WHAT IS LOGICAL FRAMEWORK ANALYSIS (LFA)? 
A log frame (also known as a Project Framework) is a tool for planning and managing development 
projects. It looks like a table (or framework) and aims to present information about the key 
components of a project in a clear, concise, logical and systematic way. The log frame model was 
developed in the United States and has since been adopted and adapted for use by many other 
donors, including the Department for International Development (DFID). 
A log frame summarises, in a standard format: 
• What the project is going to achieve? 
• What activities will be carried out to achieve its outputs and purpose? 
• What resources (inputs) are required? 
• What are the potential problems which could affect the success of the project? 
• How the progress and ultimate success of the project will be measured and verified? 
WHY USE LFA? 
Because most donors prefer it? 
LFA can be a useful tool, both in the planning, 
monitoring and evaluation management of 
development projects. It is not the only planning tool, 
and should not be considered an end in itself, but 
using it encourages the discipline of clear and 
specific thinking about what the project aims to do 
and how, and highlighting those aspects upon which 
success depends. 
LFA also provides a handy summary to inform 
project staff, donors, beneficiaries and other stakeholders, which can be referred to 
throughout the lifecycle of the project. LFA should not be set in concrete. As the project 
circumstances change it will probably need to reflect these changes but everyone involved will 
have to be kept informed. 
What is so intimidating about using LFA? 
Perhaps because we are very conscious of the complexity of development projects, we find it hard 
to believe that they can be reduced to one or two sides of A4. Remember that the log frame isn't 
intended to show every detail of the project, nor to limit the scope of the project. It is simply a 
convenient, logical summary of the key factors of the project. 
Guidance Notes No.4 
Logical Framework Analysis 
The LFA is a way of describing a 
project in a logical way so that it is: 
• Well designed. 
• Described objectively. 
• Can be evaluated. 
• Clearly structured.
WHAT DOES THE JARGON MEAN? 
Some of the terminology involved in LFA may seem rather intimidating. Do not be put off by the language. 
Remember that the goal, purpose, outputs and activities are all objectives but at different levels of the project 
hierarchy. Different donors use slightly different terminology, but the logical frameworks are all the same in 
principle. You will come across the following terms: 
TERM MEANING EXAMPLE 
___________________________________________________________________________________________ 
Narrative Summary The goal, purpose, outputs and activities of See below. 
the project as described in the left-hand 
column of the logical framework. 
(the Objectives column) 
___________________________________________________________________________________________ 
Goal The ultimate result to which your project Jamaica’s dominance of 
is contributing - the impact of the project. competitive bobsledding. 
___________________________________________________________________________________________ 
Purpose The change that occurs if the project Jamaica wins the gold medal 
outputs are achieved - the effect of the for bobsledding at the 2002 
project. Winter Olympics. 
___________________________________________________________________________________________ 
Outputs The specifically intended results of the Team members selected by 
project activities - used as milestones of (date). 
what has been accomplished at various Team at full fitness by (date) etc. 
stages during the life of the project. 
___________________________________________________________________________________________ 
Activities The actual tasks required producing the Develop training schedule. 
desired outputs. Find practice venue. 
Publicity campaign to recruit 
team member, etc. 
___________________________________________________________________________________________ 
Indicators Also referred to as measurable or 1. Team members capable of 
objectively verifiable indicators (OVI) running x metres in x seconds by 
quantitative and qualitattive ways of x time. 
measuring progress and whether project 2. 4 year training schedule, 
outputs; purpose and goal have been budget and outcomes developed 
achieved. and agreed by x, etc. 
___________________________________________________________________________________________ 
Means of M.O.V is the information or data 1. Fitness report from team 
verification required to assess progress against doctor. 
indicators and their sources. 2. Schedule written and agreed 
(signed) by coach, team 
members and team doctor. 
___________________________________________________________________________________________ 
Assumptions Factors external to the project which are The Jamaican team qualities for 
likely to influence the work of the project the Games. 
management has little control, and which It snows enough for the Games 
need to exist to permit progress to the to be held, etc. 
next level in the LFA. 
___________________________________________________________________________________________ 
Super goal The long-term results of continued Hot countries seen as serious 
achievement of the goal of the project. competitors in winter sports. 
___________________________________________________________________________________________ 
Inputs What materials, equipment, financial Funding, Coach, Bob-sled, 
and human resources are needed to carry Snow, Medical Advisor, etc. 
out the activities of the project? 
___________________________________________________________________________________________ 
BOND Guidance Notes Series 2
WHO SHOULD BE INVOLVED? 
The reality of funding proposals and completing log 
frames usually means a desk officer in the UK trying 
to summarise a project outline for a funding 
application. However, if used correctly as a planning 
tool, LFA ought to be developed first by, or working 
closely with the person most closely involved in 
project implementation who will most likely be your 
project co-ordinator or partner organisation overseas. 
The project detail can be more easily developed from 
the log frame than the other way round. 
Writing log frames in the UK is not participatory, which 
has led to criticism of the log frame as a planning 
tool. Ideally it should be produced 'in country' so that 
during the planning stage participatory approaches 
can be used to feed into the log frame as it is 
developed. Whilst project beneficiaries may not 
identify easily with the concept of LFA, they may be 
able to identify the factors that are critical to project 
success, as well as the most appropriate indicators of 
progress. In this way, participatory techniques can be 
used to inform LFA. 
The log frame can also provide a guide as to what 
information needs to be gathered through participatory 
processes, and can be enhanced by combining the 
outcomes of other planning tools, such as social 
mapping, wealth ranking, and problem and objective 
trees. 
If the log frame has 
to be written, 
adapted or changed 
in the UK, it is 
important to feed the 
detail back to 
fieldworkers, 
partners and other 
relevant 
stakeholders 
overseas. The input 
to a log frame 
should be a team 
effort, as much as 
possible. 
If you are not the person closest to the project, it is 
important to engage that person in developing the log 
frame. 
Always consider: 
• What impact the objectives & indicators will have on 
their work. 
• What is realistically achievable? 
• Will they have enough time to collect the information 
you are asking for? 
• Are the assumptions are you making realistic to 
them? Are you fully aware of their working 
conditions? 
WHAT DO I NEED TO PRODUCE A LOGICAL FRAMEWORK? 
• Supply of large sheets of paper, (preferably flip chart sheets). 
• Pencil, eraser and 'Post-it' notes or cards, so you can adjust and amend as you go along. 
• Somewhere to work without distractions. 
• Ideally, someone to discuss and 'bounce' ideas around with. 
• As much information about the planned project as possible - preferably do it 'on site'. 
NOW, WHERE DO I NEED TO START? 
Many people find it useful to start by developing a 
Problem Tree. Try to identify what is the real problem 
the project is to tackle and write it in the middle of a 
sheet of paper. Then consider the direct causes of the 
problem and write them in a horizontal line below the 
problem. 
Next, repeat the process for each of those on another 
horizontal line and continue to repeat as necessary. 
All the statements must be written in negative terms. 
This will give you a problem tree in which a cause and 
effect relationship operates from the bottom to the top. 
You may also find it useful to work upwards from the 
original problem, identifying its effect etc. 
Then changing the wording of each item into positive 
terms will change the Problem Tree into an Objective 
Tree. Next, decide whether the original problem is still 
BOND Guidance Notes Series 3
going to be the main focus (or goal) of the project. 
This may now be higher or lower on the Objective 
Tree. 
Having made that decision, the purpose, outputs and 
activities should be present in the next three 
horizontal lines of the Objective Tree. It will probably 
be necessary to decide what to include at this stage, 
as the project has to be of a manageable size. 
(See Figure 1 below: A Logical Framework - 
DFID model) 
The key to completing log frames is to use the 
information generated in the Objective Tree and: 
• Start at the top and work down 
The objectives column - what is the project going 
to achieve? 
• Then think laterally 
How can the progress of the project be measured 
against its objectives? 
• Then reflect back up 
What assumptions are to be included and what are 
their implications? 
Figure 1: A Logical Framework (DFID model) 
Taken from DFID’s “Guidelines on Humanitarian Assistance”, May 1997 
Objectives Measurable 
indicators 
Means of 
verification 
Important 
assumptions 
BOND Guidance Notes Series 4 
GOAL: 
Wider problem the 
project will help to 
resolve 
Quantitative ways of 
measuring or 
qualitative ways of 
judging timed 
achievement of goal 
Cost-effective 
methods and 
sources to quantify 
or assess indicators 
(Goal to supergoal) 
External factors 
necessary to sustain 
objectives in the long 
run 
PURPOSE: 
The immediate impact 
on the project area or 
target group i.e. the 
change or benefit to 
be achieved by the 
project 
Quantitative ways of 
measuring or 
qualitative ways of 
judging timed 
achievement of 
purpose 
Cost-effective 
methods and 
sources to quantify 
or assess indicators 
(Purpose to Goal) 
External conditions 
necessary if achieved 
project purpose is to 
contribute to reaching 
project goal 
OUTPUTS: 
These are the 
specifically deliverable 
results expected from 
the project to attain 
the purpose 
Quantitative ways of 
measuring or 
qualitative ways of 
judging timed 
production of outputs 
Cost-effective 
methods and 
sources to quantify 
or assess indicators 
(Outputs to purpose) 
Factors out of project 
control which, if present, 
could restrict progress 
from outputs to 
achieving project 
purpose 
ACTIVITIES: 
These are the tasks to 
be done to produce 
the outputs 
INPUTS: 
This is a summary of 
the project budget 
Financial out-turn 
report as agreed in 
grant agreement 
(Activity to output) 
Factors out of project 
control which, if present, 
could restrict progress 
from activities to 
achieving outputs 
DFID describes the Logical Framework as "a tool to help designers of projects think 
logically about what the project is trying to achieve (the purpose), what things the 
project needs to do to bring that about (the outputs) and what needs to be done to 
produce these outputs (the activities). The purpose of the project from the DFID 
viewpoint is to serve our higher level objectives (the goal)". 
NOTE: The two boxes in the centre of the "Activities" row are not used for Measurable 
Indicators and Means Of Verification as the progress and success of the Activities are 
measured at the Outputs level. Remember, the Activities are carried out to achieve the 
Outputs. These "spare" boxes can therefore be used to provide any useful additional 
information such as Inputs and Budgeting requirements.
THREE STAGES TO SUCCESS: 
STAGE ONE - TOP DOWN (OBJECTIVES) 
STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF 
STAGE ONE - TOP DOWN (OBJECTIVES) 
STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF 
VERIFICATION) 
As you work down each step of your objectives, think: 
• How the outputs and activities can be measured. 
• What indicators can be used to measure achievement 
against? 
• What information will be needed, and how it can be 
gathered? 
• What problems, obstacles or barriers might arise to 
prevent the project from progressing as planned? 
• How can their impact be minimised? 
6. INDICATORS 
Starting either from the top or the bottom of your 
hierarchy of objectives, begin to work across the log 
frame, identifying the indicators for measuring your 
progress. Indicators need to define ‘QQT’, Quality, 
Quantity and Timing: 
1. GOAL 
Starting at the top and using the information from the 
Objective Tree consider the overall goal of the 
project. What issue or problem is the project trying to 
address? The goal may be beyond the reach of this 
project on its own. What ultimate objective is the 
project contributing to? This should be a brief 
statement or summary. 
Example 
To increase literacy among young people in the sub- 
Sahel region. 
2. PURPOSE 
What final result are you trying to achieve? This is the 
purpose of the project. This should be clear and brief. 
Example 
School attendance and literary skills of 6-14 year olds 
in (named region) of the sub-Sahel is increased. 
3. OUTPUTS 
What are the particular outputs needed to achieve 
the Purpose of the project? There may be several 
outputs. 
Example 
'Five new language teachers recruited and trained.' 
'Classes running in all schools at times when 
children are not required to complete family duties. 
''Information sessions for families with school age 
children held in each village demonstrating benefits of 
literacy.' 
4. ACTIVITIES 
List the activities, which are needed to achieve these 
outputs. There may be several for each output. 
Statements should be brief and with an emphasis on 
action words. 
Example 
'Hold publicity campaign in (named region) to recruit 
language teachers by (date)'. 'Agree and arrange 
selection process & schedule for teacher recruitment 
involving existing teaching staff'. 'Hold training 
sessions for new teachers covering aims, approach, 
customs, potential problems holding information 
sessions, record-keeping, expenses'. 'Arrange 
appropriate accommodation for teachers in each 
village at least before arrival'. 'Plan and hold meetings 
in each village for families with school age children to 
demonstrate the benefits of literacy' etc. 
5. INPUTS 
When required to do so provide additional information, 
such as the inputs which are needed to carry out 
these activities. Again, there may be several for each 
activity and it will help to run through each individually, 
listing required inputs (resources, equipment, tools, 
people). Group the inputs and list each once rather 
than repeatedly. This may include a summary of the 
project budget. 
Example 
Budget, Training space, Accommodation, Support for 
existing teaching staff, Teaching materials, Transport 
to village, Project Co-ordinator / Fieldworker etc. 
Quality - The kind (or nature) of the 
change. 
Quantity - The scope (extent) of the 
change ie. by how much, how 
many. 
Timing - By when the change should 
have taken place. 
VERIFICATION) 
STAGE THREE - BOTTOM UP (ASSUMPTIONS) 
BOND Guidance Notes Series 5
There are two kinds of indicators you will need to use: 
Process indicators 
Which measure the extent to which you have 
achieved your stated objectives. 
Example 
How many children attending school by 
(specified)time. 
Impact indicators 
Which help to monitor the achievement and the 
impact of your work. 
Example 
How many children pass (specified) literacy test at 
(specified) time. 
In addition, indicators can also be: 
Direct 
Example 
The Number of children attending school. 
Indirect (also known as soft or proxy). 
Example 
More books borrowed from the school library - 
suggesting more children reading, therefore wider 
literacy. 
Examples 
Using Indicators at the Purpose level: 
School attendance of 6-14 year olds is increased by 
200 per cent within 4 years. 90 per cent 6-14 years 
olds (in named region) of the sub-Sahel to have 
gained (particular level) of literacy skills within 4 
years. 
Using Indicators at the Outputs Level: 
Five language teachers recruited and trained by (date). 
At least two classes running in all schools at times 
when children are not required to complete family 
duties by (date). At least three information sessions for 
families with school-age children held in each village 
demonstrating benefits of literacy by (date). 
7. INFORMATION SOURCES 
Next, try and work out your means of verification for 
each indicator. What information will you need, and 
how and from where can it be gathered? 
Will project staff or others need to keep records, or can 
they get the information from somewhere else? 
Consider the cost implications, if any, and build this into 
the project budget. 
Don't exclude anecdotal evidence (eg. views 
expressed by project beneficiaries, etc) if this is the 
most appropriate source of information, but remember 
that donors can be wary of this evidence, and it may 
later be necessary to demonstrate your claims! 
Note: 
If you are confused about indicators - don't 
panic! Identifying indicators requires some 
practice. Try to find a mentor with more 
experience who can advise you. Or move on to 
look at means of verification - thinking about what 
information you need, and how to get it, may help 
to define what the indicator should be. If you 
come up with a long list of possible indicators try 
to narrow it down to the essential ones. 
STAGE THREE - BOTTOM UP (ASSUMPTIONS) 
8. EXTERNAL FACTORS 
What external factors (outside your control) could 
affect the success of your project or prevent work 
from progressing? These may be climatic, political, 
economic, etc. but should be real (possible) 
risks rather than a list of everything that could go 
wrong. 
Reflecting up from the bottom of your log frame, 
consider how, if each assumption holds, it will 
be possible to move to the next stage of the 
project. 
Example 
There are sufficient rains to ensure that children are 
not required to replant crops and therefore unable to 
attend school. 
And/or, Sufficient teachers with knowledge of local 
dialect are recruited. 
And/or, Conflict from neighbouring region doesn't 
spread into local area so that emergency needs take 
precedence over education. 
9. DOUBLE CHECK 
Following completion of your log frame, go over it, 
from bottom to top, to check the logic of it: 
• Will the inputs and activities clearly lead to the 
outputs required to achieve the purpose and 
contribute to the goal? 
• Will the indicators and means of verification 
effectively measure the progress of the project? 
• Are the assumptions reasonable or do they indicate 
a level of risk, which suggests that the project is 
unlikely to get off the ground or be completed? (The 
killer assumption) 
• Is the project staff committed to the objectives and 
indicators identified and see them as realistic and 
achievable? 
• Are there any changes, which could be made which 
will make the project it more practical and workable? 
BOND Guidance Notes Series 6
10. WRITE IT UP 
When the log frame has been checked (and 
rechecked) and it is truly logical, and representative of 
the project, type (or write) it up onto A4 sheets. 
At this point all the relevant stakeholders should 
have had a chance to contribute to (and agree) the 
completed log frame. 
11. STAYING INFORMED 
And still you haven't finished; remember that LFA is a 
flexible tool for planning, managing, monitoring and 
reporting your project. As the project progresses 
and situations change, return to the log frame and 
revise it accordingly. Agree these changes with the 
donor and other stakeholders and keep everyone 
informed so that they are able to keep up to date 
with current progress of the project and its future 
direction. 
WANT TO FIND OUT MORE? 
•Gosling L and Edwards M (1995) "Toolkits: a practical guide to assessment, monitoring, 
review and evaluation" Development Manual 5 pp. 178-192 Save The Children, £6.95 (New 
edition due in March 2003 with updated information on Logical Frameworks) 
• The DFID "Guidelines on Humanitarian Assistance" published in May 1997 includes guidance on 
preparing log frames, and is available on the DFID web-site at 
http://62.189.42.51./DFIDstage/faqs/files/guidelines_on_humanitarian_assistance_v5.0a.doc 
• DFID Chapter on Logical Frameworks in their Tools for Development series: 
http://62.189.42.51/DFIDstage/FOI/tools/chapter_05_frame.htm 
• The Civil Society Challenge Fund Guidelines 2002 include an Annex C on The Logical 
Framework: 
http://62.189.42.51/DFIDstage/Pubs/files/cscf_guide.htm 
• Akroyd, D. (1995), 'The Logical Framework Approach and the post-evaluation of health 
sector projects by the, African Development Bank', Project Appraisal, 10 (4), Pages 210-222. 
• Akroyd, D. (1995), 'Steps toward the adoption of Logical Framework Approach in the African 
Development Bank: some illustrations for agricultural sector projects', Project Appraisal, 10 
(1), 19-30. 
• Argeetey, E. (1998), 'Consultative processes in community development in Northern Ghana', 
Community Development Journal, 33 (4), 301-33. 
• Cordingley, D. (1995), 'Incorporating the Logical Framework into the Management of 
technical co-operation projects', Project Appraisal, 10 (2), 103-112. 
• Cracknell, B. (1996), 'Evaluating Development Aid', Evaluation, 2 (1) 23-33. 
• Eggers, H. W. (1998), 'Project Cycle Management Revisited', The Courier May/June 1998, 69- 
72, Brussels: European Commission 
• Gasper, D. (1999), 'Problems in the Logical Framework Approach and the challenges for 
Project Cycle Management', The Courier, Jan/Feb 1999, 173, 75-77. Brussels: European 
Commission 
• Jackson, B, Designing Projects and Project Evaluations using the Logical Framework Approach: 
http://iucn.org/themes/eval/english/lfa.htm 
• Nancholas, S. (1998), 'How to (or not to do)... A Logical Framework', Health Policy and Planning, 
13 (2), 189-193. 
BOND Guidance Notes Series 7
Top Tips 
• Don't leave it to the last minute. Start working 
on your log frame when you begin planning the 
project. You may need to gather information as 
you go along that will be difficult to get later (eg 
baseline data against which to measure 
progress). 
•Try and get the person planning and 
implementing the project to complete the log 
frame. If this is not possible consider the 
implications of the objectives, indicators & 
verification on field staff and partners. 
• Develop a problem tree. By turning the 
problems into objectives, this should help clarify 
the goal, purpose, outputs and activities of your 
project. 
• Find a mentor with experience of writing log 
frames who can offer you advice & assistance. 
• If you get stuck, don't panic - move on to the 
next stage and come back to the tricky bit later. 
• Work in pencil so you can erase things and 
make amendments easily, and use a large sheet 
of paper with plenty of room for 'thinking' then 
reduce it down to A4 later. 
• It is difficult to get it right first time, keep 
reflecting and revising until you are satisfied that 
the project is workable and the log frame is 
clearly logical! 
• Use the log frame as the basis of the funding 
application and then throughout the project 
lifecycle to track progress and adapt to changing 
situations. You can use the log frame to review 
assumptions and implications, and to keep 
donors and other stakeholders informed of 
significant changes. 
ABOUT BOND 
BOND is the network 
of over 270 UK-based 
non-governmental 
organisations (NGOs) working in international 
development and development education. 
BOND aims to improve the extent and quality of 
the UK and Europe’s contribution to international 
development, the eradication of global poverty 
and the upholding of human rights. 
The Guidance Notes Series aims to provide 
‘how-to’ information on a variety of topics for the 
development sector. This edition also provides 
signposts to resources for those keen to pursue 
the topic further. 
Disclaimer: BOND’s Guidance Notes aim to 
encourage good practice through practical 
advice, however, BOND cannot be held 
responsible for the outcome of any actions taken 
as a result of the information contained in the 
Guidance Notes series. 
Acknowledgements 
These guidance notes are drawn from training on LFA conducted for BOND by: 
• Laurence Taylor (formerly Tutor Development Studies at Selly Oak Colleges), 37 Yardley Wood Road, 
Moseley, Birmingham B13 9JA 
• Neil Thin, Department of Social Anthropology, University of Edinburgh, Adam Ferguson Building, 
George Square, Edinburgh EH8 9LL 
• John Sartain, Tamarind Associates, Trebeck Hall, Bishop's Drive, Southwell, Nottinghamshire NG25 
0JP 
© Copyright March 2003: BOND, Regent’s Wharf, 8 All Saints Street, London, N1 9RL Tel: 020 7837 8344 
Fax: 020 7837 4220 Email: bond@bond.org.uk Website: www.bond.org.uk Charity No. 1068839

Weitere ähnliche Inhalte

Was ist angesagt?

Gender mainstreaming Nepal - Copy.pptx
Gender mainstreaming Nepal - Copy.pptxGender mainstreaming Nepal - Copy.pptx
Gender mainstreaming Nepal - Copy.pptxAnilGiri36
 
Social media & public relations power point (ncfpd 2009)
Social media & public relations power point (ncfpd   2009)Social media & public relations power point (ncfpd   2009)
Social media & public relations power point (ncfpd 2009)Karen Freberg
 
Non-Profit Program Planning and Evaluation
Non-Profit Program Planning and EvaluationNon-Profit Program Planning and Evaluation
Non-Profit Program Planning and EvaluationKristina Jones
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptxNimra zaman
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework AnalysisJFM Lohith Shetty
 
Models-Approaches-and-Strategies-of.pptx
Models-Approaches-and-Strategies-of.pptxModels-Approaches-and-Strategies-of.pptx
Models-Approaches-and-Strategies-of.pptxJhimarJurado2
 
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Scoffy Wangang
 
MERITS AND DEMERITS OF LEADERSHIP STYLES
MERITS AND DEMERITS OF LEADERSHIP STYLESMERITS AND DEMERITS OF LEADERSHIP STYLES
MERITS AND DEMERITS OF LEADERSHIP STYLESCharles Adu
 
Communication Theories
Communication TheoriesCommunication Theories
Communication TheoriesSomaiya
 
Diffusion of innovation theory
Diffusion of innovation theoryDiffusion of innovation theory
Diffusion of innovation theoryAwais Zubair
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKMADHUR VERMA
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)Tony
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkPreston Healthcare Consulting
 
Media role in climate change and disaster risk reduction
Media role in climate change and disaster risk reductionMedia role in climate change and disaster risk reduction
Media role in climate change and disaster risk reductionSai Bhaskar Reddy Nakka
 
Understanding community mobilization
Understanding community mobilizationUnderstanding community mobilization
Understanding community mobilizationEmmanuel Olashore
 

Was ist angesagt? (20)

Gender mainstreaming Nepal - Copy.pptx
Gender mainstreaming Nepal - Copy.pptxGender mainstreaming Nepal - Copy.pptx
Gender mainstreaming Nepal - Copy.pptx
 
Developing a problem tree
Developing a problem treeDeveloping a problem tree
Developing a problem tree
 
Social media & public relations power point (ncfpd 2009)
Social media & public relations power point (ncfpd   2009)Social media & public relations power point (ncfpd   2009)
Social media & public relations power point (ncfpd 2009)
 
THE DIFFERENCE BETWEEN TRAIT THEORIES & BEHAVIORAL THEORIES
THE DIFFERENCE BETWEEN TRAIT THEORIES & BEHAVIORAL THEORIESTHE DIFFERENCE BETWEEN TRAIT THEORIES & BEHAVIORAL THEORIES
THE DIFFERENCE BETWEEN TRAIT THEORIES & BEHAVIORAL THEORIES
 
Non-Profit Program Planning and Evaluation
Non-Profit Program Planning and EvaluationNon-Profit Program Planning and Evaluation
Non-Profit Program Planning and Evaluation
 
Gender based violence
Gender based violenceGender based violence
Gender based violence
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptx
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework Analysis
 
Models-Approaches-and-Strategies-of.pptx
Models-Approaches-and-Strategies-of.pptxModels-Approaches-and-Strategies-of.pptx
Models-Approaches-and-Strategies-of.pptx
 
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
 
MERITS AND DEMERITS OF LEADERSHIP STYLES
MERITS AND DEMERITS OF LEADERSHIP STYLESMERITS AND DEMERITS OF LEADERSHIP STYLES
MERITS AND DEMERITS OF LEADERSHIP STYLES
 
Communication Theories
Communication TheoriesCommunication Theories
Communication Theories
 
Diffusion of innovation theory
Diffusion of innovation theoryDiffusion of innovation theory
Diffusion of innovation theory
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Media management functions
Media management functionsMedia management functions
Media management functions
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)
 
Gender training workshop for iita 5 g ender analysis copy day 2
Gender training workshop for iita 5   g ender analysis   copy day 2Gender training workshop for iita 5   g ender analysis   copy day 2
Gender training workshop for iita 5 g ender analysis copy day 2
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical framework
 
Media role in climate change and disaster risk reduction
Media role in climate change and disaster risk reductionMedia role in climate change and disaster risk reduction
Media role in climate change and disaster risk reduction
 
Understanding community mobilization
Understanding community mobilizationUnderstanding community mobilization
Understanding community mobilization
 

Andere mochten auch

5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your projectKarzen & Karzen d.o.o.
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)rexcris
 
Proposal format
Proposal formatProposal format
Proposal formatMr SMAK
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisTony
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysisLiris Thomas
 
Elements of the Best Project Proposals
Elements of the Best Project ProposalsElements of the Best Project Proposals
Elements of the Best Project ProposalsDevex
 
Elements of a proposal
Elements of a proposalElements of a proposal
Elements of a proposalDierdre McKee
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalnooone
 
Project cycle management
Project cycle managementProject cycle management
Project cycle managementPK Agrawal
 
Introduction to the Logical Framework Approach
Introduction to the Logical Framework ApproachIntroduction to the Logical Framework Approach
Introduction to the Logical Framework ApproachDamien Sweeney
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management mohamed osama hussein
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Writing the Budget for a Grant Proposal
Writing the Budget for a Grant ProposalWriting the Budget for a Grant Proposal
Writing the Budget for a Grant ProposalDierdre McKee
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 

Andere mochten auch (20)

5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your project
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)
 
Proposal format
Proposal formatProposal format
Proposal format
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysis
 
Elements of the Best Project Proposals
Elements of the Best Project ProposalsElements of the Best Project Proposals
Elements of the Best Project Proposals
 
Elements of a proposal
Elements of a proposalElements of a proposal
Elements of a proposal
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Project cycle management
Project cycle managementProject cycle management
Project cycle management
 
Introduction to the Logical Framework Approach
Introduction to the Logical Framework ApproachIntroduction to the Logical Framework Approach
Introduction to the Logical Framework Approach
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Writing the Budget for a Grant Proposal
Writing the Budget for a Grant ProposalWriting the Budget for a Grant Proposal
Writing the Budget for a Grant Proposal
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 

Ähnlich wie A Guide to Logical Framework Analysis

Project Charter Tips.pptx
Project Charter Tips.pptxProject Charter Tips.pptx
Project Charter Tips.pptxManishBaluni2
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docxtoltonkendal
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docxwrite31
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docxwrite4
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docxgerardkortney
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxdanhaley45372
 
Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx
 Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx
Franchise Agreement Analysis Paper Guidelines and Grading Guide.docxMARRY7
 
Project proposal format
Project proposal formatProject proposal format
Project proposal formatRashmi Yadav
 
Leadership Development Plan ​MBA 610This Leadership Developm.docx
Leadership Development Plan ​MBA 610This Leadership Developm.docxLeadership Development Plan ​MBA 610This Leadership Developm.docx
Leadership Development Plan ​MBA 610This Leadership Developm.docxsmile790243
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approachReddappa Gowd Bandi
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfamirashraf61
 
getsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfgetsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfSreekrishnaPasumarth
 
Project Management as an Art Form (DrupalCon Chicago 2011)
Project Management as an Art Form (DrupalCon Chicago 2011)Project Management as an Art Form (DrupalCon Chicago 2011)
Project Management as an Art Form (DrupalCon Chicago 2011)Phase2
 

Ähnlich wie A Guide to Logical Framework Analysis (20)

Project Charter Tips.pptx
Project Charter Tips.pptxProject Charter Tips.pptx
Project Charter Tips.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
EEECSE 120 Answer SheetCapstone Design Project .docx
EEECSE 120 Answer SheetCapstone Design Project             .docxEEECSE 120 Answer SheetCapstone Design Project             .docx
EEECSE 120 Answer SheetCapstone Design Project .docx
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docx
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docx
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docx
 
grp 9.pptx
grp 9.pptxgrp 9.pptx
grp 9.pptx
 
Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx
 Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx
Franchise Agreement Analysis Paper Guidelines and Grading Guide.docx
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
Project proposal format
Project proposal formatProject proposal format
Project proposal format
 
Leadership Development Plan ​MBA 610This Leadership Developm.docx
Leadership Development Plan ​MBA 610This Leadership Developm.docxLeadership Development Plan ​MBA 610This Leadership Developm.docx
Leadership Development Plan ​MBA 610This Leadership Developm.docx
 
Drupal project management
Drupal project managementDrupal project management
Drupal project management
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approach
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 
getsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdfgetsmarters_project_management_playbook.pdf
getsmarters_project_management_playbook.pdf
 
Manage Stakeholder Relations
Manage Stakeholder RelationsManage Stakeholder Relations
Manage Stakeholder Relations
 
Project Management as an Art Form (DrupalCon Chicago 2011)
Project Management as an Art Form (DrupalCon Chicago 2011)Project Management as an Art Form (DrupalCon Chicago 2011)
Project Management as an Art Form (DrupalCon Chicago 2011)
 
I3ppw
I3ppwI3ppw
I3ppw
 
Software Team Roles
Software Team RolesSoftware Team Roles
Software Team Roles
 

Mehr von Tony

Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Tony
 
Rights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsRights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsTony
 
Remote solar project Ecogeneration Magazine
Remote solar project  Ecogeneration MagazineRemote solar project  Ecogeneration Magazine
Remote solar project Ecogeneration MagazineTony
 
Population Indicators Handout
Population Indicators Handout  Population Indicators Handout
Population Indicators Handout Tony
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposalTony
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notesTony
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8Tony
 
Exercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksExercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksTony
 
Progress Reporting - notes
Progress Reporting - notesProgress Reporting - notes
Progress Reporting - notesTony
 
Exercise cards - logframe components
Exercise cards - logframe componentsExercise cards - logframe components
Exercise cards - logframe componentsTony
 
Ten rules of project risk management
Ten rules of project risk managementTen rules of project risk management
Ten rules of project risk managementTony
 
Issues Risklog
Issues RisklogIssues Risklog
Issues RisklogTony
 
Logical framework guide
Logical framework guideLogical framework guide
Logical framework guideTony
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notesTony
 
Project Planning module 5 Handout
Project Planning module 5 HandoutProject Planning module 5 Handout
Project Planning module 5 HandoutTony
 
Project management terms
Project management termsProject management terms
Project management termsTony
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notesTony
 
3 proj plan handouts
3 proj plan handouts3 proj plan handouts
3 proj plan handoutsTony
 
11 Problem Solving
11 Problem Solving11 Problem Solving
11 Problem SolvingTony
 
8 M&E: Data Sources
8 M&E: Data Sources8 M&E: Data Sources
8 M&E: Data SourcesTony
 

Mehr von Tony (20)

Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)
 
Rights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsRights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange news
 
Remote solar project Ecogeneration Magazine
Remote solar project  Ecogeneration MagazineRemote solar project  Ecogeneration Magazine
Remote solar project Ecogeneration Magazine
 
Population Indicators Handout
Population Indicators Handout  Population Indicators Handout
Population Indicators Handout
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposal
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notes
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8
 
Exercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksExercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanks
 
Progress Reporting - notes
Progress Reporting - notesProgress Reporting - notes
Progress Reporting - notes
 
Exercise cards - logframe components
Exercise cards - logframe componentsExercise cards - logframe components
Exercise cards - logframe components
 
Ten rules of project risk management
Ten rules of project risk managementTen rules of project risk management
Ten rules of project risk management
 
Issues Risklog
Issues RisklogIssues Risklog
Issues Risklog
 
Logical framework guide
Logical framework guideLogical framework guide
Logical framework guide
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
Project Planning module 5 Handout
Project Planning module 5 HandoutProject Planning module 5 Handout
Project Planning module 5 Handout
 
Project management terms
Project management termsProject management terms
Project management terms
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notes
 
3 proj plan handouts
3 proj plan handouts3 proj plan handouts
3 proj plan handouts
 
11 Problem Solving
11 Problem Solving11 Problem Solving
11 Problem Solving
 
8 M&E: Data Sources
8 M&E: Data Sources8 M&E: Data Sources
8 M&E: Data Sources
 

Kürzlich hochgeladen

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Kürzlich hochgeladen (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

A Guide to Logical Framework Analysis

  • 1. WHAT IS LOGICAL FRAMEWORK ANALYSIS (LFA)? A log frame (also known as a Project Framework) is a tool for planning and managing development projects. It looks like a table (or framework) and aims to present information about the key components of a project in a clear, concise, logical and systematic way. The log frame model was developed in the United States and has since been adopted and adapted for use by many other donors, including the Department for International Development (DFID). A log frame summarises, in a standard format: • What the project is going to achieve? • What activities will be carried out to achieve its outputs and purpose? • What resources (inputs) are required? • What are the potential problems which could affect the success of the project? • How the progress and ultimate success of the project will be measured and verified? WHY USE LFA? Because most donors prefer it? LFA can be a useful tool, both in the planning, monitoring and evaluation management of development projects. It is not the only planning tool, and should not be considered an end in itself, but using it encourages the discipline of clear and specific thinking about what the project aims to do and how, and highlighting those aspects upon which success depends. LFA also provides a handy summary to inform project staff, donors, beneficiaries and other stakeholders, which can be referred to throughout the lifecycle of the project. LFA should not be set in concrete. As the project circumstances change it will probably need to reflect these changes but everyone involved will have to be kept informed. What is so intimidating about using LFA? Perhaps because we are very conscious of the complexity of development projects, we find it hard to believe that they can be reduced to one or two sides of A4. Remember that the log frame isn't intended to show every detail of the project, nor to limit the scope of the project. It is simply a convenient, logical summary of the key factors of the project. Guidance Notes No.4 Logical Framework Analysis The LFA is a way of describing a project in a logical way so that it is: • Well designed. • Described objectively. • Can be evaluated. • Clearly structured.
  • 2. WHAT DOES THE JARGON MEAN? Some of the terminology involved in LFA may seem rather intimidating. Do not be put off by the language. Remember that the goal, purpose, outputs and activities are all objectives but at different levels of the project hierarchy. Different donors use slightly different terminology, but the logical frameworks are all the same in principle. You will come across the following terms: TERM MEANING EXAMPLE ___________________________________________________________________________________________ Narrative Summary The goal, purpose, outputs and activities of See below. the project as described in the left-hand column of the logical framework. (the Objectives column) ___________________________________________________________________________________________ Goal The ultimate result to which your project Jamaica’s dominance of is contributing - the impact of the project. competitive bobsledding. ___________________________________________________________________________________________ Purpose The change that occurs if the project Jamaica wins the gold medal outputs are achieved - the effect of the for bobsledding at the 2002 project. Winter Olympics. ___________________________________________________________________________________________ Outputs The specifically intended results of the Team members selected by project activities - used as milestones of (date). what has been accomplished at various Team at full fitness by (date) etc. stages during the life of the project. ___________________________________________________________________________________________ Activities The actual tasks required producing the Develop training schedule. desired outputs. Find practice venue. Publicity campaign to recruit team member, etc. ___________________________________________________________________________________________ Indicators Also referred to as measurable or 1. Team members capable of objectively verifiable indicators (OVI) running x metres in x seconds by quantitative and qualitattive ways of x time. measuring progress and whether project 2. 4 year training schedule, outputs; purpose and goal have been budget and outcomes developed achieved. and agreed by x, etc. ___________________________________________________________________________________________ Means of M.O.V is the information or data 1. Fitness report from team verification required to assess progress against doctor. indicators and their sources. 2. Schedule written and agreed (signed) by coach, team members and team doctor. ___________________________________________________________________________________________ Assumptions Factors external to the project which are The Jamaican team qualities for likely to influence the work of the project the Games. management has little control, and which It snows enough for the Games need to exist to permit progress to the to be held, etc. next level in the LFA. ___________________________________________________________________________________________ Super goal The long-term results of continued Hot countries seen as serious achievement of the goal of the project. competitors in winter sports. ___________________________________________________________________________________________ Inputs What materials, equipment, financial Funding, Coach, Bob-sled, and human resources are needed to carry Snow, Medical Advisor, etc. out the activities of the project? ___________________________________________________________________________________________ BOND Guidance Notes Series 2
  • 3. WHO SHOULD BE INVOLVED? The reality of funding proposals and completing log frames usually means a desk officer in the UK trying to summarise a project outline for a funding application. However, if used correctly as a planning tool, LFA ought to be developed first by, or working closely with the person most closely involved in project implementation who will most likely be your project co-ordinator or partner organisation overseas. The project detail can be more easily developed from the log frame than the other way round. Writing log frames in the UK is not participatory, which has led to criticism of the log frame as a planning tool. Ideally it should be produced 'in country' so that during the planning stage participatory approaches can be used to feed into the log frame as it is developed. Whilst project beneficiaries may not identify easily with the concept of LFA, they may be able to identify the factors that are critical to project success, as well as the most appropriate indicators of progress. In this way, participatory techniques can be used to inform LFA. The log frame can also provide a guide as to what information needs to be gathered through participatory processes, and can be enhanced by combining the outcomes of other planning tools, such as social mapping, wealth ranking, and problem and objective trees. If the log frame has to be written, adapted or changed in the UK, it is important to feed the detail back to fieldworkers, partners and other relevant stakeholders overseas. The input to a log frame should be a team effort, as much as possible. If you are not the person closest to the project, it is important to engage that person in developing the log frame. Always consider: • What impact the objectives & indicators will have on their work. • What is realistically achievable? • Will they have enough time to collect the information you are asking for? • Are the assumptions are you making realistic to them? Are you fully aware of their working conditions? WHAT DO I NEED TO PRODUCE A LOGICAL FRAMEWORK? • Supply of large sheets of paper, (preferably flip chart sheets). • Pencil, eraser and 'Post-it' notes or cards, so you can adjust and amend as you go along. • Somewhere to work without distractions. • Ideally, someone to discuss and 'bounce' ideas around with. • As much information about the planned project as possible - preferably do it 'on site'. NOW, WHERE DO I NEED TO START? Many people find it useful to start by developing a Problem Tree. Try to identify what is the real problem the project is to tackle and write it in the middle of a sheet of paper. Then consider the direct causes of the problem and write them in a horizontal line below the problem. Next, repeat the process for each of those on another horizontal line and continue to repeat as necessary. All the statements must be written in negative terms. This will give you a problem tree in which a cause and effect relationship operates from the bottom to the top. You may also find it useful to work upwards from the original problem, identifying its effect etc. Then changing the wording of each item into positive terms will change the Problem Tree into an Objective Tree. Next, decide whether the original problem is still BOND Guidance Notes Series 3
  • 4. going to be the main focus (or goal) of the project. This may now be higher or lower on the Objective Tree. Having made that decision, the purpose, outputs and activities should be present in the next three horizontal lines of the Objective Tree. It will probably be necessary to decide what to include at this stage, as the project has to be of a manageable size. (See Figure 1 below: A Logical Framework - DFID model) The key to completing log frames is to use the information generated in the Objective Tree and: • Start at the top and work down The objectives column - what is the project going to achieve? • Then think laterally How can the progress of the project be measured against its objectives? • Then reflect back up What assumptions are to be included and what are their implications? Figure 1: A Logical Framework (DFID model) Taken from DFID’s “Guidelines on Humanitarian Assistance”, May 1997 Objectives Measurable indicators Means of verification Important assumptions BOND Guidance Notes Series 4 GOAL: Wider problem the project will help to resolve Quantitative ways of measuring or qualitative ways of judging timed achievement of goal Cost-effective methods and sources to quantify or assess indicators (Goal to supergoal) External factors necessary to sustain objectives in the long run PURPOSE: The immediate impact on the project area or target group i.e. the change or benefit to be achieved by the project Quantitative ways of measuring or qualitative ways of judging timed achievement of purpose Cost-effective methods and sources to quantify or assess indicators (Purpose to Goal) External conditions necessary if achieved project purpose is to contribute to reaching project goal OUTPUTS: These are the specifically deliverable results expected from the project to attain the purpose Quantitative ways of measuring or qualitative ways of judging timed production of outputs Cost-effective methods and sources to quantify or assess indicators (Outputs to purpose) Factors out of project control which, if present, could restrict progress from outputs to achieving project purpose ACTIVITIES: These are the tasks to be done to produce the outputs INPUTS: This is a summary of the project budget Financial out-turn report as agreed in grant agreement (Activity to output) Factors out of project control which, if present, could restrict progress from activities to achieving outputs DFID describes the Logical Framework as "a tool to help designers of projects think logically about what the project is trying to achieve (the purpose), what things the project needs to do to bring that about (the outputs) and what needs to be done to produce these outputs (the activities). The purpose of the project from the DFID viewpoint is to serve our higher level objectives (the goal)". NOTE: The two boxes in the centre of the "Activities" row are not used for Measurable Indicators and Means Of Verification as the progress and success of the Activities are measured at the Outputs level. Remember, the Activities are carried out to achieve the Outputs. These "spare" boxes can therefore be used to provide any useful additional information such as Inputs and Budgeting requirements.
  • 5. THREE STAGES TO SUCCESS: STAGE ONE - TOP DOWN (OBJECTIVES) STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF STAGE ONE - TOP DOWN (OBJECTIVES) STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF VERIFICATION) As you work down each step of your objectives, think: • How the outputs and activities can be measured. • What indicators can be used to measure achievement against? • What information will be needed, and how it can be gathered? • What problems, obstacles or barriers might arise to prevent the project from progressing as planned? • How can their impact be minimised? 6. INDICATORS Starting either from the top or the bottom of your hierarchy of objectives, begin to work across the log frame, identifying the indicators for measuring your progress. Indicators need to define ‘QQT’, Quality, Quantity and Timing: 1. GOAL Starting at the top and using the information from the Objective Tree consider the overall goal of the project. What issue or problem is the project trying to address? The goal may be beyond the reach of this project on its own. What ultimate objective is the project contributing to? This should be a brief statement or summary. Example To increase literacy among young people in the sub- Sahel region. 2. PURPOSE What final result are you trying to achieve? This is the purpose of the project. This should be clear and brief. Example School attendance and literary skills of 6-14 year olds in (named region) of the sub-Sahel is increased. 3. OUTPUTS What are the particular outputs needed to achieve the Purpose of the project? There may be several outputs. Example 'Five new language teachers recruited and trained.' 'Classes running in all schools at times when children are not required to complete family duties. ''Information sessions for families with school age children held in each village demonstrating benefits of literacy.' 4. ACTIVITIES List the activities, which are needed to achieve these outputs. There may be several for each output. Statements should be brief and with an emphasis on action words. Example 'Hold publicity campaign in (named region) to recruit language teachers by (date)'. 'Agree and arrange selection process & schedule for teacher recruitment involving existing teaching staff'. 'Hold training sessions for new teachers covering aims, approach, customs, potential problems holding information sessions, record-keeping, expenses'. 'Arrange appropriate accommodation for teachers in each village at least before arrival'. 'Plan and hold meetings in each village for families with school age children to demonstrate the benefits of literacy' etc. 5. INPUTS When required to do so provide additional information, such as the inputs which are needed to carry out these activities. Again, there may be several for each activity and it will help to run through each individually, listing required inputs (resources, equipment, tools, people). Group the inputs and list each once rather than repeatedly. This may include a summary of the project budget. Example Budget, Training space, Accommodation, Support for existing teaching staff, Teaching materials, Transport to village, Project Co-ordinator / Fieldworker etc. Quality - The kind (or nature) of the change. Quantity - The scope (extent) of the change ie. by how much, how many. Timing - By when the change should have taken place. VERIFICATION) STAGE THREE - BOTTOM UP (ASSUMPTIONS) BOND Guidance Notes Series 5
  • 6. There are two kinds of indicators you will need to use: Process indicators Which measure the extent to which you have achieved your stated objectives. Example How many children attending school by (specified)time. Impact indicators Which help to monitor the achievement and the impact of your work. Example How many children pass (specified) literacy test at (specified) time. In addition, indicators can also be: Direct Example The Number of children attending school. Indirect (also known as soft or proxy). Example More books borrowed from the school library - suggesting more children reading, therefore wider literacy. Examples Using Indicators at the Purpose level: School attendance of 6-14 year olds is increased by 200 per cent within 4 years. 90 per cent 6-14 years olds (in named region) of the sub-Sahel to have gained (particular level) of literacy skills within 4 years. Using Indicators at the Outputs Level: Five language teachers recruited and trained by (date). At least two classes running in all schools at times when children are not required to complete family duties by (date). At least three information sessions for families with school-age children held in each village demonstrating benefits of literacy by (date). 7. INFORMATION SOURCES Next, try and work out your means of verification for each indicator. What information will you need, and how and from where can it be gathered? Will project staff or others need to keep records, or can they get the information from somewhere else? Consider the cost implications, if any, and build this into the project budget. Don't exclude anecdotal evidence (eg. views expressed by project beneficiaries, etc) if this is the most appropriate source of information, but remember that donors can be wary of this evidence, and it may later be necessary to demonstrate your claims! Note: If you are confused about indicators - don't panic! Identifying indicators requires some practice. Try to find a mentor with more experience who can advise you. Or move on to look at means of verification - thinking about what information you need, and how to get it, may help to define what the indicator should be. If you come up with a long list of possible indicators try to narrow it down to the essential ones. STAGE THREE - BOTTOM UP (ASSUMPTIONS) 8. EXTERNAL FACTORS What external factors (outside your control) could affect the success of your project or prevent work from progressing? These may be climatic, political, economic, etc. but should be real (possible) risks rather than a list of everything that could go wrong. Reflecting up from the bottom of your log frame, consider how, if each assumption holds, it will be possible to move to the next stage of the project. Example There are sufficient rains to ensure that children are not required to replant crops and therefore unable to attend school. And/or, Sufficient teachers with knowledge of local dialect are recruited. And/or, Conflict from neighbouring region doesn't spread into local area so that emergency needs take precedence over education. 9. DOUBLE CHECK Following completion of your log frame, go over it, from bottom to top, to check the logic of it: • Will the inputs and activities clearly lead to the outputs required to achieve the purpose and contribute to the goal? • Will the indicators and means of verification effectively measure the progress of the project? • Are the assumptions reasonable or do they indicate a level of risk, which suggests that the project is unlikely to get off the ground or be completed? (The killer assumption) • Is the project staff committed to the objectives and indicators identified and see them as realistic and achievable? • Are there any changes, which could be made which will make the project it more practical and workable? BOND Guidance Notes Series 6
  • 7. 10. WRITE IT UP When the log frame has been checked (and rechecked) and it is truly logical, and representative of the project, type (or write) it up onto A4 sheets. At this point all the relevant stakeholders should have had a chance to contribute to (and agree) the completed log frame. 11. STAYING INFORMED And still you haven't finished; remember that LFA is a flexible tool for planning, managing, monitoring and reporting your project. As the project progresses and situations change, return to the log frame and revise it accordingly. Agree these changes with the donor and other stakeholders and keep everyone informed so that they are able to keep up to date with current progress of the project and its future direction. WANT TO FIND OUT MORE? •Gosling L and Edwards M (1995) "Toolkits: a practical guide to assessment, monitoring, review and evaluation" Development Manual 5 pp. 178-192 Save The Children, £6.95 (New edition due in March 2003 with updated information on Logical Frameworks) • The DFID "Guidelines on Humanitarian Assistance" published in May 1997 includes guidance on preparing log frames, and is available on the DFID web-site at http://62.189.42.51./DFIDstage/faqs/files/guidelines_on_humanitarian_assistance_v5.0a.doc • DFID Chapter on Logical Frameworks in their Tools for Development series: http://62.189.42.51/DFIDstage/FOI/tools/chapter_05_frame.htm • The Civil Society Challenge Fund Guidelines 2002 include an Annex C on The Logical Framework: http://62.189.42.51/DFIDstage/Pubs/files/cscf_guide.htm • Akroyd, D. (1995), 'The Logical Framework Approach and the post-evaluation of health sector projects by the, African Development Bank', Project Appraisal, 10 (4), Pages 210-222. • Akroyd, D. (1995), 'Steps toward the adoption of Logical Framework Approach in the African Development Bank: some illustrations for agricultural sector projects', Project Appraisal, 10 (1), 19-30. • Argeetey, E. (1998), 'Consultative processes in community development in Northern Ghana', Community Development Journal, 33 (4), 301-33. • Cordingley, D. (1995), 'Incorporating the Logical Framework into the Management of technical co-operation projects', Project Appraisal, 10 (2), 103-112. • Cracknell, B. (1996), 'Evaluating Development Aid', Evaluation, 2 (1) 23-33. • Eggers, H. W. (1998), 'Project Cycle Management Revisited', The Courier May/June 1998, 69- 72, Brussels: European Commission • Gasper, D. (1999), 'Problems in the Logical Framework Approach and the challenges for Project Cycle Management', The Courier, Jan/Feb 1999, 173, 75-77. Brussels: European Commission • Jackson, B, Designing Projects and Project Evaluations using the Logical Framework Approach: http://iucn.org/themes/eval/english/lfa.htm • Nancholas, S. (1998), 'How to (or not to do)... A Logical Framework', Health Policy and Planning, 13 (2), 189-193. BOND Guidance Notes Series 7
  • 8. Top Tips • Don't leave it to the last minute. Start working on your log frame when you begin planning the project. You may need to gather information as you go along that will be difficult to get later (eg baseline data against which to measure progress). •Try and get the person planning and implementing the project to complete the log frame. If this is not possible consider the implications of the objectives, indicators & verification on field staff and partners. • Develop a problem tree. By turning the problems into objectives, this should help clarify the goal, purpose, outputs and activities of your project. • Find a mentor with experience of writing log frames who can offer you advice & assistance. • If you get stuck, don't panic - move on to the next stage and come back to the tricky bit later. • Work in pencil so you can erase things and make amendments easily, and use a large sheet of paper with plenty of room for 'thinking' then reduce it down to A4 later. • It is difficult to get it right first time, keep reflecting and revising until you are satisfied that the project is workable and the log frame is clearly logical! • Use the log frame as the basis of the funding application and then throughout the project lifecycle to track progress and adapt to changing situations. You can use the log frame to review assumptions and implications, and to keep donors and other stakeholders informed of significant changes. ABOUT BOND BOND is the network of over 270 UK-based non-governmental organisations (NGOs) working in international development and development education. BOND aims to improve the extent and quality of the UK and Europe’s contribution to international development, the eradication of global poverty and the upholding of human rights. The Guidance Notes Series aims to provide ‘how-to’ information on a variety of topics for the development sector. This edition also provides signposts to resources for those keen to pursue the topic further. Disclaimer: BOND’s Guidance Notes aim to encourage good practice through practical advice, however, BOND cannot be held responsible for the outcome of any actions taken as a result of the information contained in the Guidance Notes series. Acknowledgements These guidance notes are drawn from training on LFA conducted for BOND by: • Laurence Taylor (formerly Tutor Development Studies at Selly Oak Colleges), 37 Yardley Wood Road, Moseley, Birmingham B13 9JA • Neil Thin, Department of Social Anthropology, University of Edinburgh, Adam Ferguson Building, George Square, Edinburgh EH8 9LL • John Sartain, Tamarind Associates, Trebeck Hall, Bishop's Drive, Southwell, Nottinghamshire NG25 0JP © Copyright March 2003: BOND, Regent’s Wharf, 8 All Saints Street, London, N1 9RL Tel: 020 7837 8344 Fax: 020 7837 4220 Email: bond@bond.org.uk Website: www.bond.org.uk Charity No. 1068839