1. CIRCULAM VITA
Telecommunicat ion, Gsm Network
Engineering / Technical Services
Mid Career (6+ years of experience
Personal Info:
Muhammad Ismail
Gender: Male
Pakistan
(92-0322-8145888) (92-0342-2813188)
e-mail ismail.solargroup@gmail.com ismail.solar@yahoo.com
Objective: Seeking a challenging position to utilize my education and
experience in the field of Telecommunication Profession and to
work in challenging environment to contribute the growth of
organization to work professionally, honestly and for the
prosperity of the organization. I am young, educated hard worker,
efficient and capable of doing any hard work and assignment,
which given by the administrator and authorities.
Experience:
6Z Entry(s)
Organization Husna Interprises
Organization
Type
Mobile/GSM and Wimax internet vendor (SOUTH)
Designation
Manager Civil $ Electrical (WATEEN,ZONG.WARID,WI-TRIBE.AND PTCL TELECOM
PROJECTAND PROJECT)
Location 4/1 I BLOCK JACOB LINE SADDAR
Type of
Experience
Full Time
Tenure JUN 2006 TO AUG 2009
Description
•Electric earthling for tower
•Civil construction genset paid
• Civil construction for shelter paid
•Civil construction for boundary wall
•Civil construction for tower foundation
•gravelling and compensation for tower grounding area
2. •Installation for tower
•Tower paint
•Room modification for tower•
•Installation of tower shelter room
•Installation of AC
•Installation of generator
• Leading the sites for Final Acceptance from the operator
• Documentation and acceptance
• Leading the sites for Final Acceptance from the operator
• Monitoring the sites through Engineers and Supervisors
--------------------------------------------------------------------
Experience:
6Z Entry(s)
Organization Solar Group
Organization
Type
Mobile/GSM and Wimax internet vendor (SOUTH AND CENTRAL)
Designation
Project Manager Civil $ Electrical (WATEEN,ZONG.WARID,WI-TRIBE.AND PTCL
TELECOM PROJECTAND PROJECT)
Location 4th
floor bank house #2habib square building M A Jinnah road Karachi
Type of
Experience
Full Time
Tenure SEP 2009 TO Feb 2015
Description •site survey and preparation of site survey report(SSR)
•site acquire according to the requirement of RF and civil
•conduction of technical site survey(TSS)
•signing lease agreement with all necessary document
•resolve the matters of access for after af
ter acquiring the site
•NOC obtained for concerned authority
•installation of commercial power
•Scheduling provisional acceptance of the sites by the operator
•Leading the sites for Final Acceptance from the operator
•Warehouse requisitions for material inflow and issue of the same to the sites.
•site acquisition works scheduling and monitoring
•Monitoring the sites through Engineers and Supervisors
•Scheduling provisional acceptance of the sites by the operator.
•Coordinating with BSS and Transmission departments for relevant installation, commissioning and
Integration of the sites
•Leading the sites for Final Acceptance from the operator
••Electric earthling for tower
•Civil construction genset paid
• Civil construction for shelter paid
•Civil construction for boundary wall
•Civil construction for tower foundation
•gravelling and compensation for tower grounding area
•Installation for tower
•Tower paint
•Room modification •
•Installation of tower shelter room
3. •Installation of AC
•Installation of generator
• Leading the sites for Final Acceptance from the operator
• Documentation and acceptance
• Leading the sites for Final Acceptance from the operator
• Monitoring the sites through Engineers and Supervisors Documentation and acceptance)
• Supervise for fiber optical project for wateen telecom
Education:
1 Entry(s)
Degree Name 2nd
year
Division 2nd
Institute GOVRENMENT COLLAGE LAHORE
Address Karachi, Pakistan
Session 1998
Additional Info:
Language:
3 Entry(s)
Read Write Speak Understand Typing Shorthand
English
Easily Easily Easily --
--
Punjabi
Easily Easily Easily Easily --
--
Urdu
Easily Easily Easily Easily _ _
-------------------------------------------------------------------------------------------------
4. Reference:
2 Entry(s)
Name Title Company Phone/Email Acquaintance Type
Muhmmad
Akram
MANAGER SITE ACQUSATION Huawai 0332 2323255 04 Years Personal
Zafar
Pandrani
PROJECT
MANAGER
WATEEN
0321
8110226 5Years
Personal