Decrease your risks?


Increase your profits?
Content

•   Decrease your risks
•   Increase your profit
•   Turnkey solutions concept
•   Project life cycle
•   Partners
•   Recommendations
•   References
Decrease risks

•   Single point of contact
•   Integrated QHSE approach
•   Clear and manageable interface definitions
    •   more than 120 interface items
•   Construction risks will be taken over
    •   weather, schedule risks etc.
•   Experienced project team
    •   good track record and market share
Increase profit

Standard project vs. Turn Key Solutions Concept:
- Land location (2000 full load hours)
- Coast location (2750 full load hours)
Turn Key Solutions concept

The Concept is a unique approach on how to build a wind park.

The wind turbines will be picked up at factory, OutSmart regulates the
whole construction phase, so that you get a profitable wind park built
with high standards.

How?
• Single point of contact
• Management of all project interfaces
• Support in turbine contracting phase
• Strong partners
• Strong knowledge base

Creating profit for you is our main focus, based on manageable
risks.
Project life cycle


   Development              Construction     Operations




                                 Turn Key
                                 Solutions

                                                 Asset
                                                 Management

                                                 Smart
         Consultancy / advisor
                                                 Maintenance

                      Training / Coaching
Partners




 www.sarens.nl   www.ter-linden.nl
Recommendations
Maarten de Keijzer’s Linked_in recommendation:
“I have closely worked together with Maarten for a number of years, and have experienced
Maarten as a strong analytical thinker with an eye for detail. Maarten has also the required
practical experience to put things into perspective. Furthermore Maarten is a very pleasant
guy to work with.” August 27, 2008
Albert Winnemuller, Project Director, Vestas Offshore A/S
managed Maarten at Vestas

Erwin Coolen’s Linked_in recommendation:
“Erwin worked as consultant for my company helping me to close a deal of more than 30
mln Euros in the summer of 2008. He is an excellent guy to work with, highly skilled on
the technical side (he has been educated as Eng.) and also on the business side. After 3
months of negotiation we have been able to achieve a great result thanks to Erwin
contribute. I raccomend Erwin to every company that is in renewable business and in
particular in the wind energy business.” November 18, 2008
Top qualities: Great Results, Expert, Good Value
Corrado Barberis
hired Erwin as a Business Consultant in 2008

“Ewin is a guy that can be trusted” January 18, 2008
Jaap Olthoff, Senior Business Development Manager, NUON
was a consultant or contractor to Erwin at OutSmart
Recommendations
Jacco Witteveen’s Linked_in recommendation:
“I worked with Jacco in the project team of Nordsee Ost. Jacco is a very professional
colleague, "get-things-done" minded with an always open ear, also for non-technical issues.
Besides, we had a lot of fun.” November 26, 2008
Michael Rosellen, Financial Controller Offshore, Essent Wind Deutschland GmbH
worked directly with Jacco at Outsmart


Dennis Schiricke’s Linked_in recommendation:
“Dennis is a project manager many organizations would like to have in house. He has not
only his content expertise, e.g. the technical side of the projects he has been involved in
so far, but certainly also has showned his professional capability of looking beyond.
Having worked with Dennis during a transition process on the Dutch Island of Bonaire, he
not only focussed on a smooth technical and financial process, but also kept his eye on
current project staff and as much as important also future staff working to be employed
with the local plant. Next to that he also has shown his down to earth mentality, which has
proven to be useful in challenging times.” July 5, 2009
Henk Horden , HR Consultant International , Econcern NV
worked with Dennis at Econcern
Worked on Offshore

•   Horns Rev
•   Arklow Banks
•   Barrow Offshore Wind farm
•   Kentish Flats
•   North Hoyle
•   Burbo
•   Prinses Amalia windpark (Q7)
•   Nordsee Ost
•   Seanergy Belgium
•   C-power farshore project
•   Noordzee Wind (NSW; "OWEZ“),
•   Belwind Offshore
•   Butendiek
•   Bard Offshore NL1
Worked on Onshore
Onshore Wind Energy in:
•   The Netherlands
•   Belgium
•   Germany
•   Poland
•   France
•   Italy
•   Denmark
•   Dutch Antilles
•   China

Weitere ähnliche Inhalte

Andere mochten auch

Financial Statment Analysis of TATA MOTORS
Financial Statment Analysis of TATA MOTORSFinancial Statment Analysis of TATA MOTORS
Financial Statment Analysis of TATA MOTORSHussain bohra
 
Financial statement analysis
Financial statement analysisFinancial statement analysis
Financial statement analysiskiran bala sahoo
 
A study on financial analysis of hdfc bank
A study on financial analysis of hdfc bankA study on financial analysis of hdfc bank
A study on financial analysis of hdfc bankMehul Rasadiya
 
HDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTHDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTAbhishek Keshri
 

Andere mochten auch (6)

Increasing The Profit Of Training
Increasing The Profit Of TrainingIncreasing The Profit Of Training
Increasing The Profit Of Training
 
Tata motors Financial Analysis
Tata motors Financial AnalysisTata motors Financial Analysis
Tata motors Financial Analysis
 
Financial Statment Analysis of TATA MOTORS
Financial Statment Analysis of TATA MOTORSFinancial Statment Analysis of TATA MOTORS
Financial Statment Analysis of TATA MOTORS
 
Financial statement analysis
Financial statement analysisFinancial statement analysis
Financial statement analysis
 
A study on financial analysis of hdfc bank
A study on financial analysis of hdfc bankA study on financial analysis of hdfc bank
A study on financial analysis of hdfc bank
 
HDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTHDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORT
 

Ähnlich wie Presentatie Out Smart Turn Key Solutions 1 9

3 H Management Presentation
3 H Management Presentation3 H Management Presentation
3 H Management Presentationsaphinet
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_BrochureHieu Phan Trung
 
Value Acceleration Eikenzande
Value Acceleration EikenzandeValue Acceleration Eikenzande
Value Acceleration EikenzandePaul Van Doorn
 
Intersection of Change Management and Customer Success
Intersection of Change Management and Customer SuccessIntersection of Change Management and Customer Success
Intersection of Change Management and Customer SuccessTim Creasey
 
Team Overview1.3a
Team Overview1.3aTeam Overview1.3a
Team Overview1.3acnolan
 
Team Overview Final
Team Overview FinalTeam Overview Final
Team Overview Finalteam105alan
 
Translating Agile for Execs pmi pres 201411
Translating Agile for Execs   pmi pres 201411Translating Agile for Execs   pmi pres 201411
Translating Agile for Execs pmi pres 201411DENNISE OPENSHAW
 
The super Conference ShutDown & TurnAround Forum Amsterdam Netherlands
The super Conference ShutDown & TurnAround Forum  Amsterdam Netherlands The super Conference ShutDown & TurnAround Forum  Amsterdam Netherlands
The super Conference ShutDown & TurnAround Forum Amsterdam Netherlands EPCConferenceAmsterd
 
BBITS Consulting Corporate Presentation
BBITS Consulting Corporate PresentationBBITS Consulting Corporate Presentation
BBITS Consulting Corporate Presentationbbitsc
 
Kubic.dossier.final
Kubic.dossier.finalKubic.dossier.final
Kubic.dossier.finalKubic Global
 
Roedtness, presentation of the company
Roedtness, presentation of the companyRoedtness, presentation of the company
Roedtness, presentation of the companyprebenpoulsen
 
Asset integrity management summit 2016
Asset integrity management summit 2016Asset integrity management summit 2016
Asset integrity management summit 2016PAUL Carbony
 
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016PAUL Carbony
 
Technology Enabled Business Transformation (Nordea case)
Technology Enabled Business Transformation (Nordea case)Technology Enabled Business Transformation (Nordea case)
Technology Enabled Business Transformation (Nordea case)Mikkel Brahm
 
CV 2016 Steve Shields
CV 2016 Steve ShieldsCV 2016 Steve Shields
CV 2016 Steve ShieldsSteve Shields
 
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion Resume
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion ResumeAnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion Resume
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion ResumeAnindyo Dutta
 

Ähnlich wie Presentatie Out Smart Turn Key Solutions 1 9 (20)

3 H Management Presentation
3 H Management Presentation3 H Management Presentation
3 H Management Presentation
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure
 
Value Acceleration Eikenzande
Value Acceleration EikenzandeValue Acceleration Eikenzande
Value Acceleration Eikenzande
 
Investit
InvestitInvestit
Investit
 
Intersection of Change Management and Customer Success
Intersection of Change Management and Customer SuccessIntersection of Change Management and Customer Success
Intersection of Change Management and Customer Success
 
Team Overview1.3a
Team Overview1.3aTeam Overview1.3a
Team Overview1.3a
 
Team Overview Final
Team Overview FinalTeam Overview Final
Team Overview Final
 
Translating Agile for Execs pmi pres 201411
Translating Agile for Execs   pmi pres 201411Translating Agile for Execs   pmi pres 201411
Translating Agile for Execs pmi pres 201411
 
wietze-cv-
wietze-cv-wietze-cv-
wietze-cv-
 
The super Conference ShutDown & TurnAround Forum Amsterdam Netherlands
The super Conference ShutDown & TurnAround Forum  Amsterdam Netherlands The super Conference ShutDown & TurnAround Forum  Amsterdam Netherlands
The super Conference ShutDown & TurnAround Forum Amsterdam Netherlands
 
BBITS Consulting Corporate Presentation
BBITS Consulting Corporate PresentationBBITS Consulting Corporate Presentation
BBITS Consulting Corporate Presentation
 
K. Demeuleneere_10May2015
K. Demeuleneere_10May2015K. Demeuleneere_10May2015
K. Demeuleneere_10May2015
 
Kubic.dossier.final
Kubic.dossier.finalKubic.dossier.final
Kubic.dossier.final
 
Roedtness, presentation of the company
Roedtness, presentation of the companyRoedtness, presentation of the company
Roedtness, presentation of the company
 
Présentation Séminaire Alfabet Décembre 2014
Présentation Séminaire Alfabet Décembre 2014Présentation Séminaire Alfabet Décembre 2014
Présentation Séminaire Alfabet Décembre 2014
 
Asset integrity management summit 2016
Asset integrity management summit 2016Asset integrity management summit 2016
Asset integrity management summit 2016
 
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2016
 
Technology Enabled Business Transformation (Nordea case)
Technology Enabled Business Transformation (Nordea case)Technology Enabled Business Transformation (Nordea case)
Technology Enabled Business Transformation (Nordea case)
 
CV 2016 Steve Shields
CV 2016 Steve ShieldsCV 2016 Steve Shields
CV 2016 Steve Shields
 
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion Resume
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion ResumeAnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion Resume
AnindyoDutta - Manager, MBA, BTech, Oracle Certified - Hyperion Resume
 

Presentatie Out Smart Turn Key Solutions 1 9

  • 2. Content • Decrease your risks • Increase your profit • Turnkey solutions concept • Project life cycle • Partners • Recommendations • References
  • 3. Decrease risks • Single point of contact • Integrated QHSE approach • Clear and manageable interface definitions • more than 120 interface items • Construction risks will be taken over • weather, schedule risks etc. • Experienced project team • good track record and market share
  • 4. Increase profit Standard project vs. Turn Key Solutions Concept: - Land location (2000 full load hours) - Coast location (2750 full load hours)
  • 5. Turn Key Solutions concept The Concept is a unique approach on how to build a wind park. The wind turbines will be picked up at factory, OutSmart regulates the whole construction phase, so that you get a profitable wind park built with high standards. How? • Single point of contact • Management of all project interfaces • Support in turbine contracting phase • Strong partners • Strong knowledge base Creating profit for you is our main focus, based on manageable risks.
  • 6. Project life cycle Development Construction Operations Turn Key Solutions Asset Management Smart Consultancy / advisor Maintenance Training / Coaching
  • 7. Partners www.sarens.nl www.ter-linden.nl
  • 8. Recommendations Maarten de Keijzer’s Linked_in recommendation: “I have closely worked together with Maarten for a number of years, and have experienced Maarten as a strong analytical thinker with an eye for detail. Maarten has also the required practical experience to put things into perspective. Furthermore Maarten is a very pleasant guy to work with.” August 27, 2008 Albert Winnemuller, Project Director, Vestas Offshore A/S managed Maarten at Vestas Erwin Coolen’s Linked_in recommendation: “Erwin worked as consultant for my company helping me to close a deal of more than 30 mln Euros in the summer of 2008. He is an excellent guy to work with, highly skilled on the technical side (he has been educated as Eng.) and also on the business side. After 3 months of negotiation we have been able to achieve a great result thanks to Erwin contribute. I raccomend Erwin to every company that is in renewable business and in particular in the wind energy business.” November 18, 2008 Top qualities: Great Results, Expert, Good Value Corrado Barberis hired Erwin as a Business Consultant in 2008 “Ewin is a guy that can be trusted” January 18, 2008 Jaap Olthoff, Senior Business Development Manager, NUON was a consultant or contractor to Erwin at OutSmart
  • 9. Recommendations Jacco Witteveen’s Linked_in recommendation: “I worked with Jacco in the project team of Nordsee Ost. Jacco is a very professional colleague, "get-things-done" minded with an always open ear, also for non-technical issues. Besides, we had a lot of fun.” November 26, 2008 Michael Rosellen, Financial Controller Offshore, Essent Wind Deutschland GmbH worked directly with Jacco at Outsmart Dennis Schiricke’s Linked_in recommendation: “Dennis is a project manager many organizations would like to have in house. He has not only his content expertise, e.g. the technical side of the projects he has been involved in so far, but certainly also has showned his professional capability of looking beyond. Having worked with Dennis during a transition process on the Dutch Island of Bonaire, he not only focussed on a smooth technical and financial process, but also kept his eye on current project staff and as much as important also future staff working to be employed with the local plant. Next to that he also has shown his down to earth mentality, which has proven to be useful in challenging times.” July 5, 2009 Henk Horden , HR Consultant International , Econcern NV worked with Dennis at Econcern
  • 10. Worked on Offshore • Horns Rev • Arklow Banks • Barrow Offshore Wind farm • Kentish Flats • North Hoyle • Burbo • Prinses Amalia windpark (Q7) • Nordsee Ost • Seanergy Belgium • C-power farshore project • Noordzee Wind (NSW; "OWEZ“), • Belwind Offshore • Butendiek • Bard Offshore NL1
  • 11. Worked on Onshore Onshore Wind Energy in: • The Netherlands • Belgium • Germany • Poland • France • Italy • Denmark • Dutch Antilles • China