Managed Change efforts overall still fail at 66% to 75% of the time. This means that the prevailing perspective on how to "make" change is defeating most other factors. Here's why.
2. The Current State
After decades of applying process models and certifications,
organizations still today have âfailureâ rates of 66% to 75% in managed
changes.
Somehow, the reported benefit of the discipline has not improved
despite lessons learned, new technology, and outright urgency to
succeed.
3. Types of failure
We know that there are many ways that, on evaluation day, a change
effort might be seen to have failed.
In general, the impact needed from the effort is insufficient because of:
⢠Inadequate strength, relevance, or usability at the finish,
⢠or net negatives versus positives that occurred along the way.
4. How failure developed
The general âcauseâ of any failure usually amounts to the following:
while the effort was underway, speed, complexity, or the most current
need caused the effort to go out of alignment with the eventual target
deemed âsuccessâ.
In short, the organization failed to adjust its effort over time,
or the organization did not know how to use the results obtained,
or both.
6. Where failure starts
When organizations and evaluators do not agree on what is
âvaluableâ, there is little chance that making future states different
from current states will be deemed âsuccessfulâ efforts.
The most important consideration to apply in starting change is the
understanding of âvalueâ and how the understanding can be shared
among all participants.
Any impacts that are generated by the participants need to be
compatible with obtaining the target value.
Missing, or counter-productive, co-operation is an undisputed show
stopper.
7. Staying out of trouble
Obtaining the intended value should be both viable and feasible when
having all interim impacts support progress towards the intended
future state.
But the history of managed changes so far continues to demonstrate
that aligning interim impacts is either not adequately done, or the
alignment is only a precondition, not a cause.
Most retrospectives do identify that insufficient preconditions predict
failure.
That problem is the common reality of a failure to manage risks to
expectations, in production.
8. THE PACE OF CHANGE CREATES RISKS TO VALUE
The ânew normalâ, of increased frequency and variety of change, makes an
organizationâs role as a provider of value far more risky versus any predictability.
But that risk is mainly based on preconceptions (explicit or not) about what kind
of value is worth investing in.
Organizations are usually structured specifically to address the requirements for
generating specified (preconceived) types of value. Despite that, risks may
prevail:
⢠Ongoing change can mean that prior structural preparation lacks alignment to
newly emerged requirements.
⢠Frequent change can mean that fixed structures are at best only temporarily
relevant.
⢠Unpredictable change can mean that the advertised requirements offer little
practical opportunity to misaligned providers.
9. Management usually struggles to
mitigate those risks to recognized
value, primarily through
procedural control (i.e.,
execution).
Its view of âsuccessâ against risks
in the change effort relies on
influences that look like this
matrix.
Execution
Distinction Predictability
Target Prescription
Measure Performance
Motive Completion
Means Control
Risk Efficiency
METHODS versus RISKS
Š 2020 malcolm ryder / archestra research
11. Managing execution primarily involves achieving compliance to expectations.
In turn, this heavily emphasizes predictability.
Executionâs predisposition
Š 2020 malcolm ryder / archestra research
12. Execution setbacksâŚ
The main problem with the Execution orientation is that, statistically, it does
not improve change managementâs rate of success, despite decades of
âlessons learnedâ.
Generally, that means even if execution is improving, there is a basic link
missing between âexecutionâ and âaccepted valueâ, in most cases.
Doing the work right is not equating to doing the right work.
Specifically, we have to conclude that either:
⢠the execution modeâs outputs are not likely to be sufficient in precision or
scope, orâŚ
⢠the ultimate value proposition that is dependent on change is not stated
adequately for the execution mode to target effectively.
13. Complexity and speed of response activity may
intensify common inhibitors to accepted value
ACCEPTED?
Approval Preference
PROVIDED?
Acknowledged
Familiar results are
more comfortable
but may have
inadequate influence
on new problems
Requested outputs &
outcomes may have
an uncertain lifespan
of usefulness
Permitted
Variations from
norms or standards
may not survive
beyond the local
workgroup that made
them
Discovered effects
may be held back or
held out due to
unfamiliarity or the
support burden
Complexity is both within
and around the change
effort.
The ordinary intent to also
handle complexity at speed
requires organizations to be
either specialized or
exceptionally talented when
they take the provider role in
the change.
In that role they need to
understand how their
efforts might raise or lower
the final value perceived.
Too often, in execution, that
foresight has not been
involved or was not helpful.
Š 2020 malcolm ryder / archestra research
14. Aligning execution to Value
On the surface it would seem to be good advice to tackle complexity through
simplification, and to tackle speed through sizing.
The formula would be to always pursue the fewest and smallest chunks of work
that will âsufficeâ against known requirements.
That advice presumes there is very good work done on decomposing the most
important value proposition(s) into usable requirements that are well understood
by participants in provider roles.
An even bigger presumption is that the value proposition will probably stay the
same for the duration of the change effort.
But again, this is not a new idea, and execution with these presumptions has not
improved the reported success rates for far more than a decade.
15. Aligning Value to Capability
An important point to highlight here is that the way value is defined is always a
major factor in the evaluated âsuccessâ or âfailureâ of execution.
Since the way value is defined can predetermine evaluated âsuccessâ or âfailureâ of
any supporting effort, we have to understand two things:
⢠Should value be defined especially to allow execution to be more successful? In
this matter, history suggests that it is time to look for alternatives to basing value
on execution. The vast number and variety of specific changes has been more
than enough to test different ways of having executionâs performance mandate
constrain value definition, and it has not been working well.
⢠Does the ongoing increase in the pace of change mean that value must be
defined differently than in the past? In this matter, any future state created by a
change effort needs to be a difference that can offer value â so âvalueâ itself
must be probable from the effort, whether the value is prescribed or emerges.
17. Significant impacts are Produced as Value
All of the following are production efforts that offer advantages against complexity
(structural or environmental), demand for speed, or both, in the high pace of change.
⢠Startups pivot
⢠Innovations monetize
⢠Complementary products integrate
⢠Teams self-organize
⢠Architectures are service-oriented
⢠Agile developers curate
⢠R&D experiments
⢠Collaborators open source
⢠Designers crowd source
⢠The entire world of performing arts creates
Value is: the meaning of an
impact in a given context.
Production offers an impact
based on a current capability,
and promotes that impact to one
or more contexts.
Value is generated and cultivated,
not executed and delivered.
18. Production
Distinction Relevance
Target Opportunity
Measure Impact
Motive Effect
Means Creation
Risk Scope
PRODUCING MANAGED VALUE, NOT FAILURE
âReturn On Investmentâ
Š 2020 malcolm ryder / archestra research
KeyAspectsofChangeEffort
In high-change environments, the
execution mentality so far actually
propagates risks to accepted value.
âSuccessfulâ change is based on
context-sensitive value. A different
mentality â production â more
consistently provides effective
reference points in the guidance of
the change effort towards value.
The view of âsuccessâ against risks to
the value of the change effort relies
on influences that look like this matrix.
19. Producing value follows being built for change
⢠Expecting and investing in diversity and variety
⢠Modeling business on value(s) available from impacts
⢠Adopting the production mentality and measures
⢠Cultivating capabilities for production impacts
⢠Mitigating risks to impacts, not risks to managersâ performance
evaluations
20. WHY
RECOVER GROW INNOVATE
HOW
TRANSFORM
Escape
obsolescence
Adapt for
increased range
Create new
advantage
EVOLVE
Avoid
disqualification
Meet higher standard
or newer prerequisite
Become
exclusive
BUILD
Repair
injury
Achieve
completeness
Create
uniqueness
VALUE-BASED MODEL of the CHANGE INITIATIVES PORTFOLIO
Š 2020 malcolm ryder / archestra research
The value-based portfolio identifies the goals that distinguish the future state from the current state.
The goals represent the significance of the difference generated by the mode (âhowâ) of change.
If these are not the concerns at hand, then why is there a change going on?
22. Success, Production and Execution
Change is an inevitable experience whether it is managed or not.
Execution is an inevitable concern because organizations usually have a limit to their
immediate resources.
Since the purpose of managed change is to support the sustainability of the organizationâs
business for purpose, managing execution is mandatory.
But in managing change, procedural execution has suffered from the burden of misplaced
expectations.
Reported failures consistently point to misalignments of procedural execution and eventual
accepted value.
The new normal of high-paced change means producing relevant impacts on demand, in
order to be experienced and evaluated as a success. Production is the reference
perspective of management for value and it aims for ROI.
The core concern of managing change is that production generates the relevant impact.
The production perspective then uses execution as necessary for support.
23. Execution Production
Distinction Predictability Relevance
Target Prescription Opportunity
Measure Performance Impact
Motive Completion Effect
Means Control Creation
Risk Efficiency Scope
EXECUTION vs. PRODUCTION
âReturn On Managementâ âReturn On Investmentâ
Š 2020 malcolm ryder / archestra research
KeyAspectsofChangeEffort
24. Archestra notebooks compile and organize decades of in-the-field and ongoing empirical findings.
All presented findings are derived exclusively from original research.
Archestra notebooks carry no prescriptive warranty.
As ongoing research, all notebooks are subject to change at any time.
Š2020 Malcolm Ryder / Archestra Research
www.archestra.com
mryder@archestra.com
Archestra research is done from the perspective of strategy and architecture.
With all subject matter and topics, the purpose of the notes is analytic, primarily to:
* explore, expose and model why things are
included, excluded, or can happen
in given ways and/or to certain effects.
* comment on, and navigate between,
motives and potentials that predetermine
decisions about, and shapings of, the observed activity.