10 SIMPLE POINTS TO SUPPORT YOUR PURCHASING EFFICIENCY The following presentation may show your company how to save $Millions per year of waste that could be avoided or recovered through financial audit and/or lean manufacturing workshop processes. PRESENTED BY:
DISCLAIMER: The information contained herein is hypothetical and/or fictitious in reference and is to be used strictly for educational and training purposes only. Lextron Group Inc., its shareholders, directors, employees and affiliates assume no liability for any resemblance to any person, place, organisation, company or firm, or as may be presented as coincidental, or for any effects this content may have on any said person, place, organisation, company or firm, nor for any actions taken in reliance thereon. The information contained herein has been supplied solely from creative and suggestive script and it’s visual effects as provided by the writer. Certain links on this site may take you to other websites. Lextron Group Inc. provides these links only as a convenience and not as an endorsement by our company and associates. These linked sites are not under the control of Lextron Group Inc. If you decide to visit any linked site, you do so at your own risk and it is your responsibility to take all protective measures to guard against viruses and other destructive elements. Lextron Group Inc. is not responsible for the content of any such linked sites or any other web page that is not part of this site. Unless otherwise expressly provided, Lextron Group Inc. makes no representation or warranty regarding, and does not endorse, any linked site or the information, products or services appearing thereon. Accordingly, you agree that Lextron Group Inc. or it's associates will not be responsible or liable in any way for the accuracy, relevancy, copyright compliance, legality, or decency of material contained in any presentation or site linked from this site.
DETAILED REVIEW OF A TYPICAL COST MODEL TEMPLATE Let us explore the enormous cost saving opportunities with the review of a typical cost model example. THE COST-WALK...
1)  REVIEW YOUR MATERIAL USAGE Some suppliers may inadvertently overestimate their material usage based on initial tool design concepts and prior to its’ actual engineering and construction . A careful review of the quoted material calculations compared to the actual requirements after tool build may be needed here.
1)  REVIEW YOUR MATERIAL USAGE An audit of actual material usage for the product and it’s sub-components can have a dramatic influence on your true costs. Review the suppliers set-up sheets and/or measure the tool layout to determine the real cost metrics. ?
2)  SCRAP REIMBURSEMENT Do you receive reimbursement for the off-cuts and scrap materials generated through production of your products? Are they calculated correctly? Do you know there is a 5 to 30% scrap return available for every dollar spent on raw materials used in your products?
2)  SCRAP REIMBURSEMENT You should consider to compare the raw material calculation with the net weight shown on each component drawing. The difference is YOUR money. Today’s scrap steel value is $358 per metric ton and  could offer potential savings on your purchased products. ? or..
3)  MANUFACTURING EFFICIENCY –  Value Stream Analysis Do the quoted machine cycle times match the actual output? Is the quoted equipment being used? Are there any secondary labor costs that are not actually required? These are areas where suppliers may use some creative accounting in their calculations.
3)  MANUFACTURING EFFICIENCY –  Value Stream Analysis Again, please consider to compare the supplier’s equipment set-up documents or MRP/Operations system data against the quotation or cost model. Quite often the quoted calculations do not match actual output conditions. ? ?
4)  SECONDARY PROCESSES It may also be prudent to review some of the value stream and secondary process items to determine if the quoted values match the production practice.
4)  SECONDARY PROCESSES A review of the supplier’s measurement systems, performance records and/or operations system would be a good indicator of process metrics and related costs.
5)  PURCHASED COMPONENTS & SERVICES Also an area to investigate is the  “quoted cost” v.s. “true cost” of purchased components and sub-contract services. Quite often there may be differences from the original estimates to when the suppliers purchase orders go out, just prior to program launch. Especially when there are inter-company transactions.
5)  PURCHASED COMPONENTS & SERVICES A request to your supplier for reconciliation of accounts can address this concern.  Review of your supplier’s purchase orders to the lower-tier supply chain, or review of your supplier’s MRP system, may offer opportunities to recover costs or to prevent loss.
6)  SECONDARY EQUIPMENT BURDEN Careful review of machine rate calculations, process speeds and further review of all evidence for the associated costs of those machine rates, may provide additional opportunities for savings and/or cost avoidance.
7)  DUPLICATE PROCESS COSTS You may also consider to review the cost model for duplications or errors.
8)  OTHER COSTS (eg. EXCESS LABOR) Optimize the value stream to eliminate excessive labor costs and/or ensure that what is on the quotation, is actually needed. In the example above, the packaging cost can be incorporated into the assembly labor.
8)  OTHER COSTS (eg. EXCESS LABOR) In this example, the suppliers’ packaging operator can be eliminated.
9) ASSOCIATED PROFIT, SG&A  & SCRAP ALLOWANCE  For every dollar captured through your efforts of optimizing costs and reducing waste, in this example an additional 11.4% of those savings are automatically realized from reducing the respective overhead and margin costs.
10) PACKAGING & FREIGHT COSTS Another area for close investigation are the packaging and freight costs, as they may be amortized into the product piece price.
In summary review of the costs presented and the associated hypothetical savings... here are the results. SUMMARY OF COSTS
TOOLING, FIXTURES & GAGES A further area of cost saving opportunities, not detailed in this presentation, is in the audit of tooling programs. These must be studied very carefully and a deep dive into the allocation of tool build related materials, hardware, engineering, labor and other associated direct and indirect costs.
THANK YOU FOR YOUR TIME TO REVIEW THIS PRESENTATION. WE SINCERELY HOPE THAT THERE ARE COST SAVINGS OPPORTUNITIES IN THIS REVIEW AND THAT IT MAY ALSO HELP TO STRENGTHEN THE INTEGRITY OF YOUR SUPPLY BASE. SHOULD YOU REQUIRE FURTHER SUPPORT TO REALIZE THESE COST BENEFITS, PLEASE CONTACT US AT YOUR EARLIEST CONVENIENCE.

Weitere ähnliche Inhalte

Was ist angesagt?

Product optimization.ppt
Product optimization.pptProduct optimization.ppt
Product optimization.pptRobin Kumar
 
Seven Steps for Achieving Sustainable Cost Reduction
Seven Steps for Achieving Sustainable Cost ReductionSeven Steps for Achieving Sustainable Cost Reduction
Seven Steps for Achieving Sustainable Cost ReductionScottMadden, Inc.
 
Finance cost reduction
Finance cost reductionFinance cost reduction
Finance cost reductionMarc Joiner
 
Activity based costing
Activity based costingActivity based costing
Activity based costingPraveen Ojha
 
Cost Reduction And Avoidance
Cost Reduction And AvoidanceCost Reduction And Avoidance
Cost Reduction And Avoidancerbhedrick
 
Cost Control Systems
Cost Control SystemsCost Control Systems
Cost Control SystemsUmesh Charki
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptmayank mulchandani
 
Cost control and reduction
Cost control and reduction Cost control and reduction
Cost control and reduction k sudheer
 
Purchasing & Value Analysis
Purchasing & Value AnalysisPurchasing & Value Analysis
Purchasing & Value AnalysisThomas Tanel
 
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...Sonu Sah
 
Target,kizen costing and abc..
Target,kizen costing and abc..Target,kizen costing and abc..
Target,kizen costing and abc..Manpreet Mahal
 
Standard costing - cost analysis
Standard costing - cost analysisStandard costing - cost analysis
Standard costing - cost analysisRahul Kumar
 
Activity based management fall 2016
Activity based management fall 2016 Activity based management fall 2016
Activity based management fall 2016 Stephen Brian Salter
 
Cost reduction & cost control
Cost reduction & cost controlCost reduction & cost control
Cost reduction & cost controlsachin padwal
 
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010Barrett Peterson
 

Was ist angesagt? (20)

Product optimization.ppt
Product optimization.pptProduct optimization.ppt
Product optimization.ppt
 
Corporate Cost Reduction
Corporate Cost ReductionCorporate Cost Reduction
Corporate Cost Reduction
 
Seven Steps for Achieving Sustainable Cost Reduction
Seven Steps for Achieving Sustainable Cost ReductionSeven Steps for Achieving Sustainable Cost Reduction
Seven Steps for Achieving Sustainable Cost Reduction
 
Finance cost reduction
Finance cost reductionFinance cost reduction
Finance cost reduction
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Cost Reduction And Avoidance
Cost Reduction And AvoidanceCost Reduction And Avoidance
Cost Reduction And Avoidance
 
Cost Control Systems
Cost Control SystemsCost Control Systems
Cost Control Systems
 
10 Cost Reduction
10 Cost Reduction10 Cost Reduction
10 Cost Reduction
 
Cost driver analysis
Cost driver analysisCost driver analysis
Cost driver analysis
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction ppt
 
Cost control and reduction
Cost control and reduction Cost control and reduction
Cost control and reduction
 
Tools and techniques of cost reduction
Tools and techniques of cost reductionTools and techniques of cost reduction
Tools and techniques of cost reduction
 
Purchasing & Value Analysis
Purchasing & Value AnalysisPurchasing & Value Analysis
Purchasing & Value Analysis
 
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
 
Target,kizen costing and abc..
Target,kizen costing and abc..Target,kizen costing and abc..
Target,kizen costing and abc..
 
Standard costing - cost analysis
Standard costing - cost analysisStandard costing - cost analysis
Standard costing - cost analysis
 
Activity based management fall 2016
Activity based management fall 2016 Activity based management fall 2016
Activity based management fall 2016
 
Cost reduction & cost control
Cost reduction & cost controlCost reduction & cost control
Cost reduction & cost control
 
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010
Strategic Cost Management – A Profitability Tool, Bp, Fla, November 20, 2010
 
Cost Reduction Primer
Cost Reduction PrimerCost Reduction Primer
Cost Reduction Primer
 

Andere mochten auch

Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisationCharul Sharma
 
Gartner 2013 it cost optimization strategy, best practices & risks
Gartner  2013 it cost optimization strategy, best practices & risksGartner  2013 it cost optimization strategy, best practices & risks
Gartner 2013 it cost optimization strategy, best practices & risksSatya Harish
 
Demystifying cost based optimization
Demystifying cost based optimizationDemystifying cost based optimization
Demystifying cost based optimizationRiyaj Shamsudeen
 
presentation on reducing Cost in Cloud Computing
 presentation on reducing Cost in Cloud Computing presentation on reducing Cost in Cloud Computing
presentation on reducing Cost in Cloud ComputingMuhammad Faheem ul Hassan
 
Black Swan Based VM Placement and Migration Optimizations
Black Swan Based VM Placement and Migration OptimizationsBlack Swan Based VM Placement and Migration Optimizations
Black Swan Based VM Placement and Migration OptimizationsTokyo University of Science
 
The 27th Australasian Conference on Information Systems
The 27th Australasian Conference  on Information SystemsThe 27th Australasian Conference  on Information Systems
The 27th Australasian Conference on Information SystemsMahdi_Fahmideh
 
Test Driven Development with Puppet
Test Driven Development with Puppet Test Driven Development with Puppet
Test Driven Development with Puppet Puppet
 
Netflix Story of Embracing the Cloud
Netflix Story of Embracing the CloudNetflix Story of Embracing the Cloud
Netflix Story of Embracing the CloudKate Karniouchina
 
Cloud Native Cost Optimization
Cloud Native Cost OptimizationCloud Native Cost Optimization
Cloud Native Cost OptimizationAdrian Cockcroft
 
Data Center Virtualization @ Cisco
Data Center Virtualization @ CiscoData Center Virtualization @ Cisco
Data Center Virtualization @ Ciscovmug
 
2016 Utah Cloud Summit: TCO & Cost Optimization
2016 Utah Cloud Summit: TCO & Cost Optimization2016 Utah Cloud Summit: TCO & Cost Optimization
2016 Utah Cloud Summit: TCO & Cost Optimization1Strategy
 
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...Amazon Web Services
 
Cloud computing: cost reduction
Cloud computing: cost reductionCloud computing: cost reduction
Cloud computing: cost reductionHesham Shabana
 
Data Center Architecture Trends
Data Center Architecture TrendsData Center Architecture Trends
Data Center Architecture TrendsPanduit
 
Optimization of Resource Provisioning Cost in Cloud Computing
Optimization of Resource Provisioning Cost in Cloud ComputingOptimization of Resource Provisioning Cost in Cloud Computing
Optimization of Resource Provisioning Cost in Cloud ComputingAswin Kalarickal
 
Data center network architectures v1.3
Data center network architectures v1.3Data center network architectures v1.3
Data center network architectures v1.3Jeong, Wookjae
 
Dell Data Center Networking Overview
Dell Data Center Networking OverviewDell Data Center Networking Overview
Dell Data Center Networking OverviewDell World
 
Cost Optimization as Major Architectural Consideration for Cloud Application
Cost Optimization as Major Architectural Consideration for Cloud ApplicationCost Optimization as Major Architectural Consideration for Cloud Application
Cost Optimization as Major Architectural Consideration for Cloud ApplicationUdayan Banerjee
 

Andere mochten auch (20)

Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisation
 
Gartner 2013 it cost optimization strategy, best practices & risks
Gartner  2013 it cost optimization strategy, best practices & risksGartner  2013 it cost optimization strategy, best practices & risks
Gartner 2013 it cost optimization strategy, best practices & risks
 
Demystifying cost based optimization
Demystifying cost based optimizationDemystifying cost based optimization
Demystifying cost based optimization
 
presentation on reducing Cost in Cloud Computing
 presentation on reducing Cost in Cloud Computing presentation on reducing Cost in Cloud Computing
presentation on reducing Cost in Cloud Computing
 
Black Swan Based VM Placement and Migration Optimizations
Black Swan Based VM Placement and Migration OptimizationsBlack Swan Based VM Placement and Migration Optimizations
Black Swan Based VM Placement and Migration Optimizations
 
Final Review
Final ReviewFinal Review
Final Review
 
The 27th Australasian Conference on Information Systems
The 27th Australasian Conference  on Information SystemsThe 27th Australasian Conference  on Information Systems
The 27th Australasian Conference on Information Systems
 
Test Driven Development with Puppet
Test Driven Development with Puppet Test Driven Development with Puppet
Test Driven Development with Puppet
 
Netflix Story of Embracing the Cloud
Netflix Story of Embracing the CloudNetflix Story of Embracing the Cloud
Netflix Story of Embracing the Cloud
 
Cloud Native Cost Optimization
Cloud Native Cost OptimizationCloud Native Cost Optimization
Cloud Native Cost Optimization
 
Data Center Virtualization @ Cisco
Data Center Virtualization @ CiscoData Center Virtualization @ Cisco
Data Center Virtualization @ Cisco
 
2016 Utah Cloud Summit: TCO & Cost Optimization
2016 Utah Cloud Summit: TCO & Cost Optimization2016 Utah Cloud Summit: TCO & Cost Optimization
2016 Utah Cloud Summit: TCO & Cost Optimization
 
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...
Building Cost-Aware Cloud Architectures - Jinesh Varia (AWS) and Adrian Cockc...
 
Cloud computing: cost reduction
Cloud computing: cost reductionCloud computing: cost reduction
Cloud computing: cost reduction
 
Data Center Architecture Trends
Data Center Architecture TrendsData Center Architecture Trends
Data Center Architecture Trends
 
Optimization of Resource Provisioning Cost in Cloud Computing
Optimization of Resource Provisioning Cost in Cloud ComputingOptimization of Resource Provisioning Cost in Cloud Computing
Optimization of Resource Provisioning Cost in Cloud Computing
 
Data center network architectures v1.3
Data center network architectures v1.3Data center network architectures v1.3
Data center network architectures v1.3
 
Dell Data Center Networking Overview
Dell Data Center Networking OverviewDell Data Center Networking Overview
Dell Data Center Networking Overview
 
Cost Optimization as Major Architectural Consideration for Cloud Application
Cost Optimization as Major Architectural Consideration for Cloud ApplicationCost Optimization as Major Architectural Consideration for Cloud Application
Cost Optimization as Major Architectural Consideration for Cloud Application
 
The Art of Negotiating
The Art of NegotiatingThe Art of Negotiating
The Art of Negotiating
 

Ähnlich wie Cost Optimization

Coursework ProjectCompanies are paying out too much in dividen
Coursework ProjectCompanies are paying out too much in dividenCoursework ProjectCompanies are paying out too much in dividen
Coursework ProjectCompanies are paying out too much in dividenCruzIbarra161
 
Pgpm13 project procurement and materials
Pgpm13 project procurement and materialsPgpm13 project procurement and materials
Pgpm13 project procurement and materialssakariya88
 
Ch02 Managerial accounting aiou mba mcom 8508
Ch02 Managerial accounting aiou mba mcom 8508Ch02 Managerial accounting aiou mba mcom 8508
Ch02 Managerial accounting aiou mba mcom 8508Ali Imran Awan MBA (IT)
 
Case AnalysisScenarioThe Senior Vice President of Human Resou.docx
Case AnalysisScenarioThe Senior Vice President of Human Resou.docxCase AnalysisScenarioThe Senior Vice President of Human Resou.docx
Case AnalysisScenarioThe Senior Vice President of Human Resou.docxtidwellveronique
 
“Direct” Spend Management: Optimizing spend and increasing direct material av...
“Direct” Spend Management: Optimizing spend and increasing direct material av...“Direct” Spend Management: Optimizing spend and increasing direct material av...
“Direct” Spend Management: Optimizing spend and increasing direct material av...Genpact Ltd
 
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...Vishnu Kumar
 
How to analyse accouts and cost records
How to analyse accouts and cost recordsHow to analyse accouts and cost records
How to analyse accouts and cost recordsDr. Trilok Kumar Jain
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course LeaCicelyBourqueju
 
3 Process CostingdjedzureiStockThinkstockLearning Ob.docx
3 Process CostingdjedzureiStockThinkstockLearning Ob.docx3 Process CostingdjedzureiStockThinkstockLearning Ob.docx
3 Process CostingdjedzureiStockThinkstockLearning Ob.docxtamicawaysmith
 
Spend Analysis - Process, Methodology
Spend Analysis - Process, MethodologySpend Analysis - Process, Methodology
Spend Analysis - Process, MethodologyRam Raghuraman
 
bp case study
bp case study bp case study
bp case study etizaz
 
Benchmarking Logistics Performance
Benchmarking Logistics PerformanceBenchmarking Logistics Performance
Benchmarking Logistics PerformanceARC Advisory Group
 
Relevant information and decision making
Relevant information and decision makingRelevant information and decision making
Relevant information and decision makingAliza Racelis
 
CHAPTER 3Product Costing and Cost Accumulation in a Batch Pr
CHAPTER 3Product Costing and Cost Accumulation in a Batch PrCHAPTER 3Product Costing and Cost Accumulation in a Batch Pr
CHAPTER 3Product Costing and Cost Accumulation in a Batch PrEstelaJeffery653
 
Leveraging Purchasing in a Multi-Org Environment
Leveraging Purchasing in a Multi-Org EnvironmentLeveraging Purchasing in a Multi-Org Environment
Leveraging Purchasing in a Multi-Org Environmenteprentise
 
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...eprentise
 

Ähnlich wie Cost Optimization (20)

Coursework ProjectCompanies are paying out too much in dividen
Coursework ProjectCompanies are paying out too much in dividenCoursework ProjectCompanies are paying out too much in dividen
Coursework ProjectCompanies are paying out too much in dividen
 
Pgpm13 project procurement and materials
Pgpm13 project procurement and materialsPgpm13 project procurement and materials
Pgpm13 project procurement and materials
 
Ch02 Managerial accounting aiou mba mcom 8508
Ch02 Managerial accounting aiou mba mcom 8508Ch02 Managerial accounting aiou mba mcom 8508
Ch02 Managerial accounting aiou mba mcom 8508
 
Case AnalysisScenarioThe Senior Vice President of Human Resou.docx
Case AnalysisScenarioThe Senior Vice President of Human Resou.docxCase AnalysisScenarioThe Senior Vice President of Human Resou.docx
Case AnalysisScenarioThe Senior Vice President of Human Resou.docx
 
“Direct” Spend Management: Optimizing spend and increasing direct material av...
“Direct” Spend Management: Optimizing spend and increasing direct material av...“Direct” Spend Management: Optimizing spend and increasing direct material av...
“Direct” Spend Management: Optimizing spend and increasing direct material av...
 
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
 
How to analyse accouts and cost records
How to analyse accouts and cost recordsHow to analyse accouts and cost records
How to analyse accouts and cost records
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course Lea
 
3 Process CostingdjedzureiStockThinkstockLearning Ob.docx
3 Process CostingdjedzureiStockThinkstockLearning Ob.docx3 Process CostingdjedzureiStockThinkstockLearning Ob.docx
3 Process CostingdjedzureiStockThinkstockLearning Ob.docx
 
Acc 349 Preview Full Course
Acc 349 Preview Full Course Acc 349 Preview Full Course
Acc 349 Preview Full Course
 
Spend Analysis - Process, Methodology
Spend Analysis - Process, MethodologySpend Analysis - Process, Methodology
Spend Analysis - Process, Methodology
 
bp case study
bp case study bp case study
bp case study
 
Benchmarking Logistics Performance
Benchmarking Logistics PerformanceBenchmarking Logistics Performance
Benchmarking Logistics Performance
 
Bus 630 preview full class
Bus 630 preview full classBus 630 preview full class
Bus 630 preview full class
 
MSC in Finance.docx
MSC in Finance.docxMSC in Finance.docx
MSC in Finance.docx
 
Relevant information and decision making
Relevant information and decision makingRelevant information and decision making
Relevant information and decision making
 
Chapter 7 Solution
Chapter 7 SolutionChapter 7 Solution
Chapter 7 Solution
 
CHAPTER 3Product Costing and Cost Accumulation in a Batch Pr
CHAPTER 3Product Costing and Cost Accumulation in a Batch PrCHAPTER 3Product Costing and Cost Accumulation in a Batch Pr
CHAPTER 3Product Costing and Cost Accumulation in a Batch Pr
 
Leveraging Purchasing in a Multi-Org Environment
Leveraging Purchasing in a Multi-Org EnvironmentLeveraging Purchasing in a Multi-Org Environment
Leveraging Purchasing in a Multi-Org Environment
 
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...
Are You Leaving Money on the Table Addressing the Limitations of a Multi-Org ...
 

Kürzlich hochgeladen

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 

Kürzlich hochgeladen (20)

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 

Cost Optimization

  • 1. 10 SIMPLE POINTS TO SUPPORT YOUR PURCHASING EFFICIENCY The following presentation may show your company how to save $Millions per year of waste that could be avoided or recovered through financial audit and/or lean manufacturing workshop processes. PRESENTED BY:
  • 2. DISCLAIMER: The information contained herein is hypothetical and/or fictitious in reference and is to be used strictly for educational and training purposes only. Lextron Group Inc., its shareholders, directors, employees and affiliates assume no liability for any resemblance to any person, place, organisation, company or firm, or as may be presented as coincidental, or for any effects this content may have on any said person, place, organisation, company or firm, nor for any actions taken in reliance thereon. The information contained herein has been supplied solely from creative and suggestive script and it’s visual effects as provided by the writer. Certain links on this site may take you to other websites. Lextron Group Inc. provides these links only as a convenience and not as an endorsement by our company and associates. These linked sites are not under the control of Lextron Group Inc. If you decide to visit any linked site, you do so at your own risk and it is your responsibility to take all protective measures to guard against viruses and other destructive elements. Lextron Group Inc. is not responsible for the content of any such linked sites or any other web page that is not part of this site. Unless otherwise expressly provided, Lextron Group Inc. makes no representation or warranty regarding, and does not endorse, any linked site or the information, products or services appearing thereon. Accordingly, you agree that Lextron Group Inc. or it's associates will not be responsible or liable in any way for the accuracy, relevancy, copyright compliance, legality, or decency of material contained in any presentation or site linked from this site.
  • 3. DETAILED REVIEW OF A TYPICAL COST MODEL TEMPLATE Let us explore the enormous cost saving opportunities with the review of a typical cost model example. THE COST-WALK...
  • 4. 1) REVIEW YOUR MATERIAL USAGE Some suppliers may inadvertently overestimate their material usage based on initial tool design concepts and prior to its’ actual engineering and construction . A careful review of the quoted material calculations compared to the actual requirements after tool build may be needed here.
  • 5. 1) REVIEW YOUR MATERIAL USAGE An audit of actual material usage for the product and it’s sub-components can have a dramatic influence on your true costs. Review the suppliers set-up sheets and/or measure the tool layout to determine the real cost metrics. ?
  • 6. 2) SCRAP REIMBURSEMENT Do you receive reimbursement for the off-cuts and scrap materials generated through production of your products? Are they calculated correctly? Do you know there is a 5 to 30% scrap return available for every dollar spent on raw materials used in your products?
  • 7. 2) SCRAP REIMBURSEMENT You should consider to compare the raw material calculation with the net weight shown on each component drawing. The difference is YOUR money. Today’s scrap steel value is $358 per metric ton and could offer potential savings on your purchased products. ? or..
  • 8. 3) MANUFACTURING EFFICIENCY – Value Stream Analysis Do the quoted machine cycle times match the actual output? Is the quoted equipment being used? Are there any secondary labor costs that are not actually required? These are areas where suppliers may use some creative accounting in their calculations.
  • 9. 3) MANUFACTURING EFFICIENCY – Value Stream Analysis Again, please consider to compare the supplier’s equipment set-up documents or MRP/Operations system data against the quotation or cost model. Quite often the quoted calculations do not match actual output conditions. ? ?
  • 10. 4) SECONDARY PROCESSES It may also be prudent to review some of the value stream and secondary process items to determine if the quoted values match the production practice.
  • 11. 4) SECONDARY PROCESSES A review of the supplier’s measurement systems, performance records and/or operations system would be a good indicator of process metrics and related costs.
  • 12. 5) PURCHASED COMPONENTS & SERVICES Also an area to investigate is the “quoted cost” v.s. “true cost” of purchased components and sub-contract services. Quite often there may be differences from the original estimates to when the suppliers purchase orders go out, just prior to program launch. Especially when there are inter-company transactions.
  • 13. 5) PURCHASED COMPONENTS & SERVICES A request to your supplier for reconciliation of accounts can address this concern. Review of your supplier’s purchase orders to the lower-tier supply chain, or review of your supplier’s MRP system, may offer opportunities to recover costs or to prevent loss.
  • 14. 6) SECONDARY EQUIPMENT BURDEN Careful review of machine rate calculations, process speeds and further review of all evidence for the associated costs of those machine rates, may provide additional opportunities for savings and/or cost avoidance.
  • 15. 7) DUPLICATE PROCESS COSTS You may also consider to review the cost model for duplications or errors.
  • 16. 8) OTHER COSTS (eg. EXCESS LABOR) Optimize the value stream to eliminate excessive labor costs and/or ensure that what is on the quotation, is actually needed. In the example above, the packaging cost can be incorporated into the assembly labor.
  • 17. 8) OTHER COSTS (eg. EXCESS LABOR) In this example, the suppliers’ packaging operator can be eliminated.
  • 18. 9) ASSOCIATED PROFIT, SG&A & SCRAP ALLOWANCE For every dollar captured through your efforts of optimizing costs and reducing waste, in this example an additional 11.4% of those savings are automatically realized from reducing the respective overhead and margin costs.
  • 19. 10) PACKAGING & FREIGHT COSTS Another area for close investigation are the packaging and freight costs, as they may be amortized into the product piece price.
  • 20. In summary review of the costs presented and the associated hypothetical savings... here are the results. SUMMARY OF COSTS
  • 21. TOOLING, FIXTURES & GAGES A further area of cost saving opportunities, not detailed in this presentation, is in the audit of tooling programs. These must be studied very carefully and a deep dive into the allocation of tool build related materials, hardware, engineering, labor and other associated direct and indirect costs.
  • 22. THANK YOU FOR YOUR TIME TO REVIEW THIS PRESENTATION. WE SINCERELY HOPE THAT THERE ARE COST SAVINGS OPPORTUNITIES IN THIS REVIEW AND THAT IT MAY ALSO HELP TO STRENGTHEN THE INTEGRITY OF YOUR SUPPLY BASE. SHOULD YOU REQUIRE FURTHER SUPPORT TO REALIZE THESE COST BENEFITS, PLEASE CONTACT US AT YOUR EARLIEST CONVENIENCE.