SlideShare ist ein Scribd-Unternehmen logo
1 von 27
MODULAR FACADES
DESIGNED FOR
SOLID FRAME CONSTRUCTION
Modular Facades G-tech
The system is designed for application in frame construction buildings. It
effectively solves the task of creating a comfortable interior of the building
and a unique architectural design.
3
MODULAR FACADES
A HIGH-QUIALITY FACTORY
MANUFACTURED PRODUCT
Module Components10
Newly Constructed Factory «Genesis»
• S = 22.000 m2
• 300 K. m2 — Annual
• 150 km from Moscow
• High quality components
• High precision, machine
quality
4
Application area
Our product offers a new construction
building technology - frame-panel. G-tech
system is designed for use in frame
buildings. . It effectively solves the task of
creating a comfortable interior of the
building and a unique architectural
design.
8
Facade Modular G-tech
The system allows the use of
various types of facade materials,
and provides the ability to
organically mix and match for a
single architectural solution.
INNOVATIVE SOLUTION
IN FACADE TECHNOLOGY!
9
Few Options Examples:
with Keramogranit with HPL panelwith Artificial Stone with Rockpanelwith Terracotta with Clinkerwith Fiber Cement with Aluminum Compositewith Travertine with Natural Granite
11
Support Bracket Installation
Prior to any assembly work, an
onsite compliance check of the
object is carried out for verification
of control points. In case of any
deviation, a correction statement is
sent to the factory prior to
production. The compliance check
also provides the mounting
position and location of the support
bracket for the subsequent
installation of the module.
12
Transport and packaging modules
The modules are stacked in full
operational readiness within an
especially equipped container
and are delivered to the
construction site. At the site, with
the help of a crane, rigging
container is supplied to the pre-
installed rigger platform.
13
Mounting Technology
With a mini crane, positioned
on the above floors, the
module is mounted in it’s
proper place.
Монтируемый
модуль
Кран
на перекрытии
14
Bracket Assembly15
Anchor
Support
CONSOLE
Support
CONSOLE
Support
BRACKETReference
PIN
Installing Module on the Support Bracket
Уникальная система крепления
позволяет регулировать положение
модуля до 50мм в оси X и до 10мм в
оси Y.
Guide rail
LOOP ASSEMBLY
Anchor
Module
G-tech
Support
BRACKET
16
Reference
PIN
Horizontal Adjustment
Уникальная система крепления
позволяет регулировать положение
модуля до 50мм в оси X и до 10мм в
оси Y.
Направляющая
монтажная петля
Анкера
Модуль
G-tech
Опорный
кронштейн
17
Guide rail
LOOP ASSEMBLY
Anchor
Module
G-tech
Support
BRACKET
Reference
PIN
Vertical Аdjustment
Adjusting
SCREW
Anchor
Module
G-tech
Support
BRACKET
Reference
PIN
18
Horizontal Joint Modules
Anchor
Module
G-tech
Support
BRACKET
19
Adjusting
SCREW
Reference
PIN
Vertical Joint Modules
Module
G-tech
Support
BRACKET
20
Adjusting
SCREW
Anchor
Reference
PIN
Installing Top Row of Modules
Lower module
G-tech
21
Anchor
Support
BRACKET
Guide rail
LOOP ASSEMBLY
Reference
PIN
Upper module
G-tech
Thermal Сontour22
Module
G-tech
Wall Structure
After the installation of the facade
module, an extra layer of insulation is
added and the interior wall made of
foam blocks or bricks is constructed.
Interior Wall
(foambloc/brick)
Module
G-tech
23
Additional Layer
of insulation
Interior Wall
(foambloc/brick)
Specifications
MODULE GAGE
WIDTH MODULE
HEIGHT MODULE
PERMISSIBLE WIND LOAD
WEIGHT MODULE
THERMAL RESISTANCE
ABSORPTION NOISE
FIRE RESISTANCE
INSTALLATION COPMLEXITY
ММ
ММ
ММ
КПа
KG/М2
(М2*С)/VT
Db
REI
P.-H./М2
150-350
600-2400
1800-4000
≥ 100
32...80
≥ 4,00
≥ 57
60
0,25
24
Specifications
WEIGHT
THERMAL RESISTANCE
MODULE GAGE
FIRE RESISTANCE
INSTALLATION SPEED
G-tech
25
Кирпичная
кладка2
Сборный
железобетон3
Вентилируемый
фасад4
107,0
4,0
300
120
7
490,8
2,5
320
120
0,54
689,0
2,99
480
120
0,23
153,0
3,63
370
60
0,19
KG/М2
(М2*С)/Vt
ММ
REI
М2/P.-H
1. Module G-tech
2. Facing brick 120 mm polystyrene 100 mm, 250 mm brickwork
3. Prefabricated reinforced concrete sandwich panels t = 320 mm
4. keramogranit 10 mm ventzazor 40 mm insulation 120 mm, 200 mm
foam block D600
Economic benefits
By using the G-tech technology in outer wall construction an
average of 5%-7% increase in sellable space is a standard.
01. Additional sellable space.
Overall reduction in expenses across all stages of the
building process. Less time, less workers, less expenses.
02. Expense Optimization
By utilizing modern materials within our panels, we are able
to reduce the weight load on the frame up to 15%
03. Lightweight panels reduce frame cost
G-tech system requires a 5 man specialist team to
construct 200 square meters in a standard 8 hour
work shift. Thereby effectively reducing manual labor force.
04. Minimize personal and human error cost
26
Benefits
The module is self sufficient and does not require
upkeep or any maintenance work through out it’s life
time.
05. Up to 50 years longevity.
Machine automated production cycle and
assembly, significantly reduces human error and
assures quality control.
06. High Quality G-tech product.
Modules come to the construction site with the
finished facade and are ready for installation.
07. 100% factory manufactured.
The weight of the wall module 1 m2 G-tech from 32
to 80 kg / m2, depending on the facade solutions.
08. Light weight construction
27
Projects in Progress
Sports and fitness hotel complex with parking at: Moscow, Novoyasenevsky
28
Projects in Progress
Resedential Academic, Naro-Fominsk
29
Projects in Progress
Rental Homes in Nizhny Novgorod
30
Contacts Info
OFFICE Tula
Russia, Tula,
Chernikov lane. d. 4
8 (4872) 70-19-80
STC "Genesis" in the Technopark "Skolkovo”
STC "Genesis" in the Technopark "Skolkovo”
8 (495) 645-45-17
CENTRAL OFFICE MOSCOW
Russia, Moscow, Presnenskaya nab., 12,MIBC
"Moscow-City" IFC "Federation"Tower "East"
8 (800) 555-04-00
8 (495) 645-43-17
info@genesistp.ru
PRODUCTION:
Russia, Tula region,
Yasnogorsk, ul. Factory, 3
www.genesistp.ru
31

Weitere ähnliche Inhalte

Ähnlich wie Инжиниринговая компания Генезис - фасадные модули G-tech

IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machineTeow Beng Hur
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ Est
 
Green formwork system brochure.pdf
Green formwork system brochure.pdfGreen formwork system brochure.pdf
Green formwork system brochure.pdfNick Sun
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a buildingTeow Beng Hur
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueSandeep Jain
 
MaperGlas_Introduction_Eng_v2014
MaperGlas_Introduction_Eng_v2014MaperGlas_Introduction_Eng_v2014
MaperGlas_Introduction_Eng_v2014MAPERGLAS
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Ivan Shalaevskiy
 
Octink construction product guide 2013
Octink construction product guide 2013Octink construction product guide 2013
Octink construction product guide 2013Paul Gilligan
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc indiacicabloc
 
Reports on Precast System
Reports on Precast System Reports on Precast System
Reports on Precast System Rising Sher
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructionErankajKumar
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast SystemTeow Beng Hur
 

Ähnlich wie Инжиниринговая компания Генезис - фасадные модули G-tech (20)

IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machine
 
Vasco.ppt (1)
Vasco.ppt (1)Vasco.ppt (1)
Vasco.ppt (1)
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
 
Green formwork system brochure.pdf
Green formwork system brochure.pdfGreen formwork system brochure.pdf
Green formwork system brochure.pdf
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
MaperGlas_Introduction_Eng_v2014
MaperGlas_Introduction_Eng_v2014MaperGlas_Introduction_Eng_v2014
MaperGlas_Introduction_Eng_v2014
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...
 
Octink construction product guide 2013
Octink construction product guide 2013Octink construction product guide 2013
Octink construction product guide 2013
 
Ertf
ErtfErtf
Ertf
 
Concrete batching Plant by Fibo Intercon
Concrete batching Plant by Fibo InterconConcrete batching Plant by Fibo Intercon
Concrete batching Plant by Fibo Intercon
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc india
 
Roll Forming Machine Kspan-ubm
Roll Forming Machine Kspan-ubmRoll Forming Machine Kspan-ubm
Roll Forming Machine Kspan-ubm
 
Reports on Precast System
Reports on Precast System Reports on Precast System
Reports on Precast System
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Weigbridge Manufacturers
Weigbridge ManufacturersWeigbridge Manufacturers
Weigbridge Manufacturers
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast System
 

Mehr von Татьяна Гусева

Mehr von Татьяна Гусева (11)

экспоненты
экспонентыэкспоненты
экспоненты
 
приглашение на конференцию
приглашение на конференциюприглашение на конференцию
приглашение на конференцию
 
Проект создания нового городского пространства – СМАРТ Сити Казань
Проект создания нового городского пространства – СМАРТ Сити КазаньПроект создания нового городского пространства – СМАРТ Сити Казань
Проект создания нового городского пространства – СМАРТ Сити Казань
 
Иннополис – будущая IT-столица России
Иннополис – будущая IT-столица РоссииИннополис – будущая IT-столица России
Иннополис – будущая IT-столица России
 
MOD Holding и новые города для жизни MOD Cities
MOD Holding и новые города для жизни MOD CitiesMOD Holding и новые города для жизни MOD Cities
MOD Holding и новые города для жизни MOD Cities
 
Program
ProgramProgram
Program
 
курбатова икрт (1)
курбатова икрт (1)курбатова икрт (1)
курбатова икрт (1)
 
Business programme 2013_08_23
Business programme 2013_08_23Business programme 2013_08_23
Business programme 2013_08_23
 
Mod city
Mod city Mod city
Mod city
 
идеи для города
идеи для городаидеи для города
идеи для города
 
Modcities international
Modcities international Modcities international
Modcities international
 

Kürzlich hochgeladen

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 

Kürzlich hochgeladen (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 

Инжиниринговая компания Генезис - фасадные модули G-tech

  • 2. Modular Facades G-tech The system is designed for application in frame construction buildings. It effectively solves the task of creating a comfortable interior of the building and a unique architectural design. 3 MODULAR FACADES A HIGH-QUIALITY FACTORY MANUFACTURED PRODUCT
  • 4. Newly Constructed Factory «Genesis» • S = 22.000 m2 • 300 K. m2 — Annual • 150 km from Moscow • High quality components • High precision, machine quality 4
  • 5. Application area Our product offers a new construction building technology - frame-panel. G-tech system is designed for use in frame buildings. . It effectively solves the task of creating a comfortable interior of the building and a unique architectural design. 8
  • 6. Facade Modular G-tech The system allows the use of various types of facade materials, and provides the ability to organically mix and match for a single architectural solution. INNOVATIVE SOLUTION IN FACADE TECHNOLOGY! 9
  • 7. Few Options Examples: with Keramogranit with HPL panelwith Artificial Stone with Rockpanelwith Terracotta with Clinkerwith Fiber Cement with Aluminum Compositewith Travertine with Natural Granite 11
  • 8. Support Bracket Installation Prior to any assembly work, an onsite compliance check of the object is carried out for verification of control points. In case of any deviation, a correction statement is sent to the factory prior to production. The compliance check also provides the mounting position and location of the support bracket for the subsequent installation of the module. 12
  • 9. Transport and packaging modules The modules are stacked in full operational readiness within an especially equipped container and are delivered to the construction site. At the site, with the help of a crane, rigging container is supplied to the pre- installed rigger platform. 13
  • 10. Mounting Technology With a mini crane, positioned on the above floors, the module is mounted in it’s proper place. Монтируемый модуль Кран на перекрытии 14
  • 12. Installing Module on the Support Bracket Уникальная система крепления позволяет регулировать положение модуля до 50мм в оси X и до 10мм в оси Y. Guide rail LOOP ASSEMBLY Anchor Module G-tech Support BRACKET 16 Reference PIN
  • 13. Horizontal Adjustment Уникальная система крепления позволяет регулировать положение модуля до 50мм в оси X и до 10мм в оси Y. Направляющая монтажная петля Анкера Модуль G-tech Опорный кронштейн 17 Guide rail LOOP ASSEMBLY Anchor Module G-tech Support BRACKET Reference PIN
  • 17. Installing Top Row of Modules Lower module G-tech 21 Anchor Support BRACKET Guide rail LOOP ASSEMBLY Reference PIN Upper module G-tech
  • 19. Wall Structure After the installation of the facade module, an extra layer of insulation is added and the interior wall made of foam blocks or bricks is constructed. Interior Wall (foambloc/brick) Module G-tech 23 Additional Layer of insulation Interior Wall (foambloc/brick)
  • 20. Specifications MODULE GAGE WIDTH MODULE HEIGHT MODULE PERMISSIBLE WIND LOAD WEIGHT MODULE THERMAL RESISTANCE ABSORPTION NOISE FIRE RESISTANCE INSTALLATION COPMLEXITY ММ ММ ММ КПа KG/М2 (М2*С)/VT Db REI P.-H./М2 150-350 600-2400 1800-4000 ≥ 100 32...80 ≥ 4,00 ≥ 57 60 0,25 24
  • 21. Specifications WEIGHT THERMAL RESISTANCE MODULE GAGE FIRE RESISTANCE INSTALLATION SPEED G-tech 25 Кирпичная кладка2 Сборный железобетон3 Вентилируемый фасад4 107,0 4,0 300 120 7 490,8 2,5 320 120 0,54 689,0 2,99 480 120 0,23 153,0 3,63 370 60 0,19 KG/М2 (М2*С)/Vt ММ REI М2/P.-H 1. Module G-tech 2. Facing brick 120 mm polystyrene 100 mm, 250 mm brickwork 3. Prefabricated reinforced concrete sandwich panels t = 320 mm 4. keramogranit 10 mm ventzazor 40 mm insulation 120 mm, 200 mm foam block D600
  • 22. Economic benefits By using the G-tech technology in outer wall construction an average of 5%-7% increase in sellable space is a standard. 01. Additional sellable space. Overall reduction in expenses across all stages of the building process. Less time, less workers, less expenses. 02. Expense Optimization By utilizing modern materials within our panels, we are able to reduce the weight load on the frame up to 15% 03. Lightweight panels reduce frame cost G-tech system requires a 5 man specialist team to construct 200 square meters in a standard 8 hour work shift. Thereby effectively reducing manual labor force. 04. Minimize personal and human error cost 26
  • 23. Benefits The module is self sufficient and does not require upkeep or any maintenance work through out it’s life time. 05. Up to 50 years longevity. Machine automated production cycle and assembly, significantly reduces human error and assures quality control. 06. High Quality G-tech product. Modules come to the construction site with the finished facade and are ready for installation. 07. 100% factory manufactured. The weight of the wall module 1 m2 G-tech from 32 to 80 kg / m2, depending on the facade solutions. 08. Light weight construction 27
  • 24. Projects in Progress Sports and fitness hotel complex with parking at: Moscow, Novoyasenevsky 28
  • 25. Projects in Progress Resedential Academic, Naro-Fominsk 29
  • 26. Projects in Progress Rental Homes in Nizhny Novgorod 30
  • 27. Contacts Info OFFICE Tula Russia, Tula, Chernikov lane. d. 4 8 (4872) 70-19-80 STC "Genesis" in the Technopark "Skolkovo” STC "Genesis" in the Technopark "Skolkovo” 8 (495) 645-45-17 CENTRAL OFFICE MOSCOW Russia, Moscow, Presnenskaya nab., 12,MIBC "Moscow-City" IFC "Federation"Tower "East" 8 (800) 555-04-00 8 (495) 645-43-17 info@genesistp.ru PRODUCTION: Russia, Tula region, Yasnogorsk, ul. Factory, 3 www.genesistp.ru 31