6+ years of Consulting experience working on municipal engineering projects including preliminary and detailed design and hydraulic modeling for trunk water mains, pumping stations, water and wastewater distribution and collection systems
Master ‘s degree in Civil Engineering with specialization in Water Resources
3. PAIE Program
Participating in the Professional Access into Employment (PAIE) Program led by Toronto and Region Conservation (TRCA)
Apr. 2017 – Now
4. About:
Led by Toronto and Region Conservation (TRCA), PAIE is a bridge training program that helps internationally-trained civil and environmental
professionals launch their careers in Engineering, Geoscience, Environmental Science and Planning. PAIE's 1 year program empowers participants
with an increased understanding of the local labour market. PAIE supports participants as they pursue their goals of obtaining employment and
gaining the Canadian experience required for professional licensing and certifications.
Relevant PAIE training attended to date:
Environmental Site Assessment in Ontario
TRCA Development Planning & Regulation
Environmental Legislation
Infrastructure Asset Management
Introduction to Project Management (12hrs)
Technical Report Writing, Business Writing
Corporate Culture & Communication in Canada
ISO 14001: Environmental Management System
Environmental Assessment Process/Regulator s Perspective
Software Training:
ArcGIS
AutoCAD
VS OTTHYMO
MS Project
Advanced Excel
PAIE Program
6. Index
GM BLuePlan Engineering
Schematic of Ontario Rd. Sewer Pumping Station, Welland, Ontario
Schematic of Dain City Sewer Pumping Station, Welland, Ontario
Schematic of Paris Water Distribution system, Brant, Ontario
District Meter Area (DMA) of Fort Erie, Ontario
Flow Hydrant Test, Cainsville, Brant, Ontario
I extracted data by as-built drawing and other available documents, Simplified
drawings and Drew schematics
Software: Ms. Visio
I extracted data by as-built drawing and other available documents, Simplified
drawings and Drew schematics
Software: Ms. Visio
I extracted data by as-built drawing and other available documents, Simplified
drawings and Drew schematics
Software: Ms. Visio
Designed District Meter Area (DMA) according to AWWA M36 Standard
Note: Final drawing prepared by GIS technician under my supervision
Prepared hydrant testing program for calibrating subdivision hydraulic model
Software: ArcMAP
Software I used
Project Name
What I did
8. Talbot Ave.
200Φ
PUMP 1 200Φ CVPUMP 3
200Φ GV
250Φ
Dain City Sewage Pumping Station
200Φ
50Φ AIR
COMBINATION V.
167.89
165.58
171.70
450Φ
PUMP 3
250Φ
250Φ
A
ASECTION
BSECTION
B
250Φ
KGV
166.04
PUMP DISCHARGE PIPE INFLOW PIPE CHECK VALVE GATE VALVE
9. County of Brant
Water System
2016
Paris
DISTRIBUTION SCHEMATIC
Legend
Pressure Zone System
Pumping Station
Reservoir
Volume
TWL
Elevated
Tanks
PRV
(Only PRV valves shown)
Paris Water system
Volume
TWL Standpipe
303.5 m
309.0 m 286 m
327 m
1.9
253.3Gilbert HL PS
3.7
303.5
Bethel PS
Telfer PS
5.4
286.0 Oak Park Elevated Tank
Sharpe Reservoir
Sharpe PS
Pumping Station
in freshen up
mode
Well
Wel in freshen
up mode
Bethe Wells
Bethel Reservoir
Park Hill PS
Grand River PRVBaird PRV
Telfer Wells
Consolidated Gilbert Wells
350mm
250mm
250mm
Volume
TWL
Volume
TWL
Reservoir in
freshen up
mode
10.
11.
12. Abdan Faraz Consulting Engineering Company,
Tehran, Iran
Abdan Co. provides design, planning & management services for water, wastewater, irrigation and dam projects
Position: Project Engineer
Oct. 2015 – July 2016
13. Index
Abdan Consulting Engineering Co.
Ghasr Water Pumping Station
Designed hydraulic layout, simulated steady and transient flow, Determined
Pumps, Valves and pipes, Used AWWA and local standards
Software: AutoCAD (Edited drawings), Haestad Hammer, WaterGEMS
Ghasr Water Pumping Station
Ghasr Water Pumping Station (Construction phase)
Ghasr Water Pumping Station (Construction phase)
Steel water pipeline (700mm) Under construction
Managed pumping station and water force main construction schedule and
monitored monthly costs in collaboration with on-site supervisors
Software: Ms. Project
14.
15.
16.
17.
18.
19. SARVAB Consulting Engineering Company,
Mashhad, Iran
Sarvab Co. provides design, planning and management services for water and wastewater and residential and
commercial construction projects
Position: Municipal Infrastructure Designer
Apr. 2010 – Oct. 2015
20. Bandini Water Supply System
Index
Sarvab Consulting Engineering Co.
Sangan Water Transmission system (Phase I) – Preferred Alternative
(As a member of study group) Involved in preparing feasibility and technical report,
determining alternatives and hydraulic evaluation of water force main and pumping stations
Software: AutoCAD, Haestad Hammer, WaterCAD, Ms. Excel, Local cost estimation software
Astan Pumping Station
Barzu gravity water main
Sangan Water Transmission system (Phase I) - Preferred Alternative – Hydraulic Profile
Sangan Water Transmission system (Phase I) – Cost Estmiation
Prepared hydraulic layout, performed hydraulic modeling, determined valves
and pipes specifications
Software: AutoCAD, WaterCAD, Haestad Hammer
Detailed design, engineering calculations, technical reports and provided
technical support during construction
Software: AutoCAD, WaterCAD, Ms. Project
Detailed design, engineering calculations, cost estimation and technical reports
Software: AutoCAD, WaterCAD, Ms. Excel, Haestad Hammer, Local cost estimation software
Hydraulic evaluation of GONABAD water force main
Conducted field test, calibrated C factor, Performed steady and transient
hydraulic simulation, prepared technical report
Software: AutoCAD, WaterCAD, Haestad Hammer, Ms. Excel, Local software
for Pressure devices