SlideShare ist ein Scribd-Unternehmen logo
1 von 26
<Lean Event Name> <Conducted Date(s)> <Evaluated Date(s)> BB: (Name) Champion: (Name)
Defining the Kaizen  Focus and Value
Define VOC, VOB ,[object Object],[object Object],Add slides with pictures, words, graphs, cartoons, clipart or whatever will communicate as appropriate to show “the story”.
Customer CTQ Tree  ,[object Object],Need Drivers CTQ’s Q1= Q2 - P1 - Q1 - KPI Driver 1 Driver 2 Driver 3 General Hard to measure Specific Easy to measure Q2-
Describe the Baseline Condition Include Pareto Charts, trend charts, histograms etc to characterize existing process. The purpose of the chart(s) on this page is to explore what is happening with the Y or Y’s that will make this an appropriate project to execute. Plot your primary metric here. Good!
Project Charter {Project Name & No. Here} Actual Sched Date Date Date Date Date Date Date Date Date Date Date Date Control Improve Analyze Measure Define Assigned Process Map Number:   Number here Black Belt:  Name here Process Owner:  Name here Champion:  Name here Implementation Coordinator : Name here Data Coordinator : Name here Team Members: Name & function here Name & function here Name & function here Name & function here Name & function here Expected Benefits:   Hard Savings – xxx $K Soft Savings – xxx $K Other Benefits: List benefit here List benefit here Project Timeline: Customer CTQ(s):  Describe customer CTQ (customer need/defect and spec limit.) Problem Statement : List the 4 elements of a problem statement:  * Defect identification  * Magnitude of the defect (events/unit time, etc)  * Where is the defect (location/group/segment)  * Why this project is important to work now ($, BHAG support, etc) Project Scope: List project/process boundaries here by using includes … and excludes … Goal Statement:  Increase(/decrease) the {primary metric} from {baseline state} to {improved state} by {date} without negatively impacting {secondary metric}.
SIPOC Suppliers Inputs Process Outputs Customers ?? ?? Process Description  ?? ?? ?? ?? ?? ?? Process Steps Project Boundary Project Boundary ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ??
Included/Excluded ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Quantify Project Value ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Kaizen Team I I I R I Ringo R R M M R George A A A A A Paul M M M M M John Control Improve Analyze Measure Define Key Stakeholders A  - Approval of team decisions outside their charter/authorities, i.e., sponsor, business leader. R  - Resource to the team, one whose expertise, skills, “clout” may be needed on an  ad-hoc  basis. M  - Member of team, with the authorities and boundaries of the charter. I  - Interested party, one who will need to be kept informed on direction, findings, if later support is to be forthcoming. Project Phase
Pre-Event Work
Document Existing Process ,[object Object],[object Object],[object Object],[object Object],[object Object]
Identify Targets of Opportunity ,[object Object],[object Object],[object Object],[object Object],[object Object]
Pre-Session Research ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Communicate and Secure ,[object Object],[object Object]
All Ready Check Point ,[object Object],[object Object],[object Object],[object Object],[object Object]
During the Event
Documented Baseline ,[object Object],[object Object],[object Object],[object Object],[object Object]
Work Product ,[object Object],[object Object],[object Object],[object Object],[object Object]
Document the Transition Plan Identify when it will be done Identify who will do it Identify which employees need to be trained Train employees Identify when it will be done Identify who will do it Identify which procedures need to be documented Write new procedures Date Responsibility Description  Item Use this slide to list the things that must be accomplished to transition from the baseline state to the envisioned future state
Assuring Implementation
Document the Transition Plan Identify when it will be done Identify when it will be done Date Identify when completed Identify who will do it Identify which employees need to be trained Train employees Identify when completed Identify who will do it Identify which procedures need to be documented Write new procedures Date Responsibility Description  Item Use this slide to record what is accomplished to transition from the baseline state to the envisioned future state
Control Phase
Control Tools ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Was It Worth It? ,[object Object],[object Object],[object Object],[object Object],[object Object]
Closing Report ,[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
Leanleaders.org
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
Leanleaders.org
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
Steven Bonacorsi
 

Was ist angesagt? (13)

D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Amreek dmaic template pph_may 14 project
Amreek dmaic template pph_may 14 projectAmreek dmaic template pph_may 14 project
Amreek dmaic template pph_may 14 project
 

Andere mochten auch

A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
Leanleaders.org
 
D02 Certification requirements
D02 Certification requirementsD02 Certification requirements
D02 Certification requirements
Leanleaders.org
 
D12 Airplane DMAGIC Project
D12 Airplane DMAGIC ProjectD12 Airplane DMAGIC Project
D12 Airplane DMAGIC Project
Leanleaders.org
 
Hypothesis Test Selection Guide
Hypothesis Test Selection GuideHypothesis Test Selection Guide
Hypothesis Test Selection Guide
Leanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
Leanleaders.org
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
Leanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
Leanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
Leanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
Leanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
Leanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
Leanleaders.org
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
Leanleaders.org
 

Andere mochten auch (15)

A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
D02 Certification requirements
D02 Certification requirementsD02 Certification requirements
D02 Certification requirements
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
D12 Airplane DMAGIC Project
D12 Airplane DMAGIC ProjectD12 Airplane DMAGIC Project
D12 Airplane DMAGIC Project
 
A04 Sample Size
A04 Sample SizeA04 Sample Size
A04 Sample Size
 
Hypothesis Test Selection Guide
Hypothesis Test Selection GuideHypothesis Test Selection Guide
Hypothesis Test Selection Guide
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
 

Ähnlich wie LEAN template

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
PhngPhmTrung
 
Warehouse components
Warehouse componentsWarehouse components
Warehouse components
ganblues
 
Measurement in a Continuous World - Jim Highsmith
Measurement in a Continuous World - Jim HighsmithMeasurement in a Continuous World - Jim Highsmith
Measurement in a Continuous World - Jim Highsmith
Thoughtworks
 

Ähnlich wie LEAN template (20)

6 Sigma
6 Sigma6 Sigma
6 Sigma
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
Company HQ Site Move: Requirements & Transition Plan
Company HQ Site Move: Requirements & Transition PlanCompany HQ Site Move: Requirements & Transition Plan
Company HQ Site Move: Requirements & Transition Plan
 
Six sigma define - v1.0
Six sigma   define - v1.0Six sigma   define - v1.0
Six sigma define - v1.0
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Batog
BatogBatog
Batog
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
PP C&A 3D process guide
PP C&A 3D process guidePP C&A 3D process guide
PP C&A 3D process guide
 
5 tools in dmai...
5 tools in dmai...5 tools in dmai...
5 tools in dmai...
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
La Dove Associates -- CRM/Customer Care Consulting Overview
La Dove Associates --  CRM/Customer Care Consulting Overview La Dove Associates --  CRM/Customer Care Consulting Overview
La Dove Associates -- CRM/Customer Care Consulting Overview
 
Warehouse components
Warehouse componentsWarehouse components
Warehouse components
 
Measurement in a Continuous World - Jim Highsmith
Measurement in a Continuous World - Jim HighsmithMeasurement in a Continuous World - Jim Highsmith
Measurement in a Continuous World - Jim Highsmith
 
Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
Understanding Customer Needs
Understanding Customer NeedsUnderstanding Customer Needs
Understanding Customer Needs
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Update
 

Mehr von Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 

Kürzlich hochgeladen

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Kürzlich hochgeladen (20)

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 

LEAN template

  • 1. <Lean Event Name> <Conducted Date(s)> <Evaluated Date(s)> BB: (Name) Champion: (Name)
  • 2. Defining the Kaizen Focus and Value
  • 3.
  • 4.
  • 5. Describe the Baseline Condition Include Pareto Charts, trend charts, histograms etc to characterize existing process. The purpose of the chart(s) on this page is to explore what is happening with the Y or Y’s that will make this an appropriate project to execute. Plot your primary metric here. Good!
  • 6. Project Charter {Project Name & No. Here} Actual Sched Date Date Date Date Date Date Date Date Date Date Date Date Control Improve Analyze Measure Define Assigned Process Map Number: Number here Black Belt: Name here Process Owner: Name here Champion: Name here Implementation Coordinator : Name here Data Coordinator : Name here Team Members: Name & function here Name & function here Name & function here Name & function here Name & function here Expected Benefits: Hard Savings – xxx $K Soft Savings – xxx $K Other Benefits: List benefit here List benefit here Project Timeline: Customer CTQ(s): Describe customer CTQ (customer need/defect and spec limit.) Problem Statement : List the 4 elements of a problem statement: * Defect identification * Magnitude of the defect (events/unit time, etc) * Where is the defect (location/group/segment) * Why this project is important to work now ($, BHAG support, etc) Project Scope: List project/process boundaries here by using includes … and excludes … Goal Statement: Increase(/decrease) the {primary metric} from {baseline state} to {improved state} by {date} without negatively impacting {secondary metric}.
  • 7. SIPOC Suppliers Inputs Process Outputs Customers ?? ?? Process Description ?? ?? ?? ?? ?? ?? Process Steps Project Boundary Project Boundary ?? ?? ?? ?? ?? ?? ?? ?? ?? ?? ??
  • 8.
  • 9.
  • 10. Kaizen Team I I I R I Ringo R R M M R George A A A A A Paul M M M M M John Control Improve Analyze Measure Define Key Stakeholders A - Approval of team decisions outside their charter/authorities, i.e., sponsor, business leader. R - Resource to the team, one whose expertise, skills, “clout” may be needed on an ad-hoc basis. M - Member of team, with the authorities and boundaries of the charter. I - Interested party, one who will need to be kept informed on direction, findings, if later support is to be forthcoming. Project Phase
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 18.
  • 19.
  • 20. Document the Transition Plan Identify when it will be done Identify who will do it Identify which employees need to be trained Train employees Identify when it will be done Identify who will do it Identify which procedures need to be documented Write new procedures Date Responsibility Description Item Use this slide to list the things that must be accomplished to transition from the baseline state to the envisioned future state
  • 22. Document the Transition Plan Identify when it will be done Identify when it will be done Date Identify when completed Identify who will do it Identify which employees need to be trained Train employees Identify when completed Identify who will do it Identify which procedures need to be documented Write new procedures Date Responsibility Description Item Use this slide to record what is accomplished to transition from the baseline state to the envisioned future state
  • 24.
  • 25.
  • 26.

Hinweis der Redaktion

  1. Green Belts should remove “&lt;Phase&gt; Tollgate Review” and change “BB” to “GB”.
  2. Remove yellow note for project.
  3. Need – your customer’s need stated in their language. Drivers – break down of the need into categories of how to meet the customer’s stated need. CTQ – a way to measure performance for a driver Example: Need – Fast service Drivers - 1) Quick computer system 2) Knowledgeable employees CTQ’s - 1) Average computer response time of less than 1 second 2) 100% of employees can answer 90% of customers’ questions without consulting a resource
  4. Replace chart and remove yellow note for project.
  5. Change Black Belt to Green Belt for Green Belt project.
  6. Move Project Boundary lines to reflect steps within scope of this project.
  7. Useful if the event is susceptible to scope creep. Otherwise, simply delete the slide.
  8. Remove yellow note for project report.
  9. Show either the Minitab graphs for process capability or the excel attribute process capability worksheet
  10. Remove yellow note for project.
  11. Remove yellow note for project.