Availability Check – Basics and Customization
A. Basics
1) Backward Scheduling calculates the material availability date. This is the date on which
sufficient material should be available(for activities such as picking,packing,loading and finally
goods issue) so as to be able to successfully deliver the goods to the customer on his requested
delivery date.(assuming customer requires complete delivery)
2) The delivery,therefore,should be created latest by this date or by transportation planing
date,whichever is earlier.
3) Availability Check is a function of SAP SD module that along with Transfer of Requirements
helps in checking if sufficient quantity of goods is available on the above calculated availability
date.
4) If sufficient quantity is not available on this date then goods cannot be delivered on the
customer's requested delivery date.
5) Forward Scheduling then calculates the new availability date and thus a new delivery date is
confirmed in the schedule line.
6) Availability check is done at Plant Level.
7) Results of availability check may vary according to Replenishment Lead Time(RLT) , Partial
Delivery Constraints or other such considerations.(described ahead)
8) Types of availability check :
a) Against ATP Quantities (with or without RLT)
b) Against Planning.
c)Against Product Allocation
9) Available-To-Promise or ATP : On any given date ATP quantities give the number one can
commit for an order which is to be delivered on some future.
ATP= Warehouse Stock + Planned Inward Receipts – Planned Outward Issues
Where Stock can include unrestricted stock,stock in transfer,stock in quality inspection,blocked
stock,restricted use stock etc
Inward Movements can include Purchase Orders,Purchase requisitions,Planned
orders,Production orders etc.
Outward Movements can include Sales Orders,Deliveries,Reservations,Sales Requirements
etc.
10) R-L-T : The time needed to produce or order the material. In other words it is the time by
which the material is produced in house or if it is trading good the time by which it can be
procured. If availability check includes RLT , the check is carried out only till the end of this
time any amount will be available after this time.
For goods produced in-house :
R-L-T = Tot. Replenishment time (MMR-MRP3 View), If maintained
else if above field not maintained
R-L-T = In-House Production Time (MMR- Work Scheduling view) + GR
processing time (MMR-MRP2 View)
For externally procured goods :
R-L-T = Purchasing Processing time(MMR- Purchasing view) + Planned Delivery
time(MMR-MRP2 view) + GR Processing time (MMR-MRP2 view)
$$ RLT is included only in check against ATP. * MMR is Material Master record
11) Complete Delivery/Partial Delivery Indicator : Complete delivery indicator is specified in
CuMR – Shipping Tab and is applicable at the header level of the Sales Order. This specifies if
the entire order that is all the items in the order are to be delivered together.
The Partial delivery indicator(and the number of partial deliveries allowed) comes from
either CMIR or CuMR- Shipping Tab. This specifies if all the quantities of the item has to be delivered
in one single delivery or can be delivered in multiple partial deliveries. This is applicable at Header
Level but can be changed at item level in the Sales Document.
* CMIR – Customer Material Info Record CuMR – Customer Master Record
Effects on Delivery date of complete and partial delivery.
% In above figure the End lead time(R-L-T) is 15.05.2013. Any quantity ordered will be confirmed for that date.
B. Customization
Since Availability Check lies within the integration precinct between SD and MM the control features
can be found in both SD and MM module. The focus here is on customization in SD but a bit of MM
features are also studied for getting a holistic picture.
I)
1) Transfer of Requirements : Requirements are planned outward movements. All material orders
are transferred to the MRP in the form of requirements by SD. This also helps in planning
future requirements as procurement can further advice production(in case materials need to be
produced) or purchasing(in case materials need to be procured).Without ToR availability check
is not effective.
2) Planning Strategies : Are business procedures for planning the production (quantities and dates)
of material.
3) Strategy Group : The allowed planning strategies (main strategy and further possible strategies)
are combined in the strategy group. The strategy group is plant-wise assigned to MRP group.
Also strategy group can be directly maintained in MMR-MRP3(which has priority over MRP
assignment).
4) MRP group : Groups materials having the same MRP requirements and thus helps controlling
these materials for MRP. This is maintained in MMR-MRP1 view.
5) MRP Type (MMR-MRP1 View) : Is a key that determines how the material is to be planned.
6) Requirements Type : Among other things Requirements types refer to the Requirements class.
Requirements Types in turn are a part of Planning Strategy. If not maintained there they are
determined from the combination of MRP type and Item categories.
7) Requirements Class : Apart from other things it controls globally if availability check and ToR
is to be done for the material in SD Documents on the basis of ATP Logic.
8) Schedule Line Categories : Where Requirements Class determine globally if availability and
ToR is to be done, at Micro level this is determined by Schedule Line Category. Thus if they are
switch on at Requirements Class level they can be switched off at Schedule Line Level but if
they are Off at Requirements Class level they cannot be turned on at Schedule Line Level.
9) Delivery item category : The delivery item category can be used to control whether an
availability check takes place in deliveries.
10) Checking Group : Decides which requirement to transfer - individual(for each order) or
summarized(Daily/Weekly) and whether to block the material(at plant level) during the time of
availability check for simultaneous orders. Also can deactivate availability check. It is proposed
in MMR.
11) Checking Rule : Along with Checking Group it decides scope of check for a particular
transaction and id hard coded for example for Sales Order it is 'A' for delivery it is 'B' etc
12) Scope of check : Decides what kind of stocks,incoming movements,outgoing movments are to
be checked during availability check and if check includes RLT. It also checks if Availability
Check is to be done on Storage Location Level or not.
To summarize (Refer Snapshots below for all relevant transactions):
Strategy group contains planning strategies which in turn contain Requirement
Type(if not there it comes from combination of MRP Type and Item Category) which in turn refers to
Requirements class which globally determine, for the material, if Availability check and ToR are to be
done and locally this is controlled by Schedule Line Category in Sales Document and by Delivery Item
Category in Delivery Document.
Checking Group decides if requirements are to be transferred weekly,daily or per
transaction. Also along with checking rule it decides scope of check.
SNAPSHOTS
1) T-Code: MM03
Strategy group Assignment
2) T-Code OPPT
Strategy group – Planning Startegies
3) T-Code OPPS
Planning Strategy – Requirement Type
4) T-Code OVZH
Requirement Type – Requirement Class Assignment
5) T-Code OVZG
6) T-Code VA03
Requirement type in Sales Order
7) T-Code VOV6
ToR and Availability in Schedule Line Category
8)
Checking Group
9) T-Code OVZ9

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Credit Management in SAP SD
Credit Management in SAP SDCredit Management in SAP SD
Credit Management in SAP SD
 
SAP SD Notes
SAP SD NotesSAP SD Notes
SAP SD Notes
 
Transportation in sap
Transportation in sapTransportation in sap
Transportation in sap
 
Free goods determination
Free goods determinationFree goods determination
Free goods determination
 
Sap sd quest_answer_2009061511245119496
Sap sd quest_answer_2009061511245119496Sap sd quest_answer_2009061511245119496
Sap sd quest_answer_2009061511245119496
 
Material listing & exclusion
Material listing & exclusionMaterial listing & exclusion
Material listing & exclusion
 
Third Party SAP
Third Party SAPThird Party SAP
Third Party SAP
 
Sap SD Standard Reports
Sap SD Standard ReportsSap SD Standard Reports
Sap SD Standard Reports
 
Output determination
Output determinationOutput determination
Output determination
 
Automatic batch determination based on shelf life
Automatic batch determination based on shelf lifeAutomatic batch determination based on shelf life
Automatic batch determination based on shelf life
 
Make to order document
Make to order document Make to order document
Make to order document
 
Subcontracting process jobwork in gst
Subcontracting process  jobwork in gstSubcontracting process  jobwork in gst
Subcontracting process jobwork in gst
 
Sap sd pricing
Sap sd pricingSap sd pricing
Sap sd pricing
 
Inter company STO
Inter company STOInter company STO
Inter company STO
 
SAP STO config
SAP STO configSAP STO config
SAP STO config
 
Sap sd
Sap sdSap sd
Sap sd
 
STO process with config 4th method
STO process with config 4th methodSTO process with config 4th method
STO process with config 4th method
 
Pricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat MannamPricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat Mannam
 
WM - PP Interface
WM - PP InterfaceWM - PP Interface
WM - PP Interface
 
Consignment process
Consignment processConsignment process
Consignment process
 

Ähnlich wie Check Material Availability

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Salesmradwan101
 
AVAILABLITY CHECK.ppt
AVAILABLITY CHECK.pptAVAILABLITY CHECK.ppt
AVAILABLITY CHECK.pptpankaj927772
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning Lokesh Modem
 
12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-salesmanishankara
 
SAP MM Interview questions
SAP MM Interview questionsSAP MM Interview questions
SAP MM Interview questionsIT LearnMore
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-ppLokesh Modem
 
Sap production planning
Sap production planningSap production planning
Sap production planningSourav Dass
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planningmadhu jetty
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & ManufacturingPantit Sirapobthada
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-infoMBA, MSc, Alberto Castellano
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptSwayamTiwari12
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingTop 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingIQ Online Training
 

Ähnlich wie Check Material Availability (20)

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
 
AVAILABLITY CHECK.ppt
AVAILABLITY CHECK.pptAVAILABLITY CHECK.ppt
AVAILABLITY CHECK.ppt
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales
 
SAP MM Interview questions
SAP MM Interview questionsSAP MM Interview questions
SAP MM Interview questions
 
Sapmmint 131118092016-phpapp02
Sapmmint 131118092016-phpapp02Sapmmint 131118092016-phpapp02
Sapmmint 131118092016-phpapp02
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
Sap production planning
Sap production planningSap production planning
Sap production planning
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & Manufacturing
 
Supply_Chain_PP MOD
Supply_Chain_PP MODSupply_Chain_PP MOD
Supply_Chain_PP MOD
 
MRP views in Material Master
MRP views in Material MasterMRP views in Material Master
MRP views in Material Master
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.ppt
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingTop 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
 
KDFJ
KDFJKDFJ
KDFJ
 

Kürzlich hochgeladen

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 

Kürzlich hochgeladen (20)

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 

Check Material Availability

  • 1. Availability Check – Basics and Customization A. Basics 1) Backward Scheduling calculates the material availability date. This is the date on which sufficient material should be available(for activities such as picking,packing,loading and finally goods issue) so as to be able to successfully deliver the goods to the customer on his requested delivery date.(assuming customer requires complete delivery) 2) The delivery,therefore,should be created latest by this date or by transportation planing date,whichever is earlier. 3) Availability Check is a function of SAP SD module that along with Transfer of Requirements helps in checking if sufficient quantity of goods is available on the above calculated availability date. 4) If sufficient quantity is not available on this date then goods cannot be delivered on the customer's requested delivery date. 5) Forward Scheduling then calculates the new availability date and thus a new delivery date is confirmed in the schedule line. 6) Availability check is done at Plant Level. 7) Results of availability check may vary according to Replenishment Lead Time(RLT) , Partial Delivery Constraints or other such considerations.(described ahead) 8) Types of availability check : a) Against ATP Quantities (with or without RLT) b) Against Planning. c)Against Product Allocation 9) Available-To-Promise or ATP : On any given date ATP quantities give the number one can commit for an order which is to be delivered on some future. ATP= Warehouse Stock + Planned Inward Receipts – Planned Outward Issues Where Stock can include unrestricted stock,stock in transfer,stock in quality inspection,blocked stock,restricted use stock etc Inward Movements can include Purchase Orders,Purchase requisitions,Planned orders,Production orders etc. Outward Movements can include Sales Orders,Deliveries,Reservations,Sales Requirements etc. 10) R-L-T : The time needed to produce or order the material. In other words it is the time by which the material is produced in house or if it is trading good the time by which it can be procured. If availability check includes RLT , the check is carried out only till the end of this time any amount will be available after this time. For goods produced in-house : R-L-T = Tot. Replenishment time (MMR-MRP3 View), If maintained else if above field not maintained R-L-T = In-House Production Time (MMR- Work Scheduling view) + GR processing time (MMR-MRP2 View) For externally procured goods : R-L-T = Purchasing Processing time(MMR- Purchasing view) + Planned Delivery time(MMR-MRP2 view) + GR Processing time (MMR-MRP2 view) $$ RLT is included only in check against ATP. * MMR is Material Master record
  • 2. 11) Complete Delivery/Partial Delivery Indicator : Complete delivery indicator is specified in CuMR – Shipping Tab and is applicable at the header level of the Sales Order. This specifies if the entire order that is all the items in the order are to be delivered together. The Partial delivery indicator(and the number of partial deliveries allowed) comes from either CMIR or CuMR- Shipping Tab. This specifies if all the quantities of the item has to be delivered in one single delivery or can be delivered in multiple partial deliveries. This is applicable at Header Level but can be changed at item level in the Sales Document. * CMIR – Customer Material Info Record CuMR – Customer Master Record Effects on Delivery date of complete and partial delivery. % In above figure the End lead time(R-L-T) is 15.05.2013. Any quantity ordered will be confirmed for that date. B. Customization Since Availability Check lies within the integration precinct between SD and MM the control features can be found in both SD and MM module. The focus here is on customization in SD but a bit of MM features are also studied for getting a holistic picture. I) 1) Transfer of Requirements : Requirements are planned outward movements. All material orders are transferred to the MRP in the form of requirements by SD. This also helps in planning future requirements as procurement can further advice production(in case materials need to be
  • 3. produced) or purchasing(in case materials need to be procured).Without ToR availability check is not effective. 2) Planning Strategies : Are business procedures for planning the production (quantities and dates) of material. 3) Strategy Group : The allowed planning strategies (main strategy and further possible strategies) are combined in the strategy group. The strategy group is plant-wise assigned to MRP group. Also strategy group can be directly maintained in MMR-MRP3(which has priority over MRP assignment). 4) MRP group : Groups materials having the same MRP requirements and thus helps controlling these materials for MRP. This is maintained in MMR-MRP1 view. 5) MRP Type (MMR-MRP1 View) : Is a key that determines how the material is to be planned. 6) Requirements Type : Among other things Requirements types refer to the Requirements class. Requirements Types in turn are a part of Planning Strategy. If not maintained there they are determined from the combination of MRP type and Item categories. 7) Requirements Class : Apart from other things it controls globally if availability check and ToR is to be done for the material in SD Documents on the basis of ATP Logic. 8) Schedule Line Categories : Where Requirements Class determine globally if availability and ToR is to be done, at Micro level this is determined by Schedule Line Category. Thus if they are switch on at Requirements Class level they can be switched off at Schedule Line Level but if they are Off at Requirements Class level they cannot be turned on at Schedule Line Level. 9) Delivery item category : The delivery item category can be used to control whether an availability check takes place in deliveries. 10) Checking Group : Decides which requirement to transfer - individual(for each order) or summarized(Daily/Weekly) and whether to block the material(at plant level) during the time of availability check for simultaneous orders. Also can deactivate availability check. It is proposed in MMR. 11) Checking Rule : Along with Checking Group it decides scope of check for a particular transaction and id hard coded for example for Sales Order it is 'A' for delivery it is 'B' etc 12) Scope of check : Decides what kind of stocks,incoming movements,outgoing movments are to be checked during availability check and if check includes RLT. It also checks if Availability Check is to be done on Storage Location Level or not. To summarize (Refer Snapshots below for all relevant transactions): Strategy group contains planning strategies which in turn contain Requirement Type(if not there it comes from combination of MRP Type and Item Category) which in turn refers to Requirements class which globally determine, for the material, if Availability check and ToR are to be done and locally this is controlled by Schedule Line Category in Sales Document and by Delivery Item Category in Delivery Document. Checking Group decides if requirements are to be transferred weekly,daily or per transaction. Also along with checking rule it decides scope of check.
  • 4. SNAPSHOTS 1) T-Code: MM03 Strategy group Assignment 2) T-Code OPPT Strategy group – Planning Startegies
  • 5. 3) T-Code OPPS Planning Strategy – Requirement Type 4) T-Code OVZH Requirement Type – Requirement Class Assignment
  • 6. 5) T-Code OVZG 6) T-Code VA03 Requirement type in Sales Order
  • 7. 7) T-Code VOV6 ToR and Availability in Schedule Line Category 8) Checking Group