Working together
for a safer world
MainTech Konferansen
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
prosjekter
©Lloyd’s Register Consulting
Olje og gass – en titt i glasskulen
©Lloyd’s Register Consulting
Mer prosessutstyr under vann
The subsea factory (www.statoil.com)
Åsgard havbunns gasskompresjon (www.statoil.com)
• Mer omfattende å erstatte ødelagte enheter
• Uplanlagte stanser -> skifte av moduler krever fartøy og
reservedeler -> kan gi lange nedetider og tilhørende
produksjonstap
• Ønske om å kunne planlegge utskiftninger ->
tilstandsovervåkning
• Tilstandsovervåkning viktigere i og med at en ikke kan lett
visuelt inspisere eller sjekke utstyr
• «Kvalitet» på tilstandsovervåkningen viktigere -> Vite
hvilken modul som skal skiftes -> hvor er det feilen er
©Lloyd’s Register Consulting
Redundante løsninger utfordres topside
• Gasseksport kompressor
• Re-kompressorer
• Hovedgeneratorer
• Oljeeksportpumper
• Utfordringer
• Mer sårbar ved alvorlige feil ->
tilstandsovervåkning for å forhindre
eksempelvis havari av roterende utstyr
• Ønske om å optimalisere vedlikehold ->
tilstandsovervåkning for å minimalisere
behov for vedlikeholdsstanser Aasta Hansteen (www.statoil.com)
©Lloyd’s Register Consulting
Ubemannede plattformer
• Mer aktuelt for norsk kontinental sokkel
• Utfordringer
• Mobilisering av ressurser ved uplanlagte
stanser
• Kan ikke lett ta en visuell sjekk av
utstyret ved indikasjon på feil ->
tilstandsovervåkning viktigere i forhold
til å kunne finne ut hva feilen er ->
lettere å forberede en tur til
installasjonen
• Bruke tilstandsovervåkning for å kunne
vurdere om annet utstyr bør
vedlikeholdes når kan først er på
plattformen
Ubemannet plattform, Anglia field, UK sector
(www.ithacaenergy.com)
©Lloyd’s Register Consulting
Prosjektgjennomføring
• Valg av konfigurasjon av hovedutstyr velges før eller under FEED
• Vedlikeholdsstrategi / -plan må på plass tidligere i prosjektgjennomføringen
• Driftsdisiplinen in prosjektorganisasjonen må ha kompetanse på tilstandsovervåkning
• Samarbeide mellom disiplinene i prosjekter. Ikke sitte i egne «siloer»
• PTil uttalt at det ønskes en tettere binding mellom vedlikeholdsplanlegging og pålitelighets- /
regularitetsarbeidet i prosjekter
• Tenke tilstandsovervåkning i forhold til innkjøp av utstyr. Må inn i spesifikasjoner for utstyret i
«invitation to tender»
• Mål om bedre tilstandsovervåkning i prosjektets tidlige fase, men i gjennomføringsfasen blir dette
nedprioritert
• Engineering kontraktør gjør ting «som før»
• Leverandører leverer «som før»
• Operatør sine spesifikasjoner / rammeavtaler tar ikke høyde for målene man har satt seg i
forhold til tilstandsovervåkning
• Mer instrumentering -> økte innkjøpskostnader -> forsvinner lett i kostnadskutt som utføres i
gjennomføringsfasen
©Lloyd’s Register Consulting
Prosjektgjennomføring
• Gjøres mye arbeide relatert til vedlikeholdsplanlegging og pålitelighet / regularitet
• Tilstandsovervåkning ikke tilstrekkelig med i prosjektet tidlig nok?
• FMEA / RCM / CBM – tilstandsovervåkning bør i større grad inkluderes som et aspekt i design
reviews. Identifisere feilindikatorer som kan brukes for å oppdage kritiske feilmoder
• FMEA / FMECA brukes mye i pålitelighets- og vedlikeholdsanalyser -> bør også brukes som
utgangspunkt for design av tilstandsovervåknings system -> RCM / CBM
• Mer instrumentering -> flere muligheter for tripper -> dårligere regularitet –> RCM / CBM analyser
-> hva er kritisk og kan flere signaler brukes for å unngå å være avhengig av en parameter
• Tilstandsovervåkning som barriære mot havari -> ønskelig med SIL-krav til funksjoner som
klassifiseres som utstyrsbeskyttelse? -> flere funksjoner i PSD -> må ha en edruelig i forhold til
dette -> RCM
©Lloyd’s Register Consulting
FMEA / FMECA-analyser
• Utgangspunkt for:
• Pålitelighetsanalyser
• Regularitetsanalyser
• RCM
• Tilstandsovervåkning må adresseres mer i slike
analyser
• Få oversikt over hvilke feilhendelser kan
oppdages før de fullt ut utvikler seg til et
potensielt havari
• Adressere at man måler på det rette
parameterne for å kunne bruke tilstandsbasert
vedlikehold istedenfor kalenderbasert
vedlikehold
• Eksempel på at større roterende utstyr har
opplevd havari uten at tilstandsovervåkning ga
noen indikasjon på feil
• FMEA / FMECA på tilpasses slik at man får den input
man trenger til de andre analysene
©Lloyd’s Register Consulting
Oppsummering
• Fokus på kostnader i olje og gass prosjekter, spesielt i dagens situasjon
• «Big data» – må has fokus på kvalitet og selektering , ikke bare mengden av data ->
RCM
• Ønsker man bedre tilstandsovervåkning må dette adresseres bedre i gjennomføringen
av prosjekter, og få dette inn tidlig nok i prosjektet -> inn i design reviews
• Må synliggjøre de økonomiske gevinstene ved å samle inn mer relevant driftsdata
• Tilstandsovervåkning må dekkes godt nok i spesifikasjoner / «invitation to tender».
Ellers så leverer leverandører «som før»
• FMEA / RCM / CBI må brukes mer i prosjekter – få inn tilstandsovervåkning som tema
tidlig i prosjektene -> øke kvaliteten på tilstandsovervåkningssystemet
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Consulting. 2014. A member of the Lloyd’s Register group.
Working together
for a safer world
Gunder Audun Dragsten
Principal consultant
LR Consulting Trondheim
T +47 404 93 474 E gunder.dragsten@lr.org
Lloyd’s Register Consulting
www.lr.org/consulting

Weitere ähnliche Inhalte

Ähnlich wie “Big data” – hva betyr dette i forhold til gjennomføring av olje og gass

Inngåelse og oppfølging av it kontrakter
Inngåelse og oppfølging av it kontrakterInngåelse og oppfølging av it kontrakter
Inngåelse og oppfølging av it kontrakterKjell Steffner
 
IT-utvikling som Business as Usual
IT-utvikling som Business as UsualIT-utvikling som Business as Usual
IT-utvikling som Business as UsualGeir Amsjø
 
110321 agder energi helge_larsen
110321 agder energi helge_larsen110321 agder energi helge_larsen
110321 agder energi helge_larsenFrank Emil Moen
 
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...Prosjekt 2013
 
2 - John Hegdal, Rambøll
2 - John Hegdal, Rambøll2 - John Hegdal, Rambøll
2 - John Hegdal, RambøllVVS-Foreningen
 
Presentasjon NAV frokostseminar anskaffelser_211010
Presentasjon NAV frokostseminar anskaffelser_211010Presentasjon NAV frokostseminar anskaffelser_211010
Presentasjon NAV frokostseminar anskaffelser_211010Devoteam daVinci
 
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos Difi
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos DifiSSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos Difi
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos DifiBent J. Syversen
 
Frokostmote 12 april 2018 Nye Veier
Frokostmote 12 april 2018 Nye VeierFrokostmote 12 april 2018 Nye Veier
Frokostmote 12 april 2018 Nye VeierIngrid Dahl Hovland
 
2015 02-11 systemanalyser i nav
2015 02-11 systemanalyser i nav2015 02-11 systemanalyser i nav
2015 02-11 systemanalyser i navPetter Hafskjold
 
Smidig innføring og overlevering av prosjektresultater
Smidig innføring og overlevering av prosjektresultater Smidig innføring og overlevering av prosjektresultater
Smidig innføring og overlevering av prosjektresultater Torkild Marstrander
 
Nyttan av en tydlig integrationsstrategi
Nyttan av en tydlig integrationsstrategiNyttan av en tydlig integrationsstrategi
Nyttan av en tydlig integrationsstrategiAdam Wahlund
 
Ikt prosjekter i statens vegvesen
Ikt prosjekter i statens vegvesenIkt prosjekter i statens vegvesen
Ikt prosjekter i statens vegvesenSmidigkonferansen
 
Når kunden driver smidig utvikling
Når kunden driver smidig utviklingNår kunden driver smidig utvikling
Når kunden driver smidig utviklingSmidigkonferansen
 
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...TEAM Nordmarka AS
 
Riggvedlikehold på Helgeland
Riggvedlikehold på HelgelandRiggvedlikehold på Helgeland
Riggvedlikehold på HelgelandLofthus AS
 

Ähnlich wie “Big data” – hva betyr dette i forhold til gjennomføring av olje og gass (20)

Inngåelse og oppfølging av it kontrakter
Inngåelse og oppfølging av it kontrakterInngåelse og oppfølging av it kontrakter
Inngåelse og oppfølging av it kontrakter
 
IT-utvikling som Business as Usual
IT-utvikling som Business as UsualIT-utvikling som Business as Usual
IT-utvikling som Business as Usual
 
110321 agder energi helge_larsen
110321 agder energi helge_larsen110321 agder energi helge_larsen
110321 agder energi helge_larsen
 
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...
Strøm 1 - Kai Haakon Kristensen - Prestasjonsmålinger i prosjektering av bygg...
 
2 - John Hegdal, Rambøll
2 - John Hegdal, Rambøll2 - John Hegdal, Rambøll
2 - John Hegdal, Rambøll
 
Prosjektøkonomi kurs draft
Prosjektøkonomi kurs draftProsjektøkonomi kurs draft
Prosjektøkonomi kurs draft
 
Presentasjon NAV frokostseminar anskaffelser_211010
Presentasjon NAV frokostseminar anskaffelser_211010Presentasjon NAV frokostseminar anskaffelser_211010
Presentasjon NAV frokostseminar anskaffelser_211010
 
Ledelse og storulykkesrisiko
Ledelse og storulykkesrisikoLedelse og storulykkesrisiko
Ledelse og storulykkesrisiko
 
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos Difi
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos DifiSSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos Difi
SSA-revisjonen 2014/15 - presentasjon fra høringsmøte hos Difi
 
SSA-S
SSA-SSSA-S
SSA-S
 
Frokostmote 12 april 2018 Nye Veier
Frokostmote 12 april 2018 Nye VeierFrokostmote 12 april 2018 Nye Veier
Frokostmote 12 april 2018 Nye Veier
 
2015 02-11 systemanalyser i nav
2015 02-11 systemanalyser i nav2015 02-11 systemanalyser i nav
2015 02-11 systemanalyser i nav
 
Smidig innføring og overlevering av prosjektresultater
Smidig innføring og overlevering av prosjektresultater Smidig innføring og overlevering av prosjektresultater
Smidig innføring og overlevering av prosjektresultater
 
Nyttan av en tydlig integrationsstrategi
Nyttan av en tydlig integrationsstrategiNyttan av en tydlig integrationsstrategi
Nyttan av en tydlig integrationsstrategi
 
Prosjektøkonomihåndbok utkast
Prosjektøkonomihåndbok utkastProsjektøkonomihåndbok utkast
Prosjektøkonomihåndbok utkast
 
Prosjekthåndtering
ProsjekthåndteringProsjekthåndtering
Prosjekthåndtering
 
Ikt prosjekter i statens vegvesen
Ikt prosjekter i statens vegvesenIkt prosjekter i statens vegvesen
Ikt prosjekter i statens vegvesen
 
Når kunden driver smidig utvikling
Når kunden driver smidig utviklingNår kunden driver smidig utvikling
Når kunden driver smidig utvikling
 
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...
Høydekonferansen 2014 - Hva skiller forskrifter og standarder, og hva skjer n...
 
Riggvedlikehold på Helgeland
Riggvedlikehold på HelgelandRiggvedlikehold på Helgeland
Riggvedlikehold på Helgeland
 

Mehr von Lloyd's Register Energy

Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioLloyd's Register Energy
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLloyd's Register Energy
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011Lloyd's Register Energy
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Lloyd's Register Energy
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angleLloyd's Register Energy
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Lloyd's Register Energy
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Lloyd's Register Energy
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Lloyd's Register Energy
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsLloyd's Register Energy
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryLloyd's Register Energy
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsLloyd's Register Energy
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwLloyd's Register Energy
 
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsLloyd's Register Energy
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutionsLloyd's Register Energy
 

Mehr von Lloyd's Register Energy (20)

Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Methods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throwMethods for evaluating risk caused by ice throw
Methods for evaluating risk caused by ice throw
 
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farms
 
Competence assessment
Competence assessmentCompetence assessment
Competence assessment
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
 

“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass

  • 1. Working together for a safer world MainTech Konferansen “Big data” – hva betyr dette i forhold til gjennomføring av olje og gass prosjekter
  • 2. ©Lloyd’s Register Consulting Olje og gass – en titt i glasskulen
  • 3. ©Lloyd’s Register Consulting Mer prosessutstyr under vann The subsea factory (www.statoil.com) Åsgard havbunns gasskompresjon (www.statoil.com) • Mer omfattende å erstatte ødelagte enheter • Uplanlagte stanser -> skifte av moduler krever fartøy og reservedeler -> kan gi lange nedetider og tilhørende produksjonstap • Ønske om å kunne planlegge utskiftninger -> tilstandsovervåkning • Tilstandsovervåkning viktigere i og med at en ikke kan lett visuelt inspisere eller sjekke utstyr • «Kvalitet» på tilstandsovervåkningen viktigere -> Vite hvilken modul som skal skiftes -> hvor er det feilen er
  • 4. ©Lloyd’s Register Consulting Redundante løsninger utfordres topside • Gasseksport kompressor • Re-kompressorer • Hovedgeneratorer • Oljeeksportpumper • Utfordringer • Mer sårbar ved alvorlige feil -> tilstandsovervåkning for å forhindre eksempelvis havari av roterende utstyr • Ønske om å optimalisere vedlikehold -> tilstandsovervåkning for å minimalisere behov for vedlikeholdsstanser Aasta Hansteen (www.statoil.com)
  • 5. ©Lloyd’s Register Consulting Ubemannede plattformer • Mer aktuelt for norsk kontinental sokkel • Utfordringer • Mobilisering av ressurser ved uplanlagte stanser • Kan ikke lett ta en visuell sjekk av utstyret ved indikasjon på feil -> tilstandsovervåkning viktigere i forhold til å kunne finne ut hva feilen er -> lettere å forberede en tur til installasjonen • Bruke tilstandsovervåkning for å kunne vurdere om annet utstyr bør vedlikeholdes når kan først er på plattformen Ubemannet plattform, Anglia field, UK sector (www.ithacaenergy.com)
  • 6. ©Lloyd’s Register Consulting Prosjektgjennomføring • Valg av konfigurasjon av hovedutstyr velges før eller under FEED • Vedlikeholdsstrategi / -plan må på plass tidligere i prosjektgjennomføringen • Driftsdisiplinen in prosjektorganisasjonen må ha kompetanse på tilstandsovervåkning • Samarbeide mellom disiplinene i prosjekter. Ikke sitte i egne «siloer» • PTil uttalt at det ønskes en tettere binding mellom vedlikeholdsplanlegging og pålitelighets- / regularitetsarbeidet i prosjekter • Tenke tilstandsovervåkning i forhold til innkjøp av utstyr. Må inn i spesifikasjoner for utstyret i «invitation to tender» • Mål om bedre tilstandsovervåkning i prosjektets tidlige fase, men i gjennomføringsfasen blir dette nedprioritert • Engineering kontraktør gjør ting «som før» • Leverandører leverer «som før» • Operatør sine spesifikasjoner / rammeavtaler tar ikke høyde for målene man har satt seg i forhold til tilstandsovervåkning • Mer instrumentering -> økte innkjøpskostnader -> forsvinner lett i kostnadskutt som utføres i gjennomføringsfasen
  • 7. ©Lloyd’s Register Consulting Prosjektgjennomføring • Gjøres mye arbeide relatert til vedlikeholdsplanlegging og pålitelighet / regularitet • Tilstandsovervåkning ikke tilstrekkelig med i prosjektet tidlig nok? • FMEA / RCM / CBM – tilstandsovervåkning bør i større grad inkluderes som et aspekt i design reviews. Identifisere feilindikatorer som kan brukes for å oppdage kritiske feilmoder • FMEA / FMECA brukes mye i pålitelighets- og vedlikeholdsanalyser -> bør også brukes som utgangspunkt for design av tilstandsovervåknings system -> RCM / CBM • Mer instrumentering -> flere muligheter for tripper -> dårligere regularitet –> RCM / CBM analyser -> hva er kritisk og kan flere signaler brukes for å unngå å være avhengig av en parameter • Tilstandsovervåkning som barriære mot havari -> ønskelig med SIL-krav til funksjoner som klassifiseres som utstyrsbeskyttelse? -> flere funksjoner i PSD -> må ha en edruelig i forhold til dette -> RCM
  • 8. ©Lloyd’s Register Consulting FMEA / FMECA-analyser • Utgangspunkt for: • Pålitelighetsanalyser • Regularitetsanalyser • RCM • Tilstandsovervåkning må adresseres mer i slike analyser • Få oversikt over hvilke feilhendelser kan oppdages før de fullt ut utvikler seg til et potensielt havari • Adressere at man måler på det rette parameterne for å kunne bruke tilstandsbasert vedlikehold istedenfor kalenderbasert vedlikehold • Eksempel på at større roterende utstyr har opplevd havari uten at tilstandsovervåkning ga noen indikasjon på feil • FMEA / FMECA på tilpasses slik at man får den input man trenger til de andre analysene
  • 9. ©Lloyd’s Register Consulting Oppsummering • Fokus på kostnader i olje og gass prosjekter, spesielt i dagens situasjon • «Big data» – må has fokus på kvalitet og selektering , ikke bare mengden av data -> RCM • Ønsker man bedre tilstandsovervåkning må dette adresseres bedre i gjennomføringen av prosjekter, og få dette inn tidlig nok i prosjektet -> inn i design reviews • Må synliggjøre de økonomiske gevinstene ved å samle inn mer relevant driftsdata • Tilstandsovervåkning må dekkes godt nok i spesifikasjoner / «invitation to tender». Ellers så leverer leverandører «som før» • FMEA / RCM / CBI må brukes mer i prosjekter – få inn tilstandsovervåkning som tema tidlig i prosjektene -> øke kvaliteten på tilstandsovervåkningssystemet
  • 10. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Consulting. 2014. A member of the Lloyd’s Register group. Working together for a safer world Gunder Audun Dragsten Principal consultant LR Consulting Trondheim T +47 404 93 474 E gunder.dragsten@lr.org Lloyd’s Register Consulting www.lr.org/consulting