1. RESUME
PERSONAL DETAILS
Name : Manvendra Kumar
Date of Birth : March 26, 1984
Qualification : B E (Mechanical Engineering)
University : Rajiv Gandhi Proudyogiki Vishvavidyalaya (R.G.P.V.),
Bhopal, M.P., India
Year of Graduation: July, 2005
Total Experience: 10.5 Years
Passport No : G-1694703 (Valid up to Year 2017)
Current Address : Salgu Byeokdol House – Unit A 503, Dungcheon Dong,
Gangseo-Gu, Seoul, South Korea
Pin Code – 157583
Mobile No: +82-1040699364
Permanent Address: Flat no. C-102, Haverest residency, Opp. Yash complex,
Gotri Road, Vadodara - 390023
E-mail Address : manvendrakumar10@gmail.com
WORK EXPERIENCE
WORK PROFILE :
Sheet 1 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
2. My Job Responsibilities include -
Engineering of Static equipment such as Pressure Vessels, Columns,
Reactors, Heat Exchangers, Air Coolers, Deaerators, Electrical
Heaters, Filters, Silencers and other Static Equipment used in
Petrochemical plants and Refineries.
Package Handling & Engineering like Produced Water treatment
package, Feed Filter Package, Amine Filtration Package, Nitrogen PSA
Package, Water Treatment Package etc.
Engineering of Combustion Equipment like Fired Heater, Elevated
Flares, SRU Reaction Furnaces, Burners etc.
Present Work Activities include the following:
Review of Client Specifications and Clarifications with Client.
Review of ITB Package provided by Client
Preparation of Engineering deliverables such as Datasheet, Material /
Purchase Requisitions, Bill of Materials etc..
Providing inputs for preparation of Technical proposal
Review/Clarification of Vendor Offers
Technical/Commercial Bid Evaluation of Vendor offers
Review/Approval of Drawings, Design Calculations.
Vendor Drawing Review & Approval
Interface Engineering with other departments (Process, Piping,
Instrumentation, Electrical, and Civil etc)
Technical support for Site erection and fabrication activities
Supervision of 3-D Model preparation and review of Equipment /
Package
EMPLOYMENT HISTORY
CURRENT -
Company : DAELIM Industrial Company, Seoul, South Korea.
Sheet 2 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
3. Total Experience : (~)2Years (July 2014 – Present), on Contractual
assignment
Designation : Asst. Manager (Static Equipment Engineering
Department)
MAJOR PROJECTS / ASSIGNMENTS:
Engineering for Static Equipment in OMSK Refinery, Russia Deep
Conversion Complex Project
Engineering for Static Equipment in S-Oil Refinery upgradation
Project
Proposal Engineering for Static Equipment and Packages in KNPC
New Refinery Project (NRP) - Package 3 – Utilities and Offsites
Proposal Engineering for Static Equipment and Packages in KNPC
Gas Train 5 proposal
Proposal Engineering for Static Equipment in RAPID Malaysia Project
– Package 26 – Polycarbonates
Proposal Engineering for Static Equipment and Packages in KOC
MGT & NWC Proposal
Proposal Engineering for Static Equipment and Packages in KLPE IPC
GSU & SCU PE Proposal
PREVIOUS –
Company : L&T Chiyoda Limited, Vadodara, India.
Total Experience : (~)Four (4) Years, Aug 2010 – Jul 2014
Designation : Assistant Manager (Package and Combustion
Department)
MAJOR PROJECTS / ASSIGNMENTS:
Detail Engineering Project
Detail Engineering for RHDS (Refinery Hydro De-Sulphurization)
unit of Nghi-Son Refinery project, Vietnam for the following packages
:
o Reactor Feed Furnace (Fired Heater)
o Feed Filter Package
o Membrane Hydrogen Recovery Package
Detail Engineering Project for IOCL-FCC Unit of IOCL Paradip Project
as Engineer for following items :
o Reactor-Regenerator Package comprising FCC Reactor,
Regenerator, Orifice Chamber, Hopper, Stand-pipes.
Sheet 3 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
4. o Direct Fired Air Heater
o Flue Gas Stack
Proposal (Estimation) Engineering
Proposal Engineering for Thermal Reaction Systems etc. in Jazan
Refinery IGCC Project – Sulphur Recovery Unit
Proposal Engineering for Packages in Jazan Refinery Sour Water
Stripper Unit
Proposal Engineering for Thermal Reaction systems in Oman Refinery
Improvement project - Sulphur recovery unit
Proposal Engineering for Packages in Satah Al Razboot Onshore
plant for ADMA-OPCO
Proposal Engineering for KNPC Mina Al-Ahmadi Refinery FCC
Revamp project
FEED Engineering Activities for Packages in Onshore LNG
Processing Plant of Woodside Energy Limited, Western Australia
(Thro’ Chiyoda Corporation, Japan)
Company : Reliance Engg. Associates Limited, Jamnagar, India
(EPC arm of Reliance Industries Limited, Refinery
Division, Jamnagar)
Total Experience : (~) Five (5) Years
(Worked with Reliance Engg. Associates Limited from
Sep, 2005 till Aug, 2010)
Designation : Manager (Static Equipment Department)
MAJOR PROJECTS / ASSIGNMENTS:
Jamnagar Export Refinery Project (JERP) – Various Process Units
Detail Engineering including Preparation of Requisition, Evaluation of
Vendor offers, Vendor print review etc. for Static Equipment such as
Pressure Vessels, Columns, Air Cooled Exchangers, Filters etc. for
various Process units of Reliance Industries Limited – Jamnagar
Refinery
Vendor Co-ordination, Control and Monitoring of Vendor documents
Interface and Co-ordination with other related disciplines such as
Piping / Instrumentation / Civil for engineering issues
Preparation of Fabrication / Modification drawings for activities like
Nozzle size change, Tray replacement, Tube bundle replacement, New
nozzle addition etc. for Pressure Vessels & Exchangers.
Site Engineering Query Resolution and Trouble-shooting
Sheet 4 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
5. Site activities related to erection, hydrotesting, mechanical clearance
and box up of Piping loops
Jamnagar Refinery (Existing Unit ) –
Detail Engineering for Static Equipment modifications for Refinery
Revamp / Plant Change Orders
Preparation of Site modification drawings
Engineering support & Troubleshooting for revamp / modification
activities
OVERSEAS DEPUTATIONS:
FEED Engineering activities for LNG Plant of Woodside Energy
Limited at Chiyoda Corporation, Japan (Aug. 2011 till Mar. 2012)
Junior Project Engineer for STARR project of Chevron’s Salt Lake
City, Utah refinery (Aug 2007 till Nov. 2007)
CODES AND STANDARDS:
Well conversant with following National / International Codes /
Standards
ASME Section VIII, Div. 1
API 660/661/662
API 560/530/535
API 537
TEMA
WRC-107/297
ASTM Codes for Materials
ASCE-7 Code
COMPUTER SKILLS:
Well conversant with following Design Software / Supporting Tools
PV Elite / COMPRESS for Pressure Vessel Design
HTRI for Exchanger Design
FEA analysis using software like Nozzle Pro.
3-D Model Review using Autodesk Navisworks / Smart Plant Review
(SPR)
MS Office (Including Power Point Presentations)
TRAININGS ATTENDED
Sheet 5 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
6. Training session conducted by HRTI Inc. for Thermal design of Heat
Exchangers
PV Elite for Pressure Vessel Calculations
EDUCATIONAL BACKGROUND
B.E. (Mechanical Engineering) – RGPV, Bhopal - 2005 – 77.5%
AISSC (CBSE – Delhi Public School, Ranchi) – 2001 – 71%
AIHSC (CBSE – SDS High School, Patna) – 1999 – 83%
ABOUT MYSELF:
Open minded with “Self Motivated” attitude.
Highly Team Oriented.
Adaptive and Adjusting Nature.
Fairly Good in Presentations and Extempore.
Considerably Good at Effective Interfacing. Can understand the
criticality of Input / Output Impacts of each Functional
Disciplines on the Overall Project Schedule.
Good understanding of Refinery Process.
Cost & Schedule Consciousness while working on alternative
solutions.
Familiar with Refinery site and experience of Field erection
activities for Piping of Refinery units
Sheet 6 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6
7. Training session conducted by HRTI Inc. for Thermal design of Heat
Exchangers
PV Elite for Pressure Vessel Calculations
EDUCATIONAL BACKGROUND
B.E. (Mechanical Engineering) – RGPV, Bhopal - 2005 – 77.5%
AISSC (CBSE – Delhi Public School, Ranchi) – 2001 – 71%
AIHSC (CBSE – SDS High School, Patna) – 1999 – 83%
ABOUT MYSELF:
Open minded with “Self Motivated” attitude.
Highly Team Oriented.
Adaptive and Adjusting Nature.
Fairly Good in Presentations and Extempore.
Considerably Good at Effective Interfacing. Can understand the
criticality of Input / Output Impacts of each Functional
Disciplines on the Overall Project Schedule.
Good understanding of Refinery Process.
Cost & Schedule Consciousness while working on alternative
solutions.
Familiar with Refinery site and experience of Field erection
activities for Piping of Refinery units
Sheet 6 of 6
77aad7fc-4347-4984-9e5c-abbbbf0d388d-160630153956.doc6