Working together
for a safer world
RBI Embedded within Maximo
Jarret Reeves - Asset Integrity Systems Product Manager
How technology and innovation drive optimisation AND safety.
Lloyd’s Register Energy - Offshore Europe 2015
Asset Intensive Industry Goals
To achieve
• Safe operations
• Profit and ROI
• Balance long/short decisions
• Sustainability
• Regulatory
To improve
• Improve uptime
• Asset longevity
• Safety and Risk Management
• Improve yield
• Cost control
Lloyd’s Register Energy - Offshore Europe 2015
WHY RBI?
The right insights, to make
the right decisions, to keep
assets “under control”
(operating within set
boundaries for business
performance, safety, and
compliance) at all times
Lloyd’s Register Energy - Offshore Europe 2015
 Reduce unplanned
downtime
 Reduce failures,
specifically HSE and
catastrophic ones
 Aging plant with
unknowns
 Balance long range
improvements with quick
wins
WHY RBI?
Lloyd’s Register Energy - Offshore Europe 2015
Challenges with existing Risk Approaches
Typically look backwards at failures vs. predicting and mitigating. Narrow
view. What you’re doing now, how do we get you to world class?
Lack engineering expertise in-house; start from scratch with reliability
models every time
Ability to close the loop between recommended actions and actual
performance
Lloyd’s Register Energy - Offshore Europe 2015
Challenges with existing Risk Approaches
Lloyd’s Register Energy - Offshore Europe 2015
Complianc
e Manager
Embedded within
Root
Cause
Analysis
Predictive
Modeling
Reliability
Centered
Maintenanc
e
Industry
Libraries
Lloyd’s Register Energy - Offshore Europe 2015
Introducing RBI
Embedded within
Why we’re a good fit and position to address these challeng
We’ve done
this before
• First to make integrated RBI system, often ahead of standards
• Existing RBI and APM Software (RBMI, strEAM+ and Optimizer)
• Innovative library approach accelerates time to value 50-80%
Lloyd’s Register Energy - Offshore Europe 2015
Publishing models to customers EAM
Internet
Customer A
(Maximo)
Customer B
(SAP)
Customer C
Standalone
LR
Library Manager
Publishing Models
• Version and manage models via meta data
• Model development takes weeks, not years
• Current Models include Fixed Equipment,
Pipe, Relief Devices, Instrumentation, subsea
jacketed structures, and rotating
• More models in the works
Lloyd’s Register Energy - Offshore Europe 2015
Stored in and performed in Maximo throughout asset life cycle
Design
In-Service
Construction
Decommission
Risk-Based
RBI
RCM
Optimize
Time-Based
Run to Fail
CM’s
PM’s
MOC
Spares
Plan
Work Order
Job Plan/
Details
Execute
Inspection
Maintenance
Telemetry
Analyze
Failure/RCA
NCR
Compliance
Trending
Condition-Based
Asset Management Strategy
Safety
Work pack
Improve
Maximo
LR Modules
Broadsword
FMEA
Libraries
SME
Lloyd’s Register Energy - Offshore Europe 2015
Risk provides a sustainable solution over time
Time
Risk
Acceptable Limits
Traditional Approach
The cost and effort to manage risk
increases significantly over time
Decrease effort/cost,
increasing knowledge
Plan
Do
Check
Update
Plan
Do
Check
Update
Lloyd’s Register Energy - Offshore Europe 2015
The Financial Case
EAM
RBI
Inspection
Management
RCM
As-Is
• Disparate Systems
• Costly Integration
• Redundant or Missing
information
• Not connecting workgroups
• Engineering knowledge
erosion
Lloyd’s Register Energy - Offshore Europe 2015
The Financial Case
Maximo
Analysis
Inspection
Management
RBI To-Be
• Leverage EAM investments
• Single Data Source
• Strategic and Tactical
decision making
• Right information to the right
person
• Knowledge retention
Lloyd’s Register Energy - Offshore Europe 2015
The Safety Case…..
What if you could
• Quantify your HSE risk…
• Predict failures…
• Focus resources…
• Continuous improvement…
• In your EAM system…
Lloyd’s Register Energy - Offshore Europe 2015
Demonstration of RBI, PM’s and Work Orders…..
Design
In-Service
Construction
Decommission
Risk-Based
RBI
RCM
Optimize
Time-Based
Run to Fail
CM’s
PM’s
MOC
Spares
Plan
Work Order
Job Plan/
Details
Execute
Inspection
Maintenance
Telemetry
Analyze
Failure/RCA
NCR
Compliance
Trending
Condition-Based
Asset Management Strategy
Safety
Work pack
Improve
Maximo
LR Modules
Broadsword
FMEA
Libraries
SME
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI embedded within Maximo
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI embedded within Maximo – Internal Corrosion
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI – Qualitative model
Lloyd’s Register Energy - Offshore Europe 2015
Sample RBI – Qualitative continued
Lloyd’s Register Energy - Offshore Europe 2015
Mitigating the risk (recommendations)
Auto calculation of due
dates (frequency + last
activity date)
Lloyd’s Register Energy - Offshore Europe 2015
Realizing the mitigations to work orders (PM’s in Maximo)
Lloyd’s Register Energy - Offshore Europe 2015
Summary
• Proven approach with preconfigured
models, though customers can
developer their own
Time to Value
• Predictive models
• Optimal life performance of the asset
Focus limited resources on
most important items
• Leverage existing EAM investments
• Reduce cost of ownership
Integrated processes that
generate maximum
Lloyd’s Register Energy - Offshore Europe 2015
Question and Answer
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Energy. 2015. A member of the Lloyd’s Register group.
Jarret Reeves
Asset Integrity Systems Product Manager
Lloyd’s Register Energy
T +1 281-649-2226
E jarret.reeves@lr.org
Working together
for a safer world

Weitere ähnliche Inhalte

Was ist angesagt?

Maximo76 designer431 report development guide_rev8
Maximo76 designer431 report development guide_rev8Maximo76 designer431 report development guide_rev8
Maximo76 designer431 report development guide_rev8
mohamed gamal
 
Comunicação oral e escrita segurança no trabalho ( curso Técnico de segurança)
Comunicação oral e escrita   segurança no trabalho ( curso Técnico de segurança)Comunicação oral e escrita   segurança no trabalho ( curso Técnico de segurança)
Comunicação oral e escrita segurança no trabalho ( curso Técnico de segurança)
Ronivon nascimento
 

Was ist angesagt? (20)

Meters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementMeters in IBM Maximo Asset Management
Meters in IBM Maximo Asset Management
 
Ergonomia.ppt
Ergonomia.pptErgonomia.ppt
Ergonomia.ppt
 
Maximo Training - Inventory Management
Maximo Training - Inventory ManagementMaximo Training - Inventory Management
Maximo Training - Inventory Management
 
Maximo 7.6 Features
Maximo 7.6 Features Maximo 7.6 Features
Maximo 7.6 Features
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset Management
 
Maximo overview
Maximo overviewMaximo overview
Maximo overview
 
Maximo76 designer431 report development guide_rev8
Maximo76 designer431 report development guide_rev8Maximo76 designer431 report development guide_rev8
Maximo76 designer431 report development guide_rev8
 
IBM Maximo Performance Tuning
IBM Maximo Performance TuningIBM Maximo Performance Tuning
IBM Maximo Performance Tuning
 
Curso basico de aix
Curso basico de aixCurso basico de aix
Curso basico de aix
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview
 
Comunicação oral e escrita segurança no trabalho ( curso Técnico de segurança)
Comunicação oral e escrita   segurança no trabalho ( curso Técnico de segurança)Comunicação oral e escrita   segurança no trabalho ( curso Técnico de segurança)
Comunicação oral e escrita segurança no trabalho ( curso Técnico de segurança)
 
Maximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationMaximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith Presentation
 
Maximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyMaximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journey
 
Create a new work order in Ibm Maximo
Create a new work order in Ibm MaximoCreate a new work order in Ibm Maximo
Create a new work order in Ibm Maximo
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work OverviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
 
Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset Management
 
IBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industryIBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industry
 
LMERT
LMERTLMERT
LMERT
 
Aula 2 - evolução histórica da hsst
Aula 2 - evolução histórica da hsstAula 2 - evolução histórica da hsst
Aula 2 - evolução histórica da hsst
 

Ähnlich wie RBI Embedded within Maximo

IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
Pieter van Asten
 
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
ptulachan
 
Multi Model Performance Improvement
Multi Model Performance ImprovementMulti Model Performance Improvement
Multi Model Performance Improvement
George Brotbeck
 

Ähnlich wie RBI Embedded within Maximo (20)

Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Ecosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic InsightEcosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic Insight
 
FacilitiesandAssetManagement.ppt
FacilitiesandAssetManagement.pptFacilitiesandAssetManagement.ppt
FacilitiesandAssetManagement.ppt
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
How Nationwide Insurance Transformed and Accelerated its Small_1.3.1
 
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
 
Multi Model Performance Improvement
Multi Model Performance ImprovementMulti Model Performance Improvement
Multi Model Performance Improvement
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
 
Data center insights summit 2015 disruptive force of clouds
Data center insights summit 2015   disruptive force of cloudsData center insights summit 2015   disruptive force of clouds
Data center insights summit 2015 disruptive force of clouds
 
Investment Accounting in the Cloud
Investment Accounting in the CloudInvestment Accounting in the Cloud
Investment Accounting in the Cloud
 
Oracle Cloud modernized Finance Process at CSL
Oracle Cloud modernized Finance Process at CSLOracle Cloud modernized Finance Process at CSL
Oracle Cloud modernized Finance Process at CSL
 
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...
 
BPM Application Infrastructure
BPM Application InfrastructureBPM Application Infrastructure
BPM Application Infrastructure
 
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
Comcast, Integra LifeSciences, LPL Financial, and Smucker's - Doing Your ERP ...
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
MSS Business Integration Practice Ibm Web Sphere
MSS Business Integration Practice   Ibm Web SphereMSS Business Integration Practice   Ibm Web Sphere
MSS Business Integration Practice Ibm Web Sphere
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning Prototyping
 
The Science of Predictive Maintenance: IBM's Predictive Analytics Solution
The Science of Predictive Maintenance: IBM's Predictive Analytics SolutionThe Science of Predictive Maintenance: IBM's Predictive Analytics Solution
The Science of Predictive Maintenance: IBM's Predictive Analytics Solution
 
Management Consultancy Saudi Telecom Digital Transformation Design Thinking
Management Consultancy Saudi Telecom Digital Transformation Design ThinkingManagement Consultancy Saudi Telecom Digital Transformation Design Thinking
Management Consultancy Saudi Telecom Digital Transformation Design Thinking
 

Mehr von Lloyd's Register Energy

Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy
 

Mehr von Lloyd's Register Energy (20)

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
Maximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environmentMaximising the value of late life operations in a low oil price environment
Maximising the value of late life operations in a low oil price environment
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performance
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throw
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Kürzlich hochgeladen (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

RBI Embedded within Maximo

  • 1. Working together for a safer world RBI Embedded within Maximo Jarret Reeves - Asset Integrity Systems Product Manager How technology and innovation drive optimisation AND safety.
  • 2. Lloyd’s Register Energy - Offshore Europe 2015 Asset Intensive Industry Goals To achieve • Safe operations • Profit and ROI • Balance long/short decisions • Sustainability • Regulatory To improve • Improve uptime • Asset longevity • Safety and Risk Management • Improve yield • Cost control
  • 3. Lloyd’s Register Energy - Offshore Europe 2015 WHY RBI? The right insights, to make the right decisions, to keep assets “under control” (operating within set boundaries for business performance, safety, and compliance) at all times
  • 4. Lloyd’s Register Energy - Offshore Europe 2015  Reduce unplanned downtime  Reduce failures, specifically HSE and catastrophic ones  Aging plant with unknowns  Balance long range improvements with quick wins WHY RBI?
  • 5. Lloyd’s Register Energy - Offshore Europe 2015 Challenges with existing Risk Approaches Typically look backwards at failures vs. predicting and mitigating. Narrow view. What you’re doing now, how do we get you to world class? Lack engineering expertise in-house; start from scratch with reliability models every time Ability to close the loop between recommended actions and actual performance
  • 6. Lloyd’s Register Energy - Offshore Europe 2015 Challenges with existing Risk Approaches
  • 7. Lloyd’s Register Energy - Offshore Europe 2015 Complianc e Manager Embedded within Root Cause Analysis Predictive Modeling Reliability Centered Maintenanc e Industry Libraries
  • 8. Lloyd’s Register Energy - Offshore Europe 2015 Introducing RBI Embedded within
  • 9. Why we’re a good fit and position to address these challeng
  • 10. We’ve done this before • First to make integrated RBI system, often ahead of standards • Existing RBI and APM Software (RBMI, strEAM+ and Optimizer) • Innovative library approach accelerates time to value 50-80%
  • 11. Lloyd’s Register Energy - Offshore Europe 2015 Publishing models to customers EAM Internet Customer A (Maximo) Customer B (SAP) Customer C Standalone LR Library Manager Publishing Models • Version and manage models via meta data • Model development takes weeks, not years • Current Models include Fixed Equipment, Pipe, Relief Devices, Instrumentation, subsea jacketed structures, and rotating • More models in the works
  • 12. Lloyd’s Register Energy - Offshore Europe 2015 Stored in and performed in Maximo throughout asset life cycle Design In-Service Construction Decommission Risk-Based RBI RCM Optimize Time-Based Run to Fail CM’s PM’s MOC Spares Plan Work Order Job Plan/ Details Execute Inspection Maintenance Telemetry Analyze Failure/RCA NCR Compliance Trending Condition-Based Asset Management Strategy Safety Work pack Improve Maximo LR Modules Broadsword FMEA Libraries SME
  • 13. Lloyd’s Register Energy - Offshore Europe 2015 Risk provides a sustainable solution over time Time Risk Acceptable Limits Traditional Approach The cost and effort to manage risk increases significantly over time Decrease effort/cost, increasing knowledge Plan Do Check Update Plan Do Check Update
  • 14. Lloyd’s Register Energy - Offshore Europe 2015 The Financial Case EAM RBI Inspection Management RCM As-Is • Disparate Systems • Costly Integration • Redundant or Missing information • Not connecting workgroups • Engineering knowledge erosion
  • 15. Lloyd’s Register Energy - Offshore Europe 2015 The Financial Case Maximo Analysis Inspection Management RBI To-Be • Leverage EAM investments • Single Data Source • Strategic and Tactical decision making • Right information to the right person • Knowledge retention
  • 16. Lloyd’s Register Energy - Offshore Europe 2015 The Safety Case….. What if you could • Quantify your HSE risk… • Predict failures… • Focus resources… • Continuous improvement… • In your EAM system…
  • 17. Lloyd’s Register Energy - Offshore Europe 2015 Demonstration of RBI, PM’s and Work Orders….. Design In-Service Construction Decommission Risk-Based RBI RCM Optimize Time-Based Run to Fail CM’s PM’s MOC Spares Plan Work Order Job Plan/ Details Execute Inspection Maintenance Telemetry Analyze Failure/RCA NCR Compliance Trending Condition-Based Asset Management Strategy Safety Work pack Improve Maximo LR Modules Broadsword FMEA Libraries SME
  • 18. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI embedded within Maximo
  • 19. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI embedded within Maximo – Internal Corrosion
  • 20. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI – Qualitative model
  • 21. Lloyd’s Register Energy - Offshore Europe 2015 Sample RBI – Qualitative continued
  • 22. Lloyd’s Register Energy - Offshore Europe 2015 Mitigating the risk (recommendations) Auto calculation of due dates (frequency + last activity date)
  • 23. Lloyd’s Register Energy - Offshore Europe 2015 Realizing the mitigations to work orders (PM’s in Maximo)
  • 24. Lloyd’s Register Energy - Offshore Europe 2015 Summary • Proven approach with preconfigured models, though customers can developer their own Time to Value • Predictive models • Optimal life performance of the asset Focus limited resources on most important items • Leverage existing EAM investments • Reduce cost of ownership Integrated processes that generate maximum
  • 25. Lloyd’s Register Energy - Offshore Europe 2015 Question and Answer
  • 26. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Energy. 2015. A member of the Lloyd’s Register group. Jarret Reeves Asset Integrity Systems Product Manager Lloyd’s Register Energy T +1 281-649-2226 E jarret.reeves@lr.org Working together for a safer world