SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
Ark in Glass
F R O M D I G I T A L T O A R K
As he watched, a stone "not cut by
human hands" 
 became a
mountain filling the whole world.
Daniel’s New Stone
MDIA
V3 Driving the Instance
Crossover from Digital to Ark
Contents
V1 Schema in Ark Mode Simulation
V2 Secant Wheel Applications
V3 Driving the Instance
Process Timeline
Multi Schema
Deriving New Media
from further
Simulation Process
Ark Mode
Increasing FF Menus,
Switches and Property
Plait Layers
Wall Configured
Heavier Utility
Requirements
Valuations
Approach to
Standards
Changes
Complex Design
Multiple System
Construction
Projection
Remote Site
Projection
‱ Simulation Schema required for
Motionable Products and increased
Product Confection must rely on
increasingly utilitarian packaging
that require a heavier utility
capability than Digital Plait offers
‱ This paper describes crossover
delivery
‱ Moving into Ark capability means a
complex support of product media
layers and synthesis. By delivering
design layers for multiple systems, a
remote building project will emerge.
‱ Conceptually many schemas will
converge to an articulated model.
Product Confection and Instance Simulation Remote building upgrade, maintenance, redesign
1. The Dynamic Instance: Product Media Discussed
2. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems
3. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
4. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas
5. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
6. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
7. The Digital Plait Position: Engineering Design of the Load and Thruput
8. Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
9. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal
Production System using appliances gained through Plait Object and Gate driven configurations that
work with Digital Mechanics. Six-Layer Glass and Appliances
10. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
11. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to
specify material, looking for union of Vector
12. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
13. The Glass Wall:
This is a very difficult staging of advanced engineering to depict 
Motivated by sound it creates a means by sound to cascade light. The ability to
transmit this kind of energy behind a light shield makes it safe and wireless power. Because this Virtual Glass is there, it can be positioned like that with
the rose plait.
14. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
15. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
16. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper)
17. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper)
8/5/2021 Brij Consulting, LLC, Jean Marshall 3
Topic Guide to
Related Study
Concept described Slide 11 here, wireless cascade for power
Base Build differentiated from Product Media Here
To be updated with encryptions slides 6 and 12
https://www.slideshare.net/Marshallja/presentations
Scorecard Metrics are devised, used here
Union Vector Graph included here
Paper to be rewritten
after digital maps
complete
18. The New Stone
 our last fully
digital study departs this schematic
Ark Mode
The six-
layer glass
will be
‘cubified’
BUILDING WITH
SIMULATIONS
Notations for the Load to aid
Building with Simulations from
“The New Stone.”
THE GLASS MODEL IS PREPARED WITH
SIMULATIONS for confection and switching.
8/5/2021 Brij Consulting, LLC, Jean Marshall 4
9,088,538.65
2,760,283,300.98
34,314,671,885.92
matrix proof
0.533091267 Alpha Thread
0.33428
0.867371267 Omega
1.734742534 1.65
1.777 0.084742534
-0.042257466 0.042371267
y 0.000113801
Scrum Map "e" end 0.000227601 Clock foil x 3 =335 x 3 = 1005
Pattern
Simulations
Security View
Simulations
Outer perimeter
Inner perimeter
Front
Switches
A one-wheel secant simulation
possesses 52 secants and allows for
two relational crossover instances
One Secant x 52*
Double walk
[3 x 14 = 52*]
[.5719 - .5200 = .0519]
.53309 - .53161 =
141-34=107 = Pre-Form
.867- .833= .34 Omega Adj.
F
Ω
α
Crossover Digital Load Format for Simulation
y = -0.05336x + 2,599,363,695.91464
RÂČ = 0.12306
Finger print w/ z path
One wheel = Digital Simulation
Propert
ies Cart
35
Piece
Assimil
ation
Glass
Modeli
ng
Furnitu
re Build
Array
Museu
m
Process
Applian
ce
Array
Origination Price 729.37 1,647.44 1,863.80 1,390.60 2,361.62 2,005.92
Expected U's 1000 1000 1000 1000 1000 1000
Value 729,366 1,647,43 1,863,79 1,390,60 2,361,61 2,005,92
Margin 534,868 1,334,25 1,516,16 1,113,83 1,923,01 1,649,36
ROI 73.3% 81.0% 81.3% 80.1% 81.4% 82.2%
y = 198183x + 651609
RÂČ = 0.5895
-
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
Digital
Glass
Simulations
RETURN ON INVESTMENT
Proper
ties
Cart
35
Piece
Assimil
ation
Glass
Modeli
ng
Furnitu
re
Build
Array
Museu
m
Proces
s
Applia
nce
Array
Origination Price 714.18 853.20 1,069.56 1,381.56 1,567.38 1,994.86
Expected U's 1000 1000 1000 1000 1000 1000
Value 714,180 853,200 1,069,56 1,381,56 1,567,38 1,994,86
Margin 526,232 697,004 854,300 1,106,30 1,261,15 1,639,88
ROI 73.7% 81.7% 79.9% 80.1% 80.5% 82.2%
y = 214648x + 262877
RÂČ = 0.977
-
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
Digital
Glass
Product
Media
RETURN ON INVESTMENT
Simulation
load
8/5/2021
Brij Consulting, LLC, Jean Marshall
5
80.3%
80.7%
Sum Factor 161
What does a Secant
Path do?
9,088,538.65
2,760,283,300.98
34,314,671,885.92
matrix proof
Load Bearing with torque and turn motion
8/5/2021 Brij Consulting, LLC, Jean Marshall 6
Product Confection
Instance Comparison
8/5/2021 Brij Consulting, LLC, Jean Marshall 7
Encryption Path, DOUBLE WALK
y = -0.05336x + 2,599,363,695.91464
RÂČ = 0.12306
Finger print w/ z path
Z path
Simulation
load
0
0 0
.123 + .025 = .148
WATCH
WINDOW
FOOT
Each Load can
immediately Gate
New Path, compare to slide 15
64.83+1.17=65 Gate End
Assets/Sales [Turnover] is nearly 1:1 load assimilation
8/5/2021 Brij Consulting, LLC, Jean Marshall 8
Product
Media
The Build Array includes Z-
Transform capability
In PRODUCT MEDIA with
A One Wheel Secant for
Simulation @ 3 x 14
Simulation Array in
Digital Glass Format
ω
PV
See Slide 10
360
96.9/3=32.3/2=16.1/4= 4 secant square
3*2*4= 24 Appendix II
8/5/2021 Brij Consulting, LLC, Jean Marshall 9
V2 Secant Wheel Applications
THE BIG CROSSOVER WALK LEARN CHARACTERISTIC SPECS
 We will begin to explore some Secant
Wheel Applications common to the theory
of the products we have been building
 We will describe when and why Ark mode
will be chosen for the utility and complexity
of simulations
 In V3 we will begin to explore driving
instances with Secant conversions
 One item in this room requires more
than a One Wheel Simulation
Before and
After Setups
8/5/2021 Brij Consulting, LLC, Jean Marshall 10
Defining the Secant in Digital Plait
DEFINING THE CROSSWALK
NUMBERING THE SECANT
Secants can carry
sound design
characteristics
More to come on this
topic
144
800 Branch
8/5/2021 Brij Consulting, LLC, Jean Marshall 11
Glass Artefactual Arrangements
SOUND, LIGHT, MOTION, TIMING
SECANT UTILIZATION
Analogue to
Digital
Frequency
Modulation
Sound Pocket
Orchestral
Stratification
Lengths of
Sound
Dimension
Amplification
and switching
setups
Secant Utilization for Sound
 T h e c o m p l e x i t y o f t h e s u b j e c t i s b a s e d o n a r r a n g e m e n t o f
i n s t a n c e s t h a t h o l d c h a r a c t e r i s t i c s f o r p r o d u c t i o n a n i n t e g r a l
p r o d u c t m a t r i x
 T h e u s e o f s e c a n t a r r a n g e m e n t s c a n b r i d g e t h e a r t e f a c t s f o r
o r d e r i n g i n s t a n c e s
 B y u t i l i z i n g s m a l l a r t e f a c t u a l a r r a n g e m e n t s i n a p a t t e r n o f
v a r i o u s p r o d u c t i o n , w e w i l l e v e n t u a l l y c o v e r a l l t h e
c o n s i d e r a t i o n s n e c e s s a r y t o p r o d u c e c o m p l e x
i n s t r u m e n t a t i o n . T h i s w i l l c o n t i n u e f o r s e v e r a l f u t u r e w o r k s ,
r e l a t e d t o d e v e l o p i n g t h e A r k M o d e m e t h o d o f b u i l d i n g
 L e n g t h s o f S o u n d a n d O r c h e s t r a l S t r a t i f i c a t i o n w i l l b e
p a r t i c u l a r l y h e l p f u l i n d e v e l o p i n g m a t e r i a l l e n g t h s a n d
d e v i s i n g c o m p l e x m e c h a n i c a l a p p l i c a t i o n s .
Continued
From “Dimensional
Building”
2020
Plait Glass and
Building Potential
2021
Base Build
Assembly
Product Media
Arrays
2021-
2022
Ark Crossover
Secant
Utilization
8/5/2021 Brij Consulting, LLC, Jean Marshall 12
Mu Sic, Sound and Change-ups
A CHAMBER OF MU SIC CONDITIONS
 M u s i c a n d S o u n d g o h a n d i n h a n d b u t
t h e c o n d i t i o n o f g o i n g f r o m a n a l o g t o
d i g i t a l n o w r e q u i r e s u s t o c o n s i d e r a
s e c a n t s e t u p f o r t h i s p a r t i t i o n
 A s m a l l e l e c t r i c o r g a n a s p i c t u r e d o n
s l i d e 9 u s e s f r e q u e n c y m o d u l a t i o n
t e c h n i q u e s t o p r o d u c e s o u n d f r o m a
p e r c u s s i o n b a s e
 S e c a n t s t h e m s e l v e s c a n c a r r y s o u n d
p o c k e t s f o r p e r c u s s i o n b a s e i n v a r y i n g
a r r a y
 T h e t h e o r y o f a p i p e o r g a n i s t o m a k e
t h e s o u n d m o r e o r c h e s t r a l w h i l e t h e
e l e c t r i c o r g a n i s m o r e o f a s y n t h e s i z e d
b l e n d o f t h e s o u n d .
 S e c a n t s t h e m s e l v e s c a n c a r r y s o u n d
l e n g t h s f o r v a r y i n g d i m e n s i o n a l m u s i c a l
i n s t r u m e n t a t i o n
 M u s i c a l a m p l i f i c a t i o n a n d o u t p u t i s y e t
a n o t h e r s e c a n t c o n s i d e r a t i o n , a l o n g w i t h
j o i n i n g v a r y i n g r e g i s t r y c o m b i n a t i o n s
a n d p r e d i c a t i o n a r r a n g e m e n t s
Flat Analog to Digital
7 Secant Wheels
including Make
Model (-2W for
small organ)
Need
Sound
GUP’s
Registries
Sound pitch, partition, gate
Sound lengths
Keys, Score and Resonance
Material and
Mechanical
Properties
Sometimes in comparing models, some
unlikely pairing of examples makes an
obscure subject better understood. But
not necessarily completely understood.
‱ The things operating in the
Light and in the Ark are just as
mechanical as the things
operating in earth materials
and should be viewed as the
feats accomplished in the
genius of God, not some magic
of wizardry.
‱ Similarly, what we are taught
about glass should be
accompanied by prayer for
virtuous dedication to tasks.
Multiple Secant pairings
 cloud acclimations
8/5/2021
Brij
Consulting,
LLC,
Jean
Marshall
13
Model Creation
Ω
Digital Plait Ends
In the Model of Creation, the Material World as we have
known it will end, giving way to Salt and Light, an energy format
α
See Appendix II for Alpha and Omega ends
V3 Driving the Instance
Brij
Consulting,
LLC,
Jean
Marshall
8/5/2021 14
The means by which the Instance is driven to complex designs in Ark Mode
Multiple works between these two Processes
Secant Utilization
2022 Ark Process
More G.U.P.’s are
required for the
development of
Ark Models
In 2021 we are here in our
learning path
As I looked at the living creatures, I saw wheels on
the ground, one alongside each of the four living
creatures.
16
The wheels and their construction sparkled like
yellow topaz, and all four of them looked the
same: their construction seemed as though one
wheel was inside the other. Ezekiel 1
Driving the Instance,
Trace Patterns
How can I drive my Schematic View?
This is done in Ark Mode
Secant Wheel
Trace Pattern, Marker
In 2022 we will move to this
design on the learning path
How do I open more
rooms in the House
Model?
From “The Glass Build”
shadow
The Instance necessary
to perform the scripting
is a shadow of the
product replication
instance
Instances are specified
from glass to hold their
form or shape by
definition and
designated to remain in
the background as
necessary
specified
Various designs can be
placed into the
motionable product to
impact the product
beauty or specifications
A photographic
replication can be
introduced of a scene
or of a building that will
be further
complemented with
motionable views
From “The New Stone”
How do I make an
analogue to digital
switching assembly
Flat Analog to Digital
How do I
change setups?
Ω
144/2 = 72
161
Before and After
Setups
See next
Counting the digital
wheel there are 8
secant wheels
Secant pairing
and switching
2,5
5,2
Matrix for
amplification
and switching
The glass for the organ would supply
the music score and markers for
switching from loud to soft and from
horns to flutes, for example.
Secant combinations
can “float” and
lengthen in strident
performance of
wheel combinations
acquiring tonal
properties from
Orchestral
arrangements
More to do
on the topic
of secants
and wheels
Sound Blending
comes from a
different glass
setup
Summary
Secant Wheel Concepts
1 Secant Wheels are defined according to the product specifications
a Arrangement of Secants
b Trace Patterns and Markers
c Pairing
2 The architectural drawing board in the glass allows the mode to acquire the glass format
a Switching Views is a one-wheel secant requirement
b The glass model works with the Ark Mode requirements
3 A digital switching assembly from analogue to digital may require a second wheel to cover the signal strength
a a crosswalk is required
b All secant utilization is recorded in the product matrix
4 Changing the setup
a The delivery or switching of one secant wheel to another may be predicated on an argument
b Secant wheels are available as a template within the glass for use in scripting a case for product performance
c The trace pattern is available to mark and predicate the change based on new ensembles of information like a musical score
5 Secant pairing and switching including pipe length and instrumentation enable the more technical aspects of
secant wheels to perform complex machine mechanics
a Secant combinations can "float" within an open pipe in strident performance of wheel combinations acquiring contextual or tonal properties
from adjacent secant definitions
b Secants can carry sound design or light imaging characteristics, also motion properties
8/5/2021 Brij Consulting, LLC, Jean Marshall 20
Simulation Proof
‱ Using a quadratic equation, we
proofed the Matrix for Simulation
terms against our Time and Motion
Standard
‱ This means we have a good and
reliable instance window with which
to simulate our future results
‱ We need to establish this new
fingerprint with an encryption path,
markers and a key for loading
8/5/2021 Brij Consulting, LLC Jean Marshall 21
504,365
144
c
-152.656
154.428
153.981
-461.065
-471.116035
10.05103547
151.9413
2.04
153.9813
144956
144755
201
A
Clock foil x 3 =335 x 3 = 1005
ω
W1
Omega Plait Gate End
‱ After Proving the ‘Plait Remainder’
the Omega Value is a Proof
Ω
ωX=.000560018
When applied at Gate
enhances application
speed
83.3
Watch Window look for 64, +1 in each of the cycles
The Plait End
Discovers
Burden
Progression
159.4
Critical path
ROA
Margin
Second Foil
Ω
Recon. to
Baseline
Future Gains are
Plait Gains
83.72 T&M* - 83.28 Omega= .44 Sq Pi
See T&M*
F
Simulation Assembly Table with Lock Load Position
See Slide 8
See Slide 4
See Slide 4
See Slide 4 and10
See Slide 8
from “The Dynamic Instance”
Sum = 10846
Leveraging the Data Set
8/5/2021 Brij Consulting, LLC, Jean Marshall 23
Relational Data constructs
Standard Load Requirement= 10846
Starting use of the Data Set for Digital Plait Service
Our papers
8/5/2021 24
1. The New Stone
2. Dimensional Building
3. The Dynamic Instance
4. The Glass Build
5. Glass in the Making
6. Art of the Science
7. Digital Glass Production
8. Imposition of Value Engineering
9. The Digital Plait Position
10. Mu Sic in the Advancing Age
11. Engineering Objects
12. Instancing at the Gate
13. Interpolative Scope
14. Functional Glass
15. The Glass Wall
16. The Glass Wave
17. Scrum Costing w/notes (Book It Daniel)
18. Gate Plait Green (Mark It Mark)
19. Scorecard Integration (Map It Ralph)
This paper is Ark In Glass
https://www.slideshare.net/Marshallja/presentations
Brij Consulting, LLC Jean Marshall
V3 and V4
holds all
contents
To
Change
Introduced Secant
Wheels to Drive
Instances

Weitere Àhnliche Inhalte

Ähnlich wie Ark in Glass v3 Driving the Instance

Digital Glass Production V2 Pipe Trace
Digital Glass Production V2 Pipe TraceDigital Glass Production V2 Pipe Trace
Digital Glass Production V2 Pipe TraceBrij Consulting, LLC
 
Digital Glass Production (V3) Building in the Digital Stream
Digital Glass Production (V3) Building in the Digital StreamDigital Glass Production (V3) Building in the Digital Stream
Digital Glass Production (V3) Building in the Digital StreamBrij Consulting, LLC
 
Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful DashboardsCreate Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful DashboardsAggregage
 
Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful Dashboards Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful Dashboards Hannah Flynn
 
Portfolio ix d_mitali_ak
Portfolio ix d_mitali_akPortfolio ix d_mitali_ak
Portfolio ix d_mitali_akMitaliAK
 
Telecom service futures driven by customer need
Telecom service futures driven by customer needTelecom service futures driven by customer need
Telecom service futures driven by customer needUniversity of Hertfordshire
 
Digital Data Commons - Emergence of AI Blockchain Convergence
Digital Data Commons - Emergence of AI Blockchain ConvergenceDigital Data Commons - Emergence of AI Blockchain Convergence
Digital Data Commons - Emergence of AI Blockchain ConvergenceGokul Alex
 
cofaso Presentation
cofaso Presentationcofaso Presentation
cofaso PresentationAndreassMuller
 
Demonolithing The Monolith? Bullocks!
Demonolithing The Monolith?  Bullocks!Demonolithing The Monolith?  Bullocks!
Demonolithing The Monolith? Bullocks!Scott Sosna
 
Mix up: Tall Towers as Catalysts for Social Interaction
Mix up: Tall Towers as Catalysts for Social InteractionMix up: Tall Towers as Catalysts for Social Interaction
Mix up: Tall Towers as Catalysts for Social InteractionMelodie Leung
 
Nelson_Porfolio
Nelson_PorfolioNelson_Porfolio
Nelson_PorfolioJosh Nelson
 
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016ACTUONDA
 
Functional Glass v2 Stepping Up Plait Form Design
Functional Glass v2 Stepping Up Plait Form DesignFunctional Glass v2 Stepping Up Plait Form Design
Functional Glass v2 Stepping Up Plait Form DesignBrij Consulting, LLC
 
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...Techsylvania
 
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...Artificial Intelligence – Case-based reasoning for recommender systems – Invi...
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...Thomas Roth-Berghofer
 
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]New Relic
 

Ähnlich wie Ark in Glass v3 Driving the Instance (20)

Digital Glass Production V2 Pipe Trace
Digital Glass Production V2 Pipe TraceDigital Glass Production V2 Pipe Trace
Digital Glass Production V2 Pipe Trace
 
Digital Glass Production (V3) Building in the Digital Stream
Digital Glass Production (V3) Building in the Digital StreamDigital Glass Production (V3) Building in the Digital Stream
Digital Glass Production (V3) Building in the Digital Stream
 
Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful DashboardsCreate Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful Dashboards
 
Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful Dashboards Create Success With Analytics: A Guide to Designing Delightful Dashboards
Create Success With Analytics: A Guide to Designing Delightful Dashboards
 
Portfolio ix d_mitali_ak
Portfolio ix d_mitali_akPortfolio ix d_mitali_ak
Portfolio ix d_mitali_ak
 
Telecom service futures driven by customer need
Telecom service futures driven by customer needTelecom service futures driven by customer need
Telecom service futures driven by customer need
 
Digital Data Commons - Emergence of AI Blockchain Convergence
Digital Data Commons - Emergence of AI Blockchain ConvergenceDigital Data Commons - Emergence of AI Blockchain Convergence
Digital Data Commons - Emergence of AI Blockchain Convergence
 
cofaso Presentation
cofaso Presentationcofaso Presentation
cofaso Presentation
 
Demonolithing The Monolith? Bullocks!
Demonolithing The Monolith?  Bullocks!Demonolithing The Monolith?  Bullocks!
Demonolithing The Monolith? Bullocks!
 
Mix up: Tall Towers as Catalysts for Social Interaction
Mix up: Tall Towers as Catalysts for Social InteractionMix up: Tall Towers as Catalysts for Social Interaction
Mix up: Tall Towers as Catalysts for Social Interaction
 
Nelson_Porfolio
Nelson_PorfolioNelson_Porfolio
Nelson_Porfolio
 
Technologies That Will Change Everything
Technologies That Will Change EverythingTechnologies That Will Change Everything
Technologies That Will Change Everything
 
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016
Perfect Memory Semantic Digital Asset Management @ Big Media Paris 2016
 
Functional Glass v2 Stepping Up Plait Form Design
Functional Glass v2 Stepping Up Plait Form DesignFunctional Glass v2 Stepping Up Plait Form Design
Functional Glass v2 Stepping Up Plait Form Design
 
The IoT For Real
The IoT For Real The IoT For Real
The IoT For Real
 
Small data big impact
Small data big impactSmall data big impact
Small data big impact
 
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...
Thomas Roth-Berghofer (University of West London) – Artificial Intelligence -...
 
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...Artificial Intelligence – Case-based reasoning for recommender systems – Invi...
Artificial Intelligence – Case-based reasoning for recommender systems – Invi...
 
HSS Broaches Exporter
HSS Broaches ExporterHSS Broaches Exporter
HSS Broaches Exporter
 
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]
Creating Modern Metadata Systems with New Relic, Dow Jones [FutureStack16]
 

Mehr von Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 

Mehr von Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 

KĂŒrzlich hochgeladen

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

KĂŒrzlich hochgeladen (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
VVVIP Call Girls In Greater Kailash âžĄïž Delhi âžĄïž 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash âžĄïž Delhi âžĄïž 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash âžĄïž Delhi âžĄïž 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash âžĄïž Delhi âžĄïž 9999965857 🚀 No Advance 24HRS...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Ark in Glass v3 Driving the Instance

  • 1. Ark in Glass F R O M D I G I T A L T O A R K As he watched, a stone "not cut by human hands" 
 became a mountain filling the whole world. Daniel’s New Stone MDIA V3 Driving the Instance Crossover from Digital to Ark Contents V1 Schema in Ark Mode Simulation V2 Secant Wheel Applications V3 Driving the Instance Process Timeline
  • 2. Multi Schema Deriving New Media from further Simulation Process Ark Mode Increasing FF Menus, Switches and Property Plait Layers Wall Configured Heavier Utility Requirements Valuations Approach to Standards Changes Complex Design Multiple System Construction Projection Remote Site Projection ‱ Simulation Schema required for Motionable Products and increased Product Confection must rely on increasingly utilitarian packaging that require a heavier utility capability than Digital Plait offers ‱ This paper describes crossover delivery ‱ Moving into Ark capability means a complex support of product media layers and synthesis. By delivering design layers for multiple systems, a remote building project will emerge. ‱ Conceptually many schemas will converge to an articulated model. Product Confection and Instance Simulation Remote building upgrade, maintenance, redesign
  • 3. 1. The Dynamic Instance: Product Media Discussed 2. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 3. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 4. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 5. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 6. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 7. The Digital Plait Position: Engineering Design of the Load and Thruput 8. Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 9. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 10. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 11. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 12. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 13. The Glass Wall: This is a very difficult staging of advanced engineering to depict 
Motivated by sound it creates a means by sound to cascade light. The ability to transmit this kind of energy behind a light shield makes it safe and wireless power. Because this Virtual Glass is there, it can be positioned like that with the rose plait. 14. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 15. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 16. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 17. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) 8/5/2021 Brij Consulting, LLC, Jean Marshall 3 Topic Guide to Related Study Concept described Slide 11 here, wireless cascade for power Base Build differentiated from Product Media Here To be updated with encryptions slides 6 and 12 https://www.slideshare.net/Marshallja/presentations Scorecard Metrics are devised, used here Union Vector Graph included here Paper to be rewritten after digital maps complete 18. The New Stone
 our last fully digital study departs this schematic Ark Mode The six- layer glass will be ‘cubified’
  • 4. BUILDING WITH SIMULATIONS Notations for the Load to aid Building with Simulations from “The New Stone.” THE GLASS MODEL IS PREPARED WITH SIMULATIONS for confection and switching. 8/5/2021 Brij Consulting, LLC, Jean Marshall 4 9,088,538.65 2,760,283,300.98 34,314,671,885.92 matrix proof 0.533091267 Alpha Thread 0.33428 0.867371267 Omega 1.734742534 1.65 1.777 0.084742534 -0.042257466 0.042371267 y 0.000113801 Scrum Map "e" end 0.000227601 Clock foil x 3 =335 x 3 = 1005 Pattern Simulations Security View Simulations Outer perimeter Inner perimeter Front Switches A one-wheel secant simulation possesses 52 secants and allows for two relational crossover instances One Secant x 52* Double walk [3 x 14 = 52*] [.5719 - .5200 = .0519] .53309 - .53161 = 141-34=107 = Pre-Form .867- .833= .34 Omega Adj. F Ω α
  • 5. Crossover Digital Load Format for Simulation y = -0.05336x + 2,599,363,695.91464 RÂČ = 0.12306 Finger print w/ z path One wheel = Digital Simulation Propert ies Cart 35 Piece Assimil ation Glass Modeli ng Furnitu re Build Array Museu m Process Applian ce Array Origination Price 729.37 1,647.44 1,863.80 1,390.60 2,361.62 2,005.92 Expected U's 1000 1000 1000 1000 1000 1000 Value 729,366 1,647,43 1,863,79 1,390,60 2,361,61 2,005,92 Margin 534,868 1,334,25 1,516,16 1,113,83 1,923,01 1,649,36 ROI 73.3% 81.0% 81.3% 80.1% 81.4% 82.2% y = 198183x + 651609 RÂČ = 0.5895 - 500,000.00 1,000,000.00 1,500,000.00 2,000,000.00 2,500,000.00 Digital Glass Simulations RETURN ON INVESTMENT Proper ties Cart 35 Piece Assimil ation Glass Modeli ng Furnitu re Build Array Museu m Proces s Applia nce Array Origination Price 714.18 853.20 1,069.56 1,381.56 1,567.38 1,994.86 Expected U's 1000 1000 1000 1000 1000 1000 Value 714,180 853,200 1,069,56 1,381,56 1,567,38 1,994,86 Margin 526,232 697,004 854,300 1,106,30 1,261,15 1,639,88 ROI 73.7% 81.7% 79.9% 80.1% 80.5% 82.2% y = 214648x + 262877 RÂČ = 0.977 - 500,000.00 1,000,000.00 1,500,000.00 2,000,000.00 2,500,000.00 Digital Glass Product Media RETURN ON INVESTMENT Simulation load 8/5/2021 Brij Consulting, LLC, Jean Marshall 5 80.3% 80.7% Sum Factor 161
  • 6. What does a Secant Path do? 9,088,538.65 2,760,283,300.98 34,314,671,885.92 matrix proof Load Bearing with torque and turn motion 8/5/2021 Brij Consulting, LLC, Jean Marshall 6 Product Confection Instance Comparison
  • 7. 8/5/2021 Brij Consulting, LLC, Jean Marshall 7 Encryption Path, DOUBLE WALK y = -0.05336x + 2,599,363,695.91464 RÂČ = 0.12306 Finger print w/ z path Z path Simulation load 0 0 0 .123 + .025 = .148 WATCH WINDOW FOOT Each Load can immediately Gate New Path, compare to slide 15 64.83+1.17=65 Gate End Assets/Sales [Turnover] is nearly 1:1 load assimilation
  • 8. 8/5/2021 Brij Consulting, LLC, Jean Marshall 8 Product Media The Build Array includes Z- Transform capability In PRODUCT MEDIA with A One Wheel Secant for Simulation @ 3 x 14 Simulation Array in Digital Glass Format ω PV See Slide 10 360 96.9/3=32.3/2=16.1/4= 4 secant square 3*2*4= 24 Appendix II
  • 9. 8/5/2021 Brij Consulting, LLC, Jean Marshall 9 V2 Secant Wheel Applications THE BIG CROSSOVER WALK LEARN CHARACTERISTIC SPECS  We will begin to explore some Secant Wheel Applications common to the theory of the products we have been building  We will describe when and why Ark mode will be chosen for the utility and complexity of simulations  In V3 we will begin to explore driving instances with Secant conversions  One item in this room requires more than a One Wheel Simulation Before and After Setups
  • 10. 8/5/2021 Brij Consulting, LLC, Jean Marshall 10 Defining the Secant in Digital Plait DEFINING THE CROSSWALK NUMBERING THE SECANT Secants can carry sound design characteristics More to come on this topic 144 800 Branch
  • 11. 8/5/2021 Brij Consulting, LLC, Jean Marshall 11 Glass Artefactual Arrangements SOUND, LIGHT, MOTION, TIMING SECANT UTILIZATION Analogue to Digital Frequency Modulation Sound Pocket Orchestral Stratification Lengths of Sound Dimension Amplification and switching setups Secant Utilization for Sound  T h e c o m p l e x i t y o f t h e s u b j e c t i s b a s e d o n a r r a n g e m e n t o f i n s t a n c e s t h a t h o l d c h a r a c t e r i s t i c s f o r p r o d u c t i o n a n i n t e g r a l p r o d u c t m a t r i x  T h e u s e o f s e c a n t a r r a n g e m e n t s c a n b r i d g e t h e a r t e f a c t s f o r o r d e r i n g i n s t a n c e s  B y u t i l i z i n g s m a l l a r t e f a c t u a l a r r a n g e m e n t s i n a p a t t e r n o f v a r i o u s p r o d u c t i o n , w e w i l l e v e n t u a l l y c o v e r a l l t h e c o n s i d e r a t i o n s n e c e s s a r y t o p r o d u c e c o m p l e x i n s t r u m e n t a t i o n . T h i s w i l l c o n t i n u e f o r s e v e r a l f u t u r e w o r k s , r e l a t e d t o d e v e l o p i n g t h e A r k M o d e m e t h o d o f b u i l d i n g  L e n g t h s o f S o u n d a n d O r c h e s t r a l S t r a t i f i c a t i o n w i l l b e p a r t i c u l a r l y h e l p f u l i n d e v e l o p i n g m a t e r i a l l e n g t h s a n d d e v i s i n g c o m p l e x m e c h a n i c a l a p p l i c a t i o n s . Continued From “Dimensional Building” 2020 Plait Glass and Building Potential 2021 Base Build Assembly Product Media Arrays 2021- 2022 Ark Crossover Secant Utilization
  • 12. 8/5/2021 Brij Consulting, LLC, Jean Marshall 12 Mu Sic, Sound and Change-ups A CHAMBER OF MU SIC CONDITIONS  M u s i c a n d S o u n d g o h a n d i n h a n d b u t t h e c o n d i t i o n o f g o i n g f r o m a n a l o g t o d i g i t a l n o w r e q u i r e s u s t o c o n s i d e r a s e c a n t s e t u p f o r t h i s p a r t i t i o n  A s m a l l e l e c t r i c o r g a n a s p i c t u r e d o n s l i d e 9 u s e s f r e q u e n c y m o d u l a t i o n t e c h n i q u e s t o p r o d u c e s o u n d f r o m a p e r c u s s i o n b a s e  S e c a n t s t h e m s e l v e s c a n c a r r y s o u n d p o c k e t s f o r p e r c u s s i o n b a s e i n v a r y i n g a r r a y  T h e t h e o r y o f a p i p e o r g a n i s t o m a k e t h e s o u n d m o r e o r c h e s t r a l w h i l e t h e e l e c t r i c o r g a n i s m o r e o f a s y n t h e s i z e d b l e n d o f t h e s o u n d .  S e c a n t s t h e m s e l v e s c a n c a r r y s o u n d l e n g t h s f o r v a r y i n g d i m e n s i o n a l m u s i c a l i n s t r u m e n t a t i o n  M u s i c a l a m p l i f i c a t i o n a n d o u t p u t i s y e t a n o t h e r s e c a n t c o n s i d e r a t i o n , a l o n g w i t h j o i n i n g v a r y i n g r e g i s t r y c o m b i n a t i o n s a n d p r e d i c a t i o n a r r a n g e m e n t s Flat Analog to Digital 7 Secant Wheels including Make Model (-2W for small organ) Need Sound GUP’s Registries Sound pitch, partition, gate Sound lengths Keys, Score and Resonance Material and Mechanical Properties
  • 13. Sometimes in comparing models, some unlikely pairing of examples makes an obscure subject better understood. But not necessarily completely understood. ‱ The things operating in the Light and in the Ark are just as mechanical as the things operating in earth materials and should be viewed as the feats accomplished in the genius of God, not some magic of wizardry. ‱ Similarly, what we are taught about glass should be accompanied by prayer for virtuous dedication to tasks. Multiple Secant pairings
 cloud acclimations 8/5/2021 Brij Consulting, LLC, Jean Marshall 13 Model Creation Ω Digital Plait Ends In the Model of Creation, the Material World as we have known it will end, giving way to Salt and Light, an energy format α See Appendix II for Alpha and Omega ends
  • 14. V3 Driving the Instance Brij Consulting, LLC, Jean Marshall 8/5/2021 14 The means by which the Instance is driven to complex designs in Ark Mode Multiple works between these two Processes Secant Utilization 2022 Ark Process More G.U.P.’s are required for the development of Ark Models In 2021 we are here in our learning path As I looked at the living creatures, I saw wheels on the ground, one alongside each of the four living creatures. 16 The wheels and their construction sparkled like yellow topaz, and all four of them looked the same: their construction seemed as though one wheel was inside the other. Ezekiel 1
  • 15. Driving the Instance, Trace Patterns How can I drive my Schematic View? This is done in Ark Mode Secant Wheel Trace Pattern, Marker In 2022 we will move to this design on the learning path
  • 16. How do I open more rooms in the House Model? From “The Glass Build” shadow The Instance necessary to perform the scripting is a shadow of the product replication instance Instances are specified from glass to hold their form or shape by definition and designated to remain in the background as necessary specified Various designs can be placed into the motionable product to impact the product beauty or specifications A photographic replication can be introduced of a scene or of a building that will be further complemented with motionable views From “The New Stone”
  • 17. How do I make an analogue to digital switching assembly Flat Analog to Digital
  • 18. How do I change setups? Ω 144/2 = 72 161 Before and After Setups See next Counting the digital wheel there are 8 secant wheels
  • 19. Secant pairing and switching 2,5 5,2 Matrix for amplification and switching The glass for the organ would supply the music score and markers for switching from loud to soft and from horns to flutes, for example. Secant combinations can “float” and lengthen in strident performance of wheel combinations acquiring tonal properties from Orchestral arrangements More to do on the topic of secants and wheels Sound Blending comes from a different glass setup
  • 20. Summary Secant Wheel Concepts 1 Secant Wheels are defined according to the product specifications a Arrangement of Secants b Trace Patterns and Markers c Pairing 2 The architectural drawing board in the glass allows the mode to acquire the glass format a Switching Views is a one-wheel secant requirement b The glass model works with the Ark Mode requirements 3 A digital switching assembly from analogue to digital may require a second wheel to cover the signal strength a a crosswalk is required b All secant utilization is recorded in the product matrix 4 Changing the setup a The delivery or switching of one secant wheel to another may be predicated on an argument b Secant wheels are available as a template within the glass for use in scripting a case for product performance c The trace pattern is available to mark and predicate the change based on new ensembles of information like a musical score 5 Secant pairing and switching including pipe length and instrumentation enable the more technical aspects of secant wheels to perform complex machine mechanics a Secant combinations can "float" within an open pipe in strident performance of wheel combinations acquiring contextual or tonal properties from adjacent secant definitions b Secants can carry sound design or light imaging characteristics, also motion properties 8/5/2021 Brij Consulting, LLC, Jean Marshall 20
  • 21. Simulation Proof ‱ Using a quadratic equation, we proofed the Matrix for Simulation terms against our Time and Motion Standard ‱ This means we have a good and reliable instance window with which to simulate our future results ‱ We need to establish this new fingerprint with an encryption path, markers and a key for loading 8/5/2021 Brij Consulting, LLC Jean Marshall 21 504,365 144 c -152.656 154.428 153.981 -461.065 -471.116035 10.05103547 151.9413 2.04 153.9813 144956 144755 201 A Clock foil x 3 =335 x 3 = 1005 ω W1
  • 22. Omega Plait Gate End ‱ After Proving the ‘Plait Remainder’ the Omega Value is a Proof Ω ωX=.000560018 When applied at Gate enhances application speed 83.3 Watch Window look for 64, +1 in each of the cycles The Plait End Discovers Burden Progression 159.4 Critical path ROA Margin Second Foil Ω Recon. to Baseline Future Gains are Plait Gains 83.72 T&M* - 83.28 Omega= .44 Sq Pi See T&M* F Simulation Assembly Table with Lock Load Position See Slide 8 See Slide 4 See Slide 4 See Slide 4 and10 See Slide 8 from “The Dynamic Instance” Sum = 10846
  • 23. Leveraging the Data Set 8/5/2021 Brij Consulting, LLC, Jean Marshall 23 Relational Data constructs Standard Load Requirement= 10846 Starting use of the Data Set for Digital Plait Service
  • 24. Our papers 8/5/2021 24 1. The New Stone 2. Dimensional Building 3. The Dynamic Instance 4. The Glass Build 5. Glass in the Making 6. Art of the Science 7. Digital Glass Production 8. Imposition of Value Engineering 9. The Digital Plait Position 10. Mu Sic in the Advancing Age 11. Engineering Objects 12. Instancing at the Gate 13. Interpolative Scope 14. Functional Glass 15. The Glass Wall 16. The Glass Wave 17. Scrum Costing w/notes (Book It Daniel) 18. Gate Plait Green (Mark It Mark) 19. Scorecard Integration (Map It Ralph) This paper is Ark In Glass https://www.slideshare.net/Marshallja/presentations Brij Consulting, LLC Jean Marshall V3 and V4 holds all contents To Change Introduced Secant Wheels to Drive Instances