SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Page 1 of 5
Luciano Piciacchia, Eng, P.Eng, PhD
Senior Executive
20 years of successful and demonstrated experience providing fiscal,
strategic and operations leadership
Professional summary
Dr. Piciacchia has proven himselfas an effective, strategic business leader.With 30 years of engineering and business
managementexperience Dr.Piciacchia has developed his own vision for a holistic approach to customer relationship
management.This beliefand approach to clientinteraction along with his commitmentto operational excellence and
motivational style have been the formula for rapid success and growth in his currentposition.
Dr. Piciacchia has a strong commitmentto project managementand a solid performance in budgetcontrol, invoicing and
administration;he further instills these values onto staffthroughouthis organization as being essential to operational suc cess
and necessaryto the establishmentof a high performance operational culture.
From a technical standpoint Dr.Piciacchia is an experienced mining engineer with a solid geotechnical and environmental
background. Even in his currentposition he has chosen to maintain his technical proficiency through active participation in
key projects and with major clients,typically as a projectsponsor.In this role Dr. Piciacchia ensures thatcontinuous and
effective client engagementis maintained and thata clear understanding ofthe client’s critical success factors are ever
presentwithin the project team. Internally this role allows him to mentor the next generation of engineers within his
organization from a technical,business and cultural standpoint.
Professional Qualifications
Quebec Order of Engineers
Association ofProfessional Engineers ofOntario
Association ofprofessional Engineers ofAlberta
Association ofProfessional Engineers,Geologists and Geophysicists ofthe NorthwestTerritories and Nunavut;
Professional Engineers and Geoscientists ofNewfoundland and Labrador;
Education
McGill University, PhD Rock mechanics,Montreal,Quebec, 1988
McGill University, MEng Geo Sciences,Montreal, Quebec,1984
McGill University, BEng Mining Engineering,Montreal, Quebec,1981
Languages
French, English,Italian
Core skills
 Strategy, Vision & Mission Planning
 Profitability & Cost analysis
 Billing & Cash Management
 Contract negotiations and Strategic alliances
 Strong inspirational leadership
 Mergers and Acquisitions
 Finance, budgeting & cost management
 Policy and procedure development
 Human resource management
 Team building & performance improvement
 Operational excellence
 Driven personality
Luciano Piciacchia,Eng,P.Eng, PhD
Continued...
Page 2 of 5
EmploymentHistory
2006- present
Vice President, AMEC Environment & Infrastructure
In 2006 Dr. Piciacchia willinglytook on this daunting task of taking over a failing operation.
Based on a vision and strategic understanding ofthe Quebec market, an initial shortterm
growth plan was established and implemented.Significantemphasis was given to forging
strategic partnerships which resulted in a key acquisition;required to meetthe growth plan.
Acknowledging the stresses thatare typically associated with significantdouble digit
growth particular attention was given to integration ofacquisitions and employee retention.
Today this operation is one of the mostprofitable operations within AMEC and boasts one
of the lowestvoluntary turnover statistics with its 150 staff and $25M in revenue.
In his current position Dr. Piciacchia’s primarymandate is to grow the current operations
while maintaining full accountabilityfor the operational P&L. Through intense collaboration
with his core team he has developed a long term strategic plan which includes
transformational change;evolving Amec from a geotechnical / environmental firm into a full
service engineering player in its market. He has provided leadership and direction for his
managementteam in the execution of the plan, with noted successes having inspired
confidence which continues to drive the operation.
He is further responsible for developing yearly budgets and providing quarterlyforecast
updates to Amec management.In addition he has had to build and maintain a right sized
administrative function to supportthe operations.
1987- 2006 various positions,
Sr. Vice President, Trow Consulting (currently exp inc.)
Dr. Piciacchia commenced his career with Trow Consulting’s Sudburyoperations as a geotechnical engineer specializing in
mining related projects.He quicklygrew within the managementranks and in 1992 was offered the opportunity and challenge
to cold-startan environmental /geomechanics practise in Montreal,within an existing Trow
operation,which had been recently acquired.
In 1994, circumstances allowed Dr.Piciacchia to found his own consultancypractise
(Groupe SAE) which he ran as a sole proprietor between 1994 and 1998;thereafter SAE
was acquired by Trow through a structured buy-out between 1998 and 2002. SAE was
essentiallyrolled into Trow and the entity closed in 2003.Dr. Piciacchia remained as CEO
of SAE from its’ inception to its closure in 2003.As CEO he remained responsible for the
P&L of the Quebec operations,its growth and sustainability. Upon his departure in 2006
the Quebec operation was the mostdiverse within the Trow organization and boasted 135
staff and $15M in revenue. The growth was achieved organicallyas well as through
acquisition,the mostsignificantofwhich was a civil design firm,in 2002. He was further
responsible for the integration of this firm within the Trow organization,which necessarily
included operational improvement and cultural integration.
In the same year,he was named Sr. Vice Presidentand CAO at Trow Global. In his new
role he maintained his operational responsibilities and took on leadership for HR, IT,
Marketing and Communications as well as Engineering and Quality. This experience
provided him with a well rounded and solid appreciation for the supportfunctions required
to build and sustain a successful business.
He was also an active participanton Trow’s board of directors as well as on the The Presidents’ Executive Management
Committee. During his time on the board he actively participated in acquisitions,which included due diligence,offer
evaluation and structure, integration planning and staffevaluations.
Signature
Achievements
 Cold start to success :in 2
years
 Revenue and Profit Growth
 Mergers and Acquisitions :2
 Employee development
reviews:implementation
 Board member activity
 CAO responsibility
Signature
Achievements
 Operational restructuring
 Operational turnaround :9
months
 Revenue and Profit Growth :
double Digit
 Mergers &Acquisitions :2
 Acquisition Pipeline :7-8
 Team Building and
Development
 Long-term strategic Plan :
Transformational vision
Luciano Piciacchia,Eng,P.Eng, PhD
Continued...
Page 3 of 5
Luciano Piciacchia, Eng, P.Eng, PhD
Technical Background
Complementarytechnical skills
Water management:including water quality, hydrology, pump stations,spillways,channel and erosion protection design and
reservoirs.Projects have focused on mine affected drainage including acid mine drainage and the solid waste industry.
Dam safety: including design, dam safetyinspections and DSRs
Tailings management: Projects have focused on tailings management,deposition plans and mine closure.
Rockmechanics: Particularly focused on crown pillar studies
Geotechnical foundations: Foundations in relation to urban structures and transportation
Environmental assessments anddecontamination
Representative projects
Mining rock mechanics
Canmet Investigation of Crown Pillars
Stability evaluation of various crown pillars across Quebec and Ontario including cities in Val-d'Or, Rouyn-Noranda,Timmins
and Cobalt. The projectincluded extensive diamond drilling,In-Situ testing,numerical modeling and statistical analysis ofthe
data obtained.
ONR – Crown Pillar
Ontario Northland Rail operates a rail line in northern Ontario, a portion of which runs through the town of Cobalt.Contract
mining in the area historicallycame very close to surface with numerous mining operations directlybeneath ONR’s tracks.
Our mandate was to determine which mining operations came so close to surface as to possiblyaffect track safety and then
recommend remedial measures.The near surface slopes were firstidentified,those with sufficientlystable crown pillars were
eliminated and a reinforced soil solution was developed for the remaining crown pillars.
Mining Development
ArcelorMittal Liberia Limited, North and South TMFs with a footprint of 1.24km wide by 2.4km long with an ultimate
crest height of approximately 50m,WesternAfrica.
Principal Tailings Engineer:Comprehensive,independent review of the Tailings ManagementFacilitydesign,construction
methodology,and operation/maintenance philosophy.The conclusion ofthe review should evaluate/confirm the actual
design ofthe TMF and identify areas for optimisation and improvement,while considering cost,schedule,and safetyfor the
mine operations.
Rio Tinto Fer et Titane (RTFT) Waste Rock and Water Management, collection and treatment of water,Tio Mine,
Havre-St-Pierre, Quebec
Basic engineering for dikes (phases 1 and 2),roads,platforms (UTE,pumping stations,contractor area),emergency
spillways for spring meltwaters,clean water diversion ditches,UTE discharge and the northern intermediate basin.The
construction ofthe infrastructure mentioned will allow to manage waste rock until the end of the life of the mine and make
associated effluents compliantwith the current standards and the future certificate of authorization.
Cliffs Natural Resources, Tailings and mine water at the Bloom Lake Mine, Fermont, Quebec
Tailings ManagementPlanning Reviewer:Engineering services for tailings management. Work provided primarilyconsists of
the following key aspects:
 Long term tailings deposition planning based on the optimisation ofthe ultimate tailings storage area configuration
 Short and medium-term tailings deposition allowing for seasonal conditions,water and snow management
 Hydrological analysis and design ofwater managementstructures for environmental compliance and risk mitigation
 Staging and methodologyof construction for associated infrastructure and forecasting available tailing volumes for
operations and construction
Raglan
Preparation,and review of the short,medium and long term deposition plan,design,planning & optimization ofthe tailings
area along with the implementation ofcover strategies.Dr.Piciacchia currentlysits on Xstrata Nickel (Raglan) experts
committee which is looking atthe possible effects /solutions which maybe required as a resultof global warming on the
presenttailings cover option which was originallydesigned to be permanentlyfrozen.
Luciano Piciacchia,Eng,P.Eng, PhD
Continued...
Page 4 of 5
Mines Aurizon – Mine Casa Berardi
Closure plan coordination including operational and postclosure water treatment,geochemistryof proposed deposition plans
and water management.This projecthas a particularity in that arsenic contamination has been absorbed into a peatlayer
underlying the head pond and schemes for its restoration during the mine life needed to be considered.
ArcelorMittal Mines Canada
ArcelorMittal Mines Canada operates a 260-mile railwaybetween Fermontand Port-Cartier.The railway is in part protected
by a series of1,300 structurallyplaced culverts, many of which have become critical over time and require rehabilitation.
Priorities for the mostcritical culverts were set, establishing a 5-year work plan.Yearly plans and specifications are produced
and field and contract supervision is provided.The projectrequired close coordination with AMMC’s rail operations.
ArcelorMittal Mines Canada – Mont-Wright
ArcelorMittal Mines Canada operates, under Amec Foster Wheeler’s direction,an 18.5M m3/yr. tailings facility at Fermont,
Quebec. As part of the expansion project,there was a requirementfirstto increase the capacity of the tailings facilityto 24M
m³/yr. and subsequentlyto establish a second facilityof an additional 24M m3/yr. As ProjectReviewer, ensured thatall
aspects with respectto design criteria,site optimisation,dyke and dam design and water management,were considered and
metwith the client’s needs for both the shortand long term perspectives.
ArcelorMittal Mines Canada – Port-Cartier
ArcelorMittal Mines Canada operates a 4.2M m3/yr. tailings facilityin Port-Cartier,Quebec. A portion of the footprint of the
presentfacility was being considered for the construction ofa new pelletizing plantas part of an overall expansion project.
Our mandate was to consider the displacementofthe presentfacility to permitconstruction,taking into consideration those
areas alreadyfilled,operational considerations and the additional capacityrequired by the expansion objectives.As Project
Reviewer, ensured thatall aspects with respectto design criteria,site optimisation,dyke and dam design and water
management,were considered and metwith the client’s needs for both the shortand long term perspectives.
ArcelorMittal Mines Canada – Fire Lake
As part of its expansion initiative and in lightof new requirements,Amec Foster Wheeler conducted a prefeasibilityfor the
former 6M m3/yr. tailings facilityso that it may now be expanded to 8M m3/yr. As Project Reviewer, I ensured that all
aspects,with respectto design criteria,site optimisation,dyke and dam design and water management,were consideredand
metwith the client’s needs for both the shortand long term perspectives.
ArcelorMittal Mines Canada – Mont-Reed
Amec Foster Wheeler had previouslylooked at various disposal options for tailings atthe Mont-Reed site.In the context of
future expansion,three (3) sites were being considered to handle 8M m3/yr. of tailings from various sources.As Project
Reviewer, I ensured thatall aspects with respectto design criteria,site optimisation,dyke and dam design and water
management,were considered and metwith the client’s needs for both the shortand long term perspectives.
Urban geotechnical investigations
Earlier in his career Dr. Piciacchia worked on a wide range of geotechnical related projects comprising investigations and
subsequentrecommendations for foundations including conventional footings,piled or caisson foundations and raft
foundation.In addition,recommendations take into consideration earthquake design,reuse ofexcavated materials, and
design ofparking areas where applicable. Such investigations were carried outfor institutional, lightand heavy industrial
clients as well as governmentclients with respectto roadways,bridges and municipal services.
Environmental assessments
Canada Customs and Revenue Agency
Evaluation of 12 sites in Eastern Canada including environmental assessment,evaluation of building components and
feasibilitystudy for future expansion of facility.
Neste Resin
This projectcomprised several subprojects including a Phase IIevaluation of the facility which has been in operation for over
40 years. The Phase II included geophysics,“passive vapour” survey and conventional drilling and hydroge ological modeling
program and assessmentofleachate quality. The project further included the developmentofan environmental management
plan for contaminated soils and hazardous waste.In addition,handling procedures and an occupational Health and Safety
plan was also developed.
Luciano Piciacchia,Eng,P.Eng, PhD
Continued...
Page 5 of 5
Environmental Remediation
Ashland Chemicals
Clean-up ofBrossard facility, including all process piping and reservoirs.Work was conducted in an explosive environment,
relevant safety protocols had to be established and monitored throughoutthe clean-up.
Canada Customs and Revenue Agency
Evaluation of 12 sites in Eastern Canada including environmental assessment,evaluation of building components and
feasibilitystudy for future expansion of facility.
Neste Resin
Plans and specifications for a number of decontamination projects including Phenol tank area,buried hazardous waste
basin,Naphthalene waste removal.In addition we designed a new HDPE liner for the waste water overflow basin and for the
primaryretention pond. The total of all site work was in excess of $10M.
ArcelorMittal Mines Canada (AMMC)
Evaluation of sources ofcontamination ofsurface water runoffby MES. Establishmentofa method for managing water runoff
and recommendation ofa permanentsolution to the problem.

Weitere ähnliche Inhalte

Andere mochten auch

LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...
LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...
LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...elifix
 
Building enterprise applications using open source
Building enterprise applications using open sourceBuilding enterprise applications using open source
Building enterprise applications using open sourcePeter Batty
 
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTE
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTELIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTE
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTEelifix
 
An unforgettable day
An unforgettable day   An unforgettable day
An unforgettable day isarevi
 
STRATEGIC MANAGEMENT ON VODAFONE
STRATEGIC MANAGEMENT ON VODAFONESTRATEGIC MANAGEMENT ON VODAFONE
STRATEGIC MANAGEMENT ON VODAFONEAnjali Modi
 
How to be more effective in a functional or a matrix organization
How to be more effective in a functional or a matrix organizationHow to be more effective in a functional or a matrix organization
How to be more effective in a functional or a matrix organizationfreshswdm
 
Civic Engagement Lesson Plan (Part 3)
Civic Engagement Lesson Plan (Part 3)Civic Engagement Lesson Plan (Part 3)
Civic Engagement Lesson Plan (Part 3)Everyday Democracy
 

Andere mochten auch (8)

LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...
LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...
LIBRO REALIZARSE A LOS 18. VIDA Y HUELLA DE CHIARA "LUCE" BADANO. MICHELE ZAN...
 
Building enterprise applications using open source
Building enterprise applications using open sourceBuilding enterprise applications using open source
Building enterprise applications using open source
 
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTE
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTELIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTE
LIBRO CATECISMO BIBLICO PRIMERA COMUNION. PADRE FLAVIANO AMATULLI VALENTE
 
Blast of rice
Blast of riceBlast of rice
Blast of rice
 
An unforgettable day
An unforgettable day   An unforgettable day
An unforgettable day
 
STRATEGIC MANAGEMENT ON VODAFONE
STRATEGIC MANAGEMENT ON VODAFONESTRATEGIC MANAGEMENT ON VODAFONE
STRATEGIC MANAGEMENT ON VODAFONE
 
How to be more effective in a functional or a matrix organization
How to be more effective in a functional or a matrix organizationHow to be more effective in a functional or a matrix organization
How to be more effective in a functional or a matrix organization
 
Civic Engagement Lesson Plan (Part 3)
Civic Engagement Lesson Plan (Part 3)Civic Engagement Lesson Plan (Part 3)
Civic Engagement Lesson Plan (Part 3)
 

Ähnlich wie Piciacchia, Luciano EN 2015rev2

Resume Jade FM Overview
Resume Jade FM OverviewResume Jade FM Overview
Resume Jade FM OverviewJade Thomas
 
cover letter and cv 2017
cover letter and cv 2017cover letter and cv 2017
cover letter and cv 2017Richard Cole
 
EDDIE_W_CV_R1_JUN2016
EDDIE_W_CV_R1_JUN2016EDDIE_W_CV_R1_JUN2016
EDDIE_W_CV_R1_JUN2016EDDIE WIKINA
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin C. Mattson II
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015Ray Chapa
 
Lawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pmLawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pmLawrence Dick
 
Amanda Casey CV 09042015
Amanda Casey CV 09042015Amanda Casey CV 09042015
Amanda Casey CV 09042015Amanda Casey
 
Eric Omanga - Curriculum Vitae
Eric Omanga - Curriculum VitaeEric Omanga - Curriculum Vitae
Eric Omanga - Curriculum VitaeEric Omanga
 
Resume - Robert Harris 2015
Resume - Robert Harris 2015Resume - Robert Harris 2015
Resume - Robert Harris 2015Bob Harris
 
Final - Professional CV of Jacques Erasmus
Final - Professional CV of Jacques ErasmusFinal - Professional CV of Jacques Erasmus
Final - Professional CV of Jacques ErasmusJacques Erasmus
 

Ähnlich wie Piciacchia, Luciano EN 2015rev2 (20)

Cmrw executive
Cmrw executiveCmrw executive
Cmrw executive
 
chukwuma ahiakwo cv
chukwuma ahiakwo cvchukwuma ahiakwo cv
chukwuma ahiakwo cv
 
Resume Jade FM Overview
Resume Jade FM OverviewResume Jade FM Overview
Resume Jade FM Overview
 
cover letter and cv 2017
cover letter and cv 2017cover letter and cv 2017
cover letter and cv 2017
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
EDDIE_W_CV_R1_JUN2016
EDDIE_W_CV_R1_JUN2016EDDIE_W_CV_R1_JUN2016
EDDIE_W_CV_R1_JUN2016
 
Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015
 
Scandlen
ScandlenScandlen
Scandlen
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
Margaret Wynne - CV
Margaret Wynne - CVMargaret Wynne - CV
Margaret Wynne - CV
 
Fraser Park CV
Fraser Park CVFraser Park CV
Fraser Park CV
 
PM_iCV 14_05_15
PM_iCV 14_05_15PM_iCV 14_05_15
PM_iCV 14_05_15
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
 
Lawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pmLawrence dick 10 02-2016-pm
Lawrence dick 10 02-2016-pm
 
Amanda Casey CV 09042015
Amanda Casey CV 09042015Amanda Casey CV 09042015
Amanda Casey CV 09042015
 
Eric Omanga - Curriculum Vitae
Eric Omanga - Curriculum VitaeEric Omanga - Curriculum Vitae
Eric Omanga - Curriculum Vitae
 
Resume - Robert Harris 2015
Resume - Robert Harris 2015Resume - Robert Harris 2015
Resume - Robert Harris 2015
 
Kamesh Chetty
Kamesh ChettyKamesh Chetty
Kamesh Chetty
 
Cv mark jones bc dr
Cv   mark jones bc drCv   mark jones bc dr
Cv mark jones bc dr
 
Final - Professional CV of Jacques Erasmus
Final - Professional CV of Jacques ErasmusFinal - Professional CV of Jacques Erasmus
Final - Professional CV of Jacques Erasmus
 

Piciacchia, Luciano EN 2015rev2

  • 1. Page 1 of 5 Luciano Piciacchia, Eng, P.Eng, PhD Senior Executive 20 years of successful and demonstrated experience providing fiscal, strategic and operations leadership Professional summary Dr. Piciacchia has proven himselfas an effective, strategic business leader.With 30 years of engineering and business managementexperience Dr.Piciacchia has developed his own vision for a holistic approach to customer relationship management.This beliefand approach to clientinteraction along with his commitmentto operational excellence and motivational style have been the formula for rapid success and growth in his currentposition. Dr. Piciacchia has a strong commitmentto project managementand a solid performance in budgetcontrol, invoicing and administration;he further instills these values onto staffthroughouthis organization as being essential to operational suc cess and necessaryto the establishmentof a high performance operational culture. From a technical standpoint Dr.Piciacchia is an experienced mining engineer with a solid geotechnical and environmental background. Even in his currentposition he has chosen to maintain his technical proficiency through active participation in key projects and with major clients,typically as a projectsponsor.In this role Dr. Piciacchia ensures thatcontinuous and effective client engagementis maintained and thata clear understanding ofthe client’s critical success factors are ever presentwithin the project team. Internally this role allows him to mentor the next generation of engineers within his organization from a technical,business and cultural standpoint. Professional Qualifications Quebec Order of Engineers Association ofProfessional Engineers ofOntario Association ofprofessional Engineers ofAlberta Association ofProfessional Engineers,Geologists and Geophysicists ofthe NorthwestTerritories and Nunavut; Professional Engineers and Geoscientists ofNewfoundland and Labrador; Education McGill University, PhD Rock mechanics,Montreal,Quebec, 1988 McGill University, MEng Geo Sciences,Montreal, Quebec,1984 McGill University, BEng Mining Engineering,Montreal, Quebec,1981 Languages French, English,Italian Core skills  Strategy, Vision & Mission Planning  Profitability & Cost analysis  Billing & Cash Management  Contract negotiations and Strategic alliances  Strong inspirational leadership  Mergers and Acquisitions  Finance, budgeting & cost management  Policy and procedure development  Human resource management  Team building & performance improvement  Operational excellence  Driven personality
  • 2. Luciano Piciacchia,Eng,P.Eng, PhD Continued... Page 2 of 5 EmploymentHistory 2006- present Vice President, AMEC Environment & Infrastructure In 2006 Dr. Piciacchia willinglytook on this daunting task of taking over a failing operation. Based on a vision and strategic understanding ofthe Quebec market, an initial shortterm growth plan was established and implemented.Significantemphasis was given to forging strategic partnerships which resulted in a key acquisition;required to meetthe growth plan. Acknowledging the stresses thatare typically associated with significantdouble digit growth particular attention was given to integration ofacquisitions and employee retention. Today this operation is one of the mostprofitable operations within AMEC and boasts one of the lowestvoluntary turnover statistics with its 150 staff and $25M in revenue. In his current position Dr. Piciacchia’s primarymandate is to grow the current operations while maintaining full accountabilityfor the operational P&L. Through intense collaboration with his core team he has developed a long term strategic plan which includes transformational change;evolving Amec from a geotechnical / environmental firm into a full service engineering player in its market. He has provided leadership and direction for his managementteam in the execution of the plan, with noted successes having inspired confidence which continues to drive the operation. He is further responsible for developing yearly budgets and providing quarterlyforecast updates to Amec management.In addition he has had to build and maintain a right sized administrative function to supportthe operations. 1987- 2006 various positions, Sr. Vice President, Trow Consulting (currently exp inc.) Dr. Piciacchia commenced his career with Trow Consulting’s Sudburyoperations as a geotechnical engineer specializing in mining related projects.He quicklygrew within the managementranks and in 1992 was offered the opportunity and challenge to cold-startan environmental /geomechanics practise in Montreal,within an existing Trow operation,which had been recently acquired. In 1994, circumstances allowed Dr.Piciacchia to found his own consultancypractise (Groupe SAE) which he ran as a sole proprietor between 1994 and 1998;thereafter SAE was acquired by Trow through a structured buy-out between 1998 and 2002. SAE was essentiallyrolled into Trow and the entity closed in 2003.Dr. Piciacchia remained as CEO of SAE from its’ inception to its closure in 2003.As CEO he remained responsible for the P&L of the Quebec operations,its growth and sustainability. Upon his departure in 2006 the Quebec operation was the mostdiverse within the Trow organization and boasted 135 staff and $15M in revenue. The growth was achieved organicallyas well as through acquisition,the mostsignificantofwhich was a civil design firm,in 2002. He was further responsible for the integration of this firm within the Trow organization,which necessarily included operational improvement and cultural integration. In the same year,he was named Sr. Vice Presidentand CAO at Trow Global. In his new role he maintained his operational responsibilities and took on leadership for HR, IT, Marketing and Communications as well as Engineering and Quality. This experience provided him with a well rounded and solid appreciation for the supportfunctions required to build and sustain a successful business. He was also an active participanton Trow’s board of directors as well as on the The Presidents’ Executive Management Committee. During his time on the board he actively participated in acquisitions,which included due diligence,offer evaluation and structure, integration planning and staffevaluations. Signature Achievements  Cold start to success :in 2 years  Revenue and Profit Growth  Mergers and Acquisitions :2  Employee development reviews:implementation  Board member activity  CAO responsibility Signature Achievements  Operational restructuring  Operational turnaround :9 months  Revenue and Profit Growth : double Digit  Mergers &Acquisitions :2  Acquisition Pipeline :7-8  Team Building and Development  Long-term strategic Plan : Transformational vision
  • 3. Luciano Piciacchia,Eng,P.Eng, PhD Continued... Page 3 of 5 Luciano Piciacchia, Eng, P.Eng, PhD Technical Background Complementarytechnical skills Water management:including water quality, hydrology, pump stations,spillways,channel and erosion protection design and reservoirs.Projects have focused on mine affected drainage including acid mine drainage and the solid waste industry. Dam safety: including design, dam safetyinspections and DSRs Tailings management: Projects have focused on tailings management,deposition plans and mine closure. Rockmechanics: Particularly focused on crown pillar studies Geotechnical foundations: Foundations in relation to urban structures and transportation Environmental assessments anddecontamination Representative projects Mining rock mechanics Canmet Investigation of Crown Pillars Stability evaluation of various crown pillars across Quebec and Ontario including cities in Val-d'Or, Rouyn-Noranda,Timmins and Cobalt. The projectincluded extensive diamond drilling,In-Situ testing,numerical modeling and statistical analysis ofthe data obtained. ONR – Crown Pillar Ontario Northland Rail operates a rail line in northern Ontario, a portion of which runs through the town of Cobalt.Contract mining in the area historicallycame very close to surface with numerous mining operations directlybeneath ONR’s tracks. Our mandate was to determine which mining operations came so close to surface as to possiblyaffect track safety and then recommend remedial measures.The near surface slopes were firstidentified,those with sufficientlystable crown pillars were eliminated and a reinforced soil solution was developed for the remaining crown pillars. Mining Development ArcelorMittal Liberia Limited, North and South TMFs with a footprint of 1.24km wide by 2.4km long with an ultimate crest height of approximately 50m,WesternAfrica. Principal Tailings Engineer:Comprehensive,independent review of the Tailings ManagementFacilitydesign,construction methodology,and operation/maintenance philosophy.The conclusion ofthe review should evaluate/confirm the actual design ofthe TMF and identify areas for optimisation and improvement,while considering cost,schedule,and safetyfor the mine operations. Rio Tinto Fer et Titane (RTFT) Waste Rock and Water Management, collection and treatment of water,Tio Mine, Havre-St-Pierre, Quebec Basic engineering for dikes (phases 1 and 2),roads,platforms (UTE,pumping stations,contractor area),emergency spillways for spring meltwaters,clean water diversion ditches,UTE discharge and the northern intermediate basin.The construction ofthe infrastructure mentioned will allow to manage waste rock until the end of the life of the mine and make associated effluents compliantwith the current standards and the future certificate of authorization. Cliffs Natural Resources, Tailings and mine water at the Bloom Lake Mine, Fermont, Quebec Tailings ManagementPlanning Reviewer:Engineering services for tailings management. Work provided primarilyconsists of the following key aspects:  Long term tailings deposition planning based on the optimisation ofthe ultimate tailings storage area configuration  Short and medium-term tailings deposition allowing for seasonal conditions,water and snow management  Hydrological analysis and design ofwater managementstructures for environmental compliance and risk mitigation  Staging and methodologyof construction for associated infrastructure and forecasting available tailing volumes for operations and construction Raglan Preparation,and review of the short,medium and long term deposition plan,design,planning & optimization ofthe tailings area along with the implementation ofcover strategies.Dr.Piciacchia currentlysits on Xstrata Nickel (Raglan) experts committee which is looking atthe possible effects /solutions which maybe required as a resultof global warming on the presenttailings cover option which was originallydesigned to be permanentlyfrozen.
  • 4. Luciano Piciacchia,Eng,P.Eng, PhD Continued... Page 4 of 5 Mines Aurizon – Mine Casa Berardi Closure plan coordination including operational and postclosure water treatment,geochemistryof proposed deposition plans and water management.This projecthas a particularity in that arsenic contamination has been absorbed into a peatlayer underlying the head pond and schemes for its restoration during the mine life needed to be considered. ArcelorMittal Mines Canada ArcelorMittal Mines Canada operates a 260-mile railwaybetween Fermontand Port-Cartier.The railway is in part protected by a series of1,300 structurallyplaced culverts, many of which have become critical over time and require rehabilitation. Priorities for the mostcritical culverts were set, establishing a 5-year work plan.Yearly plans and specifications are produced and field and contract supervision is provided.The projectrequired close coordination with AMMC’s rail operations. ArcelorMittal Mines Canada – Mont-Wright ArcelorMittal Mines Canada operates, under Amec Foster Wheeler’s direction,an 18.5M m3/yr. tailings facility at Fermont, Quebec. As part of the expansion project,there was a requirementfirstto increase the capacity of the tailings facilityto 24M m³/yr. and subsequentlyto establish a second facilityof an additional 24M m3/yr. As ProjectReviewer, ensured thatall aspects with respectto design criteria,site optimisation,dyke and dam design and water management,were considered and metwith the client’s needs for both the shortand long term perspectives. ArcelorMittal Mines Canada – Port-Cartier ArcelorMittal Mines Canada operates a 4.2M m3/yr. tailings facilityin Port-Cartier,Quebec. A portion of the footprint of the presentfacility was being considered for the construction ofa new pelletizing plantas part of an overall expansion project. Our mandate was to consider the displacementofthe presentfacility to permitconstruction,taking into consideration those areas alreadyfilled,operational considerations and the additional capacityrequired by the expansion objectives.As Project Reviewer, ensured thatall aspects with respectto design criteria,site optimisation,dyke and dam design and water management,were considered and metwith the client’s needs for both the shortand long term perspectives. ArcelorMittal Mines Canada – Fire Lake As part of its expansion initiative and in lightof new requirements,Amec Foster Wheeler conducted a prefeasibilityfor the former 6M m3/yr. tailings facilityso that it may now be expanded to 8M m3/yr. As Project Reviewer, I ensured that all aspects,with respectto design criteria,site optimisation,dyke and dam design and water management,were consideredand metwith the client’s needs for both the shortand long term perspectives. ArcelorMittal Mines Canada – Mont-Reed Amec Foster Wheeler had previouslylooked at various disposal options for tailings atthe Mont-Reed site.In the context of future expansion,three (3) sites were being considered to handle 8M m3/yr. of tailings from various sources.As Project Reviewer, I ensured thatall aspects with respectto design criteria,site optimisation,dyke and dam design and water management,were considered and metwith the client’s needs for both the shortand long term perspectives. Urban geotechnical investigations Earlier in his career Dr. Piciacchia worked on a wide range of geotechnical related projects comprising investigations and subsequentrecommendations for foundations including conventional footings,piled or caisson foundations and raft foundation.In addition,recommendations take into consideration earthquake design,reuse ofexcavated materials, and design ofparking areas where applicable. Such investigations were carried outfor institutional, lightand heavy industrial clients as well as governmentclients with respectto roadways,bridges and municipal services. Environmental assessments Canada Customs and Revenue Agency Evaluation of 12 sites in Eastern Canada including environmental assessment,evaluation of building components and feasibilitystudy for future expansion of facility. Neste Resin This projectcomprised several subprojects including a Phase IIevaluation of the facility which has been in operation for over 40 years. The Phase II included geophysics,“passive vapour” survey and conventional drilling and hydroge ological modeling program and assessmentofleachate quality. The project further included the developmentofan environmental management plan for contaminated soils and hazardous waste.In addition,handling procedures and an occupational Health and Safety plan was also developed.
  • 5. Luciano Piciacchia,Eng,P.Eng, PhD Continued... Page 5 of 5 Environmental Remediation Ashland Chemicals Clean-up ofBrossard facility, including all process piping and reservoirs.Work was conducted in an explosive environment, relevant safety protocols had to be established and monitored throughoutthe clean-up. Canada Customs and Revenue Agency Evaluation of 12 sites in Eastern Canada including environmental assessment,evaluation of building components and feasibilitystudy for future expansion of facility. Neste Resin Plans and specifications for a number of decontamination projects including Phenol tank area,buried hazardous waste basin,Naphthalene waste removal.In addition we designed a new HDPE liner for the waste water overflow basin and for the primaryretention pond. The total of all site work was in excess of $10M. ArcelorMittal Mines Canada (AMMC) Evaluation of sources ofcontamination ofsurface water runoffby MES. Establishmentofa method for managing water runoff and recommendation ofa permanentsolution to the problem.