC Jean Marshall 4
Compare .4669
Associative Facts
■ Unless the associative facts improve the structural content of the
engineering model they are sometimes set aside.
■ The Method of Testing the whole model is a vast improvement over
any binary method, see Appendix III
■ In a flat format all math is relational
■ The model redacts all rash prospects and dispels all dis-associative
facts in the proof
■ Whatever is not contiguous to the Plan cannot engage its proof
■ The fingerprint and footpath conditions of the componentization
give way to solid state relational threads within the t1 and t2
timeframes
■ Wave and particle theory in electronics is not conducive to building,
compilations or generational instances because it has no glass
container, plait able properties or propensities for scale and design.
This is a Morning Star Ark Based glass capability.
Build Associative Model prior to All-Glass
11/12/2022 Brij Consulting, LLC Jean Marshall 5
MDIA
Mark 2
Ark Media: Dimensional Interface
Data Field
for All Glass
■ Associative Facts
■ Time and Motion
Data
■ Statistical Outcome
11/12/2022
Brij
Consulting,
LLC
Jean
Marshall
6
Stratification for
Component Stream
Alpha =.0531
Re-inv
IMC
a
Climb
Climb
The supply chain has the iterative impact
on the asset creation and its subsequent
market demand building the scenario
through its key engineering oversight
Re-inv
a
2.195-2.19652=.00152 carriage burden
11/12/2022
Brij
Consulting,
LLC
Jean
Marshall
7
IMC
See Slide 2
a
712.96145-711[std] =1.9615 -1.9539 = .0075
196.2+.19
Forward payback
achieved in
econometric gain
Proof on App III
See Slide 17
Stream Facts in Gate Mechanics
y = -4,705,045,101.57x + 10,351,099,223.46
RÂČ = 1.00
y = 0.6445x - 1.4179
RÂČ = 1
-1E+09
0
1E+09
2E+09
3E+09
4E+09
5E+09
6E+09
Sum Average
Poly Stream Matrix
Facts derived from Anova: Two-Factor Without Replication, data field
The data forms a
circle as it cycles and
naturally lends itself
to trig functions,
while in its native
state
Correspondence to Row 10
From this Data-field Table @ Anova
11/12/2022 Brij Consulting, LLC Jean Marshall 8
Instance=Burden
Acquisition w/ Green Wall
Pointing to a Plait or to a Plane
Starting Map
■ Glass Future Tables from “Building with Glass”
■ We now have our build equation
11/12/2022 Brij Consulting, LLC Jean Marshall 9
T2
T1
T4 &
T3
Different Engineering
Groups make uniquely
fitted decisions
Based on Time Buckets
on the 50-year Glass Path
See Next: Re-User [RUF] Friendly
Glass Systems Engineering
New
BR
9
Time Bucket designation
was changed on this slide
since T4 & T3 are start
M=Instance Rate
6-L
18-L
Build Remote
Array
Agile Strategy
V2 Strat the Mat
■ How do we derive the Agile Strategy
from the events timeline and the
Matrix that corresponds to the
Supply Chain? There is a blockchain
theory of completion.
V3 Agile Design
11/12/2022 Brij Consulting, LLC Jean Marshall 10
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
■ Who made this Scrummy Plan
anyhow? Tracking overall progress
and informing everyone of
Milestones and Forward Completion
Coming Next

Flag and Post
x%
■ Full Branch Capability changes the
design from Contiguous to Continuous
BR
Events Compiled
■ Events compiled earlier
stack up very well to new
time and motion facts
compared to the forward
11/12/2022 Brij Consulting, LLC Jean Marshall 11
NT= Number Theory
7968
Tan Line
is 466/2
or 233
Slide 12
Benchmarking Requirements
11/12/2022 Brij Consulting, LLC Jean Marshall 12
Slide 6
Unadjusted rate
Rates Adjusted Forward
W
See App I Clock Thruput
Shows units of 757+
Full Ark Rate Acquired
11/12/2022 Brij Consulting, LLC Jean Marshall 13
‘Also Acceptable’
‘Also Acceptable’
‘Also Acceptable’ There are advantages in knowing both answers
11/12/2022 Brij Consulting, LLC Jean Marshall
14
Appendix I
Compiled
Events
From our Last paper

From our Events paper

11/12/2022 Brij Consulting, LLC Jean Marshall 15
Relational Functions of the Model Proof
Interior
margin
Binary
Path
Standards,
Weights
and
Measures
Reinvestment
Path
growth
Rise
over the
Run
Equity
Using the Economic
Model Equity is stated
at Fair Market Value
11/12/2022 Brij Consulting, LLC Jean Marshall 16
The Interior Margin is
preserved using relational
functions of the Model
which we developed the
Interior Margin Proofs in
“Building with Glass.”
Ark
Path
See Slide 2
Benchmark
Crystal Sea
■ Mary Star of the Sea is an
Ark Design Magnification of
Mary using the Crystal Sea
composition of the Morning
Star
■ Glass will operate in this
mode and be an available
Stream to everyone interiorly
for achievement and
competency
■ “My Soul Magnifies the
Lord,” her famous Script
■ Very Grateful to Mary for
keeping us on track with God
11/12/2022 Brij Consulting, LLC Jean Marshall 17
Engineering Economics Description The use of economic analysis is
fundamental to the engineering design process and to changes in
systems, processes, or operations nspe-body-of-knowledge.pdf
Design Series
■ This is the First Paper in
our Design Series. Its
facts are derived from
the Learning Series on
Glass in Ark Design,
listing shown next.
■ What we learn in a
Waterfall Pattern then we
do in an Agile Method
11/12/2022 Brij Consulting, LLC Jean Marshall 18
Why did we use this number? =289.33 See Red circle on slide 7
Using a maximized Load rate, we resolved the difference between climb and thread metrics, as climb is related
to production in secant engineering. Thread is associative with the Lens and is relying heavily on the utility side
of the mechanic. The Utility is not necessary to the justification, only the engineering of the build mechanics.
From Slide 7
Ark Wall Metric
19
Thread is a topic of our Learning Series
11/12/2022 Brij Consulting, LLC Jean Marshall 20
See “Functional Glass”
In Digital the spectrum is delimited but takes on dimensional context for forms control
See you next time
 Part II
■ Supply Chain Configuration
■ Agile Matrix
■ Impact Statement
11/12/2022 Brij Consulting, LLC Jean Marshall 21
Thank you

Weitere Àhnliche Inhalte

Ähnlich wie Scope of Glass Projects Part I Benchmarking.pdf

Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfJeanMarshall8
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBrij Consulting, LLC
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfBrij Consulting, LLC
 
Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusBrij Consulting, LLC
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceBrij Consulting, LLC
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdfBrij Consulting, LLC
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeBrij Consulting, LLC
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfBrij Consulting, LLC
 
Home and Foundation Test.pdf
Home and Foundation Test.pdfHome and Foundation Test.pdf
Home and Foundation Test.pdfBrij Consulting, LLC
 
Building with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdfBuilding with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdfBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfBrij Consulting, LLC
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionBrij Consulting, LLC
 
Supply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfSupply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfBrij Consulting, LLC
 
Glass Mix Z Form V1 Glass Mix Concepts
Glass Mix Z Form V1 Glass Mix ConceptsGlass Mix Z Form V1 Glass Mix Concepts
Glass Mix Z Form V1 Glass Mix ConceptsBrij Consulting, LLC
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionBrij Consulting, LLC
 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfBrij Consulting, LLC
 
The Dynamic Instance V2 Specifying the Instant
The Dynamic Instance V2 Specifying the InstantThe Dynamic Instance V2 Specifying the Instant
The Dynamic Instance V2 Specifying the InstantBrij Consulting, LLC
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationBrij Consulting, LLC
 

Ähnlich wie Scope of Glass Projects Part I Benchmarking.pdf (20)

Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and Drivers
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
 
Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load Prospectus
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the Instance
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark Mode
 
Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3Glass Mix Z-Form V1 thru V3
Glass Mix Z-Form V1 thru V3
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
 
Home and Foundation Test.pdf
Home and Foundation Test.pdfHome and Foundation Test.pdf
Home and Foundation Test.pdf
 
Building with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdfBuilding with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdf
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
Supply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfSupply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdf
 
Glass Mix Z Form V1 Glass Mix Concepts
Glass Mix Z Form V1 Glass Mix ConceptsGlass Mix Z Form V1 Glass Mix Concepts
Glass Mix Z Form V1 Glass Mix Concepts
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdf
 
The Dynamic Instance V2 Specifying the Instant
The Dynamic Instance V2 Specifying the InstantThe Dynamic Instance V2 Specifying the Instant
The Dynamic Instance V2 Specifying the Instant
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit Assimilation
 

Mehr von Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 

Mehr von Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 

KĂŒrzlich hochgeladen

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...noida100girls
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 

KĂŒrzlich hochgeladen (20)

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...BEST ✹ Call Girls In  Indirapuram Ghaziabad  ✔ 9871031762 ✔ Escorts Service...
BEST ✹ Call Girls In Indirapuram Ghaziabad ✔ 9871031762 ✔ Escorts Service...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚č,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚č,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚č,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚č,9517
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

Scope of Glass Projects Part I Benchmarking.pdf

  • 1. THE SCOPE OF GLASS PROJECTS Componentization and Supply Chain Mechanics of Ark Design MDIA Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design Comments Part I Benchmarking Part I Benchmarking
  • 2. Glass Design Series
 The Scope of Glass Projects LOAD ARRAYS STRAT THE MAT AGILE DESIGN 11/12/2022 Brij Consulting, LLC Jean Marshall 2 Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design New Scope Definition
  • 3. System Tables Small Form>>>Glass Table Maps Component>>>Supply Chain Forward >>>Market Forward Component Interior Margin Matrix Small Form (Table) Interior Margin New Facts Decision Market Ready? Component Specified System Table Media All Other Y N Y N Y N We will begin to plot an agile delivery from our waterfall tasking The generation of IP, New System Facts and Market Strategy are already timed Lifecycle changes in our project are agile once tasked and engineered events are compiled New Facts related to the table are already mapped IMF IMC IMS Sum of IM = Low level carriage burden Review for New Facts Prep. For Market Ready Events: part of the distributive cycle Are the outcome of Tasks IP 11/12/2022 Brij Consulting, LLC Jean Marshall 3
  • 4. Engineers interact with managers and analysts involved in the Justification, Financial, Planning and Implementation process of new systems. They need to assess the environmental, economic, regulatory and other requirements of a manufacturing or construction process. Next to gather and analyze the process or a portion of it in order help plan the implementation. And then find the optimum approach to the implementation. Paraphrasing Engineering BOK Engineers use economic analysis to design a process and to prepare a justification among complex design alternatives, using an assessment of the initial capital costs, annual operation, maintenance, and repair costs, periodic upgrade and determination of the remaining economic value at the end of the valuation period. The iterative value of the Revenue cycle and the scope associated with the project operation help to deliver a justification to accept or reject a proposal. If a process is cost reductive or if it is utility necessary, an appropriate justification is used. The quantification of the risk may make the outcome less likely in comparison to other viable alternatives. Paraphrasing Engineering BOK New Facts on T&M 11/12/2022 Brij Consulting, LLC Jean Marshall 4 Compare .4669
  • 5. Associative Facts ■ Unless the associative facts improve the structural content of the engineering model they are sometimes set aside. ■ The Method of Testing the whole model is a vast improvement over any binary method, see Appendix III ■ In a flat format all math is relational ■ The model redacts all rash prospects and dispels all dis-associative facts in the proof ■ Whatever is not contiguous to the Plan cannot engage its proof ■ The fingerprint and footpath conditions of the componentization give way to solid state relational threads within the t1 and t2 timeframes ■ Wave and particle theory in electronics is not conducive to building, compilations or generational instances because it has no glass container, plait able properties or propensities for scale and design. This is a Morning Star Ark Based glass capability. Build Associative Model prior to All-Glass 11/12/2022 Brij Consulting, LLC Jean Marshall 5 MDIA Mark 2 Ark Media: Dimensional Interface
  • 6. Data Field for All Glass ■ Associative Facts ■ Time and Motion Data ■ Statistical Outcome 11/12/2022 Brij Consulting, LLC Jean Marshall 6
  • 7. Stratification for Component Stream Alpha =.0531 Re-inv IMC a Climb Climb The supply chain has the iterative impact on the asset creation and its subsequent market demand building the scenario through its key engineering oversight Re-inv a 2.195-2.19652=.00152 carriage burden 11/12/2022 Brij Consulting, LLC Jean Marshall 7 IMC See Slide 2 a 712.96145-711[std] =1.9615 -1.9539 = .0075 196.2+.19 Forward payback achieved in econometric gain Proof on App III See Slide 17
  • 8. Stream Facts in Gate Mechanics y = -4,705,045,101.57x + 10,351,099,223.46 RÂČ = 1.00 y = 0.6445x - 1.4179 RÂČ = 1 -1E+09 0 1E+09 2E+09 3E+09 4E+09 5E+09 6E+09 Sum Average Poly Stream Matrix Facts derived from Anova: Two-Factor Without Replication, data field The data forms a circle as it cycles and naturally lends itself to trig functions, while in its native state Correspondence to Row 10 From this Data-field Table @ Anova 11/12/2022 Brij Consulting, LLC Jean Marshall 8 Instance=Burden Acquisition w/ Green Wall Pointing to a Plait or to a Plane
  • 9. Starting Map ■ Glass Future Tables from “Building with Glass” ■ We now have our build equation 11/12/2022 Brij Consulting, LLC Jean Marshall 9 T2 T1 T4 & T3 Different Engineering Groups make uniquely fitted decisions Based on Time Buckets on the 50-year Glass Path See Next: Re-User [RUF] Friendly Glass Systems Engineering New BR 9 Time Bucket designation was changed on this slide since T4 & T3 are start M=Instance Rate 6-L 18-L Build Remote Array
  • 10. Agile Strategy V2 Strat the Mat ■ How do we derive the Agile Strategy from the events timeline and the Matrix that corresponds to the Supply Chain? There is a blockchain theory of completion. V3 Agile Design 11/12/2022 Brij Consulting, LLC Jean Marshall 10 Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design ■ Who made this Scrummy Plan anyhow? Tracking overall progress and informing everyone of Milestones and Forward Completion Coming Next
 Flag and Post x% ■ Full Branch Capability changes the design from Contiguous to Continuous BR
  • 11. Events Compiled ■ Events compiled earlier stack up very well to new time and motion facts compared to the forward 11/12/2022 Brij Consulting, LLC Jean Marshall 11 NT= Number Theory 7968 Tan Line is 466/2 or 233 Slide 12
  • 12. Benchmarking Requirements 11/12/2022 Brij Consulting, LLC Jean Marshall 12 Slide 6 Unadjusted rate Rates Adjusted Forward W See App I Clock Thruput Shows units of 757+ Full Ark Rate Acquired
  • 13. 11/12/2022 Brij Consulting, LLC Jean Marshall 13 ‘Also Acceptable’ ‘Also Acceptable’ ‘Also Acceptable’ There are advantages in knowing both answers
  • 14. 11/12/2022 Brij Consulting, LLC Jean Marshall 14 Appendix I Compiled Events
  • 15. From our Last paper
 From our Events paper
 11/12/2022 Brij Consulting, LLC Jean Marshall 15
  • 16. Relational Functions of the Model Proof Interior margin Binary Path Standards, Weights and Measures Reinvestment Path growth Rise over the Run Equity Using the Economic Model Equity is stated at Fair Market Value 11/12/2022 Brij Consulting, LLC Jean Marshall 16 The Interior Margin is preserved using relational functions of the Model which we developed the Interior Margin Proofs in “Building with Glass.” Ark Path See Slide 2 Benchmark
  • 17. Crystal Sea ■ Mary Star of the Sea is an Ark Design Magnification of Mary using the Crystal Sea composition of the Morning Star ■ Glass will operate in this mode and be an available Stream to everyone interiorly for achievement and competency ■ “My Soul Magnifies the Lord,” her famous Script ■ Very Grateful to Mary for keeping us on track with God 11/12/2022 Brij Consulting, LLC Jean Marshall 17 Engineering Economics Description The use of economic analysis is fundamental to the engineering design process and to changes in systems, processes, or operations nspe-body-of-knowledge.pdf
  • 18. Design Series ■ This is the First Paper in our Design Series. Its facts are derived from the Learning Series on Glass in Ark Design, listing shown next. ■ What we learn in a Waterfall Pattern then we do in an Agile Method 11/12/2022 Brij Consulting, LLC Jean Marshall 18 Why did we use this number? =289.33 See Red circle on slide 7 Using a maximized Load rate, we resolved the difference between climb and thread metrics, as climb is related to production in secant engineering. Thread is associative with the Lens and is relying heavily on the utility side of the mechanic. The Utility is not necessary to the justification, only the engineering of the build mechanics. From Slide 7 Ark Wall Metric
  • 19. 19
  • 20. Thread is a topic of our Learning Series 11/12/2022 Brij Consulting, LLC Jean Marshall 20 See “Functional Glass” In Digital the spectrum is delimited but takes on dimensional context for forms control
  • 21. See you next time
 Part II ■ Supply Chain Configuration ■ Agile Matrix ■ Impact Statement 11/12/2022 Brij Consulting, LLC Jean Marshall 21 Thank you