Greystones Harbour and Marina presentation to Greystones Town Council    GREYSTONES HARBOUR: The next phase
The revised plans are very similar to the original. 

           •It retains the public and community facilities such as club houses and associated facilities, 
           •a site for a Coastguard building,
           •a boat maintenance yard,
           •public launching facilities,
           •a harbour,
           •public square,
           •public walking areas such as a Boardwalk and breakwaters,
           •The Marina,
           •new North beach,
           •a public park and children’s play area, 
           •access to the cliff walk to Bray,
           •public parking, 




Greystones Harbour and Marina presentation to Greystones Town Council 
The changes will bring some modifications to the detail of the public areas, mainly 
     to do with public car parking and associated landscaping. 

      This does not affect the quality of the public facilities, all of the key parts of the 
      public realm are there 
      They are shown in the revised overall plan.                                                   Clubs



                                                                   Breakwaters   Marina   Harbour




                                                     Boardwalk

                                                     North Beach

                                                                                                    Public 
                                                                                                    Square



                                           Public Park




Greystones Harbour and Marina presentation to Greystones Town Council 
The changes  to  the  Scheme  will  or  have  been  considered  as  a  series  of 
            Part 8 applications to Wicklow County Council

            1. Part 8 Approval granted for

                  The  inclusion  of  a  Primary  Care  Centre  within  Building  D  which  fronts  onto  the 
                  Harbourside Public Square and changes to the landscape design of the public open 
                  areas located at the Harbour,

            2. A subsequent Part 8 Application has been made

                 An  increase  in  the  number  of  residential  units  from  341  as  approved  by  the  An 
                 Bord Pleanala to 375, i.e. an increase of 34 units and an increase in the quantum 
                 of commercial space of 800sq m to 6425 sq m.

                 Changes to the landscape design of the public open areas located at the Harbour, 
                 between  the  apartment  blocks  and  at  the  Public  Park.  This  will  involve  the 
                 provision of additional parking at the Harbourside and extending Terrace 12 of the 
                 development area into the Southern edge of the Park




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                      2.                  1.

                                                1.




                                           Public Park


                                                                         Harbourside Space




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                        2.                                        1.
                      2.     Revised Housing layout to include detached and semi‐detached houses and apartment buildings




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                          2.                          1.
                        3.     Extended Terrace 12 to provide detached housing overlooking public park




Greystones Harbour and Marina presentation to Greystones Town Council 
End 2011

     •Harbour hoardings removed

     •Club building complete

     •Public Square works complete

     •Primary Care Center complete

     •Temporary Access road to serve
     Primary Care Centre and site traffic

     •Low level barrier separating existing
     North Beach Road and temporary access
     road

     •Access to North Beach at new shingle
     beach location

     •Access to Cliff Walk maintained at site
     perimeter




                                                                         Site Layout End 2011

Greystones Harbour and Marina presentation to Greystones Town Council 
The harbourside public space at end of 2011




Greystones Harbour and Marina presentation to Greystones Town Council 
DATES


           Part 8 Submissions & Approvals

           Primary Care Centre, Community Buildings & Public Spaces approved by Wicklow Co. Co.        September 2010

           A second Part 8 Application for the remaining changes has gone on display, going through 
           the consultantion and reporting process to have a decision from Wicklow Co. Council in      December 2010


           Building Works Timeframe

           New Harbour works                                                                           Completed late 2010
           Including  slipways

           Primary Care Centre , Community Clubs & Public Square                                       Commence early 2011 & 
                                                                                                       complete by end 2011

           Residential  & Commercial elements                                                          Subject to ongoing review 
                                                                                                       from early 2012 in relation to 
                                                                                                       market changes and demands




Greystones Harbour and Marina presentation to Greystones Town Council 
GREYSTONES HARBOUR: The next phase




Greystones Harbour and Marina presentation to Greystones Town Council 
Thank you.

Weitere ähnliche Inhalte

Was ist angesagt?

Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
Edison Mugoya
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
lohbingsen
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
City of College Station
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
lohbingsen
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cv
eboroil
 
Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations complete
Nuclear Energy Insider
 
Planning and Development Assessment 2 - Presentation
Planning and Development Assessment 2 - PresentationPlanning and Development Assessment 2 - Presentation
Planning and Development Assessment 2 - Presentation
Paul Senior
 
Adopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRPAdopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRP
Owen Hutchison
 
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
WRI Ross Center for Sustainable Cities
 
AIA Rose Bay_presentation board_Rev 5
AIA Rose Bay_presentation board_Rev 5AIA Rose Bay_presentation board_Rev 5
AIA Rose Bay_presentation board_Rev 5
Wayne Krygsman
 
greenroofs.com_article[1]
greenroofs.com_article[1]greenroofs.com_article[1]
greenroofs.com_article[1]
Tony Nista
 

Was ist angesagt? (20)

Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
 
Impact of EHCGP - Probe
Impact of EHCGP - Probe Impact of EHCGP - Probe
Impact of EHCGP - Probe
 
0125 wpsct bonnell project status [compatibility mode]
0125  wpsct bonnell project status [compatibility mode]0125  wpsct bonnell project status [compatibility mode]
0125 wpsct bonnell project status [compatibility mode]
 
Abergeldie Marine
Abergeldie MarineAbergeldie Marine
Abergeldie Marine
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
 
Property Acquistion Report_FINAL
Property Acquistion Report_FINALProperty Acquistion Report_FINAL
Property Acquistion Report_FINAL
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cv
 
Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations complete
 
Planning and Development Assessment 2 - Presentation
Planning and Development Assessment 2 - PresentationPlanning and Development Assessment 2 - Presentation
Planning and Development Assessment 2 - Presentation
 
Adopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRPAdopted Road and Footpath examples Cellweb TRP
Adopted Road and Footpath examples Cellweb TRP
 
Cabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact SheetCabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact Sheet
 
Marina Barrage
Marina BarrageMarina Barrage
Marina Barrage
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and Liabilities
 
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
How to Measure Success or Failure in Urban Development - Henriette Vamberg - ...
 
NW BIM 2018 7 Costain Owens
NW BIM 2018 7 Costain OwensNW BIM 2018 7 Costain Owens
NW BIM 2018 7 Costain Owens
 
AIA Rose Bay_presentation board_Rev 5
AIA Rose Bay_presentation board_Rev 5AIA Rose Bay_presentation board_Rev 5
AIA Rose Bay_presentation board_Rev 5
 
greenroofs.com_article[1]
greenroofs.com_article[1]greenroofs.com_article[1]
greenroofs.com_article[1]
 

Andere mochten auch

The Future is Social: What's Your Strategy?
The Future is Social: What's Your Strategy?The Future is Social: What's Your Strategy?
The Future is Social: What's Your Strategy?
Kim Pittaway
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling Equipments
Anuj Gandhi
 

Andere mochten auch (12)

The Future is Social: What's Your Strategy?
The Future is Social: What's Your Strategy?The Future is Social: What's Your Strategy?
The Future is Social: What's Your Strategy?
 
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
Mauritius Ports Authority (MPA) – Mrs Nomita Seebaluck, Assistant Commercial ...
 
TIKONA, Lonavla
TIKONA, LonavlaTIKONA, Lonavla
TIKONA, Lonavla
 
Tung Tikona
Tung TikonaTung Tikona
Tung Tikona
 
Mormugao port ppt
Mormugao port pptMormugao port ppt
Mormugao port ppt
 
Mormugao Port Trust
Mormugao Port TrustMormugao Port Trust
Mormugao Port Trust
 
marine cargo handling system and machines
marine cargo handling system and machines marine cargo handling system and machines
marine cargo handling system and machines
 
Types of containers
Types of containers Types of containers
Types of containers
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling Equipments
 
Material Handling in Port
Material Handling in PortMaterial Handling in Port
Material Handling in Port
 
Ports In India
Ports In IndiaPorts In India
Ports In India
 
Cargo handling facilities (sea ways)
Cargo handling facilities (sea ways)Cargo handling facilities (sea ways)
Cargo handling facilities (sea ways)
 

Ähnlich wie Greystones presentation1 (3)

Greystones Harbour Presentation
Greystones Harbour PresentationGreystones Harbour Presentation
Greystones Harbour Presentation
ExSite
 
Document Finished
Document FinishedDocument Finished
Document Finished
Gregg Boyd
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
William J. Pehaim
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
Erin Vieira
 
Presentation - Gasworks Park and Lagoon Reserve Ref Meeting
Presentation - Gasworks Park and Lagoon Reserve Ref MeetingPresentation - Gasworks Park and Lagoon Reserve Ref Meeting
Presentation - Gasworks Park and Lagoon Reserve Ref Meeting
portphillip12
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence Report
Naoise
 
Final seia report english opened for public comments new
Final seia  report english opened for public comments newFinal seia  report english opened for public comments new
Final seia report english opened for public comments new
lbrlbo
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
GardinerEast
 

Ähnlich wie Greystones presentation1 (3) (20)

Greystones Harbour Presentation
Greystones Harbour PresentationGreystones Harbour Presentation
Greystones Harbour Presentation
 
The Grove Waterfront Plan 2013
The Grove Waterfront Plan 2013The Grove Waterfront Plan 2013
The Grove Waterfront Plan 2013
 
Northriverside Research web
Northriverside Research webNorthriverside Research web
Northriverside Research web
 
Document Finished
Document FinishedDocument Finished
Document Finished
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San Diego2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San Diego
 
Presentation - Gasworks Park and Lagoon Reserve Ref Meeting
Presentation - Gasworks Park and Lagoon Reserve Ref MeetingPresentation - Gasworks Park and Lagoon Reserve Ref Meeting
Presentation - Gasworks Park and Lagoon Reserve Ref Meeting
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
Robert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec ConsultantsRobert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec Consultants
 
Accommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsAccommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle Ports
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence Report
 
Final seia report english opened for public comments new
Final seia  report english opened for public comments newFinal seia  report english opened for public comments new
Final seia report english opened for public comments new
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 

Kürzlich hochgeladen

The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Kürzlich hochgeladen (20)

The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 

Greystones presentation1 (3)

  • 2. The revised plans are very similar to the original.  •It retains the public and community facilities such as club houses and associated facilities,  •a site for a Coastguard building, •a boat maintenance yard, •public launching facilities, •a harbour, •public square, •public walking areas such as a Boardwalk and breakwaters, •The Marina, •new North beach, •a public park and children’s play area,  •access to the cliff walk to Bray, •public parking,  Greystones Harbour and Marina presentation to Greystones Town Council 
  • 3. The changes will bring some modifications to the detail of the public areas, mainly  to do with public car parking and associated landscaping.  This does not affect the quality of the public facilities, all of the key parts of the  public realm are there  They are shown in the revised overall plan. Clubs Breakwaters Marina Harbour Boardwalk North Beach Public  Square Public Park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 4. The changes  to  the  Scheme  will  or  have  been  considered  as  a  series  of  Part 8 applications to Wicklow County Council 1. Part 8 Approval granted for The  inclusion  of  a  Primary  Care  Centre  within  Building  D  which  fronts  onto  the  Harbourside Public Square and changes to the landscape design of the public open  areas located at the Harbour, 2. A subsequent Part 8 Application has been made An  increase  in  the  number  of  residential  units  from  341  as  approved  by  the  An  Bord Pleanala to 375, i.e. an increase of 34 units and an increase in the quantum  of commercial space of 800sq m to 6425 sq m. Changes to the landscape design of the public open areas located at the Harbour,  between  the  apartment  blocks  and  at  the  Public  Park.  This  will  involve  the  provision of additional parking at the Harbourside and extending Terrace 12 of the  development area into the Southern edge of the Park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 5. 3. 2. 1. 1. Public Park Harbourside Space Greystones Harbour and Marina presentation to Greystones Town Council 
  • 6. 3. 2. 1. 2. Revised Housing layout to include detached and semi‐detached houses and apartment buildings Greystones Harbour and Marina presentation to Greystones Town Council 
  • 7. 3. 2. 1. 3. Extended Terrace 12 to provide detached housing overlooking public park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 8. End 2011 •Harbour hoardings removed •Club building complete •Public Square works complete •Primary Care Center complete •Temporary Access road to serve Primary Care Centre and site traffic •Low level barrier separating existing North Beach Road and temporary access road •Access to North Beach at new shingle beach location •Access to Cliff Walk maintained at site perimeter Site Layout End 2011 Greystones Harbour and Marina presentation to Greystones Town Council 
  • 10. DATES Part 8 Submissions & Approvals Primary Care Centre, Community Buildings & Public Spaces approved by Wicklow Co. Co. September 2010 A second Part 8 Application for the remaining changes has gone on display, going through  the consultantion and reporting process to have a decision from Wicklow Co. Council in  December 2010 Building Works Timeframe New Harbour works Completed late 2010 Including  slipways Primary Care Centre , Community Clubs & Public Square  Commence early 2011 &  complete by end 2011 Residential  & Commercial elements Subject to ongoing review  from early 2012 in relation to  market changes and demands Greystones Harbour and Marina presentation to Greystones Town Council