Innovation comes after denial and before success
Pieter van Asten 2013
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
• The BOP risk model background
• why was it made and for what
purpose?
• The project
• how was it done and by whom?
• The solution
• what is the result and how is it used?
• The conclusion
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
The tragic Gulf of Mexico accident in April 2010 can be marked
as the moment that confirmed the idea for making a subsea
BOP (Blow Out Preventer) risk model.
It showed that society, enabled by
(social-)media, is our biggest stakeholder
with its own risk acceptance perception.
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
What does the
majority of society
remember about this
tragedy?
Societal risk awareness and its (non-) acceptance created the
need to manage these risks and became the foundation for the
demand for a solution to enable this.
•The industry was faced with a very conservative approach to
BOP component failure
•This conservatism was fed by the fear that something could go
wrong as we all saw happening which was very costly
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
A focal point of attention and contribution to what
happened in April 2010 became the subsea BOP
With our stakeholder’s biggest concerns in focus, the objective of the
requested solution became:
“Enable assistance in decision making if a BOP needs to be pulled or
not by means of risk based consistent failure investigation and effect
modelling and due communication”
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
A subsea BOP is a special system and among few systems
combining multiple functions:
•Drilling operations control
•Risk prevention tool (preventer)
•Emergency response tool
It is also
•Highly regulated
•Not visible when operational
These combinations mean simple component failures can cause
severe risk exposure and non-compliance.
But what to do when a
component
may have or has failed?
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
Delivery of objective assessment and consistent
communication about the risk of a BOP component
failure leading to a decision to continue or suspend
operations has proven to be a challenge.
Some symptoms:
•BOP pulling is costly and time consuming: major NPT
•BOP pulling is a risk in itself:
Leaving it down with known failure may mean taking
safety risks or being out of regulatory compliance
•Non consistent decision-motivation to senior management,
regulatory bodies and other stakeholders in the industry
•Different solutions for similar problems on different rigs or
crews
•Lack of risk based information to enable management of
compliance aspects against cost of NPT
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
Our solution and its approach to this has a true innovative
character in every aspect:
•High (society and industry) stakes
•A joined effort with five involved parties
•No route-map but the main objectives
•An industry looking at us
Today, drilling operations are always balancing
between conflicting factors:
NPT (Costs) – Risk (Safety) - Compliance
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
What made it succeed?
I worked with people that were involved in the extreme
circumstances after the accident and who lost colleagues.
That made me very humble and realized that we just could
not fail: there was too much at stake: safety and lives.
I worked with a wonderful team and this team effort, including
our client, was one of the most contributing factors for our
success.
I am proud of
•what we did;
•how we did it and
•what we achieved.
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
The total risk model is like a three dimensional cube with
six sides that input and affect the outcome and each other.
The cube’s three dimensions
represent the complexity and
interaction of all aspects
of a complete BOP risk model.
How is all this information combined to
become a risk model?
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
The risk model assesses the effect of component
failure by calculations and expresses this in a risk
level taking regulations, specifications and
operational procedures into account.
A color-coding traffic light is used as visual
indication to express the risk level of the whole
BOP, a subsystem or component.
•Red
•Orange
•Yellow
•Green
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
Example of the user screen showing the effect of
a failure of the 5k to 3k regulator to the blue POD.
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
BOP risk model solution:
• Risk-based approach in balancing
the conflicting factors
• Consistent, transparent pull or no pull
decision assistance and motivated
decision reporting to all stakeholders
• Better prioritization of maintenance
• Industry credit: done with a major drilling contractor
• Regulator agreement on methodology (BSEE)
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
• Pre-considered equipment failure:
• No need to go through all information and
• assessments upon component failure
• Reduction of rig downtime:
• Faster pull or not-pull decision
• Records history of failed and restored
components to assist pull, no-pull decisions
• The model cannot be changed by operating crew.
• Is unique for every BOP and regulatory environment
• Does not take away or replace thinking, competence or
responsibility
• Enables training and can create what-ifs: play with different
failure scenarios
SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten
Background
Project
Solution
Conclusion
Preventing one unnecessary BOP pull proves the
value of a BOP risk model.
Saving one life with the BOP risk model makes it
truly invaluable
This allows for the next steps towards failure prevention:
• BOP reliability and integrity management optimization
• Maintenance and spare parts management optimization
• Enhanced graphical representation
• Web-based application
• Other operational or safety critical equipment
For more information, go to:
www.lr.org/BOPmodel
Slide 18

Weitere ähnliche Inhalte

Ähnlich wie Pull or no pull - Risk based decision support for subsea blowout preventers

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
 
Webinar well integrity management Webinar
Webinar well integrity management WebinarWebinar well integrity management Webinar
Webinar well integrity management WebinarPetroTeach1
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentNasiru Ibrahim Barda
 
Windpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference BrochureWindpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference Brochuregm330
 
Hydraulic frac webinar
Hydraulic frac webinarHydraulic frac webinar
Hydraulic frac webinarPetroTeach1
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6Darcy Pearson
 
Life cycle costing (LCC): the basics
Life cycle costing (LCC): the basicsLife cycle costing (LCC): the basics
Life cycle costing (LCC): the basicsBruno De Wachter
 
Life cycle costing - The basics
Life cycle costing - The basicsLife cycle costing - The basics
Life cycle costing - The basicsLeonardo ENERGY
 
Reduce Risk, Save Money, and Live Happily Ever After?
Reduce Risk, Save Money, and Live Happily Ever After?Reduce Risk, Save Money, and Live Happily Ever After?
Reduce Risk, Save Money, and Live Happily Ever After?Paul Blackett
 
Practical Approaches for Defensible Cumulative Analyses under CEQA
Practical Approaches for Defensible Cumulative Analyses under CEQA Practical Approaches for Defensible Cumulative Analyses under CEQA
Practical Approaches for Defensible Cumulative Analyses under CEQA Tania Treis
 
Caixa Empreender Award | Cor Power Ocean (BGI)
Caixa Empreender Award | Cor Power Ocean (BGI)Caixa Empreender Award | Cor Power Ocean (BGI)
Caixa Empreender Award | Cor Power Ocean (BGI)Caixa Geral Depósitos
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyNSW Environment and Planning
 
Susanne Rasmussen 2013 masccc
Susanne Rasmussen 2013 mascccSusanne Rasmussen 2013 masccc
Susanne Rasmussen 2013 mascccJen Boudrie
 

Ähnlich wie Pull or no pull - Risk based decision support for subsea blowout preventers (20)

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Webinar well integrity management Webinar
Webinar well integrity management WebinarWebinar well integrity management Webinar
Webinar well integrity management Webinar
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Tata Project
Tata ProjectTata Project
Tata Project
 
Windpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference BrochureWindpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference Brochure
 
Hydraulic frac webinar
Hydraulic frac webinarHydraulic frac webinar
Hydraulic frac webinar
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6
 
Life cycle costing (LCC): the basics
Life cycle costing (LCC): the basicsLife cycle costing (LCC): the basics
Life cycle costing (LCC): the basics
 
Life cycle costing - The basics
Life cycle costing - The basicsLife cycle costing - The basics
Life cycle costing - The basics
 
Reduce Risk, Save Money, and Live Happily Ever After?
Reduce Risk, Save Money, and Live Happily Ever After?Reduce Risk, Save Money, and Live Happily Ever After?
Reduce Risk, Save Money, and Live Happily Ever After?
 
Practical Approaches for Defensible Cumulative Analyses under CEQA
Practical Approaches for Defensible Cumulative Analyses under CEQA Practical Approaches for Defensible Cumulative Analyses under CEQA
Practical Approaches for Defensible Cumulative Analyses under CEQA
 
Caixa Empreender Award | Cor Power Ocean (BGI)
Caixa Empreender Award | Cor Power Ocean (BGI)Caixa Empreender Award | Cor Power Ocean (BGI)
Caixa Empreender Award | Cor Power Ocean (BGI)
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
 
Susanne Rasmussen 2013 masccc
Susanne Rasmussen 2013 mascccSusanne Rasmussen 2013 masccc
Susanne Rasmussen 2013 masccc
 

Mehr von Lloyd's Register Energy

Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryLloyd's Register Energy
 
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...Lloyd's Register Energy
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structuresLloyd's Register Energy
 
Reliability of in-service Non-Destructive Testing (NDT)
Reliability of in-service Non-Destructive Testing (NDT)Reliability of in-service Non-Destructive Testing (NDT)
Reliability of in-service Non-Destructive Testing (NDT)Lloyd's Register Energy
 
Noise management in offshore installations
Noise management in offshore installationsNoise management in offshore installations
Noise management in offshore installationsLloyd's Register Energy
 
Material Certification or Qualification for Nuclear ASME Application
Material Certification or Qualification for Nuclear ASME ApplicationMaterial Certification or Qualification for Nuclear ASME Application
Material Certification or Qualification for Nuclear ASME ApplicationLloyd's Register Energy
 
Meeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your peopleMeeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your peopleLloyd's Register Energy
 
Offshore Technology Conference: Risk Management Services
Offshore Technology Conference: Risk Management ServicesOffshore Technology Conference: Risk Management Services
Offshore Technology Conference: Risk Management ServicesLloyd's Register Energy
 
Infographic asset maintenance management
Infographic asset maintenance managementInfographic asset maintenance management
Infographic asset maintenance managementLloyd's Register Energy
 
OTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsOTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsLloyd's Register Energy
 
Gulf of Mexico Accident and its impact on Pre-Salt development
Gulf of Mexico Accident and its impact on Pre-Salt developmentGulf of Mexico Accident and its impact on Pre-Salt development
Gulf of Mexico Accident and its impact on Pre-Salt developmentLloyd's Register Energy
 

Mehr von Lloyd's Register Energy (15)

Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
 
Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industry
 
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structures
 
Reliability of in-service Non-Destructive Testing (NDT)
Reliability of in-service Non-Destructive Testing (NDT)Reliability of in-service Non-Destructive Testing (NDT)
Reliability of in-service Non-Destructive Testing (NDT)
 
Noise management in offshore installations
Noise management in offshore installationsNoise management in offshore installations
Noise management in offshore installations
 
Rig Inspection Training overview
Rig Inspection Training overviewRig Inspection Training overview
Rig Inspection Training overview
 
Material Certification or Qualification for Nuclear ASME Application
Material Certification or Qualification for Nuclear ASME ApplicationMaterial Certification or Qualification for Nuclear ASME Application
Material Certification or Qualification for Nuclear ASME Application
 
Meeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your peopleMeeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your people
 
Offshore Technology Conference: Risk Management Services
Offshore Technology Conference: Risk Management ServicesOffshore Technology Conference: Risk Management Services
Offshore Technology Conference: Risk Management Services
 
Infographic asset maintenance management
Infographic asset maintenance managementInfographic asset maintenance management
Infographic asset maintenance management
 
OTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsOTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutions
 
Hse oil and gas management services
Hse oil and gas management servicesHse oil and gas management services
Hse oil and gas management services
 
Competence Assessment
Competence Assessment Competence Assessment
Competence Assessment
 
Gulf of Mexico Accident and its impact on Pre-Salt development
Gulf of Mexico Accident and its impact on Pre-Salt developmentGulf of Mexico Accident and its impact on Pre-Salt development
Gulf of Mexico Accident and its impact on Pre-Salt development
 

Kürzlich hochgeladen

Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 

Kürzlich hochgeladen (20)

Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 

Pull or no pull - Risk based decision support for subsea blowout preventers

  • 1. SPE 166581-MS Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs) Pieter van Asten, Lloyd’s Register Energy – Drilling
  • 2. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Innovation comes after denial and before success Pieter van Asten 2013
  • 3. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten • The BOP risk model background • why was it made and for what purpose? • The project • how was it done and by whom? • The solution • what is the result and how is it used? • The conclusion
  • 4. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion The tragic Gulf of Mexico accident in April 2010 can be marked as the moment that confirmed the idea for making a subsea BOP (Blow Out Preventer) risk model. It showed that society, enabled by (social-)media, is our biggest stakeholder with its own risk acceptance perception.
  • 5. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion What does the majority of society remember about this tragedy? Societal risk awareness and its (non-) acceptance created the need to manage these risks and became the foundation for the demand for a solution to enable this. •The industry was faced with a very conservative approach to BOP component failure •This conservatism was fed by the fear that something could go wrong as we all saw happening which was very costly
  • 6. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion A focal point of attention and contribution to what happened in April 2010 became the subsea BOP With our stakeholder’s biggest concerns in focus, the objective of the requested solution became: “Enable assistance in decision making if a BOP needs to be pulled or not by means of risk based consistent failure investigation and effect modelling and due communication”
  • 7. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion A subsea BOP is a special system and among few systems combining multiple functions: •Drilling operations control •Risk prevention tool (preventer) •Emergency response tool It is also •Highly regulated •Not visible when operational These combinations mean simple component failures can cause severe risk exposure and non-compliance. But what to do when a component may have or has failed?
  • 8. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion Delivery of objective assessment and consistent communication about the risk of a BOP component failure leading to a decision to continue or suspend operations has proven to be a challenge. Some symptoms: •BOP pulling is costly and time consuming: major NPT •BOP pulling is a risk in itself: Leaving it down with known failure may mean taking safety risks or being out of regulatory compliance •Non consistent decision-motivation to senior management, regulatory bodies and other stakeholders in the industry •Different solutions for similar problems on different rigs or crews •Lack of risk based information to enable management of compliance aspects against cost of NPT
  • 9. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion Our solution and its approach to this has a true innovative character in every aspect: •High (society and industry) stakes •A joined effort with five involved parties •No route-map but the main objectives •An industry looking at us Today, drilling operations are always balancing between conflicting factors: NPT (Costs) – Risk (Safety) - Compliance
  • 10. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion What made it succeed? I worked with people that were involved in the extreme circumstances after the accident and who lost colleagues. That made me very humble and realized that we just could not fail: there was too much at stake: safety and lives. I worked with a wonderful team and this team effort, including our client, was one of the most contributing factors for our success. I am proud of •what we did; •how we did it and •what we achieved.
  • 11. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion The total risk model is like a three dimensional cube with six sides that input and affect the outcome and each other. The cube’s three dimensions represent the complexity and interaction of all aspects of a complete BOP risk model. How is all this information combined to become a risk model?
  • 12. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion
  • 13. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion The risk model assesses the effect of component failure by calculations and expresses this in a risk level taking regulations, specifications and operational procedures into account. A color-coding traffic light is used as visual indication to express the risk level of the whole BOP, a subsystem or component. •Red •Orange •Yellow •Green
  • 14. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion Example of the user screen showing the effect of a failure of the 5k to 3k regulator to the blue POD.
  • 15. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion BOP risk model solution: • Risk-based approach in balancing the conflicting factors • Consistent, transparent pull or no pull decision assistance and motivated decision reporting to all stakeholders • Better prioritization of maintenance • Industry credit: done with a major drilling contractor • Regulator agreement on methodology (BSEE)
  • 16. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion • Pre-considered equipment failure: • No need to go through all information and • assessments upon component failure • Reduction of rig downtime: • Faster pull or not-pull decision • Records history of failed and restored components to assist pull, no-pull decisions • The model cannot be changed by operating crew. • Is unique for every BOP and regulatory environment • Does not take away or replace thinking, competence or responsibility • Enables training and can create what-ifs: play with different failure scenarios
  • 17. SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten Background Project Solution Conclusion Preventing one unnecessary BOP pull proves the value of a BOP risk model. Saving one life with the BOP risk model makes it truly invaluable This allows for the next steps towards failure prevention: • BOP reliability and integrity management optimization • Maintenance and spare parts management optimization • Enhanced graphical representation • Web-based application • Other operational or safety critical equipment
  • 18. For more information, go to: www.lr.org/BOPmodel Slide 18