Working together
for a safer world
Strategic approach to managing Environmentally Critical Elements within
SECEs.
Ian Thomas - Health, safety, environmental and quality management systems
How technology and innovation drive optimisation AND safety.
©Lloyd’s Register Consulting
Introduction
It is a requirement Offshore Directive 2013/30/EU that operators and owners
establish schemes for independent verification of safety and environmentally
critical elements (SECEs)
In the UK, follows requirement for closer integration for management of
environmental impact and major hazards specified in SCR 2015:
• Regulation 9 (Establish scheme and written record of SECEs)
• Regulation 8, Schedule 3 (Integrated SEMS)
©Lloyd’s Register Consulting
Focus
This presentation shall focus on:
• Major accident hazards and the environmental element within the SECEs
We shall look at identification and management of SECEs:
• Definitions and considerations
• Quantification and impact assessment
• Key steps in the identification process
• Management and assurance
• How we can support you.
©Lloyd’s Register Consulting
Focus
We are concerned with Environmental incidents as
defined by EU Directive / SCR 2015.
Environmental incidents within scope must exhibit two
key characteristics:
1. Related to major accident
2. Exhibit significant & lasting environmental damage.
©Lloyd’s Register Consulting
Definitions – major environmental incident
1) An environmental incident resulting from any event referred to in paragraph
(a), (b) or (d) in Reg 2 of SCR 2015.
a) fire, explosion, loss of well control or the release of a dangerous
substance
b) major damage to the structure
c) Failure of life support for diving operations
d) death or serious personal injury to five or more persons
©Lloyd’s Register Consulting
Definitions – Significant & lasting environmental damage
2) An environmental incident is further defined in terms of significance and lasting
damage. That is, an incident which results, or is likely to result, in significant adverse
effects on the environment in accordance with Environmental Liability Directive
2004/35/EC
Environmental damage to the following:
a) damage to protected
species and natural habitats.
b) water damage, which is any damage
that significantly adversely affects the
ecological, chemical & amenity /
commercial status.
c) land damage, is any land
contamination that creates a
significant risk to human health
Damage means a measurable adverse change relative to baseline
condition
©Lloyd’s Register Consulting
Definitions – significant & lasting environmental damage
Further guidance regarding definitions regarding lasting damage and setting of thresholds for
an environmental incident can be located in:
a) The Habitats Directive 92/43/EEC regarding conservation of natural habitats and of wild
fauna and flora
b) Birds Directive 79/409/EEC
c) Water Framework Directive 2000/60/EC regarding water damage
©Lloyd’s Register Consulting
Considerations for quantification when setting thresholds
Oil spill scenarios & response Times < 25 miles from
beach
Oil Quantity
(Estimate)
Oil
Type
Aerial
Surveillance
Capability
Block Specific Vulnerability (JNCC 1999)
1 (very high vulnerability) All other categories
(high, moderate and low
vulnerability
0 to 25 tonnes 1 Within 4
hours
Monitor and
natural dispersion –
(dispersant requirement
assessed on case by case
basis)
Monitor and natural dispersion -
No dispersant requirement
2; 3 and 4 Monitor and dispersant within
1 hour
Monitor and dispersant available
but no “within 1 hour
requirement”
25 to 100 tonnes 1 Monitor and
natural dispersion –
(dispersant requirement
assessed on case by case
basis)
Monitor and natural dispersion -
No dispersant requirement
2, 3 and 4 Monitor and dispersant within
2 hours
Monitor and dispersant available
but no “within 2 hour
requirement”
100 to 500
tonnes
1 Monitor and
natural dispersion –
(dispersant requirement
assessed on case by case
basis)
Monitor and natural dispersion -
No dispersant requirement
2; 3 and 4 Monitor and dispersant within
6 hours
Monitor and dispersant within 6
hours
>500 tonnes 1 Monitor and
natural dispersion –
(dispersant requirement
assessed on case by case
basis)
Monitor and natural dispersion -
No dispersant requirement
2; 3 and 4 Monitor and dispersant within
18 hours
Monitor and dispersant within 18
hours
Type of hydrocarbon inventory and proximity
to shoreline
ITOPF classification / Oil type
1. Group I SG < 0.8 e.g. Kerosenes /
Gasolines
2. Group II SG 0.8-0.85 e.g. light crude, gas
oils
3. Group III SG 0.85-0.95 e.g. medium crude
4. Group IV SG> 0.95 or Pour Point > 30
degree
International Tanker Owners Pollution Federation
Limited (ITOPF)
©Lloyd’s Register Consulting
Considerations for quantification when setting thresholds
Physical and chemical properties of hydrocarbon
• Viscosity
• Mobility
• degradability,
• molecular weight
• Toxicty
• Ability to bioaccumulate biomagnification
• Ability to react with other substances /
synergistic effects etc).
©Lloyd’s Register Consulting
Considerations for quantification when setting thresholds
Metocean factors
• Weather and sea state conditions
• Hydrographic conditions
Seasonal and temporal factors
• Time of year and time of day (breeding / migration
seasons)
Special Areas under MARPOL
Annex1 in the North-East Atlantic
OSPAR Maritime Area
©Lloyd’s Register Consulting
Considerations for quantification when setting thresholds
Example: Impact quantification
The level of harm that would constitute a Major Accident to the Environment (MATTE) is
defined as follows:
a) 2 ha or more of contamination to the littoral or sub-littoral zone;
b) 100 ha or more of open sea benthic community;
c) 100 or more dead sea birds (500 or more gulls);
d) 5 or more dead/significantly impaired sea mammals
Source Chemical and Downstream Industries Forum (CDOIF) 2014; reflecting:
• Seveso Directive
• DETR 1999 COMAH regulations
Guidance available, but there are no prescriptive thresholds.
©Lloyd’s Register Consulting
Stage 1: Identification of SECEs with safety function
Identify Major Accident Hazards using safety case
Identify system (structure, plant & IT) which can cause,
prevent, detect, control mitigate, rescue or help recover from a
major accident
Identify systems for prevention of fire and explosion and
emergency response
Record items identified as SECEs (Safety)
Stage 1
Use existing guidance to
Identify structures, plant,
equipment and IT as safety
critical.
©Lloyd’s Register Consulting
Identify MAHs
Identify Major Accident
Hazards
• HAZID
• Safety Case
Major Accident Hazards
HC.001 Loss of containment from Production Riser/ Turret System
HC.002 Loss of containment from Crude Separation/ Stabilisation
System
HC.003 Loss of containment from Gas Compression System
HC.004 Loss of containment from Gas Dehydration System
HC.005 Loss of containment from Fuel Gas System
HC.006 Loss of containment from Flare System
HC.007 Cargo or Slops Tank Fire/ Explosion
HC.008 Hydrocarbon release from Cargo Handling System
HC 009 Loss of containment from well blowout
NP.010 Loss of containment from Methanol Chemical Injection
System
NP.011 Engine Room Fire/ Explosion
RF.012 Accommodation Fire
DO.013 Impact from Dropped Object/ Swinging Load
AA.014 Helicopter Crash
MA.015 Vessel Collision
MA.016 Personnel Transfer Failure
SF.017 Structural Failure or Loss of Stability of FPSO
OH.018 Confined Space Entry
OH.019 Asphyxiation
OH.020 Impact to Personnel during FPSO Reconnection to RTM
OH.021 Dropped Fast Rescue Craft
©Lloyd’s Register Consulting
Identify systems with safety role in MAH
Apply objective method to
identify those systems which
have a safety role in Major
Accidents
• Bow tie
Identify threats &
assign preventive controls
Control
Assess consequences /
impacts & assign recovery
controls
Recover
©Lloyd’s Register Consulting
Example Bow tie
Example Bow-Tie: Systems which have a safety role in Major Accidents
©Lloyd’s Register Consulting
List of SECEs with safety role
1) Access, escape and evacuation
routes
2) Ballast and bilge
3) Blowdown, pressure relief and flare
4) Active Fire Protection (chemical)
5) Flammable gas detection
6) Communications external
7) Drainage (hazardous open)
8) Communications internal
9) Gas systems hydrocarbon
containment
10) Active Fire Protection (water)
11) Electrical fault protection
12) Emergency electrical power supplies
13) Escape lighting
14) Emergency shutdown
15) Risers and pipelines
16) Fire and smoke detection systems
17) Firewater systems
18) Foam systems
19) Portable firefighting equipment
©Lloyd’s Register Consulting
Stage 2: identify SECEs with environmental role
Establish criteria/ thresholds for a major environmental incident
Identify Major Environmental Incident from list of MAHs
(consider scenarios a, b & d)
Identify systems (plant, equipment, IT ) that interact with the hazard or
condition
(cause, contribute to or prevent or recover from a major environmental incident)
Evaluate the consequence of system failure and whether
consequence constitutes and environmental incident
Confirm SECE has an environmental role
Establish an assurance and verification scheme to manage SECEs
Stage 2
Second review
cycle to identify
those SECEs that
have an
environmental
role. Bow-Tie Analysis to
confirm SECE with an
environmental role
Confirm scenarios with
potential for significant
environmental
consequence
Use EIA, Aspects
register and OPEP to
evaluate significant &
lasting impact
Generate list of SECEs
Performance
standards,
compliance routines
link to maintenance
system
Fire, explosion, loss of
well control or release
of a dangerous
substance
©Lloyd’s Register Consulting
MAH with environmental impact
Major Accident Hazards
HC.001 Loss of containment from Production Riser/ Turret System
HC.002 Loss of containment from Crude Separation/ Stabilisation System
HC.005 Loss of containment from Fuel Gas System
HC.007 Cargo or Slops Tank Fire/ Explosion
HC.008 Hydrocarbon release from Cargo Handling System
HC 009 Loss of containment from well blowout
DO.013 Impact from Dropped Object/ Swinging Load
MA.015 Vessel Collision
SF.017 Structural Failure or Loss of Stability of FPSO
Identify MAHs with
potential environmental
impact
• ENVID
• Primary focus – loss of
hydrocarbon inventory
©Lloyd’s Register Consulting
Stage 1. Example Bow Tie output
(only those systems which have a safety role in Major Accidents)
©Lloyd’s Register Consulting
Stage 2: Example Bow Tie Output
SECEs with a role in an environmental incident.
©Lloyd’s Register Consulting
List of SECEs with safety and environmental role
Safety Function Environmental Function
BOP and well control  
Emergency shutdown  
Blowdown, pressure relief and flare  X
Access, escape and evacuation routes  X
Risers and pipeline  
Escape lighting  X
Lifeboats  X
©Lloyd’s Register Consulting
Summary
• Simple 2 stage process
• Existing operators – need to review MAHs &
SECEs for environmental implication using
existing information and transparent
procedure.
• New entrants will need to run process from
start, as described.
• Collaborative effort required.
Identify Major Accident events
using safety case
Identify system (structure, plant
& IT) which can cause, prevent,
detect, control mitigate, rescue or
help recover from a major
accident
Identify systems for
prevention of fire and
explosion and emergency
response
Record items identified as
SECEs
Establish criteria/ thresholds for a
major environmental incident
Identify Major Environmental
Incident from list of MAHs
(consider scenarios a, b & d)
Identify systems (plant,
equipment, IT ) that interact with
the hazard or condition
Evaluate the consequence of
system failure and whether
consequence constitutes and
environmental incident
Confirm SECE has an
environmental role
Establish an assurance and
verification scheme to manage
SECEs
SECE (safety)
SECE (Environment)
HAZID
©Lloyd’s Register Consulting
Where do we go from here / what can LR offer ?
Focus of SCR 2015
• to reduce the risks from major accident hazards to the health and safety of the workforce
• to increase the protection of the environment
Specifically:
• Regulations require confirmation that the likelihood of a major environmental incident has been
identified and its environmental consequence assessed.
Reg 9 • establish a verification scheme for ensuring that the SECEs will be suitable;
and where provided remain in good repair and condition.
• produce a written record of the safety and environmental – critical
elements and specified plant
Reg 8 Schedule 3 • SEMS and integration of environmental impact into major accident risk
assessments in the safety case.
©Lloyd’s Register Consulting
Where do we go from here / what can LR offer ?
Specifically, we can help you with:
1. Identification of SECE (safety and environmental function)
2. Quantify consequences (both safety and environment impact)
3. Advice regulatory compliance strategies
4. Establish performance standards
• functionality – what is SECE required to do?
• availability – for what proportion of time will the SECE be capable of performing
• reliability – how likely is the SECE to perform on demand
• survivability – does the SECE have a role to perform post event
• interactions – do other systems need to be functional for the SECE to operate
5. Assurance in the management of MAH and SECE (e.g. audits, SEMS processes, procedures and policies)
6. Develop verification scheme
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Consulting. 2013. A member of the Lloyd’s Register group.
Working together
for a safer world
Ian Thomas
Department Manager
Aberdeen
T + 44 1224 267 485 / Mobile +44 7785 515 403 E
ian.thomas@lr.org
Lloyd’s Register Consulting
www.lr.org/consulting

Weitere ähnliche Inhalte

Was ist angesagt?

Updated - Safety Management Systems - Workshop - DGCA SAG Members - As Presented
Updated - Safety Management Systems - Workshop - DGCA SAG Members - As PresentedUpdated - Safety Management Systems - Workshop - DGCA SAG Members - As Presented
Updated - Safety Management Systems - Workshop - DGCA SAG Members - As Presentedtherunwaycentreline
 
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...Triumvirate Environmental
 
Ep seminar presentation version 2 morgan mar 2013
Ep seminar presentation version 2 morgan mar 2013Ep seminar presentation version 2 morgan mar 2013
Ep seminar presentation version 2 morgan mar 2013Andrew Morgan
 
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019Triumvirate Environmental
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Mike Poland, CMRP
 
Asset Integrity Management
Asset Integrity ManagementAsset Integrity Management
Asset Integrity ManagementHafiz Atif
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 finalSamarth Mewada
 
Regulatory Update 2015
Regulatory Update 2015Regulatory Update 2015
Regulatory Update 2015Jane Besch
 
History of Process Safety in AIChE
History of Process Safety in AIChEHistory of Process Safety in AIChE
History of Process Safety in AIChEDIv CHAS
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY  MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY ElmerCausing2
 
PSM RM - Process Safety Management implementation guidance 1
PSM RM - Process Safety Management implementation guidance 1PSM RM - Process Safety Management implementation guidance 1
PSM RM - Process Safety Management implementation guidance 1Process Safety Culture
 
Psm guide 4th edition
Psm guide 4th editionPsm guide 4th edition
Psm guide 4th editionArul Arasu K
 

Was ist angesagt? (20)

Updated - Safety Management Systems - Workshop - DGCA SAG Members - As Presented
Updated - Safety Management Systems - Workshop - DGCA SAG Members - As PresentedUpdated - Safety Management Systems - Workshop - DGCA SAG Members - As Presented
Updated - Safety Management Systems - Workshop - DGCA SAG Members - As Presented
 
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
 
Keeping Bowties Alive
Keeping Bowties AliveKeeping Bowties Alive
Keeping Bowties Alive
 
Ep seminar presentation version 2 morgan mar 2013
Ep seminar presentation version 2 morgan mar 2013Ep seminar presentation version 2 morgan mar 2013
Ep seminar presentation version 2 morgan mar 2013
 
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
 
SOQ RCI
SOQ RCISOQ RCI
SOQ RCI
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
 
Asset Integrity Management
Asset Integrity ManagementAsset Integrity Management
Asset Integrity Management
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 final
 
Regulatory Update 2015
Regulatory Update 2015Regulatory Update 2015
Regulatory Update 2015
 
History of Process Safety in AIChE
History of Process Safety in AIChEHistory of Process Safety in AIChE
History of Process Safety in AIChE
 
Gr Stuckart Ehs
Gr Stuckart EhsGr Stuckart Ehs
Gr Stuckart Ehs
 
Safety Management System
Safety  Management  System Safety  Management  System
Safety Management System
 
Psm by Ronak
Psm by RonakPsm by Ronak
Psm by Ronak
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY  MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY
 
Safety Pillar internal audit
Safety Pillar internal auditSafety Pillar internal audit
Safety Pillar internal audit
 
Cyanide Mitigation and Worker Protection May 7, 2014
Cyanide Mitigation and Worker Protection May 7, 2014Cyanide Mitigation and Worker Protection May 7, 2014
Cyanide Mitigation and Worker Protection May 7, 2014
 
PSM RM - Process Safety Management implementation guidance 1
PSM RM - Process Safety Management implementation guidance 1PSM RM - Process Safety Management implementation guidance 1
PSM RM - Process Safety Management implementation guidance 1
 
Psm guide 4th edition
Psm guide 4th editionPsm guide 4th edition
Psm guide 4th edition
 

Ähnlich wie Strategic approach to managing Environmentally Critical Elements within SECEs.

18001 &amp; 14001 ohsas ems
18001 &amp; 14001 ohsas   ems18001 &amp; 14001 ohsas   ems
18001 &amp; 14001 ohsas emsMOHAMMED KABIR
 
Suraj 2 environmental protection act-1986
Suraj 2  environmental protection act-1986Suraj 2  environmental protection act-1986
Suraj 2 environmental protection act-1986DEVIKA ANTHARJANAM
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdfssuser2fc67e
 
EO100.1 Standard Technical Addendum for Shale Oil and Gas Operations
EO100.1 Standard Technical Addendum for Shale Oil and Gas OperationsEO100.1 Standard Technical Addendum for Shale Oil and Gas Operations
EO100.1 Standard Technical Addendum for Shale Oil and Gas OperationsMarcellus Drilling News
 
Rcra training eoc
Rcra training eocRcra training eoc
Rcra training eoctlhedges
 
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATION
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATIONMINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATION
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATIONGjorgi Vezenkovski
 
Harnessing the Market for Environmental Protection
Harnessing the Market for Environmental ProtectionHarnessing the Market for Environmental Protection
Harnessing the Market for Environmental ProtectionCentre for Civil Society
 
Env legislation and implementation in india
Env legislation and implementation in india Env legislation and implementation in india
Env legislation and implementation in india Arvind Kumar
 
David Woolgar DSEAR and gas safety
David Woolgar  DSEAR and gas safetyDavid Woolgar  DSEAR and gas safety
David Woolgar DSEAR and gas safetyJessica Allan
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Applicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clauseApplicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clauseBryan Haywood
 
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespie
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven GillespieCarbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespie
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespieicarb
 
3. demilitarzn & melt out.pptx
3. demilitarzn & melt out.pptx3. demilitarzn & melt out.pptx
3. demilitarzn & melt out.pptxlaavash
 

Ähnlich wie Strategic approach to managing Environmentally Critical Elements within SECEs. (20)

Final booklet
Final bookletFinal booklet
Final booklet
 
C0 1 ricardo_regulation
C0 1 ricardo_regulationC0 1 ricardo_regulation
C0 1 ricardo_regulation
 
18001 &amp; 14001 ohsas ems
18001 &amp; 14001 ohsas   ems18001 &amp; 14001 ohsas   ems
18001 &amp; 14001 ohsas ems
 
Suraj 2 environmental protection act-1986
Suraj 2  environmental protection act-1986Suraj 2  environmental protection act-1986
Suraj 2 environmental protection act-1986
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdf
 
EO100.1 Standard Technical Addendum for Shale Oil and Gas Operations
EO100.1 Standard Technical Addendum for Shale Oil and Gas OperationsEO100.1 Standard Technical Addendum for Shale Oil and Gas Operations
EO100.1 Standard Technical Addendum for Shale Oil and Gas Operations
 
Rcra training eoc
Rcra training eocRcra training eoc
Rcra training eoc
 
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATION
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATIONMINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATION
MINERS EXPOSURE TO GASEOUS CONTAMINATS CURENT SITUATION AND LEGISLATION
 
Chemical Safety.pdf
Chemical Safety.pdfChemical Safety.pdf
Chemical Safety.pdf
 
C0 2 ricardo_environmental
C0 2 ricardo_environmentalC0 2 ricardo_environmental
C0 2 ricardo_environmental
 
Harnessing the Market for Environmental Protection
Harnessing the Market for Environmental ProtectionHarnessing the Market for Environmental Protection
Harnessing the Market for Environmental Protection
 
Env legislation and implementation in india
Env legislation and implementation in india Env legislation and implementation in india
Env legislation and implementation in india
 
Final Project work
Final Project workFinal Project work
Final Project work
 
David Woolgar DSEAR and gas safety
David Woolgar  DSEAR and gas safetyDavid Woolgar  DSEAR and gas safety
David Woolgar DSEAR and gas safety
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Applicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clauseApplicability of caa section112(r) & general duty clause
Applicability of caa section112(r) & general duty clause
 
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespie
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven GillespieCarbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespie
Carbon Accounting in the Tourism Sector | Rachel Dunk & Steven Gillespie
 
3. demilitarzn & melt out.pptx
3. demilitarzn & melt out.pptx3. demilitarzn & melt out.pptx
3. demilitarzn & melt out.pptx
 
Regulatory regime
Regulatory regimeRegulatory regime
Regulatory regime
 

Mehr von Lloyd's Register Energy

Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioLloyd's Register Energy
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLloyd's Register Energy
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011Lloyd's Register Energy
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Lloyd's Register Energy
 
Maximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentMaximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentLloyd's Register Energy
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceLloyd's Register Energy
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angleLloyd's Register Energy
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Lloyd's Register Energy
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsLloyd's Register Energy
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryLloyd's Register Energy
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingLloyd's Register Energy
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gassLloyd's Register Energy
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsLloyd's Register Energy
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwLloyd's Register Energy
 

Mehr von Lloyd's Register Energy (20)

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
Maximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentMaximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environment
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performance
 
RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throw
 

Kürzlich hochgeladen

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Kürzlich hochgeladen (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Strategic approach to managing Environmentally Critical Elements within SECEs.

  • 1. Working together for a safer world Strategic approach to managing Environmentally Critical Elements within SECEs. Ian Thomas - Health, safety, environmental and quality management systems How technology and innovation drive optimisation AND safety.
  • 2. ©Lloyd’s Register Consulting Introduction It is a requirement Offshore Directive 2013/30/EU that operators and owners establish schemes for independent verification of safety and environmentally critical elements (SECEs) In the UK, follows requirement for closer integration for management of environmental impact and major hazards specified in SCR 2015: • Regulation 9 (Establish scheme and written record of SECEs) • Regulation 8, Schedule 3 (Integrated SEMS)
  • 3. ©Lloyd’s Register Consulting Focus This presentation shall focus on: • Major accident hazards and the environmental element within the SECEs We shall look at identification and management of SECEs: • Definitions and considerations • Quantification and impact assessment • Key steps in the identification process • Management and assurance • How we can support you.
  • 4. ©Lloyd’s Register Consulting Focus We are concerned with Environmental incidents as defined by EU Directive / SCR 2015. Environmental incidents within scope must exhibit two key characteristics: 1. Related to major accident 2. Exhibit significant & lasting environmental damage.
  • 5. ©Lloyd’s Register Consulting Definitions – major environmental incident 1) An environmental incident resulting from any event referred to in paragraph (a), (b) or (d) in Reg 2 of SCR 2015. a) fire, explosion, loss of well control or the release of a dangerous substance b) major damage to the structure c) Failure of life support for diving operations d) death or serious personal injury to five or more persons
  • 6. ©Lloyd’s Register Consulting Definitions – Significant & lasting environmental damage 2) An environmental incident is further defined in terms of significance and lasting damage. That is, an incident which results, or is likely to result, in significant adverse effects on the environment in accordance with Environmental Liability Directive 2004/35/EC Environmental damage to the following: a) damage to protected species and natural habitats. b) water damage, which is any damage that significantly adversely affects the ecological, chemical & amenity / commercial status. c) land damage, is any land contamination that creates a significant risk to human health Damage means a measurable adverse change relative to baseline condition
  • 7. ©Lloyd’s Register Consulting Definitions – significant & lasting environmental damage Further guidance regarding definitions regarding lasting damage and setting of thresholds for an environmental incident can be located in: a) The Habitats Directive 92/43/EEC regarding conservation of natural habitats and of wild fauna and flora b) Birds Directive 79/409/EEC c) Water Framework Directive 2000/60/EC regarding water damage
  • 8. ©Lloyd’s Register Consulting Considerations for quantification when setting thresholds Oil spill scenarios & response Times < 25 miles from beach Oil Quantity (Estimate) Oil Type Aerial Surveillance Capability Block Specific Vulnerability (JNCC 1999) 1 (very high vulnerability) All other categories (high, moderate and low vulnerability 0 to 25 tonnes 1 Within 4 hours Monitor and natural dispersion – (dispersant requirement assessed on case by case basis) Monitor and natural dispersion - No dispersant requirement 2; 3 and 4 Monitor and dispersant within 1 hour Monitor and dispersant available but no “within 1 hour requirement” 25 to 100 tonnes 1 Monitor and natural dispersion – (dispersant requirement assessed on case by case basis) Monitor and natural dispersion - No dispersant requirement 2, 3 and 4 Monitor and dispersant within 2 hours Monitor and dispersant available but no “within 2 hour requirement” 100 to 500 tonnes 1 Monitor and natural dispersion – (dispersant requirement assessed on case by case basis) Monitor and natural dispersion - No dispersant requirement 2; 3 and 4 Monitor and dispersant within 6 hours Monitor and dispersant within 6 hours >500 tonnes 1 Monitor and natural dispersion – (dispersant requirement assessed on case by case basis) Monitor and natural dispersion - No dispersant requirement 2; 3 and 4 Monitor and dispersant within 18 hours Monitor and dispersant within 18 hours Type of hydrocarbon inventory and proximity to shoreline ITOPF classification / Oil type 1. Group I SG < 0.8 e.g. Kerosenes / Gasolines 2. Group II SG 0.8-0.85 e.g. light crude, gas oils 3. Group III SG 0.85-0.95 e.g. medium crude 4. Group IV SG> 0.95 or Pour Point > 30 degree International Tanker Owners Pollution Federation Limited (ITOPF)
  • 9. ©Lloyd’s Register Consulting Considerations for quantification when setting thresholds Physical and chemical properties of hydrocarbon • Viscosity • Mobility • degradability, • molecular weight • Toxicty • Ability to bioaccumulate biomagnification • Ability to react with other substances / synergistic effects etc).
  • 10. ©Lloyd’s Register Consulting Considerations for quantification when setting thresholds Metocean factors • Weather and sea state conditions • Hydrographic conditions Seasonal and temporal factors • Time of year and time of day (breeding / migration seasons) Special Areas under MARPOL Annex1 in the North-East Atlantic OSPAR Maritime Area
  • 11. ©Lloyd’s Register Consulting Considerations for quantification when setting thresholds Example: Impact quantification The level of harm that would constitute a Major Accident to the Environment (MATTE) is defined as follows: a) 2 ha or more of contamination to the littoral or sub-littoral zone; b) 100 ha or more of open sea benthic community; c) 100 or more dead sea birds (500 or more gulls); d) 5 or more dead/significantly impaired sea mammals Source Chemical and Downstream Industries Forum (CDOIF) 2014; reflecting: • Seveso Directive • DETR 1999 COMAH regulations Guidance available, but there are no prescriptive thresholds.
  • 12. ©Lloyd’s Register Consulting Stage 1: Identification of SECEs with safety function Identify Major Accident Hazards using safety case Identify system (structure, plant & IT) which can cause, prevent, detect, control mitigate, rescue or help recover from a major accident Identify systems for prevention of fire and explosion and emergency response Record items identified as SECEs (Safety) Stage 1 Use existing guidance to Identify structures, plant, equipment and IT as safety critical.
  • 13. ©Lloyd’s Register Consulting Identify MAHs Identify Major Accident Hazards • HAZID • Safety Case Major Accident Hazards HC.001 Loss of containment from Production Riser/ Turret System HC.002 Loss of containment from Crude Separation/ Stabilisation System HC.003 Loss of containment from Gas Compression System HC.004 Loss of containment from Gas Dehydration System HC.005 Loss of containment from Fuel Gas System HC.006 Loss of containment from Flare System HC.007 Cargo or Slops Tank Fire/ Explosion HC.008 Hydrocarbon release from Cargo Handling System HC 009 Loss of containment from well blowout NP.010 Loss of containment from Methanol Chemical Injection System NP.011 Engine Room Fire/ Explosion RF.012 Accommodation Fire DO.013 Impact from Dropped Object/ Swinging Load AA.014 Helicopter Crash MA.015 Vessel Collision MA.016 Personnel Transfer Failure SF.017 Structural Failure or Loss of Stability of FPSO OH.018 Confined Space Entry OH.019 Asphyxiation OH.020 Impact to Personnel during FPSO Reconnection to RTM OH.021 Dropped Fast Rescue Craft
  • 14. ©Lloyd’s Register Consulting Identify systems with safety role in MAH Apply objective method to identify those systems which have a safety role in Major Accidents • Bow tie Identify threats & assign preventive controls Control Assess consequences / impacts & assign recovery controls Recover
  • 15. ©Lloyd’s Register Consulting Example Bow tie Example Bow-Tie: Systems which have a safety role in Major Accidents
  • 16. ©Lloyd’s Register Consulting List of SECEs with safety role 1) Access, escape and evacuation routes 2) Ballast and bilge 3) Blowdown, pressure relief and flare 4) Active Fire Protection (chemical) 5) Flammable gas detection 6) Communications external 7) Drainage (hazardous open) 8) Communications internal 9) Gas systems hydrocarbon containment 10) Active Fire Protection (water) 11) Electrical fault protection 12) Emergency electrical power supplies 13) Escape lighting 14) Emergency shutdown 15) Risers and pipelines 16) Fire and smoke detection systems 17) Firewater systems 18) Foam systems 19) Portable firefighting equipment
  • 17. ©Lloyd’s Register Consulting Stage 2: identify SECEs with environmental role Establish criteria/ thresholds for a major environmental incident Identify Major Environmental Incident from list of MAHs (consider scenarios a, b & d) Identify systems (plant, equipment, IT ) that interact with the hazard or condition (cause, contribute to or prevent or recover from a major environmental incident) Evaluate the consequence of system failure and whether consequence constitutes and environmental incident Confirm SECE has an environmental role Establish an assurance and verification scheme to manage SECEs Stage 2 Second review cycle to identify those SECEs that have an environmental role. Bow-Tie Analysis to confirm SECE with an environmental role Confirm scenarios with potential for significant environmental consequence Use EIA, Aspects register and OPEP to evaluate significant & lasting impact Generate list of SECEs Performance standards, compliance routines link to maintenance system Fire, explosion, loss of well control or release of a dangerous substance
  • 18. ©Lloyd’s Register Consulting MAH with environmental impact Major Accident Hazards HC.001 Loss of containment from Production Riser/ Turret System HC.002 Loss of containment from Crude Separation/ Stabilisation System HC.005 Loss of containment from Fuel Gas System HC.007 Cargo or Slops Tank Fire/ Explosion HC.008 Hydrocarbon release from Cargo Handling System HC 009 Loss of containment from well blowout DO.013 Impact from Dropped Object/ Swinging Load MA.015 Vessel Collision SF.017 Structural Failure or Loss of Stability of FPSO Identify MAHs with potential environmental impact • ENVID • Primary focus – loss of hydrocarbon inventory
  • 19. ©Lloyd’s Register Consulting Stage 1. Example Bow Tie output (only those systems which have a safety role in Major Accidents)
  • 20. ©Lloyd’s Register Consulting Stage 2: Example Bow Tie Output SECEs with a role in an environmental incident.
  • 21. ©Lloyd’s Register Consulting List of SECEs with safety and environmental role Safety Function Environmental Function BOP and well control   Emergency shutdown   Blowdown, pressure relief and flare  X Access, escape and evacuation routes  X Risers and pipeline   Escape lighting  X Lifeboats  X
  • 22. ©Lloyd’s Register Consulting Summary • Simple 2 stage process • Existing operators – need to review MAHs & SECEs for environmental implication using existing information and transparent procedure. • New entrants will need to run process from start, as described. • Collaborative effort required. Identify Major Accident events using safety case Identify system (structure, plant & IT) which can cause, prevent, detect, control mitigate, rescue or help recover from a major accident Identify systems for prevention of fire and explosion and emergency response Record items identified as SECEs Establish criteria/ thresholds for a major environmental incident Identify Major Environmental Incident from list of MAHs (consider scenarios a, b & d) Identify systems (plant, equipment, IT ) that interact with the hazard or condition Evaluate the consequence of system failure and whether consequence constitutes and environmental incident Confirm SECE has an environmental role Establish an assurance and verification scheme to manage SECEs SECE (safety) SECE (Environment) HAZID
  • 23. ©Lloyd’s Register Consulting Where do we go from here / what can LR offer ? Focus of SCR 2015 • to reduce the risks from major accident hazards to the health and safety of the workforce • to increase the protection of the environment Specifically: • Regulations require confirmation that the likelihood of a major environmental incident has been identified and its environmental consequence assessed. Reg 9 • establish a verification scheme for ensuring that the SECEs will be suitable; and where provided remain in good repair and condition. • produce a written record of the safety and environmental – critical elements and specified plant Reg 8 Schedule 3 • SEMS and integration of environmental impact into major accident risk assessments in the safety case.
  • 24. ©Lloyd’s Register Consulting Where do we go from here / what can LR offer ? Specifically, we can help you with: 1. Identification of SECE (safety and environmental function) 2. Quantify consequences (both safety and environment impact) 3. Advice regulatory compliance strategies 4. Establish performance standards • functionality – what is SECE required to do? • availability – for what proportion of time will the SECE be capable of performing • reliability – how likely is the SECE to perform on demand • survivability – does the SECE have a role to perform post event • interactions – do other systems need to be functional for the SECE to operate 5. Assurance in the management of MAH and SECE (e.g. audits, SEMS processes, procedures and policies) 6. Develop verification scheme
  • 25. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Consulting. 2013. A member of the Lloyd’s Register group. Working together for a safer world Ian Thomas Department Manager Aberdeen T + 44 1224 267 485 / Mobile +44 7785 515 403 E ian.thomas@lr.org Lloyd’s Register Consulting www.lr.org/consulting