Are you looking for lean six sigma black belt training? Here is the Lean Six Sigma Black Belt Training material Part 1 presented by Lean-insight.com
At lean-Insight you will get training
Six Sigma Black belt
Six Sigma Green Belt
Lean Six Sigma training
For more details visit: http://lean-insight.com/six-sigma-training-bangalore/
2. LET US DECIDE TOGETHER
Ways of Working (Team Rules)
2
⢠All mobiles turned off or on silent
⢠Take any urgent calls outside the classroom
⢠Come to class prepared
⢠Contribute: Learning is maximized with participation
⢠Prompt: Be on time
⢠Respect each other: Do not criticize and ridicule others
comments or questions
⢠Lets discuss later: Use a parking lot to capture items not
covered in class
⢠Have fun: Exercises and other activities are designed for you
to learn and enjoy the learning experience
⢠Any others?
3. Team Introductions
ď§ Name
ď§ Vertical
ď§ Role
ď§ Work Experience
ď§ One Exciting thing done in life
ď§ WHY DO YOU WANT TO ATTEND THIS
SESSION
ď§ WHAT DO WANT TO TAKE AWAY
3
4. Purpose
4
⢠Learn/review goals and key principles of Lean and Six Sigma
⢠Be ready to lead improvement projects through the âDMAICâ process
⢠Define
⢠Measure
⢠Analyze
⢠Improve
⢠Control
⢠Understand and be able to use improvement and team tools
⢠Problem definition
⢠Data gathering and analysis
⢠Leadership and teamwork
5. 5
Six Sigma benefit for you
If you are Business School or College
⢠In a recent survey, it was found that
89% employer has preferred Six Sigma
certified (Black Belt) candidates rather
than just MBA
⢠Companies are increasingly making it
mandatory to hire Green Belt/Black
Belt for each department
If you are an Employer
⢠Improve your sales, Revenue, Profit &
also provide quality and customer
satisfaction
⢠Systematic approach to solve problem
with statistical validation along with
long term control plan
⢠Improve your creativity, Employee
satisfaction, Productivity, Reduce cost,
defects, delay, inefficiency, attrition,
rejection, complaint & bad quality
If you are employee or student
⢠Better Career- New Job Opportunities,
Progression in Current Job and
recognition at work place
⢠Better skill set- Problem Solving, Data
Analysis, Process Analysis, Creative
Thinking & Process Improvement Skills
6. 6
What is Quality?
Customer come for business but stay for quality. Its very important to
Bring quality in process & system to sustain any business in todayâs
Competitive world.
I would say âQuality is meeting & exceeding customer requirement at
Minimum costâ.
Each Quality Guru define definition in their way
Deming: âQuality is defined from the customerâs
point of view as anything that enhances
their satisfaction.â
Juran: âFitness for use. Those product features
which meet the needs of customers and
thereby provide product satisfaction.
Freedom from deficiencies.â
ASQC: âThe totality of features and characteristics
of a product or service that bear on its
ability to satisfy stated or implied needs.â
Quality
7. 7
Quality is need of business
ďŽ Generally Checklist / Audit based
ďŽ Externally Validated
ďŽ Focus is on Adherence to
Documentation
ďŽ Examples: COPC, CMMI, ISO etc
Certification-Based Continuous-Improvement-Based
ďŽ Believes in striving for excellence as a
moving target
ďŽ Needs no external validation
ďŽ Documentation is just a part of the
outcome of an improvement initiative
ďŽ Examples: Six Sigma, Lean, BPR, TQM,
etc
Approaches to Quality
Quality
8. History of Six Sigma
ď1986: Motorola Starts Six Sigma Initiative. Bill
Smith. The first team of professionals
implementing Six Sigma in Motorola were Karate
Belts, hence the term Black Belts, Green Belts.
ď2001: Motorola Saves $16 Billion cumulatively
ď1995: Jack Welch Initiates Six Sigma at GE
ď1998: Allied Signal Saves $0.5 Billion
ď2000: GE Saves $2 Billion Annually
ďMotorola initiated Six Sigma for process
improvement thereby reducing defects to
negligible levels.
ďMotorola initiated the project when the
company was not doing too well with Customer
Satisfaction levels.
ďIt was at GE that Six Sigma was used to
improve the entire Business System
1998: Allied Signal Saves
$0.5 Billion
2001:
Motorola
Saves $16
Billion
cumulatively
2000: GE Saves
$2 Billion
Annually
P-Define
9. 9
Lean-Insight.com
If you are looking for Six Sigma (Black Belt) training in Bangalore along with
certification visit:
http://lean-insight.com/six-sigma-training-bangalore/