Metrics  Examples for Project Management byeugene.veselov@magento.com
To reinforce Magento team with some ideas about metrics and their usage in project management To share positive knowledge Goal 'To know your future you must know your past‘George Santayana, a philosopher
Preface Year 1944. The US Third Fleet, under the command of Admiral "Bull" William Halsey aboard the USS New Jersey, began moving toward the Philippines Islands.  The admiral decided to find a short way through the Calamian Islands. He sent a spy plane to make some photos of the route. After having analyzed the photos experts discovered that shapes of some islands differed from previous ones….  In the early morning, fleet of bombers took off towards a target area some 350 miles away from their carriers.  At the time it was the longest range air raid in history. At 09.00 the Planes reached Busuanga Island, found 15-18 large Japanese enemy ships anchored in CORON BAY. 45 minutes later it was all over, the planes returned home leaving behind a hell of burning oil, explosions and sinking vessels….
Preface Now a quick question:   How do you think, Admiral William Halsey was good at mastering metrics or not?
Preface I think yes because he: ,[object Object]
Kept  comprehensive historical data of the project he managed
Performed quick and correct action to fix problem that had been showed by the metrics.,[object Object]
Kept  comprehensive historical data of the project he managed
Performed quick and correct action to fix problem that had been showed by the metrics.,[object Object]
Estimation/Time Metrics Estimation Accuracy (EA) Description EA shows resulting deviation from original estimations which was made by developers.  Could be positive (work took more efforts than planned) or negative when the task was overestimated. EA = (actual efforts/planned efforts)-1
Estimation/Time Metrics Estimation Accuracy (EA) History Conclusion  We are becoming better in estimations; however, estimations aren’t very precise so far. Attention : You do not find here real metrics values from our project  due to NDA. All the values are  made-up
QA Metrics Customer Reported Unique Defects ratio (CRUD) Description CRUD = amount of unique defects which were reported by customers/total amount of bugs CRUD = 0 means that QA can see the system in the same way as  customers do, 100% means we do not have the same system vision with our customers
QA Metrics CRUD History (July-August 2011) Conclusion  There is a very small positive trend of adjusting our internal QA  procedures to customer’s demand. Attention : You do not find here real metrics values from our project  due to NDA. All the values are  made-up
QA Metrics Bug Density (BD) Description Bug density is a ratio of changed (added or deleted) or total number LOC of code to quantity of unique bugs during defined period of time. BD = total strings / unique bugs This metric is a way to express the system’s quality as a function from lines of code and bug amount. The highest quality a system has the bigger value BD gets.  Anyway, this metric is useless when is unlinked from time.
QA Metrics Bug Density History (July-August 2011) Attention : You do not find here real metrics values from our project  due to NDA. All the values are  made-up Conclusion  System quality fluctuates now. We need to perform some  actions to get strong increasing trend.
QA Metrics Critical Mass (CM) CM shows how many bugs from the total amount are critical.  CM=quantity of critical bugs/total amount of bugs Only when CM=Zero,  Core team makes the release.
QA Metrics Attention : You do not find here real metrics values from our project  due to NDA. All the values are  made-up Critical Mass History (July-August 2011) Conclusion  The peak on 7/21/2010 is because PO added some bugs to be fixed in the release.
HR Metrics Total Available Resources  (TAR ) TAR = (team size-absent people)/team size.  TAR allows better understanding consequences of team member’s unavailability. For instance, 5 absent people for   project of 10 people could be a disaster while 5 people for project of 100 people won’t affect it at all. TAR = 1 - all is OK, TAR = 0 team is totally absent. Usually, TAR=70 is an edge on which the manager should become worried

Weitere ähnliche Inhalte

Andere mochten auch

Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
selinasimpson1601
 
Quality metrics project management
Quality metrics project managementQuality metrics project management
Quality metrics project management
selinasimpson1501
 
Quality Metrics
Quality Metrics Quality Metrics
Quality Metrics
Haroon Abbu
 
Quantitative approach 1
Quantitative approach 1Quantitative approach 1
Quantitative approach 1
Sri Naga Ramya
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
Jayson Narito
 
Quantitative techniques introduction 19 pages
Quantitative techniques introduction 19 pagesQuantitative techniques introduction 19 pages
Quantitative techniques introduction 19 pages
taniyakhurana
 

Andere mochten auch (17)

Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
Managing project performance: alignment of Agile and traditional metrics
Managing project performance: alignment of Agile and traditional metricsManaging project performance: alignment of Agile and traditional metrics
Managing project performance: alignment of Agile and traditional metrics
 
Project quality (and test process) metrics
Project quality (and test process) metricsProject quality (and test process) metrics
Project quality (and test process) metrics
 
Quality metrics project management
Quality metrics project managementQuality metrics project management
Quality metrics project management
 
5 of 5 Quality Metrics & Science by Obaid Ali
5 of 5  Quality Metrics & Science by Obaid Ali5 of 5  Quality Metrics & Science by Obaid Ali
5 of 5 Quality Metrics & Science by Obaid Ali
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Software Quality Metrics for Testers - StarWest 2013
Software Quality Metrics for Testers - StarWest 2013Software Quality Metrics for Testers - StarWest 2013
Software Quality Metrics for Testers - StarWest 2013
 
Quality Metrics
Quality Metrics Quality Metrics
Quality Metrics
 
Quality Metrics
Quality MetricsQuality Metrics
Quality Metrics
 
The Metrics of Project Management Performance and PMBOK
The Metrics of Project Management Performance and PMBOKThe Metrics of Project Management Performance and PMBOK
The Metrics of Project Management Performance and PMBOK
 
Quantitative approach 1
Quantitative approach 1Quantitative approach 1
Quantitative approach 1
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
Project performance tracking analysis and reporting
Project performance tracking analysis and reportingProject performance tracking analysis and reporting
Project performance tracking analysis and reporting
 
Quantitative techniques introduction 19 pages
Quantitative techniques introduction 19 pagesQuantitative techniques introduction 19 pages
Quantitative techniques introduction 19 pages
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
The Three Things You Need to Know to Transform Any Size Organization Into an ...
The Three Things You Need to Know to Transform Any Size Organization Into an ...The Three Things You Need to Know to Transform Any Size Organization Into an ...
The Three Things You Need to Know to Transform Any Size Organization Into an ...
 

Mehr von Yevheniy Veselov, MBA, PMP

Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
Yevheniy Veselov, MBA, PMP
 
Стратагемный анализ в ИТ
Стратагемный анализ в ИТСтратагемный анализ в ИТ
Стратагемный анализ в ИТ
Yevheniy Veselov, MBA, PMP
 
Team decision making or Do you know that a camel was originally a horse desig...
Team decision making or Do you know that a camel was originally a horse desig...Team decision making or Do you know that a camel was originally a horse desig...
Team decision making or Do you know that a camel was originally a horse desig...
Yevheniy Veselov, MBA, PMP
 

Mehr von Yevheniy Veselov, MBA, PMP (20)

Right question pm day 2019 kharkiv
Right question pm day 2019 kharkivRight question pm day 2019 kharkiv
Right question pm day 2019 kharkiv
 
Что делать, если главный демотиватор команды - это вы ?
Что делать, если главный демотиватор команды - это вы ?Что делать, если главный демотиватор команды - это вы ?
Что делать, если главный демотиватор команды - это вы ?
 
Team de-building
Team de-buildingTeam de-building
Team de-building
 
Instant workhappines
Instant workhappinesInstant workhappines
Instant workhappines
 
Чи варто менеджеру ігнорувати мову тіла”
Чи варто менеджеру ігнорувати мову тіла”Чи варто менеджеру ігнорувати мову тіла”
Чи варто менеджеру ігнорувати мову тіла”
 
ПРИМЕНЕНИЕ СТРАТАГЕМНОГО АНАЛИЗА В УПРАВЛЕНИИ ИТ ПРОЕКТАМИ
ПРИМЕНЕНИЕ СТРАТАГЕМНОГО АНАЛИЗА В УПРАВЛЕНИИ ИТ ПРОЕКТАМИПРИМЕНЕНИЕ СТРАТАГЕМНОГО АНАЛИЗА В УПРАВЛЕНИИ ИТ ПРОЕКТАМИ
ПРИМЕНЕНИЕ СТРАТАГЕМНОГО АНАЛИЗА В УПРАВЛЕНИИ ИТ ПРОЕКТАМИ
 
Управление изменениями без Б
Управление изменениями без Б Управление изменениями без Б
Управление изменениями без Б
 
Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
Peoplemanagement: Теории мотивации и основные концепции современного дизайна ...
 
Стратагемный анализ в ИТ
Стратагемный анализ в ИТСтратагемный анализ в ИТ
Стратагемный анализ в ИТ
 
PM Forum 2012, my presentation
PM Forum 2012, my presentationPM Forum 2012, my presentation
PM Forum 2012, my presentation
 
Communications management in Agile projects
Communications management in Agile projectsCommunications management in Agile projects
Communications management in Agile projects
 
Feature SLDC
Feature SLDCFeature SLDC
Feature SLDC
 
My presentation for PM-Forum in Ukraine
My presentation for PM-Forum in UkraineMy presentation for PM-Forum in Ukraine
My presentation for PM-Forum in Ukraine
 
Magento Unified Process
Magento Unified ProcessMagento Unified Process
Magento Unified Process
 
Classical estimating methods
Classical estimating methodsClassical estimating methods
Classical estimating methods
 
Team decision making or Do you know that a camel was originally a horse desig...
Team decision making or Do you know that a camel was originally a horse desig...Team decision making or Do you know that a camel was originally a horse desig...
Team decision making or Do you know that a camel was originally a horse desig...
 
Risk management essentials
Risk management essentialsRisk management essentials
Risk management essentials
 
TOC2 - Current reality tree (CRT) and other tools
TOC2 - Current reality tree (CRT) and other toolsTOC2 - Current reality tree (CRT) and other tools
TOC2 - Current reality tree (CRT) and other tools
 
Interview in Requirement Management
Interview in Requirement ManagementInterview in Requirement Management
Interview in Requirement Management
 
Goldrat's Theory of Constraints
Goldrat's Theory of ConstraintsGoldrat's Theory of Constraints
Goldrat's Theory of Constraints
 

Kürzlich hochgeladen

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Kürzlich hochgeladen (20)

Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 

Metrics in project management

  • 1. Metrics Examples for Project Management byeugene.veselov@magento.com
  • 2. To reinforce Magento team with some ideas about metrics and their usage in project management To share positive knowledge Goal 'To know your future you must know your past‘George Santayana, a philosopher
  • 3. Preface Year 1944. The US Third Fleet, under the command of Admiral "Bull" William Halsey aboard the USS New Jersey, began moving toward the Philippines Islands.  The admiral decided to find a short way through the Calamian Islands. He sent a spy plane to make some photos of the route. After having analyzed the photos experts discovered that shapes of some islands differed from previous ones…. In the early morning, fleet of bombers took off towards a target area some 350 miles away from their carriers. At the time it was the longest range air raid in history. At 09.00 the Planes reached Busuanga Island, found 15-18 large Japanese enemy ships anchored in CORON BAY. 45 minutes later it was all over, the planes returned home leaving behind a hell of burning oil, explosions and sinking vessels….
  • 4. Preface Now a quick question: How do you think, Admiral William Halsey was good at mastering metrics or not?
  • 5.
  • 6. Kept comprehensive historical data of the project he managed
  • 7.
  • 8. Kept comprehensive historical data of the project he managed
  • 9.
  • 10. Estimation/Time Metrics Estimation Accuracy (EA) Description EA shows resulting deviation from original estimations which was made by developers. Could be positive (work took more efforts than planned) or negative when the task was overestimated. EA = (actual efforts/planned efforts)-1
  • 11. Estimation/Time Metrics Estimation Accuracy (EA) History Conclusion We are becoming better in estimations; however, estimations aren’t very precise so far. Attention : You do not find here real metrics values from our project due to NDA. All the values are made-up
  • 12. QA Metrics Customer Reported Unique Defects ratio (CRUD) Description CRUD = amount of unique defects which were reported by customers/total amount of bugs CRUD = 0 means that QA can see the system in the same way as customers do, 100% means we do not have the same system vision with our customers
  • 13. QA Metrics CRUD History (July-August 2011) Conclusion There is a very small positive trend of adjusting our internal QA procedures to customer’s demand. Attention : You do not find here real metrics values from our project due to NDA. All the values are made-up
  • 14. QA Metrics Bug Density (BD) Description Bug density is a ratio of changed (added or deleted) or total number LOC of code to quantity of unique bugs during defined period of time. BD = total strings / unique bugs This metric is a way to express the system’s quality as a function from lines of code and bug amount. The highest quality a system has the bigger value BD gets. Anyway, this metric is useless when is unlinked from time.
  • 15. QA Metrics Bug Density History (July-August 2011) Attention : You do not find here real metrics values from our project due to NDA. All the values are made-up Conclusion System quality fluctuates now. We need to perform some actions to get strong increasing trend.
  • 16. QA Metrics Critical Mass (CM) CM shows how many bugs from the total amount are critical. CM=quantity of critical bugs/total amount of bugs Only when CM=Zero, Core team makes the release.
  • 17. QA Metrics Attention : You do not find here real metrics values from our project due to NDA. All the values are made-up Critical Mass History (July-August 2011) Conclusion The peak on 7/21/2010 is because PO added some bugs to be fixed in the release.
  • 18. HR Metrics Total Available Resources (TAR ) TAR = (team size-absent people)/team size. TAR allows better understanding consequences of team member’s unavailability. For instance, 5 absent people for project of 10 people could be a disaster while 5 people for project of 100 people won’t affect it at all. TAR = 1 - all is OK, TAR = 0 team is totally absent. Usually, TAR=70 is an edge on which the manager should become worried
  • 19. HR Metrics Total Available Resources (TAR ) History (July-August 2011) Attention : You do not find here real metrics values from our project due to NDA. All the values are made-up Conclusion You can see that TAR was on 70% level a few times during this month. That could be a reason of putting off the release for a week.