SlideShare ist ein Scribd-Unternehmen logo
1 von 13
1
Lean-Insight.com
Lean Six Sigma Training
Part 16
Training Location: Bangalore / Bengaluru
2
Failure Modes and Effects Analysis (FMEA)
First developed in the 1950’s
Applied by NASA in the 1960’s for the space program
Ford Motor Company was the first North American company
to widely implement the use of FMEAs
The FMEA reduces risk of failure, a barrier to acceptance of change.
A tool to help manage the risk of change
The point of this brainstorming tool is to identify potential change risks and provide
focus on the significant few from the insignificant many.
The FMEA form, in addition to identifying the critical risks, serves as a vehicle for
generating future improvement actions.
FMEA’s have been used at the macro and micro level of process change. They are
perhaps most commonly known for their use to reduce risk with the design of new
products.
FMEA
Lean-Insight.com
3
Initial Assessment Actions and History
Actions Taken
S
E
V
O
C
C
D
E
T
R
P
N
What are the actions for
reducing the occurrence, or
improving detection, or for
identifying the root cause if it
is unknown? Shouldhave
actions only on high RPN's or
easy fixes.
Who is
responsible for
the
recommended
action?
List the completed actions
that are included in the
recalculated RPN.
Include the implementation
date for any changes.
Whatisthenew
severity?
Whatisthenewprocess
capability?
Arethedetectionlimits
improved?
RecomkputeRPNafter
actionsarecomplete.
0
0
0
0
0
0
Action Results
Recommended
Action(s)
Responsibility
and
Completion
Date
The highest value
process steps
fromthe C&E
matrix.
In what ways might the
process potentially fail to
meet the process
requirements and/or design
intent?
What is the effect of each
failure mode on the outputs
and/or customer requirements?
The customer could be the next
operation, subsequent
operations, another division or
the end user.
HowSevereistheeffect
tothecusotmer?
How can the failure occur?
Describe in terms of something
that can be corrected or
controlled. Be specific. Try
identify the causes that directly
impacts the failure mode, i.e., root
causes.
Howoftendoesthe
causeorfailuremode
occur?
What are the existing controls and
procedures (inspection and test) that
either prevent failure mode from
occurring or detect the failure should
it occur? Shouldinclude an SOP
number.
Howwellcanyoudetect
causeorFM?
SEVxOCCxDET
0
0
0
0
0
0
R
P
N
Potential Cause(s)/
Mechanism(s) of Failure
O
C
C
Current
Process
Controls
D
E
T
Process
Function
Potential Failure Mode
Potential Effects
of Failure
S
E
V
Parts of the FMEA Form
 The first section of the FMEA form, “initial assessment”, is used to evaluate initial
conditions of the process.
 After completing the initial assessment, the team then generates a list of actions
to reduce the occurrence or increase the detection.
Lean-Insight.com
4
FMEA Examples
Documentation Example
The Human Resources Department for a particular organization maintains “official” files for
all personnel. Included is personal data, benefits, current organizational status, and
performance evaluation packages. Many within the organization query HR for the info
contained in those files. A SCORE team is applying Lean techniques to reduce the query
response time. They use FMEA to identify risks with the changes they have planned.
Service Time Example
A Customer Service Department for a particular organization handles all customer inquiries.
A SCORE team has been formed to improve the timeliness of completing those inquiries.
They have created an improvement plan. Before implementing that plan, they conduct an
FMEA to surface potential problems.
In the following examples, a single line from the FMEA is used as an illustration for
each of the above examples.
Lean-Insight.com
5
Process FMEA -- Terminology
 FMEA: A systematic analysis of a process used to identify potential failures and to prevent their
occurrence.
 Potential Failure mode: The manner in which the process could potentially fail to meet the
process requirements.
 Potential Failure Effect: The effects of the failure mode on the customer.
 Severity: An assessment of the seriousness of a failure mode. Severity applies to the effects only.
 Cause: How the failure could occur, described in terms of something that can be corrected or
controlled.
 Occurrence: The likelihood that a specific failure mode is projected to occur.
 Detection: The effectiveness of current process controls to identify the failure mode (or the
failure effect) prior to occurring, prior to release to production, or prior to shipment to the
customer.
 RPN -- Risk Priority Number: The product of Severity, Occurrence & Detection.
Lean-Insight.com
Noble Institute of Quality Certification – NIQC
6
Who are the stakeholders associated with your process?
What is important to them?
How do you get their support?
We must plan.
Steps:
1. Identify Stakeholders
2. Understand their power over the organization and influence
3. Determine their level of support
4. Recognize the nature of their resistance
5. Learn how to address their needs and fears
6. Enlist the help of your influential allies
7. Develop an action plan
Stakeholder Analysis
7
Stakeholder Analysis
WHAT is a Stakeholder Analysis?
A method to identify and understand your project’s stakeholders
WHY is it important?
Without support and acceptance of key stakeholders, the probability of project success is greatly reduced
WHEN should it be used?
Early in the project (Define Phase) to ensure a good start
Stakeholder support should be monitored and managed throughout the project
WHO should conduct it?
The project leader, with input from the team
 A stakeholder is any individual or group with an interest in the outcome of a project, either
as a result of being:
Affected by the project or
Able to influence the project
 The effect on or by the stakeholder can be positive or negative.
 There are three main types of stakeholder:
Person who is responsible for the final decision
People who have influence over whether implementation proceeds or not
People who are affected by the project outcome
Lean-Insight.com
8
Who Are Your Stakeholders?
• Some possible examples:
• External customers
• Internal customers
• Suppliers
• Champion
• Process Owner
• Project team resources
• Affected departments
• Process workers
• Support personnel
Lean-Insight.com
9
There is confusion as to how to plan and conduct kaizen events.
SCORE provides the needed method.
The SCORE method can be planned and progress tracked, similar to the benefits of
DMAIC.
SCORE ’s meaning:- SCORE relates to sports where the objective is to score points.
Each SCORE needs to be celebrated.
Like a good sports team, you will want to SCORE often. It takes a team effort.
Look for many quick SCORE s.
SCORE can also be related to music, where the score is the plan for the music.
SCORE provides a method so that participants can act in harmony.
SCORE
“If you’re not keeping score , you’re only practicing.”
Vince Lombardi
Lean-Insight.com
10
 Select the process to be worked on.
 Clarify the problem statement and project objective. Measure historical data
to quantify the current capability.
 Organize the team members and train them on methods and scope of
project. Ready the work place and interfaces such as suppliers, customers,
and facilities people.
 Run the event (observe, brainstorm improvements, select improvements,
test, implement).
 Evaluate the results, standardize the new procedure, and define future work.
The Acronym of SCORE
Lean-Insight.com
11
Six Sigma (DMAIC) Define Measure Analyze Improve Control
Design for Six Sigma (DFSS) Define Measure Analyze Design Verify
SCORE fits with Six Sigma methods
 SCORE is a means to accelerate
improvements.
Improving
Worker productivity
Worker involvement
Create savings in
Time
Space
Output
Reducing
Lead times
WIP
Scrap
Defects
Rework
 Very Similar to
• Workout
 Effective in
• Service
• Manufacturing
• Transactional processes
Lean-Insight.com
12
SCORE is all about speed to complete
 Removes “Red Tape” barriers
 Blasts through business politics
 Focuses on
Business priorities
Progress
Cooperation
Improving communications
SCORE savings potential
 Reduced cycle time
 Increased productivity
 Reduction in floor space needed
 Higher quality
 Less overtime
 Faster service to customers
 Improved profits
 Improved moral
 Improved communication
between management and
workers
 Respect for each other
Lean-Insight.com
13
Lean-Insight.com
If you are looking for Lean Six Sigma training in Bangalore / Bengaluru along with
certification visit:
http://lean-insight.com/six-sigma-training-bangalore/

Weitere ähnliche Inhalte

Was ist angesagt?

Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis LearningSix Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
Invensis Learning
 

Was ist angesagt? (20)

Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13Lean Six Sigma Course Training Part 13
Lean Six Sigma Course Training Part 13
 
Lean Six Sigma Course Training Part 2
Lean Six Sigma Course Training Part 2Lean Six Sigma Course Training Part 2
Lean Six Sigma Course Training Part 2
 
Lean Six Sigma Black Belt Training Part 4
Lean Six Sigma Black Belt Training Part 4Lean Six Sigma Black Belt Training Part 4
Lean Six Sigma Black Belt Training Part 4
 
Lean Six Sigma Course Training Part 5
Lean Six Sigma Course Training Part 5Lean Six Sigma Course Training Part 5
Lean Six Sigma Course Training Part 5
 
Lean Six Sigma Course Training Part 11
Lean Six Sigma Course Training Part 11Lean Six Sigma Course Training Part 11
Lean Six Sigma Course Training Part 11
 
Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3
 
Lean Six Sigma Black Belt Training Part 2
Lean Six Sigma Black Belt Training Part 2Lean Six Sigma Black Belt Training Part 2
Lean Six Sigma Black Belt Training Part 2
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtec
 
Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5
 
Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6
 
Zero Defects Through Lean six Sigma
Zero Defects Through Lean six SigmaZero Defects Through Lean six Sigma
Zero Defects Through Lean six Sigma
 
What does it mean to be Lean
What does it mean to be LeanWhat does it mean to be Lean
What does it mean to be Lean
 
Lean six sigma introduction
Lean six sigma   introductionLean six sigma   introduction
Lean six sigma introduction
 
Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
What Is 6 Sigma
What Is 6 SigmaWhat Is 6 Sigma
What Is 6 Sigma
 
Continuous Improvement techniques
Continuous Improvement techniquesContinuous Improvement techniques
Continuous Improvement techniques
 
Bpm teaser
Bpm teaserBpm teaser
Bpm teaser
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis LearningSix Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
 

Andere mochten auch

Andere mochten auch (9)

Lean Six Sigma Course Training Part 7
Lean Six Sigma Course Training Part 7Lean Six Sigma Course Training Part 7
Lean Six Sigma Course Training Part 7
 
Lean Six Sigma Black Belt Training Part 1
Lean Six Sigma Black Belt Training Part 1Lean Six Sigma Black Belt Training Part 1
Lean Six Sigma Black Belt Training Part 1
 
5s slideshare
5s slideshare5s slideshare
5s slideshare
 
Autonomous Team Requirements
Autonomous Team RequirementsAutonomous Team Requirements
Autonomous Team Requirements
 
The 4th component – fast knowledge sharing
The 4th component – fast knowledge sharingThe 4th component – fast knowledge sharing
The 4th component – fast knowledge sharing
 
Process Design and Visual Value Streams
Process Design and Visual Value StreamsProcess Design and Visual Value Streams
Process Design and Visual Value Streams
 
The 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for SustainmentThe 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for Sustainment
 
The 1st component - Leadership and Mentoring
The 1st component - Leadership and MentoringThe 1st component - Leadership and Mentoring
The 1st component - Leadership and Mentoring
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 

Ähnlich wie Lean Six Sigma Course Training Part 16

Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for website
Adrien Boespflug
 
My Vision
My VisionMy Vision
My Vision
melynch
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
 
Measurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_CrosstalkMeasurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_Crosstalk
pbaxter
 
Management systems
Management systemsManagement systems
Management systems
melynch
 

Ähnlich wie Lean Six Sigma Course Training Part 16 (20)

Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for website
 
Strategic management note. 2
Strategic management note.  2 Strategic management note.  2
Strategic management note. 2
 
My Vision
My VisionMy Vision
My Vision
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
implementing an Applicant Tracking System
implementing an Applicant Tracking Systemimplementing an Applicant Tracking System
implementing an Applicant Tracking System
 
APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
APPLYING DMAIC TO PROCESS IMPROVEMENT’S. APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
 
Module 5_Functional Competences.pptx
Module 5_Functional Competences.pptxModule 5_Functional Competences.pptx
Module 5_Functional Competences.pptx
 
Measurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_CrosstalkMeasurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_Crosstalk
 
Value Summary 2.0 Overview
Value Summary 2.0 OverviewValue Summary 2.0 Overview
Value Summary 2.0 Overview
 
Management systems
Management systemsManagement systems
Management systems
 
Pfmea training 1111.pptx
Pfmea training 1111.pptxPfmea training 1111.pptx
Pfmea training 1111.pptx
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Benchmarking Basic.pdf
Benchmarking Basic.pdfBenchmarking Basic.pdf
Benchmarking Basic.pdf
 
Quality management
Quality managementQuality management
Quality management
 
Unit 1 basic concepts of testing & quality
Unit 1   basic concepts of testing & qualityUnit 1   basic concepts of testing & quality
Unit 1 basic concepts of testing & quality
 
Unit 1 basic concepts of testing & quality
Unit 1   basic concepts of testing & qualityUnit 1   basic concepts of testing & quality
Unit 1 basic concepts of testing & quality
 
4 Practical Tips For Successful Release Management
4 Practical Tips For Successful Release Management4 Practical Tips For Successful Release Management
4 Practical Tips For Successful Release Management
 
ISTQB Advanced Study Guide - 8
ISTQB Advanced Study Guide - 8ISTQB Advanced Study Guide - 8
ISTQB Advanced Study Guide - 8
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Benchmark-Free-Template-by-Slidecore-klehd8.pptx
Benchmark-Free-Template-by-Slidecore-klehd8.pptxBenchmark-Free-Template-by-Slidecore-klehd8.pptx
Benchmark-Free-Template-by-Slidecore-klehd8.pptx
 

Kürzlich hochgeladen

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Kürzlich hochgeladen (20)

Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 

Lean Six Sigma Course Training Part 16

  • 1. 1 Lean-Insight.com Lean Six Sigma Training Part 16 Training Location: Bangalore / Bengaluru
  • 2. 2 Failure Modes and Effects Analysis (FMEA) First developed in the 1950’s Applied by NASA in the 1960’s for the space program Ford Motor Company was the first North American company to widely implement the use of FMEAs The FMEA reduces risk of failure, a barrier to acceptance of change. A tool to help manage the risk of change The point of this brainstorming tool is to identify potential change risks and provide focus on the significant few from the insignificant many. The FMEA form, in addition to identifying the critical risks, serves as a vehicle for generating future improvement actions. FMEA’s have been used at the macro and micro level of process change. They are perhaps most commonly known for their use to reduce risk with the design of new products. FMEA Lean-Insight.com
  • 3. 3 Initial Assessment Actions and History Actions Taken S E V O C C D E T R P N What are the actions for reducing the occurrence, or improving detection, or for identifying the root cause if it is unknown? Shouldhave actions only on high RPN's or easy fixes. Who is responsible for the recommended action? List the completed actions that are included in the recalculated RPN. Include the implementation date for any changes. Whatisthenew severity? Whatisthenewprocess capability? Arethedetectionlimits improved? RecomkputeRPNafter actionsarecomplete. 0 0 0 0 0 0 Action Results Recommended Action(s) Responsibility and Completion Date The highest value process steps fromthe C&E matrix. In what ways might the process potentially fail to meet the process requirements and/or design intent? What is the effect of each failure mode on the outputs and/or customer requirements? The customer could be the next operation, subsequent operations, another division or the end user. HowSevereistheeffect tothecusotmer? How can the failure occur? Describe in terms of something that can be corrected or controlled. Be specific. Try identify the causes that directly impacts the failure mode, i.e., root causes. Howoftendoesthe causeorfailuremode occur? What are the existing controls and procedures (inspection and test) that either prevent failure mode from occurring or detect the failure should it occur? Shouldinclude an SOP number. Howwellcanyoudetect causeorFM? SEVxOCCxDET 0 0 0 0 0 0 R P N Potential Cause(s)/ Mechanism(s) of Failure O C C Current Process Controls D E T Process Function Potential Failure Mode Potential Effects of Failure S E V Parts of the FMEA Form  The first section of the FMEA form, “initial assessment”, is used to evaluate initial conditions of the process.  After completing the initial assessment, the team then generates a list of actions to reduce the occurrence or increase the detection. Lean-Insight.com
  • 4. 4 FMEA Examples Documentation Example The Human Resources Department for a particular organization maintains “official” files for all personnel. Included is personal data, benefits, current organizational status, and performance evaluation packages. Many within the organization query HR for the info contained in those files. A SCORE team is applying Lean techniques to reduce the query response time. They use FMEA to identify risks with the changes they have planned. Service Time Example A Customer Service Department for a particular organization handles all customer inquiries. A SCORE team has been formed to improve the timeliness of completing those inquiries. They have created an improvement plan. Before implementing that plan, they conduct an FMEA to surface potential problems. In the following examples, a single line from the FMEA is used as an illustration for each of the above examples. Lean-Insight.com
  • 5. 5 Process FMEA -- Terminology  FMEA: A systematic analysis of a process used to identify potential failures and to prevent their occurrence.  Potential Failure mode: The manner in which the process could potentially fail to meet the process requirements.  Potential Failure Effect: The effects of the failure mode on the customer.  Severity: An assessment of the seriousness of a failure mode. Severity applies to the effects only.  Cause: How the failure could occur, described in terms of something that can be corrected or controlled.  Occurrence: The likelihood that a specific failure mode is projected to occur.  Detection: The effectiveness of current process controls to identify the failure mode (or the failure effect) prior to occurring, prior to release to production, or prior to shipment to the customer.  RPN -- Risk Priority Number: The product of Severity, Occurrence & Detection. Lean-Insight.com
  • 6. Noble Institute of Quality Certification – NIQC 6 Who are the stakeholders associated with your process? What is important to them? How do you get their support? We must plan. Steps: 1. Identify Stakeholders 2. Understand their power over the organization and influence 3. Determine their level of support 4. Recognize the nature of their resistance 5. Learn how to address their needs and fears 6. Enlist the help of your influential allies 7. Develop an action plan Stakeholder Analysis
  • 7. 7 Stakeholder Analysis WHAT is a Stakeholder Analysis? A method to identify and understand your project’s stakeholders WHY is it important? Without support and acceptance of key stakeholders, the probability of project success is greatly reduced WHEN should it be used? Early in the project (Define Phase) to ensure a good start Stakeholder support should be monitored and managed throughout the project WHO should conduct it? The project leader, with input from the team  A stakeholder is any individual or group with an interest in the outcome of a project, either as a result of being: Affected by the project or Able to influence the project  The effect on or by the stakeholder can be positive or negative.  There are three main types of stakeholder: Person who is responsible for the final decision People who have influence over whether implementation proceeds or not People who are affected by the project outcome Lean-Insight.com
  • 8. 8 Who Are Your Stakeholders? • Some possible examples: • External customers • Internal customers • Suppliers • Champion • Process Owner • Project team resources • Affected departments • Process workers • Support personnel Lean-Insight.com
  • 9. 9 There is confusion as to how to plan and conduct kaizen events. SCORE provides the needed method. The SCORE method can be planned and progress tracked, similar to the benefits of DMAIC. SCORE ’s meaning:- SCORE relates to sports where the objective is to score points. Each SCORE needs to be celebrated. Like a good sports team, you will want to SCORE often. It takes a team effort. Look for many quick SCORE s. SCORE can also be related to music, where the score is the plan for the music. SCORE provides a method so that participants can act in harmony. SCORE “If you’re not keeping score , you’re only practicing.” Vince Lombardi Lean-Insight.com
  • 10. 10  Select the process to be worked on.  Clarify the problem statement and project objective. Measure historical data to quantify the current capability.  Organize the team members and train them on methods and scope of project. Ready the work place and interfaces such as suppliers, customers, and facilities people.  Run the event (observe, brainstorm improvements, select improvements, test, implement).  Evaluate the results, standardize the new procedure, and define future work. The Acronym of SCORE Lean-Insight.com
  • 11. 11 Six Sigma (DMAIC) Define Measure Analyze Improve Control Design for Six Sigma (DFSS) Define Measure Analyze Design Verify SCORE fits with Six Sigma methods  SCORE is a means to accelerate improvements. Improving Worker productivity Worker involvement Create savings in Time Space Output Reducing Lead times WIP Scrap Defects Rework  Very Similar to • Workout  Effective in • Service • Manufacturing • Transactional processes Lean-Insight.com
  • 12. 12 SCORE is all about speed to complete  Removes “Red Tape” barriers  Blasts through business politics  Focuses on Business priorities Progress Cooperation Improving communications SCORE savings potential  Reduced cycle time  Increased productivity  Reduction in floor space needed  Higher quality  Less overtime  Faster service to customers  Improved profits  Improved moral  Improved communication between management and workers  Respect for each other Lean-Insight.com
  • 13. 13 Lean-Insight.com If you are looking for Lean Six Sigma training in Bangalore / Bengaluru along with certification visit: http://lean-insight.com/six-sigma-training-bangalore/